CN116816362A - Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel - Google Patents

Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel Download PDF

Info

Publication number
CN116816362A
CN116816362A CN202311107891.6A CN202311107891A CN116816362A CN 116816362 A CN116816362 A CN 116816362A CN 202311107891 A CN202311107891 A CN 202311107891A CN 116816362 A CN116816362 A CN 116816362A
Authority
CN
China
Prior art keywords
transverse channel
tunnel
intersection
positive
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311107891.6A
Other languages
Chinese (zh)
Other versions
CN116816362B (en
Inventor
谭忠盛
赵金鹏
张宝瑾
王凤喜
林克
周振梁
李宗林
范晓敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN202311107891.6A priority Critical patent/CN116816362B/en
Publication of CN116816362A publication Critical patent/CN116816362A/en
Application granted granted Critical
Publication of CN116816362B publication Critical patent/CN116816362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The application discloses a supporting and reinforcing method for an intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel, which comprises the following steps: when the transverse channel is constructed by picking the top, a pipe shed is constructed to reinforce the rock mass above the front of the transverse channel; the position of the arch waist, the side wall and the arch foot of the transverse channel within the range of 4m close to the side of the main tunnel is used as a locking foot pile; and (5) performing double-layer primary support. The application can greatly reduce the serious large deformation problem caused by the transverse channel excavation on the pilot tunnel, and ensure the safety of the tunnel structure under the condition of ultra-large buried soft rock.

Description

Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel
Technical Field
The application belongs to the technical field of tunnel construction, and particularly relates to a supporting and reinforcing method for an intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel.
Background
The ultra-large buried soft rock tunnel faces the problems of large ground stress, soft surrounding rock and the like, and compared with a common tunnel, the risk brought by constructing a transverse channel is higher, and even the tunnel collapses due to the arch forming effect of the tunnel, so that unexpected casualties and property loss are caused. Therefore, the application provides a supporting and reinforcing method for the intersection of the positive tunnel and the transverse channel of the ultra-large buried soft rock tunnel, which aims to reinforce the supporting measures of the intersection, reduce the influence of the transverse channel excavation on the arch forming effect damage of the positive tunnel as much as possible and ensure the safety of tunnel construction.
Along with the rapid development of tunnel construction in China, challenges in tunnel construction are more and more, one of the unavoidable problems is that the construction is performed in an oversized buried soft rock tunnel, and serious large deformation problems such as a Sichuan railway can be caused due to high ground stress and low uniaxial compressive strength of rock. In an oversized soft rock tunnel with a buried depth, a transverse channel is excavated to damage the arching effect of the positive hole, so that more serious large deformation occurs, and if the support measures are improper or the support rigidity is insufficient, the large deformation of the transverse channel and the positive hole is difficult to control. Under the background, a supporting and reinforcing method for the intersection of the positive tunnel and the transverse channel of the ultra-large buried soft rock tunnel is provided.
Disclosure of Invention
The present application has been made to solve the above-mentioned problems occurring in the prior art. Therefore, a supporting and reinforcing method for the intersection of the positive hole and the transverse channel of the ultra-large buried soft rock tunnel is needed, and in the tunnel with high ground stress and soft lithology, supporting measures and rigidity for reinforcing the intersection of the positive hole and the transverse channel are considered. The method can greatly reduce the serious large deformation problem caused by the transverse channel excavation on the pilot tunnel, and ensure the safety of the tunnel structure under the condition of ultra-large buried soft rock.
The application provides a supporting and reinforcing method for an intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel, which comprises the following steps:
when the transverse channel is constructed by picking the top, a pipe shed is constructed to reinforce the rock mass above the front of the transverse channel;
the position of the arch waist, the side wall and the arch foot of the transverse channel within the range of 4m close to the side of the main tunnel is used as a locking foot pile;
and (5) performing double-layer primary support.
Further, the number of the pipe sheds is multiple, the pipe sheds are distributed in an annular array mode, and the annular distance is 20-40 cm.
Further, the length of the pipe shed is 10-30 m.
Further, the length of the lock foot pile is 3-5 m, and the construction interval is as follows: the circumferential spacing is 0.8-1.2 m, the longitudinal spacing is 0.8-1.2 m, and the angle formed by the lock foot piles and the lateral channel side wall is 40-60 degrees.
Further, the construction double-layer primary support specifically comprises:
the concrete is sprayed by adopting C30, the steel arch frame adopts I25 b-shaped steel, a reinforcing mesh is arranged, and the mesh spacing of the reinforcing mesh is 18-22 cm multiplied by 18-22 cm.
Further, the method further comprises:
a positive hole section crossing the transverse channel, wherein a first prestressed anchor cable is arranged at the arch waist and arch foot of the positive hole near one side of the transverse channel in the range of the crossing, and a second prestressed anchor cable and a first self-advancing anchor rod are arranged at the side wall position of the other side; adopts double-layer support.
Further, the first prestress anchor cable is arranged in a plurality of pieces, the length is 10-20 m, the prestress is 350kN, and the construction space is: the circumferential spacing is 0.8-1.2 m, and the longitudinal spacing is 0.8-1.2 m.
Further, the second prestressed anchor cable and the self-advancing anchor rod are arranged in a plurality, quincuncial arrangement is adopted, and the construction interval is as follows: the circumferential spacing is 0.8-1.2 m, the longitudinal spacing is 0.8-1.2 m, the length of the second prestressed anchor cable is 15-25 m, the prestress is 300-400 kN, the length of the first self-advancing anchor rod is 10-15 m, and the diameter is 30-40 mm.
Further, the method further comprises:
a second self-advancing anchor rod is arranged at the arch crown, the arch waist and the side wall of the positive hole section with the range of 5m in the front and rear of the transverse channel in the axial direction of the positive hole; and a third pre-stress anchor cable is arranged on the side wall.
Further, the length of the second self-advancing anchor rod is 5-10 m, the diameter is 30-40 mm, the length of the third pre-stressed anchor cable is 10-20 m, the pre-stress is 300-400 kN, the second self-advancing anchor rod and the third pre-stressed anchor cable are arranged in a quincuncial shape, and the construction interval is as follows: circumferential spacing of 0.8-1.2 m and longitudinal spacing of 0.8-1.2 m
The application has at least the following beneficial effects:
1. the horizontal channel vault is used as a pipe shed, double-layer primary supports are used, and the arch waists, the side walls and the arch feet Shi Zuo are reinforced.
2. The positive hole is used as a double-layer primary support, and is reinforced by a pre-stressed anchor cable at the arch waist and arch foot position Shi Zuochang on one side of the transverse passage, a pre-stressed anchor cable at the other side Shi Zuochang and a long anchor rod.
3. The joint of the transverse channel and the steel arch of the positive hole is welded by bolts. The method can strengthen the intersection formed by the transverse channel and the positive hole into a whole.
4. And the deformation of surrounding rock is better controlled by adopting an anchor rod and a long anchor rope for supporting in the range of 5m in the front and rear of a transverse passage in the axial direction of the positive hole.
Drawings
In the drawings, which are not necessarily drawn to scale, like numerals may describe similar components in different views. The same reference numerals with letter suffixes or different letter suffixes may represent different instances of similar components. The accompanying drawings illustrate various embodiments by way of example in general and not by way of limitation, and together with the description and claims serve to explain the inventive embodiments. Wherever possible, the same reference numbers will be used throughout the drawings to refer to the same or like parts. Such embodiments are illustrative and not intended to be exhaustive or exclusive of the present apparatus or method.
Fig. 1 shows a cross-channel support structure according to an embodiment of the present application.
Figure 2 shows a section A-A in figure 1.
Fig. 3 shows a section B-B of fig. 1.
Reference numerals:
1 is the outline of the upper part of the positive hole; 2 is a positive hole track surface; 3 is the outline of the bottom of the inverted arch of the positive hole; 4 is a pipe shed for the transverse channel to enter the positive tunnel to pick the roof; 5 is a lateral passage side wall lock foot pile; 6 is a primary support and a secondary support of the transverse channel; 7 is a prestressed anchor cable of the arch part of the positive hole in the range of the transverse channel; 8 is a prestressed anchor cable of the side wall of the positive hole in the range of the transverse channel; 9 is a side wall anchor rod of the right hole in the range of the transverse channel; 10 is a positive hole inverted arch pre-stress anchor cable in the range of the transverse channel; 11 is a primary support and a secondary support of the positive tunnel in the range of the transverse channel; 12 is a positive hole anchor rod within 5m of the front and rear of the transverse channel; 13 is a positive hole prestressed anchor cable within 5m of the front and rear of the transverse channel; 14 is the primary support and the secondary support of the positive tunnel within 5m before and after the transverse channel.
Detailed Description
The present application will be described in detail below with reference to the drawings and detailed description to enable those skilled in the art to better understand the technical scheme of the present application. Embodiments of the present application will be described in further detail below with reference to the drawings and specific examples, but not by way of limitation. The order in which the steps are described herein by way of example should not be construed as limiting if there is no necessity for a relationship between each other, and it should be understood by those skilled in the art that the steps may be sequentially modified without disrupting the logic of each other so that the overall process is not realized.
According to the method for reinforcing the intersection of the positive hole and the transverse channel of the ultra-large buried soft rock tunnel, the reinforcing of the intersection of the positive hole and the transverse channel is considered after the transverse channel is excavated for the ultra-large buried soft rock tunnel. Firstly, considering Shi Zuo pipe sheds to reinforce rock bodies above the front of a transverse channel in the transverse channel roof-picking construction, as shown in fig. 1, the circumferential spacing of the pipe sheds is 30cm, the length is 20m, and the pipe sheds have a certain inclination angle so as to prevent the pipe sheds from entering the excavation range of a main tunnel and strengthen surrounding rocks above the main tunnel to the greatest extent; the arch waist, side walls and arch leg positions Shi Zuo lock leg piles are arranged in the range of 4m on one side of the straight hole of the transverse channel, the length is 4m, the construction interval is 1m multiplied by 1m (ring multiplied by longitudinal direction), and the angles between the lock leg piles and the side walls of the transverse channel are controlled within the range of 40-60 degrees; and (3) constructing a double-layer primary support, adopting C30 sprayed concrete, adopting I25b section steel for a steel arch, setting a reinforcing steel bar net with phi 8mm, and setting the grid spacing to be 20cm multiplied by 20cm.
The supporting parameters of the transverse channel are specifically shown in fig. 1, wherein the primary supporting and secondary supporting 6 (i.e. double-layer primary supporting) of the transverse channel is arranged on the track surface 2 of the main tunnel, the height of the primary supporting and secondary supporting is not more than the upper contour 1 of the main tunnel, the length of the transverse channel side wall locking foot pile 5 at the bottom is preferably ensured to exceed the inverted arch bottom contour 3 of the main tunnel, and the pipe shed 4 for entering the top of the main tunnel passes through the upper contour 1 of the main tunnel, so that the stability of the whole structure can be ensured.
In some embodiments, the method further comprises:
the section of the positive hole which is intersected with the transverse channel adopts a section A-A design shown in figure 2, the arch waist and arch foot positions of the positive hole on one side of the transverse channel in the range of the intersection adopt a first prestress anchor cable which is 15m long and has a prestress of 350kN, and the arrangement interval is 1m multiplied by 1m (ring multiplied by longitudinal); the other side wall is provided with a second prestress anchor cable with the prestress of 350kN and a first self-advancing anchor rod with the length of 12m and phi of 35mm, which are arranged in a quincuncial shape, and the distance is 1m multiplied by 1m (ring multiplied by longitudinal direction); the double-layer support is adopted, the support parameters are the same as those of the transverse channel, and the steel arch frame connection at the intersection is further reinforced by adopting bolt welding.
Referring to fig. 2, fig. 2 specifically shows the support parameters of the main tunnel in the range of the cross channel, the main tunnel arch prestressed anchorage cable 7 in the range of the cross channel and the main tunnel inverted arch prestressed anchorage cable 10 in the range of the cross channel are the first prestressed anchorage cables with 15m length and 350kN prestress at the arch waist and arch foot positions of the main tunnel near the side of the cross channel in the range of the fork opening, and the main tunnel side wall prestressed anchorage cable 8 in the range of the cross channel and the main tunnel side wall anchor 9 in the range of the cross channel are respectively represented by the second prestressed anchorage cable and the first self-advancing anchor rod, which are arranged in a quincuncial shape and have the interval of 1m×1m (ring×longitudinal). The primary support and the secondary support 11 of the positive tunnel in the range of the transverse passage represent double-layer supports, C30 shotcrete is adopted, I25b section steel is adopted for the steel arch, a reinforcing steel bar net with phi 8mm is arranged, and the grid spacing is set to be 20cm multiplied by 20cm.
In some embodiments, the method further comprises:
the front and rear 5m range positive hole section of the transverse channel in the axial direction of the positive hole adopts the design of the B-B section shown in figure 3, and the vault, the arch waist and the side wall parts are applied with second self-advancing anchor rods with the length of 8m and phi 35 mm; in addition, a third prestressed anchor cable with the length of 15m and 350kN is applied on the side wall, and the anchor rods and the anchor cable are arranged in a quincuncial shape, and the distance is 1m multiplied by 1m (ring multiplied by longitudinal direction).
Fig. 3 specifically shows the parameters of the hole support in the range of 5m before and after the transverse channel section, wherein the hole pre-stressed anchor cable 13 in the range of 5m before and after the transverse channel and the hole anchor rod 12 in the range of 5m before and after the transverse channel respectively represent a third pre-stressed anchor cable and a second self-advancing anchor rod, which are arranged in a quincuncial shape, the spacing is 1m×1m (ring×longitudinal), and meanwhile, the hole primary support and the hole secondary support 14 in the range of 5m before and after the transverse channel are constructed, the support and the primary support and the hole secondary support 6 of the transverse channel can be constructed by adopting the same method, namely adopting C30 sprayed concrete, adopting I25b steel for a steel arch frame, arranging a reinforcing steel mesh with phi 8mm, and arranging the mesh spacing to be 20cm×20cm.
The foregoing is only a preferred embodiment of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art, who is within the scope of the present application, should make equivalent substitutions or modifications according to the technical solution of the present application and the inventive concept thereof, and should be covered by the scope of the present application.

Claims (10)

1. The method for supporting and reinforcing the intersection of the positive tunnel and the transverse channel of the ultra-large buried soft rock tunnel is characterized by comprising the following steps of:
when the transverse channel is constructed by picking the top, a pipe shed is constructed to reinforce the rock mass above the front of the transverse channel;
the position of the arch waist, the side wall and the arch foot of the transverse channel within the range of 4m close to the side of the main tunnel is used as a locking foot pile;
and (5) performing double-layer primary support.
2. The method for supporting and reinforcing the intersection of the positive tunnel and the transverse channel of the ultra-large buried soft rock tunnel according to claim 1, wherein a plurality of pipe sheds are arranged, the pipe sheds are distributed in an annular array, and the annular distance is 20-40 cm.
3. The method for supporting and reinforcing the intersection of the positive tunnel and the transverse channel of the ultra-large buried soft rock tunnel according to claim 2, wherein the length of the pipe shed is 10-30 m.
4. The method for supporting and reinforcing the intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel according to claim 1, wherein the length of the lock leg pile is 3-5 m, and the construction interval is as follows: the circumferential spacing is 0.8-1.2 m, the longitudinal spacing is 0.8-1.2 m, and the angle formed by the lock foot piles and the lateral channel side wall is 40-60 degrees.
5. The method for reinforcing the support of the intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel according to claim 1, wherein the constructing a double-layer primary support specifically comprises:
the concrete is sprayed by adopting C30, the steel arch frame adopts I25 b-shaped steel, a reinforcing mesh is arranged, and the mesh spacing of the reinforcing mesh is 18-22 cm multiplied by 18-22 cm.
6. A method of reinforcing a positive hole and lateral passageway intersection of an oversized soft rock tunnel as claimed in claim 1, the method further comprising:
a positive hole section crossing the transverse channel, wherein a first prestressed anchor cable is arranged at the arch waist and arch foot of the positive hole near one side of the transverse channel in the range of the crossing, and a second prestressed anchor cable and a first self-advancing anchor rod are arranged at the side wall position of the other side; adopts double-layer support.
7. The method for supporting and reinforcing the intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel according to claim 6, wherein the number of the first prestressed anchor cables is 10-20 m, the length of the first prestressed anchor cables is 350kN, and the construction interval is as follows: the circumferential spacing is 0.8-1.2 m, and the longitudinal spacing is 0.8-1.2 m.
8. The method for supporting and reinforcing the intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel according to claim 6, wherein a plurality of second prestressed anchor cables and self-advancing anchor rods are arranged, and quincuncial arrangement is adopted, wherein the construction interval is as follows: the circumferential spacing is 0.8-1.2 m, the longitudinal spacing is 0.8-1.2 m, the length of the second prestressed anchor cable is 15-25 m, the prestress is 300-400 kN, the length of the first self-advancing anchor rod is 10-15 m, and the diameter is 30-40 mm.
9. A method of reinforcing a positive hole and lateral passageway intersection of an oversized soft rock tunnel as claimed in claim 1, the method further comprising:
a second self-advancing anchor rod is arranged at the arch crown, the arch waist and the side wall of the positive hole section with the range of 5m in the front and rear of the transverse channel in the axial direction of the positive hole; and a third pre-stress anchor cable is arranged on the side wall.
10. The method for supporting and reinforcing the intersection of a positive tunnel and a transverse channel of an oversized soft rock tunnel according to claim 9, wherein the length of the second self-advancing anchor rod is 5-10 m, the diameter is 30-40 mm, the length of the third prestressed anchor cable is 10-20 m, the prestress is 300-400 kn, the second self-advancing anchor rod and the third prestressed anchor cable are arranged in a quincuncial shape, and the construction interval is: the circumferential spacing is 0.8-1.2 m, and the longitudinal spacing is 0.8-1.2 m.
CN202311107891.6A 2023-08-31 2023-08-31 Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel Active CN116816362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311107891.6A CN116816362B (en) 2023-08-31 2023-08-31 Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311107891.6A CN116816362B (en) 2023-08-31 2023-08-31 Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel

Publications (2)

Publication Number Publication Date
CN116816362A true CN116816362A (en) 2023-09-29
CN116816362B CN116816362B (en) 2023-10-31

Family

ID=88139661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311107891.6A Active CN116816362B (en) 2023-08-31 2023-08-31 Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel

Country Status (1)

Country Link
CN (1) CN116816362B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117189160A (en) * 2023-11-07 2023-12-08 北京交通大学 Reasonable setting method for construction transverse channel of ultra-large buried soft rock tunnel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4019280A1 (en) * 1990-06-16 1992-01-09 Beton & Monierbau Gmbh Construction of underground roadways - uses mat reinforcement with arch supports and distribution bars pneumatically concreted in
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN106979027A (en) * 2017-05-15 2017-07-25 中国铁路设计集团有限公司 Control the convergent lock pin stake supporting construction of Tunnel sedimentation
CN110439571A (en) * 2019-08-21 2019-11-12 中铁隧道局集团有限公司 Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
CN113236259A (en) * 2021-06-02 2021-08-10 崔旭雄 Special construction process for excavation and supporting of combined tunnel
CN215057408U (en) * 2021-06-08 2021-12-07 中国水利水电第十一工程局有限公司 Reinforcing device for intersection of inclined shaft and main tunnel of highway tunnel
CN113833490A (en) * 2021-10-22 2021-12-24 中铁隧道勘测设计院有限公司 Support-free primary support opening supporting structure and method for arch-intersected T-shaped tunnel intersection
WO2022083096A1 (en) * 2020-10-20 2022-04-28 中铁十九局集团第五工程有限公司 Tunnel excavation method for upper-soft and lower-hard stratum
CN115717536A (en) * 2022-11-22 2023-02-28 中铁十二局集团有限公司 Inclined shaft forward-hole-entering and top-raising construction method for large-section tunnel in weak water-rich stratum
CN116006221A (en) * 2023-02-10 2023-04-25 中铁二十五局集团第五工程有限公司 Shallow buried bias broken stratum small-clear-distance double-tunnel entrance and exit construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4019280A1 (en) * 1990-06-16 1992-01-09 Beton & Monierbau Gmbh Construction of underground roadways - uses mat reinforcement with arch supports and distribution bars pneumatically concreted in
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN106979027A (en) * 2017-05-15 2017-07-25 中国铁路设计集团有限公司 Control the convergent lock pin stake supporting construction of Tunnel sedimentation
CN110439571A (en) * 2019-08-21 2019-11-12 中铁隧道局集团有限公司 Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
WO2022083096A1 (en) * 2020-10-20 2022-04-28 中铁十九局集团第五工程有限公司 Tunnel excavation method for upper-soft and lower-hard stratum
CN113236259A (en) * 2021-06-02 2021-08-10 崔旭雄 Special construction process for excavation and supporting of combined tunnel
CN215057408U (en) * 2021-06-08 2021-12-07 中国水利水电第十一工程局有限公司 Reinforcing device for intersection of inclined shaft and main tunnel of highway tunnel
CN113833490A (en) * 2021-10-22 2021-12-24 中铁隧道勘测设计院有限公司 Support-free primary support opening supporting structure and method for arch-intersected T-shaped tunnel intersection
CN115717536A (en) * 2022-11-22 2023-02-28 中铁十二局集团有限公司 Inclined shaft forward-hole-entering and top-raising construction method for large-section tunnel in weak water-rich stratum
CN116006221A (en) * 2023-02-10 2023-04-25 中铁二十五局集团第五工程有限公司 Shallow buried bias broken stratum small-clear-distance double-tunnel entrance and exit construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117189160A (en) * 2023-11-07 2023-12-08 北京交通大学 Reasonable setting method for construction transverse channel of ultra-large buried soft rock tunnel

Also Published As

Publication number Publication date
CN116816362B (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN116816362B (en) Supporting and reinforcing method for intersection of positive tunnel and transverse channel of ultra-large buried soft rock tunnel
CN105041353B (en) Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN103075165B (en) Vertical beam of coal road combined type supporting method
CN106759376A (en) Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN107676103A (en) A kind of construction method of super-large span cave depot grillage supporting
CN112176952A (en) Anchor cable support system for tunnel top soil high slope and construction method
CN110159323B (en) Construction method suitable for extra-large section underground chamber excavation and steel arch frame fixing
CN109083660B (en) Soft rock roadway or tunnel bottom heave treatment supporting structure and method based on reinforced concrete bottom beam
CN101570968B (en) Combination stiffening filling pile
CN111927489A (en) Active and pile-plate combined tunnel supporting system penetrating through tunnel dissolving group and construction method
CN108843340B (en) Support structure in shape of character of ultra-large span tunnel and excavation construction method thereof
CN102787605A (en) Method for inclining bar-type foundation pit support steel sheet pile of soft soil foundation
CN216892449U (en) Foundation pit supporting structure combining cast-in-place pile and jet grouting pile
CN214940186U (en) Reinforcing and protecting structure for broken wall of large-section tunnel to pass through station foundation pit
CN201406683Y (en) Combined reinforced filling pile
CN114411762A (en) Rear-anchor type rigid foundation pit supporting structure and construction method
CN114033440A (en) Construction method of tunnel supporting structure
CN113006079A (en) Foundation pit extension support body and foundation pit extension support method
CN216973422U (en) Inside big space foundation ditch retaining structure
CN206625233U (en) The support-replacing system of the outer existing structures of foundation ditch in foundation pit construction
CN212272222U (en) Active and pile plate combined tunnel supporting system for penetrating through tunnel dissolving group
CN218467616U (en) Tunnel advanced horizontal reinforcement jet grouting pile supporting structure
CN212774327U (en) Large-section tunnel supporting structure
CN218716814U (en) Large-section tunnel coincide supporting construction under unfavorable geological conditions
CN214530693U (en) Earth-rock combined ground layer combined pile foundation pit supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant