CN117113886B - Pressure prediction method and device - Google Patents

Pressure prediction method and device Download PDF

Info

Publication number
CN117113886B
CN117113886B CN202311370113.6A CN202311370113A CN117113886B CN 117113886 B CN117113886 B CN 117113886B CN 202311370113 A CN202311370113 A CN 202311370113A CN 117113886 B CN117113886 B CN 117113886B
Authority
CN
China
Prior art keywords
pipe network
data
operation data
pressure
hydrogen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311370113.6A
Other languages
Chinese (zh)
Other versions
CN117113886A (en
Inventor
吴永文
杨啸
尼古劳斯·拉科夫蒂斯
王淑奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Scienco Technology Co ltd
Original Assignee
Beijing Scienco Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Scienco Technology Co ltd filed Critical Beijing Scienco Technology Co ltd
Priority to CN202311370113.6A priority Critical patent/CN117113886B/en
Publication of CN117113886A publication Critical patent/CN117113886A/en
Application granted granted Critical
Publication of CN117113886B publication Critical patent/CN117113886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/04Architecture, e.g. interconnection topology
    • G06N3/044Recurrent networks, e.g. Hopfield networks
    • G06N3/0442Recurrent networks, e.g. Hopfield networks characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/08Learning methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/08Fluids
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/08Thermal analysis or thermal optimisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/12Timing analysis or timing optimisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Artificial Intelligence (AREA)
  • Mathematical Physics (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Molecular Biology (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Computational Linguistics (AREA)
  • Biophysics (AREA)
  • Biomedical Technology (AREA)
  • Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Fluid Mechanics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computational Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Medical Informatics (AREA)
  • Algebra (AREA)
  • Computer Vision & Pattern Recognition (AREA)

Abstract

The application relates to a pressure prediction method and device. The main technical scheme comprises the following steps: the method comprises the steps of obtaining operation data of a hydrogen system, preprocessing the operation data to obtain alternative operation data, screening the alternative operation data related to the pipe network pressure of a hydrogen pipe network in the hydrogen system to obtain target operation data, and predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model according to the target operation data.

Description

Pressure prediction method and device
Technical Field
The application relates to the technical field of petroleum refining, in particular to a pressure prediction method and device.
Background
Hydrogen is an important petrochemical raw material, and a large amount of hydrogen is consumed by devices such as hydrocracking or hydrotreating of a refinery, and is critical to the production of the refinery. The transportation of hydrogen in a refinery mainly depends on a hydrogen pipe network, and the hydrogen pipe network is connected with a hydrogen production device and a hydrogen consumption device to transport hydrogen with different purities and pressures to the inlets of the hydrogen consumption devices. When the pressure of the hydrogen pipe network is too high, the pressure is an important index, when hydrogen cannot be timely consumed or hydrogen production is reduced, an emergency torch or a fuel gas pipe network is required, when the pressure of the hydrogen pipe network is too low, the inlet pressure of a downstream new hydrogen compressor is influenced, emergency linkage stop of the compressor is caused when necessary, normal production of a hydrogen consumption device is influenced, and the planned completion progress is influenced at the end of a month. Therefore, the pressure of the hydrogen pipe network is maintained in a stable range, the waste of hydrogen can be reduced to a certain extent, and the method has important significance for the safe production and stable production of hydrogen production devices and hydrogenation devices.
At present, domestic petrochemical enterprises continuously expand, upgrade and reform, hydrogen pipe networks correspondingly upgrade and reform, newly-added pipelines are added again based on the layout of historical pipelines, and the structures of the hydrogen pipe networks are generally complex. The current operation condition of the hydrogen pipe network is judged by a refinery production manager according to the current pressure of certain key sites, and human intervention is performed when the pressure of the pipe network is too high or too low, so that the pressure of the hydrogen pipe network is difficult to accurately regulate and control, and the management difficulty of the hydrogen pipe network is improved.
Disclosure of Invention
Based on the above, the application provides a pressure prediction method and device, which can accurately regulate and control the pressure of a hydrogen pipe network and better manage the hydrogen pipe network.
In a first aspect, a method of pressure prediction is provided, the method comprising:
acquiring operation data of a hydrogen system;
preprocessing operation data to obtain alternative operation data;
screening alternative operation data related to the pipe network pressure of a hydrogen pipe network in the hydrogen system to obtain target operation data;
and predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model according to the target operation data.
According to one implementation in an embodiment of the present application, the operational data includes gas flow data; the method of preprocessing the operational data includes at least one of:
Performing time frequency correction processing, missing value processing, exception processing, noise data processing and normalization processing on the operation data;
converting the data type of the operation data into a standard type;
and correcting the gas flow data in the operation data.
According to one implementation manner in the embodiment of the application, the alternative operation data comprise the pressure of a hydrogen system pipe network and various variable data; screening the alternative operation data related to the pressure of a hydrogen pipe network in a hydrogen system to obtain target operation data, wherein the method comprises the following steps of:
calculating a first correlation value between each variable data in the plurality of variable data and a second correlation value between each variable data in the plurality of variable data and the pressure of the hydrogen system pipe network;
constructing a two-dimensional matrix according to the first correlation and the second correlation value;
generating a correlation sequence of the first correlation and the second correlation value according to the two-dimensional matrix;
and selecting target operation data according to the correlation sequence.
According to one implementation manner in the embodiments of the present application, selecting the target operation data according to the correlation sequence includes:
selecting variable data corresponding to the correlation value meeting the preset condition in the correlation sequence as primary selection operation data;
Determining a weight value corresponding to the primary selection operation data according to a pre-stored variable data and an influence list of pipe network pressure;
and determining target operation data according to the primary operation data and the weight value corresponding to the primary operation data.
According to one implementation manner in the embodiment of the application, the prediction model comprises a plurality of sub-prediction models with different durations, and the intervals between the sub-prediction models are preset for the durations; according to the target operation data, predicting the pipe network pressure of a hydrogen pipe network in a hydrogen system in a future preset time period based on a pre-trained prediction model, including:
inputting target operation data into a pre-trained prediction model, and respectively predicting the pipe network pressure of a hydrogen pipe network in the hydrogen system according to the sub-prediction models which are arranged in sequence from large to small according to the time length to obtain a plurality of initial pipe network pressures;
and determining the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period according to the plurality of initial pipe network pressures.
According to an implementation manner in the embodiments of the present application, predicting the pipe network pressure of a hydrogen pipe network in a hydrogen system according to target operation data by using sub-prediction models arranged in order from large to small according to time length includes:
Inputting current target operation data into a sub-prediction model with the maximum duration to obtain a first initial pipe network pressure;
the target operation data with preset time intervals are input into a second sub-prediction model, and the second initial pipe network pressure is obtained;
and taking a time point for obtaining the pressure of the second initial pipe network as a starting point, inputting target operation data with preset time intervals, arranging the time intervals in a third sub-prediction model to obtain the pressure of the third initial pipe network, and the like until the time intervals are arranged in a last sub-prediction model to output the pressure of the last initial pipe network. According to one possible implementation manner in the embodiment of the present application, before acquiring the operation data of the hydrogen system, the method further includes:
acquiring sample data, wherein the sample data comprises various variable data and pipe network pressure corresponding to the various variable data;
training a plurality of neural network models with different time length values according to a plurality of variable data and pipe network pressures corresponding to the variable data to obtain a plurality of sub-prediction models;
and combining the plurality of sub-prediction models to obtain a prediction model.
According to one implementation manner in the embodiments of the present application, the method further includes:
Determining an abnormal event in the process of regulating and controlling the pressure of the pipe network according to the operation data of the hydrogen system;
storing the abnormal event into a pre-built event library;
based on the event library, sample data for training the predictive model is updated.
According to one implementation manner in the embodiments of the present application, updating sample data of a prediction model based on an event library includes:
based on the event library, periodically updating sample data of a training prediction model;
or when the number of abnormal events of the event library exceeds the accommodation threshold value of the event library within the preset safety time, updating the sample data of the training prediction model.
In a second aspect, there is provided a pressure predicting apparatus comprising:
the acquisition module is used for acquiring the operation data of the hydrogen system;
the preprocessing module is used for preprocessing the operation data to obtain alternative operation data;
the screening module is used for screening the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system to obtain target operation data;
and the prediction module is used for predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model according to the target operation data.
In a third aspect, there is provided a computer device comprising:
at least one processor; and
a memory communicatively coupled to the at least one processor; wherein,
the memory stores computer instructions executable by the at least one processor to enable the at least one processor to perform the method as referred to in the first aspect above.
In a fourth aspect, there is provided a computer readable storage medium having stored thereon computer instructions for causing a computer to perform the method referred to in the first aspect above.
According to the technical content provided by the embodiment of the application, the operation data of the hydrogen system are obtained, the operation data are preprocessed to obtain the alternative operation data, the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system are screened to obtain the target operation data, the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period is predicted based on a pre-trained prediction model according to the target operation data, the change trend of the pipe network pressure in the future time period can be known, the optimal adjustment opportunity is sought, the pressure adjustment is carried out in advance, the pressure of the hydrogen pipe network is accurately regulated, the hydrogen pipe network is managed better, and the pipe network pressure is maintained in a stable range.
Drawings
FIG. 1 is a flow chart of a method of pressure prediction in one embodiment;
FIG. 2 is a block diagram of a pressure prediction device in one embodiment;
FIG. 3 is a schematic block diagram of a computer device in one embodiment.
Detailed Description
The present application will be described in further detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the present application.
Fig. 1 shows a flow chart of a pressure prediction method according to an embodiment of the present application. As shown in fig. 1, the method may include the steps of:
s110, acquiring operation data of the hydrogen system.
The hydrogen system mainly comprises a hydrogen pipe network and a main device, wherein the main device can comprise a hydrogen production device, a hydrogen consumption device and a purification device. The operation data is data of the hydrogen pipe network and the main device in operation, and can comprise gas flow data, gas pressure data, volume flow data, mass flow data, load flow data, pipe network pressure data, operation temperature, operation pressure data, composition analysis data and the like. The operation data is derived from real-time database data, assay analysis data, instrument design parameters and the like, and can be obtained from the real-time database, or can be obtained from a management system of the hydrogen system.
S120, preprocessing the operation data to obtain alternative operation data.
Because of factors such as the service life of the instrument, the existence of calibration, the gas surface characteristics, the component site analysis frequency and the like, the operation data has errors and even data is lost. Noise data, vacancy data and abnormal data generally reduce the prediction accuracy and robustness of the prediction model, and in order to truly and effectively display the running state of the hydrogen system, the running data needs to be preprocessed, standardized, and the accuracy and precision of the model data are improved.
The preprocessing may include time-frequency correction processing, missing value processing, anomaly processing, noise data processing and normalization processing, data type conversion, correction processing, and the like. The preprocessed operation data is the alternative operation data.
S130, screening the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system to obtain target operation data.
The alternative operation data comprise the pressure of the hydrogen system pipe network and various variable data, wherein the variable data comprise volume flow data, mass flow data, load flow data, temperature data, composition analysis data and the like. And selecting the obtained alternative operation data related to the pipe network pressure of the hydrogen pipe network as target operation data, and taking the target operation data as input of a prediction model.
The selection of the input data of the prediction model directly influences the prediction result of the pipe network pressure, and the physical meaning of each variable data to the pipe network pressure can be analyzed according to the correlation between each variable data and the hydrogen system pipe network pressure, so that the target operation data can be determined.
And S140, predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model according to the target operation data.
The prediction model is trained based on a long-short-time memory cyclic neural network and consists of a plurality of sub-models with different time lengths, and the intervals among the sub-prediction models are the same in time length. And inputting the target operation data into prediction models, and predicting the initial pipe network pressure of the hydrogen pipe network in a preset time period in the future according to the target operation data by each sub-prediction model, wherein the prediction models output the pipe network pressure of the hydrogen pipe network in the preset time period in the future based on a plurality of initial pipe network pressures.
It can be seen that, according to the embodiment of the application, through obtaining the operation data of the hydrogen system, preprocessing the operation data to obtain alternative operation data, screening the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system to obtain target operation data, and according to the target operation data, predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model, the change trend of the pipe network pressure in the future time period can be known, the optimal adjustment opportunity is sought, the pressure adjustment is performed in advance, the pressure of the hydrogen pipe network is accurately regulated and controlled, the hydrogen pipe network is better managed, and the pipe network pressure is maintained in a stable range.
The steps in the above-described process flow are described in detail below. The above step S120, i.e. "preprocessing operation data to obtain alternative operation data" will be described in detail with reference to the embodiments.
As one possible way, the method of preprocessing the operation data includes at least one of the following ways:
performing time frequency correction processing, missing value processing, exception processing, noise data processing and normalization processing on the operation data;
converting the data type of the operation data into a standard type;
and correcting the gas flow data in the operation data.
Wherein the time-frequency correction process and the missing value process are also referred to as data normalization process. In view of inconsistent data frequency and assay analysis data frequency in the real-time database, uniform time stamping is needed, and time frequency correction processing is performed on the operation data according to the uniform time frequency of the data frequency in the real-time database.
Because the real-time data can generate a very small amount of missing data in the process of being integrated into the database and being exported, for the variable of which the data presents continuous change, the average value of a period of time before the current moment is taken as a supplementary value, and for the variable of which the data presents discrete change, the value of the last moment is taken as the supplementary value, so that the missing value processing is carried out on the running data.
When the operation data is processed abnormally, different processing is performed according to the abnormal type of the abnormal data in the operation data.
When the abnormal type of the abnormal data in the operation data is self-abnormality, that is, abnormal data occurring in the normal production process, such data deviate from the normal value to belong to a bad value, correction processing thereof is required. Such data becomes an off-site point, which refers to a data point that is significantly far from other points and significantly not subject to sample distribution in the measured operation data. The method for detecting the external points adopts t-test criteria and the like, calculates the residual error of the observed value to the expected estimated value, and compares the residual error with the selected critical value to judge and exclude possible external points.
When the abnormality type of the abnormality data in the operation data is a meter abnormality, that is, the abnormality data is an abnormality value caused by a meter failure, such an abnormality value is substantially constant. First, whether the meter is normal or not is determined from the abnormal data using the following formula:
(1)
wherein S is var,i Representing variance of abnormal data, K i Indicating switch parameterNumber, X val,i Indicating that the i-th abnormal data is present,represents the average value of the i-th abnormal data, and n represents the total number of abnormal data.
When K is i When the value is=1, the operation data measured by the instrument is in a fluctuation state, if the variance of the abnormal data is smaller than the minimum set value, the variance is too small, the data is considered to be constant, the instrument has a bad value, and whether the operation data are deleted or not is judged by combining the physical meaning of the variable data; when the variance of the abnormal data is larger than the maximum set value, the variance is too large, and the instrument is abnormal, and at the moment, the standby instrument corresponding to the instrument is called as the current using equipment.
When K is i When=0, the operation data representing the meter measurement is in a steady state, and no handling thereof is required.
Noise exists in operation data measured by the instrument in the normal production process, the noise values influence the accuracy of the operation data, the prediction accuracy of the prediction model can be reduced, and in order to improve the accuracy of the prediction model, filtering processing is carried out on the noise data. The data filtering has a plurality of methods, and different filtering processing modes can be adopted according to the characteristics of each data in the hydrogen system, such as a mean value filtering method, a first-order post-filtering method, a median filtering method and the like.
The variable data in the hydrogen system are more, such as temperature, pressure, gas flow, device load and the like, the variable data are inconsistent in size, the change of the absolute value with larger absolute value can submerge the change with smaller absolute value in data training, and in order to reduce the influence caused by dimension, normalization processing is finally needed to be carried out on all variables, and the variables are normalized to the [0,1] interval.
The standard type is a data type which can be identified by program calculation, and when the type of the operation data is in the form of numerical type, category type, text type and the like, the operation data of the types needs to be converted into the data which can be identified by the program calculation.
The hydrogen production data and the hydrogen consumption data in the hydrogen system are mainly gas data, and a pore plate flowmeter, a mass flowmeter and the like are common in a gas flow measurement mode, so that the pore plate flowmeter is common. The orifice plate flowmeter is affected by the real-time temperature, real-time pressure and gas composition change of the medium, the temperature, pressure and composition of the orifice plate flowmeter are required to be corrected in order to improve the accuracy of data, and the following formula can be adopted to correct the temperature, pressure and composition of the gas flow in the operation data:
(2)
wherein F' (i,t) Represents the corrected gas flow rate at time t, F (i,t) Representing the measured value of the gas flowmeter at the time t, P (i,t) Representing the pressure measurement value corresponding to the gas flow at the time t, P (i,0) Representing the pressure design value, MW, of the gas flowmeter (i,t) Molecular weight measurement, MW, representing the gas composition on a gas line at time t (i,0) Representing the design value of the molecular weight of the gas flowmeter, T (i,t) Representing the temperature measurement value corresponding to the gas flow at the time T (i,0) The temperature design value of the gas flowmeter is represented, and i represents the type of gas to be corrected. The gas flow rate may be a new hydrogen flow rate and a hydrogen production flow rate.
The following describes in detail the above S130, i.e. "screening the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system, and obtaining the target operation data" with reference to the embodiment.
As one implementation manner, calculating a first correlation value between each variable data in the plurality of variable data and a second correlation value between each variable data in the plurality of variable data and the pressure of the hydrogen system pipe network;
constructing a two-dimensional matrix according to the first correlation and the second correlation value;
generating a correlation sequence of the first correlation and the second correlation value according to the two-dimensional matrix;
and selecting target operation data according to the correlation sequence.
The variable data are data except pipe network pressure data in the alternative operation data. And calculating a first correlation value between each variable data in the plurality of variable data and a second correlation value between each variable data in the plurality of variable data and the pressure of the hydrogen system pipe network by adopting the Pearson correlation coefficient. And calculating a group of first correlation values and a group of second correlation values, and constructing a two-dimensional matrix with the size of N+1 by two groups of numerical values, wherein N is the variety number of variable data. And converting the two-dimensional matrix into a one-dimensional array to generate a correlation sequence of the first correlation value and the second correlation value. And selecting target operation data according to the correlation sequence.
Specifically, variable data corresponding to a correlation value meeting a preset condition in a correlation sequence is selected as primary selection operation data;
determining a weight value corresponding to the primary selection operation data according to a pre-stored variable data and an influence list of pipe network pressure;
and determining target operation data according to the primary operation data and the weight value corresponding to the primary operation data.
The preset condition may be that the correlation value is greater than a preset threshold, or that a preset number of correlation values are selected according to the sequence of the correlations from the large to the small. The preset threshold and the preset number can be set according to actual production requirements.
The variable data corresponding to the correlation value meeting the preset condition may be variable data corresponding to the first correlation value or variable data corresponding to the second correlation value, when the variable data is variable data corresponding to the first correlation value, one of the variable data is determined to be primary operation data according to the attribute of the variable data and the actual production relation, and the other variable data is determined to be alternative variable data. And when the variable data is the variable data corresponding to the second correlation value, directly determining the variable data as the primary selection operation data.
The variable data and pipe network pressure influence list is a list obtained by sequencing the influence degree of variable data on the pipe network pressure according to the variable data which is determined by combining the physical meaning of the variable data with the accumulated experience of the production process and has larger influence on the pipe network pressure.
According to a pre-stored influence list of variable data and pipe network pressure, determining influence of the variable data on the pipe network pressure, and determining a weight value corresponding to each variable data in the primary selected operation data according to the influence. And the primary selection operation data after the weight value is matched is the target operation data.
The following describes in detail the above S140, that is, "predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in the future preset time period based on the pre-trained prediction model according to the target operation data" with reference to the embodiment.
As an achievable mode, inputting target operation data into a pre-trained prediction model, and respectively predicting the pipe network pressure of a hydrogen pipe network in a hydrogen system according to the target operation data by sub-prediction models which are arranged in sequence from large to small according to the duration to obtain a plurality of initial pipe network pressures;
and determining the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period according to the plurality of initial pipe network pressures.
The prediction model comprises a plurality of sub-prediction models with different time lengths, and the intervals between the sub-prediction models are preset for the time lengths; in accordance with the target operational data,
the preset time period is a future time period set according to actual production requirements. The time length of the first sub-prediction model in the prediction model is the largest, and is the preset time period, the time length of the second sub-prediction model is reduced by the preset time length on the basis of the time length of the first sub-prediction model, the time length of the third sub-prediction model is reduced by the preset time length on the basis of the time length of the second sub-prediction model, and the like until the time length of the last sub-prediction model is set. For example, based on a pre-trained prediction model, the pipe network pressure of the hydrogen pipe network in the hydrogen system after 30min is predicted, the prediction model can be composed of sub-prediction models with the duration of 30min 25min 20min 15min 10min 5min, and the preset duration is 5min at this time.
And respectively predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system according to the target operation data by the sub prediction models which are arranged in sequence from large to small according to the time length, so as to obtain a plurality of initial pipe network pressures.
Specifically, inputting current target operation data into a sub-prediction model with the maximum duration to obtain a first initial pipe network pressure;
The target operation data with preset time intervals are input into a second sub-prediction model, and the second initial pipe network pressure is obtained;
and taking a time point for obtaining the pressure of the second initial pipe network as a starting point, inputting target operation data with preset time intervals, arranging the time intervals in a third sub-prediction model to obtain the pressure of the third initial pipe network, and the like until the time intervals are arranged in a last sub-prediction model to output the pressure of the last initial pipe network.
Taking a prediction model consisting of sub-prediction models with the duration of 30 min/25 min/20 min/15 min/10 min/5 min as an example, inputting current target operation data into the sub-prediction model with the duration of 30min to obtain the first initial pipe network pressure. And inputting target operation data after 5min into a sub-prediction model with the duration of 25min to obtain the second initial pipe network pressure. When the second initial pipe network pressure is obtained, taking the time point as a starting point, inputting target operation data after the time point is 5min into a sub-prediction model with the duration of 20min, and obtaining the third initial pipe network pressure. And the same is done until the sub-prediction model with the duration of 5min outputs the last initial pipe network pressure.
Outputting a plurality of initial pipe network pressures, displaying the pipe network pressure change trend of the hydrogen pipe network in a preset time period in the future, and determining the pipe network pressure of the hydrogen pipe network in the preset time period in the future according to the pipe network pressure change trend.
As one possible way, before acquiring the operation data of the hydrogen system, the method further includes:
acquiring sample data, wherein the sample data comprises various variable data and pipe network pressure corresponding to the various variable data;
training a plurality of neural network models with different time length values according to a plurality of variable data and pipe network pressures corresponding to the variable data to obtain a plurality of sub-prediction models;
and combining the plurality of sub-prediction models to obtain a prediction model.
The variable data can comprise gas flow data, volume flow data, mass flow data, load flow data, pipe network pressure data, temperature data, composition analysis data and the like, and the pipe network pressure corresponding to each variable data combination is obtained by combining the influence of each variable data on the pipe network pressure.
The variable data related to the hydrogen pipe network is time-series data, so that the time-series predictive analysis is suitable. The time sequence prediction analysis predicts the development direction of an event in a future period by utilizing the time continuity characteristic of the event in the past period, the time sequence model is dependent on the sequence of the event, and the model prediction results of the next value are different in different time sequences of the same value. Thus, the neural network model may be selected from a differential autoregressive moving average model (Autoregressive Integrated Moving Average Model, ARIMA), a common recurrent neural network model (Recurrent Neuron Network, RNN), a Long-Short-Term-Memory (LSTM).
Because the ARIMA network model belongs to a relatively mature method in the traditional machine learning method, the RNN network model extends on the basis of the ARIMA network model, and the ARIMA network model is more flexible and has stronger expressive performance. The LSTM network model is improved on the basis of the RNN network model, and long-term and short-term characteristics of various features can be learned and distinguished. For the hydrogen pipe network pressure data set, each characteristic is separated in time, and the hydrogen pipe network has certain accumulation characteristic, so that the LSTM network model is a better choice.
According to the characteristic of processing time sequence data of an LSTM network model, training data is firstly required to be adjusted, the total length of samples is set to be N, the types of sample input variables are set to be C, the length of sample batches is set according to the process characteristics, the total length of the samples is the total number of input samples, the types of the sample input variables are the types of the sample input variables, and the lengths of the sample batches are the time sequence lengths in a preset time period.
Adjusting (N, B, C) the input data for training to three-dimensional data; the output data may be set to a Delay value between [5,60] minutes based on the predicted time period, and the input data is time aligned with the output data based on the Delay value.
Secondly, building an LSTM network structure, setting the size of an input layer as the number of input variables, setting a hidden layer to be adjusted according to the types of the input variables, adjusting the number of layers between [1 and 5], outputting the pressure of the pipe network as the output size, and selecting a proper loss function and a proper solver according to the speed and effect requirements of LSTM training.
And dividing the various variable data and the pipe network pressure corresponding to the various variable data into training data and test data. And taking various variable data in the training data as the input of the LSTM network model, taking pipe network pressure corresponding to the various variable data in the training data as the output of the LSTM network model, and training the LSTM network model to obtain a plurality of sub-prediction models with different duration values. The multiple sub-predictive models are combined to form a rolling predictive model.
Inputting various variable data in the test data into a prediction model to calculate the predicted pipe network pressure, calculating the error of the predicted pipe network pressure and a true value by using a mean square error loss function, and when the error exceeds an expected range, debugging the input data and an LSTM network structure, performing model training again until the error of a verification set is within a reasonable range, and ending the training.
As one implementation, the method further includes:
Determining an abnormal event in the process of regulating and controlling the pressure of the pipe network according to the operation data of the hydrogen system;
storing the abnormal event into a pre-built event library;
based on the event library, sample data for training the predictive model is updated.
The operation data of the hydrogen system is classified according to the device attribute, and can be classified into hydrogen production devices, hydrogen consumption devices and pipe network pressure, and the operation data in each category is subjected to fluctuation analysis. When the accumulated time length of the running data of a plurality of preset variables in the device exceeds the time point of the steady state judgment condition is longer than the preset judgment time length, the accumulated time length is marked as an abnormal state of the device. This period of time is marked as an abnormal event when one or more devices or network pressures are in an abnormal condition. And identifying fluctuation events with larger adjustment amplitude, emergency events occurring in a single device and the like in the process of regulating and controlling the pressure of the pipe network through fluctuation analysis, marking the time periods with larger fluctuation as abnormal events, and storing the abnormal events into a pre-built event library.
Based on the event library, the sample data of the training prediction model may be updated periodically, for example, for one month, or may be updated when the number of abnormal events in the event library exceeds the accommodation threshold of the event library within a preset safety time. The preset safety time is the time when the normal storage of the abnormal events does not cause the abnormality of the event library, the accommodation threshold is the time when the event library is ensured to store the number of the abnormal events under the normal working condition in the preset safety time, if the number of the abnormal events of the event library exceeds the accommodation threshold of the event library in the preset safety time, the abnormal events occurring in the time period are relatively more, the sample data of the training prediction model should be immediately updated, the prediction result of the prediction model is timely adjusted, the prediction model is beneficial to coping with wider problems, particularly the condition of larger fluctuation, and further higher prediction precision is achieved.
It should be understood that, although the steps in the flowchart of fig. 1 are shown in sequence as indicated by the arrows, the steps are not necessarily performed in sequence as indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly stated in the present application, and the steps may be executed in other orders. Moreover, at least some of the steps in fig. 1 may include multiple sub-steps or stages that are not necessarily performed at the same time, but may be performed at different times, nor do the order in which the sub-steps or stages are performed necessarily performed in sequence, but may be performed alternately or alternately with at least a portion of other steps or sub-steps of other steps.
Fig. 2 is a schematic structural diagram of a pressure prediction apparatus according to an embodiment of the present application, where the apparatus is configured to perform the method flow shown in fig. 1. As shown in fig. 2, the apparatus may include: the obtaining module 210, the preprocessing module 220, the screening module 230, and the predicting module 240 may further include: training module, updating module. The main functions of each component module are as follows:
An obtaining module 210, configured to obtain operation data of the hydrogen system;
a preprocessing module 220, configured to preprocess the operation data to obtain alternative operation data;
a screening module 230, configured to screen candidate operation data related to a pipe network pressure of a hydrogen pipe network in the hydrogen system to obtain target operation data;
the prediction module 240 is configured to predict a pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model according to the target operation data.
As one implementation, the operational data includes gas flow data; the preprocessing module 220 is specifically configured to perform time-frequency correction processing, missing value processing, exception processing, noise data processing, and normalization processing on the operation data;
converting the data type of the operation data into a standard type;
and correcting the gas flow data in the operation data.
As one possible way, the alternative operating data includes hydrogen system pipe network pressure and various variable data; the screening module 230 is specifically configured to calculate a first correlation value between each variable data in the plurality of variable data and a second correlation value between each variable data in the plurality of variable data and the pressure of the hydrogen system pipe network;
Constructing a two-dimensional matrix according to the first correlation and the second correlation value;
generating a correlation sequence of the first correlation and the second correlation value according to the two-dimensional matrix;
and selecting target operation data according to the correlation sequence.
As an implementation manner, the screening module 230 is specifically configured to select variable data corresponding to a correlation value satisfying a preset condition in the correlation sequence as primary selection operation data;
determining a weight value corresponding to the primary selection operation data according to a pre-stored variable data and an influence list of pipe network pressure;
and determining target operation data according to the primary operation data and the weight value corresponding to the primary operation data.
As an achievable way, the prediction model comprises a plurality of sub-prediction models with different time lengths, and the preset time length is arranged between each two sub-prediction models; the prediction module 240 is specifically configured to input the target operation data into a pre-trained prediction model, and predict the pipe network pressure of the hydrogen pipe network in the hydrogen system according to the target operation data by using sub-prediction models arranged in sequence from large to small according to the duration, so as to obtain a plurality of initial pipe network pressures;
and determining the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period according to the plurality of initial pipe network pressures.
As an achievable manner, the prediction module 240 is specifically configured to input the current target operation data into a sub-prediction model with the largest duration, so as to obtain a first initial pipe network pressure;
the target operation data with preset time intervals are input into a second sub-prediction model, and the second initial pipe network pressure is obtained;
and taking a time point for obtaining the pressure of the second initial pipe network as a starting point, inputting target operation data with preset time intervals, arranging the time intervals in a third sub-prediction model to obtain the pressure of the third initial pipe network, and the like until the time intervals are arranged in a last sub-prediction model to output the pressure of the last initial pipe network.
As an achievable way, the device further comprises a training module, which is used for acquiring sample data before acquiring the operation data of the hydrogen system, wherein the sample data comprises various variable data and pipe network pressure corresponding to the various variable data;
training a plurality of neural network models with different time length values according to a plurality of variable data and pipe network pressures corresponding to the variable data to obtain a plurality of sub-prediction models;
and combining the plurality of sub-prediction models to obtain a prediction model.
As an achievable way, the device further comprises an updating module, which is used for determining an abnormal event in the process of regulating and controlling the pressure of the pipe network according to the operation data of the hydrogen system;
storing the abnormal event into a pre-built event library;
based on the event library, sample data for training the predictive model is updated.
As an achievable way, the updating module is specifically configured to periodically update sample data of the training prediction model based on the event library;
or when the number of abnormal events of the event library exceeds the accommodation threshold value of the event library within the preset safety time, updating the sample data of the training prediction model.
The same and similar parts of the above embodiments are all referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the device embodiments, since they are substantially similar to the method embodiments, the description is relatively simple, and reference is made to the description of the method embodiments in part.
According to embodiments of the present application, there is also provided a computer device, a computer-readable storage medium.
As shown in fig. 3, is a block diagram of a computer device according to an embodiment of the present application. Computer equipment is intended to represent various forms of digital computers or mobile devices. Wherein the digital computer may comprise a desktop computer, a portable computer, a workstation, a personal digital assistant, a server, a mainframe computer, and other suitable computers. The mobile device may include a tablet, a smart phone, a wearable device, etc.
As shown in fig. 3, the apparatus 300 includes a computing unit 301, a ROM 302, a RAM 303, a bus 304, and an input/output (I/O) interface 305, the computing unit 301, the ROM 302, and the RAM 303 being connected to each other through the bus 304. An input/output (I/O) interface 305 is also connected to bus 304.
The computing unit 301 may perform various processes in the method embodiments of the present application according to computer instructions stored in a Read Only Memory (ROM) 302 or computer instructions loaded from a storage unit 308 into a Random Access Memory (RAM) 303. The computing unit 301 may be a variety of general and/or special purpose processing components having processing and computing capabilities. The computing unit 301 may include, but is not limited to, a Central Processing Unit (CPU), a Graphics Processing Unit (GPU), various specialized Artificial Intelligence (AI) computing chips, various computing units running machine learning model algorithms, a Digital Signal Processor (DSP), as well as any suitable processor, controller, microcontroller, etc. In some embodiments, the methods provided by embodiments of the present application may be implemented as a computer software program tangibly embodied on a computer-readable storage medium, such as storage unit 308.
RAM 303 can also store various programs and data required for operation of device 300. Part or all of the computer program may be loaded and/or installed onto the device 300 via the ROM 802 and/or the communication unit 309.
An input unit 306, an output unit 307, a storage unit 308, and a communication unit 309 in the device 300 may be connected to the I/O interface 305. Wherein the input unit 306 may be such as a keyboard, mouse, touch screen, microphone, etc.; the output unit 307 may be, for example, a display, a speaker, an indicator light, or the like. The device 300 is capable of exchanging information, data, and the like with other devices through the communication unit 309.
It should be noted that the device may also include other components necessary to achieve proper operation. It may also include only the components necessary to implement the present application, and not necessarily all the components shown in the figures.
Various implementations of the systems and techniques described here can be implemented in digital electronic circuitry, integrated circuitry, field Programmable Gate Arrays (FPGAs), application Specific Integrated Circuits (ASICs), application Specific Standard Products (ASSPs), systems On Chip (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and/or combinations thereof.
Computer instructions for implementing the methods of the present application may be written in any combination of one or more programming languages. These computer instructions may be provided to the computing unit 301 such that the computer instructions, when executed by the computing unit 301, such as a processor, cause the steps involved in the method embodiments of the present application to be performed.
The computer readable storage medium provided herein may be a tangible medium that may contain, or store, computer instructions for performing the steps involved in the method embodiments of the present application. The computer readable storage medium may include, but is not limited to, storage media in the form of electronic, magnetic, optical, electromagnetic, and the like.
The above embodiments do not limit the scope of the application. It will be apparent to those skilled in the art that various modifications, combinations, sub-combinations and alternatives are possible, depending on design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application are intended to be included within the scope of the present application.

Claims (9)

1. A method of pressure prediction, the method comprising:
acquiring operation data of a hydrogen system;
Preprocessing the operation data to obtain alternative operation data;
screening alternative operation data related to the pipe network pressure of a hydrogen pipe network in the hydrogen system to obtain target operation data;
according to the target operation data, predicting the pipe network pressure of the hydrogen pipe network in the hydrogen system in a future preset time period based on a pre-trained prediction model, and specifically comprising: inputting the target operation data into a pre-trained prediction model, and respectively predicting the pipe network pressure of a hydrogen pipe network in the hydrogen system according to the target operation data by sub-prediction models which are arranged in sequence from large to small according to the time length to obtain a plurality of initial pipe network pressures; determining the pipe network pressure of a hydrogen pipe network in the hydrogen system in a future preset time period according to the initial pipe network pressures; the prediction model comprises a plurality of sub-prediction models with different time lengths, and the preset time length is reserved between each two sub-prediction models.
2. The method of claim 1, wherein the operational data comprises gas flow data; the method for preprocessing the operation data comprises at least one of the following modes:
performing time frequency correction processing, missing value processing, exception processing, noise data processing and normalization processing on the operation data;
Converting the data type of the operation data into a standard type;
and correcting the gas flow data in the operation data.
3. The method of claim 1, wherein the alternative operating data comprises hydrogen system pipe network pressure and a plurality of variable data; the screening of the candidate operation data related to the pressure of the hydrogen pipe network in the hydrogen system to obtain target operation data comprises the following steps:
calculating a first correlation value between each variable data in the plurality of variable data and a second correlation value between each variable data in the plurality of variable data and the pressure of the hydrogen system pipe network;
constructing a two-dimensional matrix according to the first correlation value and the second correlation value;
generating a correlation sequence of a first correlation and the second correlation value according to the two-dimensional matrix;
and selecting the target operation data according to the correlation sequence.
4. A method according to claim 3, wherein said selecting said target operational data based on said correlation sequence comprises:
selecting variable data corresponding to the correlation value meeting the preset condition in the correlation sequence as primary selection operation data;
Determining a weight value corresponding to the primary selection operation data according to a pre-stored variable data and an influence list of pipe network pressure;
and determining the target operation data according to the primary operation data and the weight value corresponding to the primary operation data.
5. The method according to claim 1, wherein the predicting the network pressure of the hydrogen network in the hydrogen system according to the target operation data by using the sub-prediction models arranged in the order of the length of time from the large to the small includes:
inputting current target operation data into a sub-prediction model with the maximum duration to obtain a first initial pipe network pressure;
the target operation data with preset time intervals are input into a second sub-prediction model, and the second initial pipe network pressure is obtained;
and taking a time point for obtaining the pressure of the second initial pipe network as a starting point, inputting target operation data with preset time intervals, arranging the time intervals in a third sub-prediction model to obtain the pressure of the third initial pipe network, and the like until the time intervals are arranged in a last sub-prediction model to output the pressure of the last initial pipe network.
6. The method of claim 1, wherein prior to obtaining the operational data of the hydrogen system, the method further comprises:
Acquiring sample data, wherein the sample data comprises various variable data and pipe network pressure corresponding to the various variable data;
training a plurality of neural network models with different time length values according to the variable data and the pipe network pressure corresponding to the variable data to obtain a plurality of sub-prediction models;
and combining the plurality of sub-prediction models to obtain a prediction model.
7. The method according to claim 1, wherein the method further comprises:
determining an abnormal event in the process of regulating and controlling the pressure of the pipe network according to the operation data of the hydrogen system;
storing the abnormal event into a pre-built event library;
based on the event library, sample data for training the predictive model is updated.
8. The method of claim 7, wherein updating sample data of the predictive model based on the event library comprises:
based on the event library, periodically updating sample data for training the prediction model;
or updating sample data for training the prediction model when the number of abnormal events of the event library exceeds the accommodation threshold of the event library within a preset safety time.
9. A pressure prediction apparatus, the apparatus comprising:
the acquisition module is used for acquiring the operation data of the hydrogen system;
the preprocessing module is used for preprocessing the operation data to obtain alternative operation data;
the screening module is used for screening the alternative operation data related to the pipe network pressure of the hydrogen pipe network in the hydrogen system to obtain target operation data;
the prediction module is configured to predict a pipe network pressure of a hydrogen pipe network in the hydrogen system in a preset time period in the future based on a pre-trained prediction model according to the target operation data, and specifically includes: inputting the target operation data into a pre-trained prediction model, and respectively predicting the pipe network pressure of a hydrogen pipe network in the hydrogen system according to the target operation data by sub-prediction models which are arranged in sequence from large to small according to the time length to obtain a plurality of initial pipe network pressures; determining the pipe network pressure of a hydrogen pipe network in the hydrogen system in a future preset time period according to the initial pipe network pressures; the prediction model comprises a plurality of sub-prediction models with different time lengths, and the preset time length is reserved between each two sub-prediction models.
CN202311370113.6A 2023-10-23 2023-10-23 Pressure prediction method and device Active CN117113886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311370113.6A CN117113886B (en) 2023-10-23 2023-10-23 Pressure prediction method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311370113.6A CN117113886B (en) 2023-10-23 2023-10-23 Pressure prediction method and device

Publications (2)

Publication Number Publication Date
CN117113886A CN117113886A (en) 2023-11-24
CN117113886B true CN117113886B (en) 2024-02-06

Family

ID=88811363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311370113.6A Active CN117113886B (en) 2023-10-23 2023-10-23 Pressure prediction method and device

Country Status (1)

Country Link
CN (1) CN117113886B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484285A (en) * 2022-04-01 2022-05-13 正和集团股份有限公司 Pressure adjusting method for hydrogen pipe network of oil refinery
CN114881207A (en) * 2022-04-26 2022-08-09 北京和隆优化科技股份有限公司 Steam pressure prediction method and device based on LSTM deep circulation neural network
CN116882290A (en) * 2023-07-14 2023-10-13 武汉理工大学 Pipe network pressure prediction method and system based on space-time diagram convolutional neural network

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111353656B (en) * 2020-03-23 2021-05-07 大连理工大学 Steel enterprise oxygen load prediction method based on production plan

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484285A (en) * 2022-04-01 2022-05-13 正和集团股份有限公司 Pressure adjusting method for hydrogen pipe network of oil refinery
CN114881207A (en) * 2022-04-26 2022-08-09 北京和隆优化科技股份有限公司 Steam pressure prediction method and device based on LSTM deep circulation neural network
CN116882290A (en) * 2023-07-14 2023-10-13 武汉理工大学 Pipe network pressure prediction method and system based on space-time diagram convolutional neural network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于ARIMA-NN组合模型的钢铁企业氧气管网压力预测研究;张子阳;孙彦广;;冶金自动化(06);18-21 *

Also Published As

Publication number Publication date
CN117113886A (en) 2023-11-24

Similar Documents

Publication Publication Date Title
JP7461440B2 (en) COMPUTER SYSTEM AND METHOD FOR PERFORMING ROOT CAUSE ANALYSIS AND BUILDING PREDICTION MODELS FOR THE OCCURRENCE OF RARE EVENTS IN PLANT-WIDE OPERATIONS - Patent application
Yan et al. Multiple sensor data fusion for degradation modeling and prognostics under multiple operational conditions
Liu et al. Prediction of remaining useful life of multi-stage aero-engine based on clustering and LSTM fusion
US20200097921A1 (en) Equipment repair management and execution
CN109840362B (en) Multi-objective optimization-based integrated just-in-time learning industrial process soft measurement modeling method
CN106249709B (en) Dynamic process quality control figure repairs co-design optimal control method with age is determined
CN108390380B (en) Method and system for predicting state parameter trend of transformer
CN113741362B (en) Liquefied natural gas receiving station operation optimization method, system, medium and computing equipment
CN112069685A (en) Interpretability-considered complex electromechanical system health assessment method and system
CN114219129A (en) Task and MTBF-based weapon system accompanying spare part demand prediction and evaluation system
CN116091118A (en) Electricity price prediction method, device, equipment, medium and product
CN117029968A (en) Traffic data diagnosis method, system, storage medium and electronic equipment
CN115238573A (en) Hydroelectric generating set performance degradation trend prediction method and system considering working condition parameters
CN117113886B (en) Pressure prediction method and device
CN109829115B (en) Search engine keyword optimization method
Grenyer et al. Multistep prediction of dynamic uncertainty under limited data
CN109376957A (en) A kind of prediction technique of thermal power plant's load
CN113779893B (en) Reliability evaluation method for guaranteed simulation output result based on echo state network
WO2022222230A1 (en) Indicator prediction method and apparatus based on machine learning, and device and storage medium
CN114048925A (en) Power grid comprehensive operation early warning method and device and terminal equipment
CN117108924B (en) Intelligent hydrogen management system and method
CN117113858B (en) Early warning method and device for hydrogen system
Chou et al. Economic design of variable sampling intervals charts with B&L switching rule
CN113077105B (en) Long-false-day load prediction method and device
CN118246705B (en) Energy demand prediction method, system, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant