CN117094542A - Enterprise service management system and method for intelligent park - Google Patents
Enterprise service management system and method for intelligent park Download PDFInfo
- Publication number
- CN117094542A CN117094542A CN202211544378.9A CN202211544378A CN117094542A CN 117094542 A CN117094542 A CN 117094542A CN 202211544378 A CN202211544378 A CN 202211544378A CN 117094542 A CN117094542 A CN 117094542A
- Authority
- CN
- China
- Prior art keywords
- enterprise
- project
- information
- service
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000011161 development Methods 0.000 claims abstract description 23
- 238000007781 pre-processing Methods 0.000 claims abstract description 14
- 230000010365 information processing Effects 0.000 claims abstract description 5
- 238000007726 management method Methods 0.000 claims description 69
- 238000004364 calculation method Methods 0.000 claims description 20
- 238000012545 processing Methods 0.000 claims description 10
- 238000012797 qualification Methods 0.000 claims description 9
- 238000012550 audit Methods 0.000 claims description 4
- 230000005484 gravity Effects 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000012546 transfer Methods 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 abstract description 8
- 230000010354 integration Effects 0.000 abstract description 3
- 230000018109 developmental process Effects 0.000 description 18
- 230000002349 favourable effect Effects 0.000 description 2
- 230000012447 hatching Effects 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
- G06Q10/1057—Benefits or employee welfare, e.g. insurance, holiday or retirement packages
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of service management, and particularly discloses an enterprise service management system and method for an intelligent park, wherein the enterprise service management system comprises an enterprise information management subsystem and an enterprise project service management subsystem, the enterprise information management subsystem comprises an enterprise information acquisition module, an enterprise information preprocessing module, an enterprise information processing module and an enterprise information presentation module, and the enterprise project management subsystem comprises an enterprise project information acquisition module, an enterprise project auditing module, an enterprise project service module and an enterprise project feedback module; the invention is beneficial to implementing real-time supervision on project execution of enterprises and providing project cooperation service by arranging the enterprise project service module, is beneficial to solving the problems of the enterprise projects in time, searching suitable cooperators in time, realizing the integration of the park enterprises, being beneficial to increasing the efficiency and development speed of the enterprise projects and improving the park service management level.
Description
Technical Field
The invention relates to the technical field of service management, in particular to an enterprise service management system and method for an intelligent park.
Background
An intelligent park refers to a standard building or building group which is generally planned and built by government (civil enterprises and government cooperations), has complete water supply, power supply, air supply, communication, road, storage and other supporting facilities, is reasonably distributed and can meet the requirements of production and scientific experiments in a specific industry, and comprises an industrial park, a logistics park, an urban industrial park, a scientific park, a creative park and the like. The park operation business relates to the integration of various resources including business states, brands, merchants, leasing units, agreements and the like, and the linkage of a plurality of professional lines including systematic engineering of business, operation, finance, property, engineering and the like.
In order to improve the residence rate and the service quality of enterprises in the present park, the existing park management system generally reduces the residence threshold and the management force so that the enterprises have wider growth space, meanwhile, a certain degree of preferential strength is added to the project service of the enterprises in the park, so that the enterprises can be more effectively and humanizedly served in the hatching process, lowering the threshold inevitably results in a lower overall level of specialization for small micro-businesses and in-garden hatching new businesses, so that enterprises encounter a plurality of dilemmas in the process of independently developing and carrying out projects, and the management system of the park can integrate resources in the park to provide professional cooperators of the projects, which is certainly more beneficial to the development of enterprises and management systems in the park, secondly, the existing park management system usually only uses the information of the enterprise as registration records, and does not relate to professional skills of the enterprise and completion data of the enterprise project, the method ensures that the follow-up collaborators in the park cannot timely and effectively check each capability of the enterprise when searching for the proper enterprise to finish the project, cannot timely judge whether the processing capability of the collaborating enterprise on the project meets the standard, meanwhile, the in-garden enterprises have lower knowledge degree for the partners, are unfavorable for sharing information, are easy to generate information barriers, are unfavorable for fair competition and public publicization of cooperative information, in addition, the existing service management system does not show the service matters of enterprises, so that both parties cannot be fed back in time in the whole flow, the service efficiency and the service quality are affected, the distrust of both parties is easy to generate, and the service level of the park can not be effectively improved, and the method has no advantage for common progress of enterprises and park management systems in the park.
Disclosure of Invention
In order to overcome the above-mentioned drawbacks of the prior art, the present invention provides an enterprise service management system and method for an intelligent park, which solve the above-mentioned problems in the prior art.
The invention provides the following technical scheme: the enterprise service management system comprises an enterprise information management subsystem and an enterprise project service management subsystem, wherein the enterprise information management subsystem comprises an enterprise information acquisition module, an enterprise information preprocessing module, an enterprise information processing module and an enterprise information display module, and the enterprise project management subsystem comprises an enterprise project information acquisition module, an enterprise project auditing module, an enterprise project service module and an enterprise project feedback module;
further, the specific operation steps of the enterprise information management subsystem are as follows:
s1: and carrying out statistics evaluation on the internal information of the enterprise, including staff number, average wage level and total enterprise assets, and simultaneously carrying out statistics on project information executed by the enterprise and project fund flow executing conditions of the enterprise.
S2: information preprocessing is carried out on the existing fund situation and the historical fund flowing situation of the enterprise, enterprise volume values are calculated, and the calculation formula is as follows:
wherein C is the enterprise volume value,
s is enterprise registration time;
m is the existing total assets of the enterprise;
average declaring funds for the enterprise project;
n is the number of persons in charge of the company;
R min lowest salary of historical project participators;
the calculated enterprise volume value is compared to a specific value.
S3: the enterprise project development growth coefficient in the preprocessing range is calculated, and the calculation formula is specifically as follows:
wherein Q is an enterprise project development coefficient;
p is the enterprise species specific gravity;
k historical complete item number;
t is project use cost;
v is project use time;
M i declaring funds for the project;
N i balance funds for the project;
the enterprise is classified by comparing the enterprise project development coefficients to reference values.
S4: and the calculation result is disclosed to the enterprise and the partner.
Further, the specific operation steps of the enterprise project service management subsystem are as follows:
s1: qualification auditing is carried out on the project applicant.
S2: and carrying out specialized classification on service requirements generated in the enterprise project process and submitting applications to a management system.
S3: reasonable recommendation of fit-to-partnership enterprise lists for enterprise volume values and enterprise development coefficients
S4: information updating is performed on enterprises completing the project, and feedback is performed on project service contents.
Further, the qualification audit of the project applicant comprises existing funds, historical work project completion, historical project fund level, historical cooperation enterprise qualification and enterprise project personnel.
Further, the enterprise information acquisition module comprises an enterprise network information acquisition and enterprise information filling and reporting mode, the enterprise network information acquisition refers to that the system checks the enterprise through network searching and sorts and records information, the enterprise information filling and reporting refers to that the enterprise fills and reports the internal information of the enterprise by itself, and the information acquired by the enterprise information acquisition and the enterprise information reporting mode are simply compared by the system and judged by management staff.
Further, the enterprise information preprocessing module includes enterprise volume value calculation compared to a range of reference values, the range of reference values being 5 to 10.
Furthermore, the enterprise project service management subsystem establishes a central management module in a management center, and a manual service window is arranged in the management center, the system terminal comprises a pc platform and a mobile display platform, and the system terminal is used by an enterprise through a network key.
Furthermore, the enterprise information management subsystem and the enterprise project service management subsystem are two sets of processing systems with independent operation of calculation content, and the internal enterprise information of the two sets of processing systems is synchronously updated but the calculation processing modules are independently operated.
Further, the enterprise makes service requests to the service management system through the system terminal, the system classifies the application types made by the enterprise after the enterprise identity is checked, for large-scale cooperation service demands, the system provides service enterprises or personal options for the enterprise to select through calculation, and for small-scale business handling systems of the enterprise, the enterprise can automatically transfer to the display terminal of management personnel, and the management personnel performs registration handling.
The invention has the technical effects and advantages that:
1. the enterprise information preprocessing module is arranged, so that the enterprise volume value is favorable for calculation, when the enterprise volume value is smaller than 5, the enterprise profit space is very large, a certain hidden danger of illegal income exists, when the enterprise volume value is larger than 10, the possibility of excessive stripping of workers exists in an enterprise, the comparison of the enterprise volume value and the reference value is favorable for preliminary judgment and screening of the self operation condition of the enterprise, the huge workload of manual screening is reduced, and the management system has approximate understanding on the cooperation service level of the enterprise.
2. The invention is beneficial to calculating the development and growth coefficient of enterprises by arranging the enterprise information processing module, and obtains the data of the actual situation of the enterprises under the situation and the future development possibility by comparing the coefficient with the reference value, the policy tendency of the park to the high-quality enterprises can be adjusted in real time by the data of the item, and meanwhile, the invention has a certain guiding significance on the working center of the park, the optimal high-quality option of the enterprises for selecting proper cooperators is increased, and the information completeness of the enterprises is increased.
3. The invention is beneficial to implementing real-time supervision on project execution of enterprises and providing project cooperation service by arranging the enterprise project service module, is beneficial to solving the problems of the enterprise projects in time, searching suitable cooperators in time, realizing the integration of the park enterprises, being beneficial to increasing the efficiency and development speed of the enterprise projects and improving the park service management level.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present invention.
FIG. 2 is a flow chart of an enterprise information management subsystem of the present invention.
FIG. 3 is a flow chart of an enterprise project service management subsystem of the present invention.
Detailed Description
The embodiments of the present invention will be described more fully hereinafter with reference to the accompanying drawings, in which the configurations of the embodiments are shown by way of illustration only, and the system and method for managing enterprise services in a smart campus according to the present invention are not limited to the configurations shown in the embodiments, but all other embodiments obtained by one skilled in the art without making any creative effort are within the scope of the present invention.
1-3, the invention provides an enterprise service management system and method for an intelligent park, comprising an enterprise information management subsystem and an enterprise project service management subsystem, wherein the enterprise information management subsystem comprises an enterprise information acquisition module, an enterprise information preprocessing module, an enterprise information processing module and an enterprise information presentation module, and the enterprise project management subsystem comprises an enterprise project information acquisition module, an enterprise project auditing module, an enterprise project service module and an enterprise project feedback module;
in a preferred embodiment, the enterprise information management subsystem specifically comprises the following operation steps:
s1: and carrying out statistics evaluation on the internal information of the enterprise, including staff number, average wage level and total enterprise assets, and simultaneously carrying out statistics on project information executed by the enterprise and project fund flow executing conditions of the enterprise.
S2: information preprocessing is carried out on the existing fund situation and the historical fund flowing situation of the enterprise, enterprise volume values are calculated, and the calculation formula is as follows:
wherein C is the enterprise volume value,
s is enterprise registration time;
m is the existing total assets of the enterprise;
average declaring funds for the enterprise project;
n is the number of persons in charge of the company;
R min lowest salary of historical project participators;
the calculated enterprise volume value is compared to a specific value.
S3: the enterprise project development growth coefficient in the preprocessing range is calculated, and the calculation formula is specifically as follows:
wherein Q is an enterprise project development coefficient;
p is the enterprise species specific gravity;
k historical complete item number;
t is project use cost;
v is project use time;
M i declaring funds for the project;
N i balance funds for the project;
the enterprise is classified by comparing the enterprise project development coefficients to reference values.
If Q <3 is calculated, the enterprise has no development potential in the industry, the project declaration and fund application can be ignored, the correction notification is issued at the same time, and the cooperation relationship is considered to be released when the enterprise is in the range for a long time;
if 3< Q <5 is calculated, the development potential of the enterprise is lower, the project service recommendation and the fund application are not considered, and the enterprise service is not prone;
if 3< Q <20 is calculated, the enterprise has medium development potential and cooperative cultivation value, a certain tendency is increased in the aspect of enterprise service, and the specific gravity can be increased to a certain extent in an allowable range when a project is declared;
if Q is calculated to be more than 20, the enterprise development potential is larger, the enterprise development potential has higher priority in the aspects of fund application and project application, meanwhile, project service and management service are supported greatly, recommendation strength is increased, supervision strength is increased in the project execution period under the condition that progress is not affected, and stable and high-speed development of the enterprise is ensured.
S4: and the calculation result is disclosed to the enterprise and the partner.
In a preferred embodiment, the enterprise project service management subsystem specifically operates as follows:
s1: qualification auditing is carried out on the project applicant.
S2: and carrying out specialized classification on service requirements generated in the enterprise project process and submitting applications to a management system.
S3: reasonable recommendation of fit-to-partnership enterprise lists for enterprise volume values and enterprise development coefficients
S4: information updating is performed on enterprises completing the project, and feedback is performed on project service contents.
In a preferred embodiment, the qualification of the project applicant includes existing funds, historical work project completion, historical project fund level, historical collaborative enterprise qualification, enterprise project personnel.
In a preferred embodiment, the enterprise information collection module includes a mode of combining enterprise network information collection and enterprise information filling, where the enterprise network information collection refers to that the system checks the enterprise through network searching and sorts and records information, the enterprise information filling refers to that the enterprise fills the internal information of the enterprise by itself, and the information collected by the enterprise are simply compared by the system and judged by a manager.
In a preferred embodiment, the enterprise information preprocessing module includes comparing enterprise volume value calculation with a reference value range, wherein the reference value range is 5 to 10, when the enterprise volume value is smaller than 5, the enterprise profit space is very large, a certain hidden danger of illegal income exists, further staff is required to conduct strict project fund flow audit, when the enterprise volume value is larger than 10, the possibility of excessive staff stripping exists in the enterprise, and the staff is required to conduct detailed audit flow.
In a preferred embodiment, the enterprise project service management subsystem sets up a central management module in a management center, and sets up a manual service window in the management center, and the system terminal comprises a pc platform and a mobile display platform, and is accessed by an enterprise through a network key.
In a preferred embodiment, the enterprise information management subsystem and the enterprise project service management subsystem are two sets of processing systems with independent computing contents, and the two sets of processing systems have synchronous updating of enterprise information and independent operation of computing processing modules.
In a preferred embodiment, an enterprise makes a service request to a service management system through a system terminal, the system classifies the proposed application types after the enterprise identity is checked, for large-scale cooperation service requirements, the system provides service enterprises or personal options for the enterprise to select through calculation, and for small-scale business handling systems of the enterprise, the system automatically shifts to a display terminal of a manager, and the manager performs registration handling.
Claims (9)
1. An enterprise service management system of wisdom garden, includes enterprise information management subsystem, still includes enterprise project service management subsystem, its characterized in that: the enterprise information management subsystem comprises an enterprise information acquisition module, an enterprise information preprocessing module, an enterprise information processing module and an enterprise information presentation module, and the enterprise project management subsystem comprises an enterprise project information acquisition module, an enterprise project auditing module, an enterprise project service module and an enterprise project feedback module.
2. The intelligent campus enterprise service management system of claim 1, wherein: the enterprise information management subsystem comprises the following specific operation steps:
s1: and carrying out statistics evaluation on the internal information of the enterprise, including staff number, average wage level and total enterprise assets, and simultaneously carrying out statistics on project information executed by the enterprise and project fund flow executing conditions of the enterprise.
S2: information preprocessing is carried out on the existing fund situation and the historical fund flowing situation of the enterprise, enterprise volume values are calculated, and the calculation formula is as follows:
wherein C is the enterprise volume value,
s is enterprise registration time;
m is the existing total assets of the enterprise;
average declaring funds for the enterprise project;
n is the number of persons in charge of the company;
R min lowest salary of historical project participators;
the calculated enterprise volume value is compared to a specific value.
S3: the enterprise project development growth coefficient in the preprocessing range is calculated, and the calculation formula is specifically as follows:
wherein Q is an enterprise project development coefficient;
p is the enterprise species specific gravity;
k historical complete item number;
t is project use cost;
v is project use time;
M i declaring funds for the project;
N i balance funds for the project;
the enterprise is classified by comparing the enterprise project development coefficients to reference values.
S4: and the calculation result is disclosed to the enterprise and the partner.
3. The intelligent campus enterprise service management system of claim 1, wherein: the enterprise project service management subsystem comprises the following specific operation steps:
s1: qualification auditing is carried out on the project applicant.
S2: and carrying out specialized classification on service requirements generated in the enterprise project process and submitting applications to a management system.
S3: reasonable recommendation of fit-to-partnership enterprise lists for enterprise volume values and enterprise development coefficients
S4: information updating is performed on enterprises completing the project, and feedback is performed on project service contents.
4. The intelligent campus enterprise service management system of claim 1, wherein: the qualification audit of the project applicant comprises existing funds, historical work project completion, historical project fund level, historical cooperation enterprise qualification and enterprise project personnel.
5. The intelligent campus enterprise service management system of claim 1, wherein: the enterprise information acquisition module comprises an enterprise network information acquisition and enterprise information filling and reporting mode, the enterprise network information acquisition means that the system checks the enterprise through network searching and sorts and records information, the enterprise information filling and reporting means that the enterprise fills and reports the internal information of the enterprise by itself, and the information acquired by the enterprise information acquisition and the enterprise information reporting are simply compared by the system and judged by management personnel.
6. An intelligent park enterprise service management system according to claim 2 wherein: the enterprise information preprocessing module includes enterprise volume value calculation compared to a range of reference values, the range of reference values being 5 to 10.
7. The intelligent campus enterprise service management system of claim 1, wherein: the enterprise project service management subsystem is characterized in that a central management module is arranged in a management center, a manual service window is arranged in the management center, a system terminal comprises a pc platform and a mobile display platform, and the system terminal is used by an enterprise through a network key.
8. The intelligent campus enterprise service management system of claim 1, wherein: the enterprise information management subsystem and the enterprise project service management subsystem are two sets of processing systems with independent operation of calculation content, and enterprise information in the two sets of processing systems is synchronously updated but the calculation processing modules are independently operated.
9. The method for enterprise service management for intelligent parks as claimed in claim 1, wherein: the enterprise makes service requests to the service management system through the system terminal, the system classifies the application types made by the enterprise after the enterprise identity is checked, for large-scale cooperation service demands, the system provides service enterprises or personal options for the enterprise to select through calculation, and for small-scale business handling systems of the enterprise, the system can automatically transfer to the display terminal of management personnel, and the management personnel performs registration handling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211544378.9A CN117094542A (en) | 2022-12-04 | 2022-12-04 | Enterprise service management system and method for intelligent park |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211544378.9A CN117094542A (en) | 2022-12-04 | 2022-12-04 | Enterprise service management system and method for intelligent park |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117094542A true CN117094542A (en) | 2023-11-21 |
Family
ID=88768672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211544378.9A Pending CN117094542A (en) | 2022-12-04 | 2022-12-04 | Enterprise service management system and method for intelligent park |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117094542A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117575370A (en) * | 2024-01-16 | 2024-02-20 | 浙江省发展规划研究院 | Project recommendation method and device based on park material flow |
-
2022
- 2022-12-04 CN CN202211544378.9A patent/CN117094542A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117575370A (en) * | 2024-01-16 | 2024-02-20 | 浙江省发展规划研究院 | Project recommendation method and device based on park material flow |
CN117575370B (en) * | 2024-01-16 | 2024-04-12 | 浙江省发展规划研究院 | Project recommendation method and device based on park material flow |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106339829A (en) | Big data, Cloud, IoT and mobile internet technologies based active maintenance panorama monitoring system of power distribution network | |
CN117094542A (en) | Enterprise service management system and method for intelligent park | |
CN114140090A (en) | Engineering project full-process tracking and monitoring system | |
Dinc et al. | Regional universal telecommunication service provisions in the US: efficiency versus penetration | |
Ou et al. | Research and analysis on cloud accounting of enterprises under the background of new economy | |
Yang | FinTech in promoting the development of green finance in China against the background of big data and artificial intelligence | |
CN113947337A (en) | Method for cooperatively sharing engineering construction resources | |
Qin et al. | Cloud platform for enterprise financial budget management based on artificial intelligence | |
Yu et al. | Optimization of E-commerce logistics distribution path algorithm under the background of big data | |
Chen et al. | Application of big data technology in cost management and control in construction project | |
Tasmilah et al. | The Impact of Digital Technology In The Entrepreneur Transition During The Covid-19 Pandemic | |
CN116739208A (en) | Unified management system for power supply service | |
CN114707810A (en) | Case optimal allocation strategy and system based on dynamic planning algorithm | |
CN112561350A (en) | Marketization establishing method for power marketing system data | |
Tian et al. | Research on Supply Chain Shortage of Electronic Technology Companies under the Pandemic Situation: A Case Study of Apple Inc. and Xiaomi Inc. | |
Hu et al. | Analysis of artificial intelligence industry based on grey correlation‐‐a case study of Tianjin | |
Weiguo et al. | Research on the application of smart logistics system based on big data: Taking jingdong logistics as an example | |
Price | Challenges, opportunities, and approaches for integrating demand response in markets | |
Chen et al. | Research on Transformation, Integration, Innovation and Development of International Freight Forwarding Logistics Enterprises | |
Ya et al. | Survey and Research on the Influencing Factors for the Development of Rural Digital Logistics under the Background of the Internet-Based on Observation of H County, Yunnan Province | |
Zeng et al. | Research on Urban Development under the Background of Online Red Economy | |
Liu | Research on enterprise supply chain management from the perspective of information sharing | |
Wang et al. | Research on Information Cooperative Operation of Smart Logistics Park | |
CN112084175B (en) | Novel intellectual property transaction system and index evaluation system based on blockchain and big data technology | |
Zheng et al. | Research on the realization path of intelligent logistics in the “new retail” era |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |