CN116706792A - Cable laying bridge of communication machine room and installation method thereof - Google Patents

Cable laying bridge of communication machine room and installation method thereof Download PDF

Info

Publication number
CN116706792A
CN116706792A CN202310698890.7A CN202310698890A CN116706792A CN 116706792 A CN116706792 A CN 116706792A CN 202310698890 A CN202310698890 A CN 202310698890A CN 116706792 A CN116706792 A CN 116706792A
Authority
CN
China
Prior art keywords
bridge
fixed
bridge body
installation method
cable laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310698890.7A
Other languages
Chinese (zh)
Inventor
祁步仁
蔡昊
谈军
梅增杨
束一
汪大洋
江凇
李沛
蒋春霞
赵金城
华纬韬
殷俊杰
何沐昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd filed Critical Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd
Priority to CN202310698890.7A priority Critical patent/CN116706792A/en
Publication of CN116706792A publication Critical patent/CN116706792A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0462Tubings, i.e. having a closed section
    • H02G3/0487Tubings, i.e. having a closed section with a non-circular cross-section
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof
    • H02G3/0418Covers or lids; Their fastenings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention relates to the technical field of a bridge, in particular to a cable laying bridge of a communication machine room and an installation method thereof, comprising a bridge body, wherein a cover plate is arranged above the bridge body, a hanging connecting seat is fixed on the outer wall of the bridge body, a preformed hole is formed in the surface of the hanging connecting seat, a sealing plate is movably connected to the bottom surface of the bridge body, a baffle frame is fixed on the inner wall of the bridge body to limit the sealing plate, and a baffle is rotatably connected to the bottom of the bridge body; the beneficial effects are as follows: according to the cable laying bridge of the communication machine room and the mounting method thereof, the bottom of the bottom end of the bridge body is provided with the sealing plate which is opened in a rotating way, so that workers can conveniently maintain the cable from the lower part of the bridge body, and the defect caused by small space above the bridge body is avoided; and the side plates of the bridge body are additionally provided with the hanging connecting seats, so that the hanging rod penetrates through the hanging connecting seats, the bridge body is hung, and the investment of the traditional cross rod is reduced.

Description

Cable laying bridge of communication machine room and installation method thereof
Technical Field
The invention relates to the technical field of bridges, in particular to a cable laying bridge for a communication machine room and an installation method thereof.
Background
The bridge frame is divided into a groove type structure, a tray type structure, a ladder frame type structure, a grid type structure and the like, and consists of a bracket, a bracket arm, an installation accessory and the like. The bridge frame in the building can be independently erected, and can also be laid on various building (architecture) structures and pipe gallery brackets, and the characteristics of simple structure, attractive appearance, flexible configuration, convenient maintenance and the like are embodied.
In the prior art, cables are placed in a bridge, the bridge is hung below a roof through a cross rod and a hanging rod, when the cables inside the bridge are required to be maintained, workers climb to the roof by means of a ladder, and then after a cover plate is removed from the bridge, the workers lean on the cables inside the bridge to be maintained.
However, the bridge mounting position is small in distance from the roof, so that the enclosure operation space of workers is limited; and resource waste phenomenon exists in the cross bars for supporting the bridge frame installation; and cables inside the bridge frame lack a limiting classification structure.
Disclosure of Invention
The invention aims to provide a cable laying bridge frame of a communication machine room and an installation method thereof, so as to solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a communication computer lab cable lays crane span structure and installation method thereof, includes the crane span structure body, and the top of crane span structure body is equipped with the apron, the outer wall of crane span structure body is fixed with hangs the connecting seat, hangs the surface of connecting seat and has seted up the preformed hole, and the bottom surface swing joint of crane span structure body has the shrouding, and the inner wall of crane span structure body is fixed with keeps off the frame spacing to the shrouding, and the bottom of crane span structure body rotates to be connected with the baffle, and the inside of crane span structure body is fixed with the layer board, and the surface sliding connection of layer board has the slipframe, and the top surface of slipframe is fixed with the ply-yarn drill.
Preferably, the cover plate is of a -shaped platy structure, the cover plate is buckled at the top of the bridge body, rubber strips are fixed on two side walls of the cover plate, which are distributed in parallel, and the rubber strips are clamped between the cover plate and the side plates of the bridge body.
Preferably, the bottom surface of the bridge body is provided with a reserved opening, the surface of the reserved opening is fixedly provided with a shaft lever, the shaft lever penetrates through the first perforation, the first perforation is arranged on the surface of the sealing plate, and the sealing plate is provided with two groups.
Preferably, the surface of the baffle plate is provided with a second through hole, a limiting shaft is inserted into the second through hole, the limiting shaft is of an inverted T-shaped cylinder structure, one end of the limiting shaft is fixed on the bottom surface of the bridge body, and the surface of the baffle plate is provided with a finger groove.
Preferably, the surface fixing of shrouding has two sets of spacing strips of rubber, and the baffle is in when two sets of spacing strips of rubber, and the baffle is exerted and can not rotate around spacing axle when no external force, and the embedded groove has been seted up on the surface of baffle, and the embedded groove is "ten" font groove, and the inside of embedded groove is fixed with rubber gasket, and rubber gasket's thickness is greater than the degree of depth of embedded groove.
Preferably, the supporting plate is in a -shaped platy structure, the supporting plate is provided with a plurality of side plates which are distributed in parallel, and the two side plates of the supporting plate are fixed on the two side plates of the bridge body through bolts.
Preferably, the sliding frame is annular platy structure, and the sliding frame is equipped with a plurality ofly, and a plurality of sliding frames distribute side by side on the layer board, and the ply-yarn drill is square board, and the top surface integrated into one piece of ply-yarn drill has circular arc wire casing, and the elasticity hoop piece is circular arc piece, and the elasticity hoop piece is equipped with two sets of, and two sets of elasticity hoop pieces are about circular arc wire casing symmetric distribution.
Preferably, a rubber pad is fixed on the surface of the supporting plate, the rubber pad is positioned between the inner wall of the sliding frame and the supporting plate, a clamping screw is screwed on a side plate of the sliding frame, and the clamping screw locks the clamping rubber pad to realize braking of the sliding frame.
A bridge frame installation method for laying cables in a communication machine room is characterized in that the bottom end of a suspender penetrates through a reserved hole, and nuts are screwed on the upper side and the lower side of a hanging connecting seat to achieve limit, so that a cross rod support is not required to be additionally arranged below a bridge frame body.
Compared with the prior art, the invention has the beneficial effects that:
according to the cable laying bridge of the communication machine room and the mounting method thereof, the bottom of the bottom end of the bridge body is provided with the sealing plate which is opened in a rotating way, so that workers can conveniently maintain the cable from the lower part of the bridge body, and the defect caused by small space above the bridge body is avoided; the hanging connecting seat is additionally arranged on the side plate of the bridge body, and the suspender penetrates through the hanging connecting seat, so that the bridge body is hung, and the investment of a traditional cross rod is reduced; and the support plate is arranged in the bridge body for supporting the cables, and the sliding frames on the surface of the support plate can be adjusted in a sliding manner, so that the sliding frames of the plurality of groups of cables with the same type of support are close together, and the classification limit of the cables is realized.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the bottom structure of the present invention;
FIG. 3 is a schematic view of the semi-sectional structure of the present invention;
FIG. 4 is a schematic view of the connection structure of the pallet and the slide frame of the present invention;
FIG. 5 is a schematic view of a baffle structure according to the present invention;
FIG. 6 is a schematic diagram of a finger slot distribution structure according to the present invention.
In the figure: bridge body 1, apron 2, rubber strip 3, hang connecting seat 4, preformed hole 5, preformed hole 6, axostylus axostyle 7, shrouding 8, perforation one 9, spacing axle 10, perforation two 11, baffle 12, embedded groove 13, rubber gasket 14, finger groove 15, rubber spacing 16, fender frame 17, layer board 18, bolt 19, sliding frame 20, ply-yarn drill 21, elasticity hoop piece 22, clamping screw 23, rubber pad 24.
Detailed Description
In order to make the objects, technical solutions, and advantages of the present invention more apparent, the embodiments of the present invention will be further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are some, but not all, embodiments of the present invention, are intended to be illustrative only and not limiting of the embodiments of the present invention, and that all other embodiments obtained by persons of ordinary skill in the art without making any inventive effort are within the scope of the present invention.
Example 1
Referring to fig. 1 to 2, the present invention provides a technical solution: the utility model provides a communication computer lab cable lays bridge and installation method thereof, including bridge body 1, the top of bridge body 1 is equipped with apron 2, apron 2 is "" font platy structure, apron 2 detains and establishes at the top of bridge body 1, and all be fixed with rubber strip 3 on the lateral wall of apron 2 two parallel distributions, rubber strip 3 centre gripping is between the curb plate of apron 2 and bridge body 1, the outer wall of bridge body 1 is fixed with and hangs connecting seat 4, the surface of hanging connecting seat 4 has seted up preformed hole 5, the bottom surface swing joint of bridge body 1 has shrouding 8, the inner wall of bridge body 1 is fixed with and keeps off frame 17 and spacing to shrouding 8, the bottom rotation of bridge body 1 is connected with baffle 12, the inside of bridge body 1 is fixed with layer board 18, the surface sliding connection of layer board 18 has smooth frame 20, the top surface of smooth frame 20 is fixed with ply-yarn package 21, bottom at bridge body 1 sets up the shrouding 8 that rotates and opens, the staff is convenient for to maintain the cable bridge body 1 from the below, the defect that space is little above bridge body 1 has been avoided; the hanging connecting seat 4 is additionally arranged on the side plate of the bridge body 1, and the hanging rod penetrates through the hanging connecting seat 4, so that the bridge body 1 is hung, and the investment of a traditional cross rod is reduced; and the support plate 18 is arranged in the bridge body 1 to support the cables, and the sliding frames 20 on the surface of the support plate 18 can be slidably adjusted, so that a plurality of groups of sliding frames 20 for supporting the cables of the same type are close together, and the classification limit of the cables is realized.
Example two
Referring to fig. 3, 5 and 6, on the basis of the first embodiment, in order to realize the opening and closing adjustment of the sealing plate 8, a reserved opening 6 is formed in the bottom surface of the bridge body 1, a shaft lever 7 is fixed on the surface of the reserved opening 6, the shaft lever 7 penetrates through the first through hole 9, the first through hole 9 is formed in the surface of the sealing plate 8, two groups of sealing plates 8 are arranged, the second through hole 11 is formed in the surface of the baffle 12, a limiting shaft 10 is inserted into the second through hole 11, the limiting shaft 10 is of an inverted T-shaped cylinder structure, one end of the limiting shaft 10 is fixed on the bottom surface of the bridge body 1, a finger groove 15 is formed in the surface of the baffle 12, two groups of rubber limiting strips 16 are fixed on the surface of the sealing plate 8, when the baffle 12 is located between the two groups of rubber limiting strips 16, the baffle 12 cannot rotate around the limiting shaft 10 when no external force is applied, an embedded groove 13 is formed in the surface of the baffle 12, the embedded groove 13 is formed in the shape, a rubber gasket 14 is fixed in the embedded groove 13, and the thickness of the rubber gasket 14 is larger than the depth of the embedded groove 13.
Example III
Referring to fig. 4, in order to realize position adjustment of the sliding frame 20 on the surface of the supporting plate 18 on the basis of the second embodiment, the supporting plate 18 is in a -shaped plate structure, the supporting plate 18 is provided with a plurality of parallel side plates, the two parallel side plates of the supporting plate 18 are all fixed on the two side plates of the bridge body 1 through bolts 19, the sliding frame 20 is in an annular plate structure, the sliding frame 20 is provided with a plurality of sliding frames 20 which are distributed on the supporting plate 18 side by side, the line card 21 is a square plate, the top surface of the line card 21 is integrally formed with an arc slot, the elastic hoop sheets 22 are arc sheets, the elastic hoop sheets 22 are provided with two groups, the two groups of elastic hoop sheets 22 are symmetrically distributed about the arc slot, a rubber pad 24 is fixed on the surface of the supporting plate 18, the rubber pad 24 is positioned between the inner wall of the sliding frame 20 and the supporting plate 18, the side plates of the sliding frame 20 are screwed with clamping screws 23, and the clamping screws 23 clamp the rubber pad 24 after locking, so as to realize braking of the sliding frame 20.
Example IV
A bridge frame installation method for laying cables in a communication machine room is characterized in that the bottom end of a suspender penetrates through a reserved hole, and nuts are screwed on the upper side and the lower side of a hanging connecting seat to achieve limit, so that a cross rod support is not required to be additionally arranged below a bridge frame body.
When in actual use, the existing suspender is fixed on a roof in advance, then the bottom end of the suspender passes through the reserved hole 5, and nuts are screwed on the upper side and the lower side of the hanging connecting seat 4 to realize limit, so that a cross rod support is not required to be additionally arranged below the bridge body 1; the wire body is pushed into the wire clamp 21, two elastic hooping sheets 22 are enclosed at two sides of the wire body to limit, the position of the sliding frame 20 is adjusted according to the requirement, namely the sliding frame 20 is stirred to slide along the supporting plate 18, and a clamping screw 23 is locked to clamp a rubber pad 24, so that the sliding frame 20 is braked; when the inner cable of the bridge body 1 is required to be overhauled from the bottom of the bridge body 1, fingers are scratched in the finger grooves 15, the baffle 12 is stirred to rotate around the limiting shaft 10 until the baffle 12 does not shade the sealing plate 8, at the moment, the sealing plate 8 rotates and falls around the shaft lever 7, the reserved opening 6 lacks blocking, and staff stretches into the reserved opening 6 to operate the cable which needs to be overhauled in the bridge body 1.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a communication computer lab cable lays crane span structure and installation method thereof, includes crane span structure body (1), and the top of crane span structure body (1) is equipped with apron (2), its characterized in that: the outer wall of crane span structure body (1) is fixed with and hangs connecting seat (4), and preformed hole (5) have been seted up on the surface of hanging connecting seat (4), and the bottom surface swing joint of crane span structure body (1) has shrouding (8), and the inner wall of crane span structure body (1) is fixed with keeps off frame (17) and spacing to shrouding (8), and the bottom rotation of crane span structure body (1) is connected with baffle (12), and the inside of crane span structure body (1) is fixed with layer board (18), and the surface sliding connection of layer board (18) has slipframe (20), and the top surface of slipframe (20) is fixed with cable clamp (21).
2. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the cover plate (2) is of a -shaped platy structure, the cover plate (2) is buckled at the top of the bridge body (1), rubber strips (3) are fixed on two side walls of the cover plate (2) which are distributed in parallel, and the rubber strips (3) are clamped between the cover plate (2) and the side plates of the bridge body (1).
3. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the bridge frame comprises a bridge frame body (1), wherein a reserved opening (6) is formed in the bottom surface of the bridge frame body (1), a shaft lever (7) is fixed on the surface of the reserved opening (6), the shaft lever (7) penetrates through a first perforation (9), the first perforation (9) is formed in the surface of a sealing plate (8), and two groups of sealing plates (8) are arranged.
4. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the surface of baffle (12) has seted up perforation two (11), and peg graft in the inside of perforation two (11) has spacing axle (10), and spacing axle (10) are the column structure of "T" font of inversion, and the bottom surface at crane span structure body (1) is fixed to one end of spacing axle (10), and finger groove (15) have been seted up on the surface of baffle (12).
5. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the surface mounting of shrouding (8) has two sets of spacing strips of rubber (16), and when baffle (12) were in between two sets of spacing strips of rubber (16), baffle (12) were exerted and can not rotate around spacing axle (10) at no external force, and embedded groove (13) have been seted up on the surface of baffle (12), and embedded groove (13) are "cross" font groove, and the inside of embedded groove (13) is fixed with rubber gasket (14), and the thickness of rubber gasket (14) is greater than the degree of depth of embedded groove (13).
6. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the support plate (18) is of a -shaped platy structure, the support plate (18) is provided with a plurality of side plates which are distributed in parallel, and the two side plates of the support plate (18) are fixed on the two side plates of the bridge body (1) through bolts (19).
7. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: the utility model discloses a device for fixing a cable, including slide frame (20), support board (18), line card (21), elastic hoop piece (22) and support board (18), slide frame (20) are annular platelike structure, and slide frame (20) are equipped with a plurality of, and a plurality of slide frames (20) distribute side by side on support board (18), and line card (21) are square board, and the top surface integrated into one piece of line card (21) has the circular arc wire casing, and elastic hoop piece (22) are the circular arc piece, and elastic hoop piece (22) are equipped with two sets of, and two sets of elastic hoop piece (22) are about circular arc wire casing symmetric distribution.
8. The cable laying bridge of a communication room and the installation method thereof according to claim 1, wherein: a rubber pad (24) is fixed on the surface of the supporting plate (18), the rubber pad (24) is positioned between the inner wall of the sliding frame (20) and the supporting plate (18), a clamping screw (23) is screwed on a side plate of the sliding frame (20), and the clamping screw (23) clamps the rubber pad (24) after being locked, so that the sliding frame (20) is braked.
9. A method for installing a telecommunication room cable laying bridge according to any one of claims 1 to 8, characterized in that: the bottom end of the suspender passes through the preformed hole, and the limit is realized by the screw nuts on the upper side and the lower side of the hanging connecting seat, so that the cross rod support is not required to be additionally arranged below the bridge body.
CN202310698890.7A 2023-06-13 2023-06-13 Cable laying bridge of communication machine room and installation method thereof Pending CN116706792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310698890.7A CN116706792A (en) 2023-06-13 2023-06-13 Cable laying bridge of communication machine room and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310698890.7A CN116706792A (en) 2023-06-13 2023-06-13 Cable laying bridge of communication machine room and installation method thereof

Publications (1)

Publication Number Publication Date
CN116706792A true CN116706792A (en) 2023-09-05

Family

ID=87835347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310698890.7A Pending CN116706792A (en) 2023-06-13 2023-06-13 Cable laying bridge of communication machine room and installation method thereof

Country Status (1)

Country Link
CN (1) CN116706792A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117913715A (en) * 2024-03-19 2024-04-19 国网山东省电力公司安丘市供电公司 Cable installation bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117913715A (en) * 2024-03-19 2024-04-19 国网山东省电力公司安丘市供电公司 Cable installation bridge

Similar Documents

Publication Publication Date Title
CN116706792A (en) Cable laying bridge of communication machine room and installation method thereof
CN210326848U (en) Metal material pressure-resistant cable bridge
CN211480806U (en) Bracket for cable bridge
CN211405349U (en) Bridge installation fixing support
CN213087134U (en) Solar photovoltaic curtain wall glass
CN217867859U (en) Crane wall-attached device with protective hanging net
CN214946696U (en) Water supply and drainage control device
CN219801768U (en) Cable fixing device is used in light current intellectuality
CN202370332U (en) Anti-dropping device and window using same
CN215962067U (en) Supplementary device of climbing of electric power tower with safety protection structure
CN218403556U (en) Roof cord hanging device
CN111790076B (en) Portable safety rope fixing frame for high-altitude installation of air conditioner outdoor unit
CN214100694U (en) Cable testing bridge level is bent with isolation groove and adjustable isolation size
CN215119921U (en) Dual-purpose cable bridge bracket for side supporting and top hanging
CN118074035B (en) Stable cable bridge
CN218991440U (en) Invisible protective net track
CN212518224U (en) Bracket arm for cable bridge
CN214657233U (en) Regulation type well head safety warning ware
CN215645956U (en) Novel cable bridge
CN213359457U (en) Keel auxiliary connecting device for decoration and finishing engineering
CN221015161U (en) Outdoor dust device
CN213926956U (en) Mounting assembly of curtain wall upright post
CN218813878U (en) Protection plate for basement well pit
CN217325996U (en) Pneumatic curtain wall assembly
CN213016155U (en) Auxiliary device for air conditioner installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination