CN117000339A - Waste treatment device for construction of energy storage power station - Google Patents

Waste treatment device for construction of energy storage power station Download PDF

Info

Publication number
CN117000339A
CN117000339A CN202311125170.8A CN202311125170A CN117000339A CN 117000339 A CN117000339 A CN 117000339A CN 202311125170 A CN202311125170 A CN 202311125170A CN 117000339 A CN117000339 A CN 117000339A
Authority
CN
China
Prior art keywords
chamber
unit
crushing
conveying
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311125170.8A
Other languages
Chinese (zh)
Inventor
吴刚
孟继慧
程剑林
汪伟铤
彭泽豹
石天磊
张金宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ninghai Pumped Storage Co ltd
State Grid Xinyuan Group Co ltd
Original Assignee
Zhejiang Ninghai Pumped Storage Co ltd
State Grid Xinyuan Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ninghai Pumped Storage Co ltd, State Grid Xinyuan Group Co ltd filed Critical Zhejiang Ninghai Pumped Storage Co ltd
Priority to CN202311125170.8A priority Critical patent/CN117000339A/en
Publication of CN117000339A publication Critical patent/CN117000339A/en
Pending legal-status Critical Current

Links

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The invention discloses a waste treatment device for construction of an energy storage power station, which comprises a seat body, an L-shaped box body and a supporting unit; the L-shaped box body is provided with a feeding hopper at the top and a discharging hopper below the right end part; the L-shaped box body is internally provided with a primary treatment chamber, a secondary treatment chamber and a conveying chamber from top to bottom in sequence; the crushing unit is arranged in the primary treatment chamber, the fine grinding unit is arranged in the secondary treatment chamber, and the conveying unit is arranged at the bottom of the conveying chamber; a magnetic unit is arranged below the secondary treatment chamber and above the conveying unit; a recovery chamber corresponding to the magnetic unit is arranged above the right end of the conveying chamber. According to the invention, the L-shaped box body is arranged, the inside of the L-shaped box body is divided into the first-stage treatment chamber, the second-stage treatment chamber and the conveying chamber, the crushing unit and the fine grinding unit are respectively and correspondingly arranged, the first-stage crushing and the second-stage crushing treatment are carried out on the waste, and the waste can be fully crushed into fine particles; through setting up the magnetism and inhale the unit, the metal resource in the waste material adsorbs the recovery. The invention has the advantages of thoroughly treating waste and recycling metal resources.

Description

Waste treatment device for construction of energy storage power station
Technical Field
The invention relates to the technical field of construction, in particular to a waste treatment device for construction of an energy storage power station.
Background
Various building wastes are generated in the building construction process of the energy storage power station, and the garbage dumping can be carried out on the building wastes generated by construction after corresponding treatment along with the improvement of consciousness such as environmental protection, resource saving and the like; the common building waste materials have different sizes, the related materials, the related shapes and the like are various, and the manual mode is adopted to clean the building waste materials, so that the time and the labor are consumed, the treatment efficiency is limited, and the building waste materials cannot be rapidly and effectively treated.
Therefore, waste is generally treated by a waste treatment device such as a crusher. However, when the existing waste treatment device is used for treating the waste, most of the existing waste treatment device adopts a crushing roller or an extrusion device to directly discharge the waste after one-time treatment, and the construction waste with larger volume cannot be crushed thoroughly after only one-time treatment, so that waste which cannot be directly recycled or discarded still exists in the actually discharged treatment material, and the treatment effect of the waste cannot be ensured at all;
moreover, the existing waste treatment device only has the function of breaking waste and does not have the function of recycling resources, but the construction waste actually contains a large amount of recyclable metal resources, and the metal resources are directly discarded without recycling, so that great resource waste is probably caused.
Therefore, the existing waste treatment device has the problems that the waste treatment is not thorough and the metal resources cannot be recovered.
Disclosure of Invention
The invention aims to provide a waste treatment device for construction of an energy storage power station. The invention has the advantages of thoroughly treating waste and recycling metal resources.
The technical scheme of the invention is as follows: the waste treatment device for construction of the energy storage power station comprises a base body, an L-shaped box body arranged on the base body and a supporting unit arranged below the base body; the top of the L-shaped box body is provided with a feeding hopper, and a discharging hopper is arranged below the right end part; the L-shaped box body is internally provided with a primary treatment chamber, a secondary treatment chamber and a conveying chamber from top to bottom in sequence; the crushing unit is arranged in the primary treatment chamber, the fine grinding unit which is vertically staggered with the crushing unit is arranged in the secondary treatment chamber, and the conveying unit which is horizontally arranged is arranged at the bottom of the conveying chamber; a magnetic unit positioned above the conveying unit is arranged below the secondary treatment chamber; and a recovery chamber corresponding to the magnetic unit is arranged above the right end of the conveying chamber.
In the waste treatment device for construction of the energy storage power station, the crushing unit comprises an elliptical crushing chamber, a pair of crushing rollers correspondingly distributed in the crushing chamber and an auxiliary roller arranged between the crushing rollers and the inner wall of the crushing chamber; and a blanking port is formed below the middle part of the crushing chamber, and corresponds to the fine grinding unit.
In the waste treatment device for construction of the energy storage power station, the fine grinding unit comprises grinding rollers which are distributed correspondingly, and grinding convex parts are distributed on each grinding roller.
In the waste treatment device for construction of the energy storage power station, the magnetic attraction unit comprises a transmission screw rod horizontally arranged above the conveying chamber, a driving motor arranged outside the L-shaped box body and used for driving the transmission screw rod to rotate, and a magnetic attraction structure movably arranged below the transmission screw rod; the magnetic attraction structure comprises a movable seat sleeved on the transmission screw rod, a connecting seat arranged at the bottom of the movable seat, a plurality of sections of telescopic rods arranged at the bottom of the connecting seat, a mounting seat arranged at the bottom of the plurality of sections of telescopic rods and an electromagnetic adsorption block arranged at the bottom of the mounting seat; and an electromagnetic coil is arranged in the electromagnetic adsorption block.
In the waste treatment device for construction of the energy storage power station, the recovery chamber comprises a recovery frame which is slidably arranged and a limit seat for installing the recovery frame; the right side of the L-shaped box body is provided with a recovery box door corresponding to the recovery box.
In the waste treatment device for construction of the energy storage power station, the supporting unit comprises three pairs of hydraulic supporting legs which are uniformly distributed and horizontal connecting rods which are connected with the corresponding hydraulic supporting legs; the hydraulic support leg comprises a pump body, a hydraulic rod and a table-type foot arranged at the bottom of the hydraulic rod.
In the waste treatment device for construction of the energy storage power station, an openable cover plate is arranged above the feeding hopper.
Compared with the prior art, the invention has the advantages that the L-shaped box body is arranged, the inside of the L-shaped box body is divided into the first-stage treatment chamber, the second-stage treatment chamber and the conveying chamber, the crushing unit, the fine grinding unit and the magnetic attraction unit are respectively and correspondingly arranged, the crushing unit is used for carrying out first-stage crushing on the waste, and the fine grinding unit is used for carrying out second-stage crushing treatment on the crushed waste, so that the waste can be fully crushed into fine particles, and the subsequent treatment is facilitated; through setting up the magnetism and inhale the unit and supporting the setting and retrieve the room, utilize magnetism to inhale the unit and adsorb the recovery to the metal resource in the waste material after the breakage, ensure that the metal resource can not be wasted.
In summary, the invention has the advantages of thoroughly treating waste and recycling metal resources.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Description of the drawings: the device comprises a 1-L-shaped box body, a 11-primary treatment chamber, a 12-secondary treatment chamber, a 13-conveying chamber, a 14-discharge hopper, a 15-limit seat, a 16-discharge hopper, a 17-cover plate, a 21-crushing chamber, a 22-crushing roller, a 23-auxiliary roller, a 24-blanking port, a 3-grinding roller, a 31-grinding convex part, a 41-driving motor, a 42-transmission screw rod, a 43-magnetic structure, a 5-conveying unit, a 6-recovery frame, a 71-pump body, a 72-table-type foot and a 73-horizontal connecting rod.
Detailed Description
The invention is further illustrated by the following figures and examples, which are not intended to be limiting.
Examples. The waste treatment device for construction of the energy storage power station comprises a base body, an L-shaped box body 1 arranged on the base body and a supporting unit arranged below the base body as shown in fig. 1; the top of the L-shaped box body 1 is provided with a feeding hopper 16, and a discharging hopper 14 is arranged below the right end part; a primary treatment chamber 11, a secondary treatment chamber 12 and a conveying chamber 13 are sequentially arranged in the L-shaped box body 1 from top to bottom; the primary treatment chamber 11 is internally provided with a crushing unit, the secondary treatment chamber 12 is internally provided with fine grinding units which are vertically staggered with the crushing unit, and the bottom of the conveying chamber 13 is provided with a conveying unit 5 which is horizontally arranged; a magnetic attraction unit positioned above the conveying unit 5 is arranged below the secondary treatment chamber 12; a recovery chamber corresponding to the magnetic unit is arranged above the right end of the conveying chamber 13.
The crushing unit comprises a crushing chamber 21 with an elliptical shape, a pair of crushing rollers 22 correspondingly distributed in the crushing chamber 21, and an auxiliary roller 23 arranged between the crushing rollers 22 and the inner wall of the crushing chamber 21; a blanking port 24 is formed below the middle part of the crushing chamber 21, and the blanking port 24 corresponds to the fine grinding unit.
The fine grinding unit comprises a pair of grinding rollers 3 which are distributed in a corresponding manner, and each grinding roller 3 is distributed with a grinding convex part 31.
The magnetic attraction unit comprises a transmission screw rod 42 horizontally arranged above the conveying chamber 13, a driving motor 41 arranged outside the L-shaped box body 1 and used for driving the transmission screw rod 42 to rotate, and a magnetic attraction structure 43 movably arranged below the transmission screw rod 42; the magnetic attraction structure 43 comprises a movable seat sleeved on the transmission screw rod 42, a connecting seat arranged at the bottom of the movable seat, a plurality of sections of telescopic rods arranged at the bottom of the connecting seat, a mounting seat arranged at the bottom of the plurality of sections of telescopic rods and an electromagnetic adsorption block arranged at the bottom of the mounting seat; and an electromagnetic coil is arranged in the electromagnetic adsorption block.
The recovery chamber comprises a recovery frame 6 which is slidably arranged and a limit seat 15 for installing the recovery frame 6; the right side of the L-shaped box body 1 is provided with a recovery box door corresponding to the recovery box 6.
The supporting unit comprises three pairs of hydraulic supporting legs which are uniformly distributed and a horizontal connecting rod 73 which is connected with the corresponding hydraulic supporting legs; the hydraulic support leg comprises a pump body 71, a hydraulic rod and a table-type foot 72 arranged at the bottom of the hydraulic rod.
An openable cover plate 17 is arranged above the feeding hopper 16.
Working principle:
the construction waste is put into the L-shaped box body 1 through the feeding hopper 16, firstly crushed by the crushing roller 22 in the primary treatment chamber 11, and simultaneously crushed by the auxiliary roller 23 and the crushing roller 22, so that the unbroken waste is prevented from falling below;
the crushed waste falls into the secondary treatment chamber 12 and is finely ground by the grinding roller 3, and the waste is ground into particles with smaller volume by the grinding convex part 31;
the ground waste falls onto a conveying unit 5 for conveying 13, and the conveying unit 5 conveys the waste to a discharge hopper 14 on the right side;
in the process of transporting the waste, the driving motor 41 drives the transmission screw rod 42 to rotate, so that the magnetic attraction structure 43 is driven to transversely move left and right, the magnetic attraction structure 43 simultaneously utilizes the electromagnetic adsorption block to adsorb metal resources in the waste in the transverse moving process, and the adsorbed metal resources are sent into the recovery frame 6 for uniform recovery.

Claims (7)

1. Waste material processing apparatus is used in energy storage power station construction, its characterized in that: comprises a seat body, an L-shaped box body (1) arranged on the seat body and a supporting unit arranged under the seat body; the top of the L-shaped box body (1) is provided with a feeding hopper (16), and the lower part of the right end part is provided with a discharging hopper (14); a primary treatment chamber (11), a secondary treatment chamber (12) and a conveying chamber (13) are sequentially arranged in the L-shaped box body (1) from top to bottom; the primary treatment chamber (11) is internally provided with a crushing unit, the secondary treatment chamber (12) is internally provided with a fine grinding unit which is vertically staggered with the crushing unit, and the bottom of the conveying chamber (13) is provided with a conveying unit (5) which is horizontally arranged; a magnetic attraction unit positioned above the conveying unit (5) is arranged below the secondary treatment chamber (12); and a recovery chamber corresponding to the magnetic unit is arranged above the right end of the conveying chamber (13).
2. The energy storage power station construction waste disposal device according to claim 1, wherein: the crushing unit comprises an elliptical crushing chamber (21), a pair of crushing rollers (22) correspondingly distributed in the crushing chamber (21) and an auxiliary roller (23) arranged between the crushing rollers (22) and the inner wall of the crushing chamber (21); a blanking port (24) is formed below the middle part of the crushing chamber (21), and the blanking port (24) corresponds to the fine grinding unit.
3. The energy storage power station construction waste disposal device according to claim 1, wherein: the fine grinding unit comprises a pair of grinding rollers (3) which are distributed in a corresponding manner, and grinding convex parts (31) are distributed on each grinding roller (3).
4. The energy storage power station construction waste disposal device according to claim 1, wherein: the magnetic attraction unit comprises a transmission screw rod (42) horizontally arranged above the conveying chamber (13), a driving motor (41) arranged outside the L-shaped box body (1) for driving the transmission screw rod (42) to rotate, and a magnetic attraction structure (43) movably arranged below the transmission screw rod (42); the magnetic attraction structure (43) comprises a movable seat sleeved on the transmission screw rod (42), a connecting seat arranged at the bottom of the movable seat, a plurality of sections of telescopic rods arranged at the bottom of the connecting seat, a mounting seat arranged at the bottom of the plurality of sections of telescopic rods and an electromagnetic adsorption block arranged at the bottom of the mounting seat; and an electromagnetic coil is arranged in the electromagnetic adsorption block.
5. The energy storage power station construction waste disposal device according to claim 1, wherein: the recycling chamber comprises a recycling frame (6) which is arranged in a sliding manner and a limiting seat (15) for installing the recycling frame (6); the right side of the L-shaped box body (1) is provided with a recovery box door corresponding to the recovery frame (6).
6. The energy storage power station construction waste disposal device according to claim 1, wherein: the supporting unit comprises three pairs of hydraulic supporting legs which are uniformly distributed and a horizontal connecting rod (73) connected with the corresponding hydraulic supporting legs; the hydraulic support leg comprises a pump body (71), a hydraulic rod and a table-type foot (72) arranged at the bottom of the hydraulic rod.
7. The energy storage power station construction waste disposal device according to claim 1, wherein: an openable cover plate (17) is arranged above the feeding hopper (16).
CN202311125170.8A 2023-09-01 2023-09-01 Waste treatment device for construction of energy storage power station Pending CN117000339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311125170.8A CN117000339A (en) 2023-09-01 2023-09-01 Waste treatment device for construction of energy storage power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311125170.8A CN117000339A (en) 2023-09-01 2023-09-01 Waste treatment device for construction of energy storage power station

Publications (1)

Publication Number Publication Date
CN117000339A true CN117000339A (en) 2023-11-07

Family

ID=88574464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311125170.8A Pending CN117000339A (en) 2023-09-01 2023-09-01 Waste treatment device for construction of energy storage power station

Country Status (1)

Country Link
CN (1) CN117000339A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117839842A (en) * 2024-03-05 2024-04-09 山东建筑大学 Industrial solid waste recycling treatment device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117839842A (en) * 2024-03-05 2024-04-09 山东建筑大学 Industrial solid waste recycling treatment device and method
CN117839842B (en) * 2024-03-05 2024-05-31 山东建筑大学 Industrial solid waste recycling treatment device and method

Similar Documents

Publication Publication Date Title
CN117000339A (en) Waste treatment device for construction of energy storage power station
CN212596048U (en) Reduce construction cost's construction waste recovery device
CN213528813U (en) Sorting and recycling device for construction waste
CN216705432U (en) Solid refuse handles with categorised reducing mechanism
CN210753162U (en) Building rubbish classification reducing mechanism
CN105149325A (en) Industrial plastic waste recycling method
CN211990215U (en) Industrial waste recycling equipment
CN109201169B (en) Energy-concerving and environment-protective civil engineering construction waste material processing apparatus
CN115709120A (en) Construction waste recycling and crushing device and crushing method thereof
CN105170611A (en) Crushing method for industrial plastic garbage
CN113368953A (en) Building rubbish sorting device and building rubbish disposal system
CN211099227U (en) Collection device convenient to resource major possession rubbish
CN209901927U (en) Screening plant of domestic waste discharge of being convenient for is selected separately
KR100425026B1 (en) System for life refuse treatment
CN213376883U (en) Construction waste recycling apparatus
CN213377104U (en) Building material reducing mechanism
CN212596185U (en) Soil crushing device
CN219682796U (en) Solid garbage quick crushing equipment
CN211443694U (en) Municipal administration refuse treatment device
CN205058369U (en) Industry plastic refuse's breaker
CN219518985U (en) Material impurity removing mechanism of cement vertical mill
CN219400511U (en) Dual-function three-dimensional device for crushing and dedusting reclaimed materials
CN219850075U (en) Titanium sponge crushing linkage device
CN211755702U (en) Construction waste recovery device
CN114986639B (en) Wood structure waste treatment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination