CN1195053A - Offshore structure for extreme water depth - Google Patents

Offshore structure for extreme water depth Download PDF

Info

Publication number
CN1195053A
CN1195053A CN97104598A CN97104598A CN1195053A CN 1195053 A CN1195053 A CN 1195053A CN 97104598 A CN97104598 A CN 97104598A CN 97104598 A CN97104598 A CN 97104598A CN 1195053 A CN1195053 A CN 1195053A
Authority
CN
China
Prior art keywords
boring tower
pedestal
pile foundation
sleeve
marine structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN97104598A
Other languages
Chinese (zh)
Inventor
约翰·西蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
McDermott International Inc
Original Assignee
McDermott International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by McDermott International Inc filed Critical McDermott International Inc
Priority to CN97104598A priority Critical patent/CN1195053A/en
Publication of CN1195053A publication Critical patent/CN1195053A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

An off shore structure that utilizes a central tower that is wholly or partly supported by pilings external to the tower and a template on the sea floor. The central tower is attached to a pre-installed template on the sea floor. Sleeves attached to cantilevers that extend from the central tower each receive and are attached to a piling that is driven into the sea floor. The pilings extend up from the sea floor to approximately mid-height of the central tower and are preferably below elevation of the wave affected zone. Environmental forces are mainly resisted by the pilings. Only a small proportion of the environmental and other forces are transferred directly to the template.

Description

Used marine structure in the deep water
The present invention relates generally to the technology of offshore drilling and recover petroleum or mineral matter, relates to particularly by pile foundation anchoring fixed buildings on the throne.
In the well drilling industry, generally all adopt a kind of fixed buildings at sea such as overcoat or boring tower.This overcoat or boring tower usually by through the supporting leg of building, may be also through the pedestal of settling boring tower and fixing on the throne by the pile foundation of squeezing into the seabed.Exploitation and excavation oil and mineral matter need higher boring tower in deep water.Bigger boring tower has higher manufacturing cost, and need be with the equipment that has increased elevating capacity and weight enabling capabilities to adapt to the additional weight of big boring tower.May also there be stability problem in bigger boring tower in installation process.
The present invention is intended to address the above problem.The invention provides a kind of marine structure, it has adopted a center boring tower, and it is whole or in part by pile foundation that is positioned at the boring tower outside and the base supports that is positioned at the seabed.The center boring tower is installed on the seabed on the preassembled pedestal.Being installed in sleeve on the semi girder that stretches out from the center boring tower holds separately and is installed to a pile foundation squeezing into the seabed.This pile foundation reaches near half waist of center boring tower and preferably is lower than the height of wave influence area from the seabed.Advocate to be resisted by pile foundation in the external world.The center boring tower only with a fraction of extraneous power and other force transmission to pedestal.
In order further to understand characteristics of the present invention and purpose, should do following description in conjunction with the accompanying drawings, parts identical among the figure are illustrated by same numeral, wherein:
Fig. 1 is vertical view of the present invention;
Fig. 2 is vertical view of the present invention, and a tubular structure that is used for the center boring tower is wherein arranged;
Fig. 3 is vertical view of another embodiment of the present invention;
Fig. 4 is the sectional view on the top of building shown in Fig. 3;
Fig. 5 A-5D shows the installation process that adopts a marine structure of the present invention;
Fig. 6-the 8th is installed to a pile foundation sectional view of the another kind of device on the marine structure;
Fig. 9 is a sectional view, shows the mechanical fastener that can be used between pile foundation and sleeve or the pedestal;
Figure 10 is the view along Fig. 9 center line 10-10.
Referring to accompanying drawing, visible total the illustrating of the present invention among Fig. 1 by label 10.Marine structure 10 comprises pedestal 12, center boring tower 14, platform 16 and pile foundation 18 substantially.
Pedestal 12 is positioned on the seabed 20 and is used as the guide of center boring tower 14 location.Pedestal 12 can be held in place through the sleeve in the pedestal by the pile foundation in the seabed 20 of hitting the person.Pedestal 12 has a locking mechanism 22, preferably sees Fig. 9 and 10, to be used for a forming mechanical connection between pile foundation 18 and pedestal 2.Pedestal 12 also has a plurality of sleeves that are mounted thereon around its outer peripheral edges.
Center boring tower 14 generally is regarded as overcoat in the well drilling industry at sea, and it is formed by grid framework.As shown in Figure 2, center boring tower 14 can also be a kind of tubular structure.Tower 14 has a plurality of along its length and around the semi girder 24 of its periphery.This semi girder 24 begins about tower half waist place, and essentially horizontally the supporting leg 26 from tower stretches out, and reaches the bottom or the base portion of tower separatedly vertically downward.In the embodiment of Fig. 2, semi girder 24 directly is installed on the tubular tower and by stretching out on it.Each semi girder 24 has a sleeve 28 that is sized to accommodate the pile foundation 18 of passing wherein.All is coaxial at the sleeve on the semi girder that is installed on the identical legs of tower 28 each other and with corresponding sleeve 13 on the pedestal 12.One or more sleeves 28 also may have one hereinafter with the locking mechanism of addressing 22.
For but be convenient for reference and describe, platform 16 should be understood to refer to all devices that held on the center boring tower 14.These equipment comprise a rig 30, crane 32 equipment relevant with drilling well and production operation with other substantially.As seen from the figure, boring tower 14 has one section enough distance above the water surface 34, makes platform 16 be in wave elevation-over maximum under the normal condition.
Pile foundation 18 is tubuloses, and to be widely known by the people in the industry be to be used for squeezing into seabed 20 so that overcoat or pedestal are fixed in the seabed through overcoat supporting leg or pedestal.
The tubulose boring tower 14 that sectional view among Fig. 4 shows among Fig. 2 may have a plurality of gas ballasting jars 54, oil storage tank 56 and surge guard device 58.
Fig. 5 A-5D shows installation process of the present invention.In Fig. 5 A, pedestal 12 has been positioned at seabed 20 and fixing on the throne by basis 36, and these bases can be pile foundations.As seen, flatboat 38 is used for boring tower 14 is placed on the position that should locate on the pedestal 12 among Fig. 5 B.In Fig. 5 C, pile foundation 18 has installed through sleeve 28 and has forged installation in position by various suitable manner on basis 36 as grouting or machinery.In Fig. 5 D, platform 16 has been installed in the top of boring tower 14.
Fig. 6-8 shows and can be used for pile foundation 18 is installed to variety of way on the sleeve 28.Fig. 6 shows the use of grouting way, and wherein mud 40 is pumped into the annular region between the external diameter of the internal diameter of sleeve 28 and pile foundation 18.Top and bottom mud cover 42 at sleeve place between pile foundation and the sleeve.Fig. 7 shows a linkage, and wherein the part of pile foundation 18 mechanically is swaged in the groove 44, and these grooves 44 have been processed on the inner surface of sleeve 28.Fig. 8 illustrates the mode that is installed in the elastomeric material 46 between sleeve 28 and the pile foundation 18 of utilizing.The frictional force that is provided by elastomeric material 46 is held in place pile foundation 18.
Fig. 9 and 10 is illustrated in the installation or removal process to what keep that a temporary transient structural integrity is provided with and one can be used to center boring tower 14 is coupled to pedestal 12 or sleeve 28 is coupled to locking mechanism 22 on the pile foundation 18.This locking mechanism 22 comprises a plurality of fluid heads 48 and piston 50, and they all are installed to the outer circumferentially spaced apart of erection loop 52 on the sleeve 28 around one.Fluid head 48 makes piston 50 radial motions, and 50 in piston is against pile foundation 18 and provide enough mechanical constraint power to stop the motion of the relative sleeve of pile foundation like this.
Fig. 3 shows an alternative embodiment of the invention, and wherein pile foundation 18 20 upwards reaches platform 16 and platform is supported on the water surface 34 tops from the seabed.Center boring tower 14 is 20 Ban Yaochu that reach near pile foundation 18 from the seabed.Drilling well and product elevator 52 are exposed at the top of tower 14, and it will eliminate the possible accumulation of boring tower 14 internal gas, and make things convenient for examination and maintenance.
Owing in the scope of teaching the principle of the invention shown in this paper, can make many variations and different embodiment, and because described in an embodiment basic demand also can be made many modification according to this paper, so be to be understood that details as herein described only be used for illustrating of the present invention, and can not be as limitation of the invention.

Claims (15)

1. marine structure comprises:
A. a pedestal that is fixed in the seabed, described pedestal has a plurality of sleeves that are mounted thereon around its outer peripheral edges;
B. a boring tower that is installed on the described pedestal;
C. many individual along the length direction of described boring tower and the sleeve of installing and separating around its outer peripheral edges, make described sleeve be installed to coaxially on the described pedestal;
D. the described sleeve of a process is contained in the pile foundation on described boring tower and the described pedestal; And
E. be used between described pile foundation on described boring tower and the pedestal and described sleeve, providing the device of a mechanical connection.
2. marine structure as claimed in claim 1 is characterized in that, described pile foundation reaches the Ban Yaochu near described boring tower.
3. marine structure as claimed in claim 1 is characterized in that, also comprises the device that is used for providing a mechanical connection between described pile foundation on the described pedestal and described sleeve.
4. marine structure as claimed in claim 1 is characterized in that described boring tower is stretched above the water surface.
5. marine structure as claimed in claim 1 is characterized in that described boring tower is made of a grid framework.
6. marine structure as claimed in claim 1 is characterized in that described boring tower is made of a tubular structure.
7. marine structure as claimed in claim 1 is characterized in that described boring tower comprises buoyancy can.
8. marine structure as claimed in claim 1 is characterized in that described boring tower comprises oil storage tank.
9. marine structure comprises:
A. a pedestal that is fixed in the seabed, described pedestal has a plurality of sleeves that are mounted thereon around its outer peripheral edges;
B. a boring tower that is installed on the described pedestal, described boring tower reaches undersurface a certain height from the seabed;
C. many individual along the length direction of described boring tower and the sleeve of installing and separating around its outer peripheral edges, make described sleeve be installed to coaxially on the described pedestal;
D. the described sleeve of a process is contained in the pile foundation on described boring tower and the described pedestal, and described pile foundation reaches water surface top; And
E. be used between described pile foundation on described boring tower and the pedestal and described sleeve, providing the device of a mechanical connection.
10. marine structure as claimed in claim 9 is characterized in that, also comprises the device that is used for providing a mechanical connection between described pile foundation on the described pedestal and described sleeve.
11. marine structure as claimed in claim 9 is characterized in that, described boring tower is made of a grid framework.
12. marine structure as claimed in claim 9 is characterized in that, described boring tower is made of a tubular structure.
13. marine structure as claimed in claim 9 is characterized in that, described boring tower comprises buoyancy can.
14. marine structure as claimed in claim 9 is characterized in that, described boring tower comprises oil storage tank.
15. a marine structure comprises:
A. a pedestal that is fixed in the seabed, described pedestal has a plurality of sleeves that are mounted thereon around its outer peripheral edges;
B. a boring tower that is installed on the described pedestal;
C. many individual along the length direction of described boring tower and the sleeve of installing and separating around its outer peripheral edges, make described sleeve be installed to coaxially on the described pedestal;
D. the described sleeve of a process is contained in the pile foundation on described boring tower and the described pedestal, makes external influence mainly by described pile foundation opposing; And
E. be used between described pile foundation on described boring tower and the pedestal and described sleeve, providing the device of a mechanical connection.
CN97104598A 1997-03-28 1997-03-28 Offshore structure for extreme water depth Pending CN1195053A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN97104598A CN1195053A (en) 1997-03-28 1997-03-28 Offshore structure for extreme water depth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN97104598A CN1195053A (en) 1997-03-28 1997-03-28 Offshore structure for extreme water depth

Publications (1)

Publication Number Publication Date
CN1195053A true CN1195053A (en) 1998-10-07

Family

ID=5167421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN97104598A Pending CN1195053A (en) 1997-03-28 1997-03-28 Offshore structure for extreme water depth

Country Status (1)

Country Link
CN (1) CN1195053A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101316966B (en) * 2005-10-11 2012-08-08 Itrec有限责任公司 Offshore platform with movable cantilever extending outside deck
CN103362478A (en) * 2013-07-22 2013-10-23 江苏文汇钢业工程有限公司 Preassembled type fixed and movable two-function bracket
CN104790368A (en) * 2015-04-21 2015-07-22 天津大学前沿技术研究院有限公司 Offshore building structure capable of achieving self-floating and towing and construction method of offshore building structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101316966B (en) * 2005-10-11 2012-08-08 Itrec有限责任公司 Offshore platform with movable cantilever extending outside deck
CN103362478A (en) * 2013-07-22 2013-10-23 江苏文汇钢业工程有限公司 Preassembled type fixed and movable two-function bracket
CN104790368A (en) * 2015-04-21 2015-07-22 天津大学前沿技术研究院有限公司 Offshore building structure capable of achieving self-floating and towing and construction method of offshore building structure

Similar Documents

Publication Publication Date Title
EP1774122B8 (en) A device for a bending moment deficient strut connection
CN1051128C (en) Deep water offshore apparatus
CN1092277C (en) Subsea well
NL2005755C2 (en) Floating marine structure.
EP0035023B1 (en) Gravity base, jack-up platform method and apparatus
CN1118618A (en) Flexible riser system
KR102144423B1 (en) Semi-submergible type wind power generator and its installation and decomission method
CN201056685Y (en) Combined simple shaft mouth processing platform
WO1998029638A2 (en) Deepwater riser system
CN107933828B (en) A kind of expandable Novel fish mine anchor of anchor head and its installation method
EP0231056A2 (en) Offshore deep water platform
US4428702A (en) Sliding tension leg tower with pile base
EP0795648B1 (en) Offshore production platform
US5669735A (en) Offshore production platform and method of installation thereof
AU686237B2 (en) Offshore platform structure and reusable foundation pile sleeve for use with such a structure
US4422806A (en) Sliding tension leg tower
CN1195053A (en) Offshore structure for extreme water depth
US5899639A (en) Offshore structure for extreme water depth
CN2815871Y (en) Strong-anti-outer-force high stability on-sea platform
GB2247038A (en) Shock absorber for the leg structure of offshore jack-up rig
US5114276A (en) Apparatus and method for mooring a floating vessel
CN1035782C (en) Offshore structures
US20100054863A1 (en) Flex-Leg Offshore Structure
CN111335354A (en) Ocean anchor foundation construction device with adjustable height
CN1029377C (en) Ottshore gravity platform

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication