CN117266220A - Construction method for pile tops of fabricated wharf - Google Patents

Construction method for pile tops of fabricated wharf Download PDF

Info

Publication number
CN117266220A
CN117266220A CN202311242218.3A CN202311242218A CN117266220A CN 117266220 A CN117266220 A CN 117266220A CN 202311242218 A CN202311242218 A CN 202311242218A CN 117266220 A CN117266220 A CN 117266220A
Authority
CN
China
Prior art keywords
pile
hoisting
construction
walking
longitudinal beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311242218.3A
Other languages
Chinese (zh)
Inventor
刘鹏飞
冯先导
文定旭
郭强
薛志武
吴睿
余汉锦
唐黎明
李立威
胡琦
周霞
余龙飞
曹煜
屈建明
刘益平
胥奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN202311242218.3A priority Critical patent/CN117266220A/en
Publication of CN117266220A publication Critical patent/CN117266220A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a pile top construction method of an assembled wharf, which comprises the steps of installing a walking track on a pile foundation, installing door-type structure hoisting equipment on the walking track, and installing a walking longitudinal beam and a walking cross beam of the door-type structure hoisting equipment; hoisting a construction pile cap by a pile in the direction of a front cantilever of a walking longitudinal beam, and hoisting a pile driving platform to the pile cap of the pile by the walking longitudinal beam; the walking longitudinal beam hoisting lifting equipment is arranged on a piling platform, a counterweight is arranged at the tail part of the piling platform, and at least one guide frame is arranged at the front end of the piling platform; installing a temporary construction channel on a pile foundation, hoisting a pile to be constructed on the temporary construction channel through a walking longitudinal beam, enabling the guide frame to reach the position to be installed, hoisting the pile to be constructed through hoisting equipment, hoisting the pile to be constructed to the position of the guide frame through the hoisting equipment, and lowering the pile to be constructed through the guide frame; and hoisting the pile hammer by hoisting equipment, and driving the pile to be constructed on the guide frame to the designed elevation by the pile hammer to finish the construction of the pile.

Description

Construction method for pile tops of fabricated wharf
Technical Field
The invention relates to the field of pier pile top construction, in particular to an assembled pier pile top construction method.
Background
The high pile wharf structure is one of the main types of harbor hydraulic buildings, is quite common in application, has the characteristics of multiple component types, large construction quantity on water, long construction period and the like, and is particularly suitable for adopting an assembled structure. Prefabrication and assembly have become a trend, and not only have the applications gradually started in the bridge construction field, but also the prefabrication and assembly gradually started to replace a cast-in-place construction method in the wharf construction. The bridge is mainly constructed along the longitudinal bridge direction, and the bridge girder erection machine is adopted to construct the bridge span by span along the longitudinal bridge direction, so that the problem of erecting the prefabricated components can be well solved. However, the wharf is different from a bridge, more planar prefabricated parts are provided, and the space for the bridge girder erection machine to stand is small or even not. In order to solve the problem of erection of prefabricated components of a wharf, improve the construction efficiency, reduce the influence on the surrounding environment, reduce the labor investment, reduce the construction risk, ensure the construction quality, and urgently need large-scale integrated construction equipment capable of meeting the requirements.
The construction of the fabricated wharf generally adopts four engineering equipment such as a floating crane ship, a lifting platform, a crawler crane, a construction platform, a crawler crane and a bridge girder erection machine. Floating vessels are most conventional. Overseas projects are also commonly applied by adopting a crawler crane and a refuted organization floating crane due to the lack of a large crane ship, but are greatly influenced by severe sea conditions, so that the method is difficult to adapt to offshore wharf construction of the open sea, such as the floating ship construction considered at the beginning of a bucky Hu Bu wharf, and the construction method is finally abandoned under medium-long period waves. The jacking platform can separate the platform main part from the surface of water, avoids the influence of adverse sea conditions during operation, and the crawler crane on the platform can realize high accuracy hoist and mount, but still need look for the construction window period under its shift operating mode, and pier engineering shoreline is longer, and whole construction shift times is more, and its landing leg length is limited simultaneously, also is difficult to adapt to the pier construction of deep water deep weak stratum.
Disclosure of Invention
The invention mainly aims to provide a construction method for the pile top of an assembled wharf, which can be used for constructing the assembled wharf on the pile top, has long construction window period, can avoid the influence of severe sea conditions and reduces the requirement on a large crane ship. Intelligent control is introduced in the construction method, so that the construction efficiency is improved, and the construction risk is reduced.
In order to solve the technical problems, the invention adopts the following technical scheme: a construction method of pile tops of an assembled wharf comprises the following steps:
s1, installing a walking track on a pile foundation, installing door-type structure hoisting equipment on the walking track, and installing a walking longitudinal beam and a walking cross beam of the door-type structure hoisting equipment;
s2, hoisting a construction pile cap by a pile in the direction of a front cantilever of the walking longitudinal beam, and hoisting a pile driving platform by the walking longitudinal beam to the pile cap of the pile;
s3, the hoisting and lifting equipment of the walking longitudinal beam is mounted on a piling platform, a counterweight is mounted at the tail part of the piling platform, and at least one guide frame is mounted at the front end position of the piling platform;
s4, installing a temporary construction channel on the pile foundation, hoisting a pile to be constructed on the temporary construction channel through a walking longitudinal beam, and placing the pile to be constructed down through a guide frame, wherein the guide frame reaches the position to be installed, hoisting the pile to be constructed through hoisting equipment, and hoisting the pile to be constructed to the position of the guide frame through the hoisting equipment;
s5, hoisting the pile hammer by hoisting equipment, and driving the pile to be constructed on the guide frame to a designed elevation by the pile hammer to finish the construction of the pile.
In the preferred scheme, the pile driving platform is a plurality of pile driving platforms, the pile driving platform covers at least six groups of piles, four groups of piles are used for supporting the pile driving platform, and two groups of piles are constructed at the end part of the pile driving platform.
In a preferred scheme, at least two groups of piling platforms are arranged;
after the construction of the pile at the front end of the pile driving platform is finished, the hoisting equipment on the pile driving platform hoistes the whole pile driving platform to the next area by the walking longitudinal beam to continue the construction pile driving;
and paving a walking track on the post after construction, and moving the whole door-shaped structure hoisting equipment forwards on the walking track.
In the preferred scheme, the temporary construction channel construction method comprises the following steps: firstly, arranging temporary construction channels at the tops of at least two rows of pile columns along the longitudinal direction;
when the temporary construction channel unit is hoisted, supporting legs are installed on the walking track according to the construction site conditions, and the heights of the supporting legs are adjusted;
each temporary construction channel unit is meshed and spliced to form a temporary construction channel, and the temporary construction channel is used for conveying the pile caps, the prestress assembly cross beams, the prestress assembly longitudinal beams and the prefabricated panels to the lower part of a door type lifting device structure and is lifted and installed by the door type lifting device;
after the installation of the current pile top prefabricated part is completed, the door-type hoisting equipment is used for dismantling each temporary construction channel unit of the temporary construction channel, adjusting the height of the lifting support leg again, or dismantling the lifting support leg, hoisting each temporary construction channel unit to the tops of two rows of piles for which the construction of the pile top assembled type part is completed, and splicing to form a new temporary construction channel.
In the preferred scheme, the pile can also be transported to a position nearby the pile driving platform through a barge, and the pile is hoisted by the pile driving platform for construction.
The invention provides an assembled wharf pile top construction method, which adopts the scheme that a pile driving platform is arranged on a pile foundation, and the pile driving platform is hoisted by a door-type structure hoisting device, so that the pile driving platform can carry out wharf pile top construction at different positions, the pile driving platform is arranged on a pile post which is already constructed, the pile driving platform is ensured to be more stably arranged, and the arranged door-type structure hoisting device can be matched with a counterweight besides hoisting and installing the pile driving platform and is used for adjusting the gravity center of the pile driving platform. The construction method has the advantages of less displacement times of the whole equipment, short track laying distance and higher construction efficiency. By adopting pile top construction equipment, the influence of severe sea conditions can be avoided, the construction window period is long, and the moving times are few. Greatly improves the construction efficiency and the construction safety.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a front view block diagram of the present invention;
FIG. 2 is a left-hand construction view of the piling level construction site of the present invention;
FIG. 3 is a block diagram of a pile driving platform according to the present invention;
fig. 4 is a top view layout diagram of the pile driving platform of the present invention.
In the figure: a main hoisting device 1; a posture adjusting lifting appliance 2; a walking longitudinal beam 3; a walking beam 4; a leg 5; a crane 6; a walking rail 7; a pile cap 8; a pile 9; a temporary construction passageway 10; a lifting device 11; a counterweight 12; a pile driving platform 13; a pile cap 14; a guide frame 15.
Detailed Description
Example 1
As shown in fig. 1 to 4, the construction method of the pile top of the fabricated wharf comprises the following steps:
s1, installing a walking track 7 on a pile foundation, installing door-type structure hoisting equipment on the walking track 7, and installing a walking longitudinal beam 3 and a walking cross beam 4 of the door-type structure hoisting equipment;
s2, hoisting a construction pile cap 8 by a pile 9 in the direction of a front cantilever of the walking longitudinal beam 3, and hoisting a pile driving platform 13 by the walking longitudinal beam 3 to the pile cap 8 of the pile 9;
s3, hoisting equipment 11 of the walking longitudinal beam 3 is installed on a piling platform 13, a counterweight 12 is installed at the tail of the piling platform 13, and at least one guide frame 15 is installed at the front end of the piling platform 13;
s4, installing a temporary construction channel 10 on a pile foundation, hoisting a pile to be constructed on the temporary construction channel 10 through a traveling longitudinal beam 3, and under the condition of the position of a guide frame 15, the guide frame 15 reaches the position to be installed, hoisting the pile to be constructed by hoisting equipment 11, hoisting the pile to be constructed to the position of the guide frame 15 through the hoisting equipment 11, and lowering the pile to be constructed through the guide frame 15;
s5, hoisting the pile hammer by hoisting equipment 11, and driving the pile to be constructed on the guide frame 15 to a designed elevation by the pile hammer to finish the construction of the pile.
In a preferred scheme, the pile driving platform 13 is a plurality of pile driving platforms 13, at least six groups of piles are covered by the pile driving platform 13, four groups of piles are used for supporting the pile driving platform 13, and two groups of piles are constructed at the end positions of the pile driving platform 13.
In a preferred embodiment, at least two sets of pile driving platforms 13 are provided;
after the construction of the pile at the front end position of the pile driving platform 13 is finished by the lifting equipment 11 on the pile driving platform 13, the whole pile driving platform 13 is lifted by the walking longitudinal beam 3 to reach the next area for continuous construction pile driving;
and paving a walking track 7 on the post after construction, and moving the whole door-shaped structure hoisting equipment forwards on the walking track 7.
In the preferred scheme, the temporary construction channel construction method comprises the following steps: firstly, arranging temporary construction channels 10 at the tops of at least two rows of piles 9 along the longitudinal direction;
when the temporary construction channel unit is hoisted, the supporting legs 5 are installed on the walking track 7 according to the condition of a construction site, and the heights of the supporting legs 5 are adjusted;
each temporary construction channel unit is meshed and spliced to form a temporary construction channel 10, and the temporary construction channel 10 is used for conveying the pile cap 8, the prestress assembly cross beam, the prestress assembly longitudinal beam and the prefabricated panel to the lower part of a door type lifting device structure and is lifted and installed by the door type lifting device;
after the installation of the current pile top prefabricated part is completed, the door type hoisting equipment is used for disassembling each temporary construction channel unit of the temporary construction channel 10, adjusting the height of the lifting support leg again, or disassembling the lifting support leg, hoisting each temporary construction channel unit to the tops of two rows of piles 9 of which the pile top assembled part construction is completed, and assembling to form a new temporary construction channel 10.
In a preferred embodiment, the pile 9 can be transported to a position near the pile driving platform 13 by a barge, and the pile 9 is hoisted by the pile driving platform 13 for construction.
The above embodiments are only preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention should be defined by the claims, including the equivalents of the technical features in the claims. I.e., equivalent replacement modifications within the scope of this invention are also within the scope of the invention.

Claims (5)

1. A construction method for pile tops of assembled wharfs is characterized by comprising the following steps: the method comprises the following steps:
s1, installing a walking rail (7) on a pile foundation, installing door-type structure hoisting equipment on the walking rail (7), and installing a walking longitudinal beam (3) and a walking cross beam (4) of the door-type structure hoisting equipment;
s2, hoisting a construction pile cap (8) by a pile (9) in the direction of a front cantilever of the walking longitudinal beam (3), and hoisting a pile driving platform (13) to the pile cap (8) of the pile (9) by the walking longitudinal beam (3);
s3, hoisting lifting equipment (11) of the walking longitudinal beam (3) is mounted on a piling platform (13), a counterweight (12) is mounted at the tail of the piling platform (13), and at least one guide frame (15) is mounted at the front end of the piling platform (13);
s4, installing a temporary construction channel (10) on a pile foundation, hoisting a pile to be constructed on the temporary construction channel (10) through a walking longitudinal beam (3), and lowering the pile to be constructed through a guide frame (15), wherein the guide frame (15) reaches the position to be installed, hoisting equipment (11) is used for hoisting the pile to be constructed, and the pile to be constructed is hoisted to the position of the guide frame (15) through the hoisting equipment (11);
s5, hoisting a pile hammer by hoisting equipment (11), and driving the pile to be constructed on the guide frame (15) to a designed elevation by the pile hammer to finish the construction of the pile.
2. The method for constructing the pile top of the fabricated wharf according to claim 1, which is characterized in that: the pile driving platform (13) is a plurality of, and the pile driving platform (13) covers at least six groups of piles, wherein four groups of piles are used for supporting the pile driving platform (13), and two groups of piles are constructed at the end part position of the pile driving platform (13).
3. The method for constructing the pile top of the fabricated wharf according to claim 1, which is characterized in that: at least two groups of piling platforms (13) are arranged;
after the construction of the pile at the front end position of the pile driving platform (13) is finished by the lifting equipment (11) on the pile driving platform (13), the whole pile driving platform (13) is lifted by the walking longitudinal beam (3) to reach the next area for continuous construction pile driving;
and paving a walking track (7) on the post after construction, and moving the whole door-type structure hoisting equipment forwards on the walking track (7).
4. The method for constructing the pile top of the fabricated wharf according to claim 1, which is characterized in that: the temporary construction channel construction method comprises the following steps: firstly, arranging temporary construction channels (10) at the tops of at least two rows of piles (9) along the longitudinal direction;
when the temporary construction channel unit is hoisted, the supporting legs (5) are installed on the walking track (7) according to the construction site conditions, and the heights of the supporting legs (5) are adjusted;
each temporary construction channel unit is meshed and spliced to form a temporary construction channel (10) for conveying the pile cap (8), the prestress assembly cross beam, the prestress assembly longitudinal beam and the prefabricated panel to the lower part of a door type lifting device structure, and lifting and installing the pile cap, the prestress assembly cross beam, the prestress assembly longitudinal beam and the prefabricated panel by the door type lifting device;
after the installation of the current pile top prefabricated part is completed, the door-type hoisting equipment is used for disassembling each temporary construction channel unit of the temporary construction channel (10), adjusting the height of the lifting support leg again, or disassembling the lifting support leg, hoisting each temporary construction channel unit to the tops of two rows of piles (9) for which the pile top assembled part construction is completed, and assembling to form a new temporary construction channel (10).
5. The method for constructing the pile top of the fabricated wharf according to claim 1, which is characterized in that: the pile (9) can be transported to a position near the pile driving platform (13) through a barge, and the pile (9) is hoisted by the pile driving platform (13) for construction.
CN202311242218.3A 2023-09-25 2023-09-25 Construction method for pile tops of fabricated wharf Pending CN117266220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311242218.3A CN117266220A (en) 2023-09-25 2023-09-25 Construction method for pile tops of fabricated wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311242218.3A CN117266220A (en) 2023-09-25 2023-09-25 Construction method for pile tops of fabricated wharf

Publications (1)

Publication Number Publication Date
CN117266220A true CN117266220A (en) 2023-12-22

Family

ID=89213849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311242218.3A Pending CN117266220A (en) 2023-09-25 2023-09-25 Construction method for pile tops of fabricated wharf

Country Status (1)

Country Link
CN (1) CN117266220A (en)

Similar Documents

Publication Publication Date Title
CN108179735B (en) Pebble layer large-scale deep water foundation construction platform and pebble layer large-scale deep water foundation construction method
CN112726409B (en) Hoisting device for bridge water surface pile tie beam and construction method thereof
CN106012864A (en) Method for lifting and installing whole bridge arch rib
KR20170018001A (en) Method for building a bridge and bridge-building apparatus
CN112695696A (en) Integrated construction equipment for superstructure of high-pile wharf and construction method thereof
CN211815986U (en) High-pile beamless plate wharf structure
CN217350438U (en) Offshore wide platform wharf upper component hoisting construction equipment
CN113152472B (en) Structure and method for lowering steel cofferdam by using drilling platform steel pipe pile
CN114000459B (en) Method for erecting platform for high-pile wharf cast-in-place pile construction
JP4574273B2 (en) Water structure and its construction method
CN114855839A (en) Steel suspension box applied to hydraulic structure and construction method thereof
CN113026563B (en) Suspension bridge high-low displacement girder trestle girder hoisting facility and construction method thereof
JP3850785B2 (en) Caisson laying method using main foundation pile
CN113047330A (en) Assembled high-rise pile cap for offshore wind power
KR200439935Y1 (en) device of fixing tower crane for bridge
CN215329670U (en) Integrated construction equipment for superstructure of high-pile wharf
CN117266220A (en) Construction method for pile tops of fabricated wharf
US3511057A (en) Erection and construction of multispan bridges and piers
CN115491986A (en) Construction system suitable for trestle and construction method thereof
CN213507989U (en) Deepwater steel trestle capable of being constructed quickly
RU41032U1 (en) TECHNOLOGICAL COMPLEX FOR CONSTRUCTION OF HYDROTECHNICAL STRUCTURE
CN220246645U (en) Temporary trestle structure on water
CN115362292B (en) High pile wharf superstructure and construction equipment and construction method thereof
CN115233712B (en) Super-large dumbbell-shaped double-wall steel cofferdam and pile casing group and lifting floating construction method thereof
CN113897968B (en) Mounting system for assembling, sinking and positioning water surface under water-moving condition of block-type hydraulic building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination