CN116220263A - Construction method of rapid assembly building outer curtain wall - Google Patents

Construction method of rapid assembly building outer curtain wall Download PDF

Info

Publication number
CN116220263A
CN116220263A CN202211734716.5A CN202211734716A CN116220263A CN 116220263 A CN116220263 A CN 116220263A CN 202211734716 A CN202211734716 A CN 202211734716A CN 116220263 A CN116220263 A CN 116220263A
Authority
CN
China
Prior art keywords
curtain wall
outer curtain
channel steel
keel
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211734716.5A
Other languages
Chinese (zh)
Inventor
杨佳林
房霆宸
童震庭
赵一鸣
冯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN202211734716.5A priority Critical patent/CN116220263A/en
Publication of CN116220263A publication Critical patent/CN116220263A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention provides a construction method of an outer curtain wall system of a rapid assembly building, which comprises the steps that in a prefabrication factory, curtain wall glass connecting mechanisms for curtain wall glass are correspondingly arranged on opposite sides of two outer curtain wall longitudinal keels, two ends of the two outer curtain wall longitudinal keels are respectively connected with a six-way support, curtain wall glass with curtain wall glass connecting holes on two sides is sequentially connected to the two outer curtain wall longitudinal keels through the corresponding curtain wall glass connecting mechanisms, and prefabrication of an outer curtain wall prefabrication unit is completed; transporting a plurality of outer curtain wall prefabricated units to a construction site; the outer curtain wall prefabricated units are hung to the outer facade installation place of the building, are connected with the main building structure through the six-way support, can effectively avoid safety accidents such as broken curtain wall glass, falling and hurting people caused by deformation caused by internal and external forces such as thermal stress and wind load, and can integrate a plurality of curtain wall glass outer curtain wall prefabricated units through prefabrication, so that the installation quality, the installation efficiency and the construction safety of the curtain wall can be improved.

Description

Construction method of rapid assembly building outer curtain wall
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a construction method of a rapid assembly building outer curtain wall.
Background
With the rapid development of economy and the improvement of the living standard of people, china starts to build more and more high-rise and super-high-rise buildings. The glass curtain wall is a common enclosure decoration structure form of a modern high-rise building, and is a beautiful and novel building wall decoration method. It gives the building the characteristics of building aesthetic, building function, building energy saving and building structure integration.
However, glass curtain walls adopted in curtain wall engineering have a plurality of defects: on one hand, the glass is broken and falls off due to the factors of thermal stress, structural adhesive failure and the like, so that safety accidents occur. On the other hand, because the curtain wall quantity of being installed is more, need workman's top-down to install in proper order piece by piece, and the efficiency of construction is lower to at present install the curtain wall and adopt the form of hanging flower basket generally, also produce the potential safety hazard easily in the installation.
Disclosure of Invention
The invention aims to provide a construction method of an outer curtain wall of a rapid assembled building, which solves the problems that curtain wall engineering is easy to drop and potential safety hazards are generated, improves curtain wall installation efficiency and improves curtain wall installation safety level.
In order to solve the technical problems, the invention provides the following technical scheme:
a construction method of a rapid assembly building outer curtain wall system comprises the following steps:
scheme 1: in a prefabrication factory, curtain wall glass connecting mechanisms for curtain wall glass are correspondingly arranged on opposite sides of two outer curtain wall longitudinal keels, two ends of the two outer curtain wall longitudinal keels are respectively connected with a six-way support, curtain wall glass with curtain wall glass connecting holes on two sides is sequentially connected to the two outer curtain wall longitudinal keels through the corresponding curtain wall glass connecting mechanisms, and sealant is arranged at a gap between the adjacent curtain wall glass to finish prefabrication of an outer curtain wall prefabrication unit;
scheme 2: transporting a plurality of outer curtain wall prefabricated units to a construction site;
scheme 3: hanging the outer curtain wall prefabricated unit to an outer elevation installation position of a building by adopting a hanging tool, and completing the installation work of the outer curtain wall prefabricated unit by welding a six-way support and an embedded part of a main structure of the building;
scheme 4: and (3) repeating the process 3, and installing the prefabricated units of the outer curtain wall one by one on the outer vertical surface of the building until all curtain wall installation works are completed.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the six-direction support is a structure for connecting the embedded part of the building structure main body and the longitudinal keels of the outer curtain wall, and the six-direction support can provide X, Y, Z three-dimensional six-direction displacement for curtain wall glass connected to the longitudinal keels of the outer curtain wall, so that the deformability of the curtain wall system is enhanced, and curtain wall glass breakage accidents caused by deformation of the curtain wall glass are avoided.
Preferably, in the construction method of the rapid assembly building outer curtain wall system, the outer curtain wall longitudinal keels adopt channel steel, the outer curtain wall longitudinal keels comprise keel groove bottom plates and two keel side walls, and the two keel side walls are vertically arranged at two ends of the keel groove bottom plates.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the six-way support comprises a support bottom channel steel and two vertical connecting plates, the support bottom channel steel comprises a first groove bottom plate and two first side walls, the two first side walls are vertically arranged at two ends of the first groove bottom plate, the two vertical connecting plates are respectively provided with a connecting plate horizontal transverse guide groove, and the inner surfaces of the two vertical connecting plates are respectively attached to the outer surfaces of the corresponding keel side walls and are connected through connecting plate bolts penetrating through the connecting plate horizontal transverse guide grooves; a channel steel vertical guide groove and a channel steel T-shaped guide groove are respectively formed in the first groove bottom plate, the channel steel T-shaped guide groove comprises a vertical groove and a horizontal longitudinal groove, the vertical groove and the horizontal longitudinal groove are communicated to form a T-shaped groove, the outer surface of the first groove bottom plate is attached to the outer surface of the keel groove bottom plate and is connected with the longitudinal keel through a second channel steel bolt penetrating through the channel steel vertical guide groove and a first channel steel bolt penetrating through the channel steel T-shaped guide groove respectively, the end portions, far away from the first groove bottom plate, of the two first side walls are welded and fixed with a main structure embedded part, the back face of the channel steel at the bottom of the support is welded with the main structure embedded part, and the front face of the channel steel at the bottom of the support is provided with the channel steel vertical guide groove and the channel steel T-shaped guide groove and is connected with the longitudinal keel through bolts.
Preferably, in the construction method of the rapid assembled building outer curtain wall system, the connecting plate horizontal transverse guide groove formed on the six-way support provides horizontal transverse displacement of the outer curtain wall longitudinal keel, namely Z-direction displacement, the vertical guide groove provides vertical displacement of the longitudinal keel, namely Y-direction displacement, and the channel steel T-shaped guide groove provides horizontal longitudinal displacement of the outer curtain wall longitudinal keel, namely X-direction displacement.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the curtain wall glass connecting mechanism comprises a connecting lug plate, lug plate bolts, a connecting collar, connecting bolts, connecting nuts and rubber washers, wherein the connecting lug plate is fixed on the outer curtain wall longitudinal keels through a plurality of lug plate bolts, one end of the connecting lug plate is fixedly connected with one end of the connecting collar, the connecting collar is vertically arranged, and a screw rod part of the connecting bolts sequentially penetrates through the connecting collar, the rubber washers, the curtain wall glass connecting hole and the other rubber washer and then is locked through the connecting nuts.
Compared with the prior art, the technical scheme disclosed by the invention has the following beneficial effects:
the invention provides a rapid assembly building outer curtain wall system, which comprises: the invention relates to a prefabricated outer curtain wall prefabricated unit, which comprises at least two outer curtain wall longitudinal keels, four six-way supports, a plurality of curtain wall glass connecting mechanisms and more than two curtain wall glasses, wherein the curtain wall glass connecting mechanisms for connecting the curtain wall glasses are correspondingly arranged on opposite sides of the two outer curtain wall longitudinal keels; in addition, as the outer curtain wall prefabricating unit is prefabricated in a processing plant and then transported to an assembly process of field installation, a plurality of curtain wall glasses can be integrated on the outer curtain wall prefabricating unit, the defects of complex construction and low efficiency of traditional installer in turn from top to bottom are avoided, and meanwhile, the construction safety risk of traditional hanging basket installation is avoided; on the other hand, the invention can check the quality, connection reliability and assembly quality of curtain wall glass when in engineering prefabrication, and avoids the defects of construction quality, installation error and the like when the traditional curtain wall is assembled on site.
The invention provides a construction method of an outer curtain wall system of a rapid assembly building, which comprises the steps that in a prefabrication factory, curtain wall glass connecting mechanisms for curtain wall glass are correspondingly arranged on opposite sides of two outer curtain wall longitudinal keels, two ends of the two outer curtain wall longitudinal keels are respectively connected with a six-way support, curtain wall glass with curtain wall glass connecting holes on two sides is sequentially connected to the two outer curtain wall longitudinal keels through the corresponding curtain wall glass connecting mechanisms, and sealant is arranged at a gap between the adjacent curtain wall glass to finish prefabrication of an outer curtain wall prefabrication unit; transporting a plurality of outer curtain wall prefabricated units to a construction site; the outer curtain wall prefabrication unit is hoisted to the installation position of the outer elevation of the building by adopting the lifting appliance, and the installation work of the outer curtain wall prefabrication unit is completed by welding the six-way support and the embedded part of the main building structure; in addition, as the outer curtain wall prefabricating unit is prefabricated in a processing plant and then transported to an assembly process of field installation, a plurality of curtain wall glasses can be integrated on the outer curtain wall prefabricating unit, the defects of complex construction and low efficiency of traditional installer in turn from top to bottom are avoided, and meanwhile, the construction safety risk of traditional hanging basket installation is avoided; on the other hand, the invention can check the quality, connection reliability and assembly quality of curtain wall glass when in engineering prefabrication, and avoids the defects of construction quality, installation error and the like when the traditional curtain wall is assembled on site.
Drawings
FIG. 1 is an elevation view of a quick-assembly building outer curtain wall system;
FIG. 2 is a schematic view of a six-way bearing;
FIG. 3 is a schematic diagram of the connection of the six-way support to the longitudinal keels of the outer curtain wall;
fig. 4 is a schematic view of the connection collar to the outer curtain wall longitudinal keel.
Fig. 5 is a schematic sectional view of a curtain wall glass connection mechanism.
In the figure: the external curtain wall longitudinal keel is characterized in that the external curtain wall longitudinal keel is 1-2, the keel side wall is 1-2, the six-way support is 2-1, the support bottom channel steel is 2-1, the first groove bottom plate is 2-1-2, the first side wall is 2-1-2, the vertical connecting plate is 2-2, the connecting plate bolt is 2-3, the horizontal transverse guide groove of the connecting plate is 2-4, the channel steel T-shaped guide groove is 2-5, the first channel steel bolt is 2-6, the channel steel vertical guide groove is 2-7, the second channel steel bolt is 2-8, the weld joint position of the embedded part with the main body structure is 2-9, the curtain wall glass connecting mechanism is 3-1, the connecting lug plate is 3-2, the lug plate bolt is 3-3, the connecting lantern ring is 3-4, the connecting nut is 3-5, the rubber gasket is 3-6, the sealant is 4, and the curtain wall glass is 5.
Detailed Description
The invention is described in further detail below with reference to the drawings and the specific examples. The technical contents and features of the present invention will be described in detail below with reference to the attached drawings by way of the illustrated embodiments. It should be further noted that the drawings are in a very simplified form and are all to a non-precise scale, merely for convenience and clarity in aiding in the description of embodiments of the invention. For convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the drawings, but this should not be construed as a limitation of the technical scheme of the present invention.
Referring to fig. 1 to 5, the embodiment discloses a construction method of a rapid assembly building outer curtain wall system, which comprises the following steps:
scheme 1: in a prefabrication factory, curtain wall glass connecting mechanisms 3 for curtain wall glass are correspondingly arranged on opposite sides of two outer curtain wall longitudinal keels 1, two six-way supports 2 are respectively connected to two ends of the two outer curtain wall longitudinal keels 1, curtain wall glass 5 with curtain wall glass connecting holes on two sides are sequentially connected to the two outer curtain wall longitudinal keels 1 through the corresponding curtain wall glass connecting mechanisms 3, and sealant 3-4 is arranged at a gap between the adjacent curtain wall glass 5 to finish prefabrication of an outer curtain wall prefabrication unit;
scheme 2: transporting a plurality of outer curtain wall prefabricated units to a construction site;
scheme 3: hanging the outer curtain wall prefabricated unit to an outer elevation installation position of a building by adopting a hanging tool, and completing the installation work of the outer curtain wall prefabricated unit by welding the six-way support 2 with an embedded part of a main structure of the building;
scheme 4: and (3) repeating the process 3, and installing the prefabricated units of the outer curtain wall one by one on the outer vertical surface of the building until all curtain wall installation works are completed.
The invention provides a construction method of an outer curtain wall system of a rapid assembly building, which is characterized in that in a prefabrication factory, two opposite sides of two outer curtain wall longitudinal keels 1 are correspondingly provided with curtain wall glass connecting mechanisms 3 for curtain wall glass 5, two ends of the two outer curtain wall longitudinal keels 1 are respectively connected with a six-way support 2, curtain wall glass with curtain wall glass connecting holes on two sides is sequentially connected to the two outer curtain wall longitudinal keels 1 through the corresponding curtain wall glass connecting mechanisms 3, and gaps between the adjacent curtain wall glass 5 are provided with sealant 3-4, so that prefabrication of an outer curtain wall prefabrication unit is completed; transporting a plurality of outer curtain wall prefabricated units to a construction site; the outer curtain wall prefabrication unit is hoisted to the installation position of the outer elevation of the building by adopting the lifting appliance, and the installation work of the outer curtain wall prefabrication unit is completed by welding the embedded parts of the main building structure of the six-way support 2, on one hand, the six-way support 2 is connected with the main building structure, so that safety accidents such as curtain wall glass breakage, falling and hurting people caused by deformation of the curtain wall due to internal and external forces such as thermal stress, wind load and the like can be effectively avoided; in addition, as the outer curtain wall prefabricating unit is prefabricated in a processing plant and then transported to an assembly process of field installation, a plurality of curtain wall glasses can be integrated on the outer curtain wall prefabricating unit, the defects of complex construction and low efficiency of traditional installer in turn from top to bottom are avoided, and meanwhile, the construction safety risk of traditional hanging basket installation is avoided; on the other hand, the invention can check the quality, connection reliability and assembly quality of curtain wall glass when in engineering prefabrication, and avoids the defects of construction quality, installation error and the like when the traditional curtain wall is assembled on site.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the six-direction support 2 is a structure for connecting the embedded part of the building structure main body and the outer curtain wall longitudinal keel 1, and the six-direction support 2 can provide X, Y, Z three-dimensional six-direction displacement for curtain wall glass connected to the outer curtain wall longitudinal keel 1, so that the deformability of the curtain wall system is enhanced, and curtain wall glass breakage accidents caused by curtain wall glass deformation are avoided. X, Y, Z it is a three-dimensional rectangular coordinate system in which the horizontal direction is the Z direction, the vertical direction is the Y direction, and the horizontal direction is the X direction.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the outer curtain wall longitudinal keel 1 is a channel steel, the outer curtain wall longitudinal keel 1 comprises a keel groove bottom plate 1-1 and two keel side walls 1-2, and the two keel side walls 1-2 are vertically arranged at two ends of the keel groove bottom plate 1-1.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the six-way support 2 comprises a support bottom channel steel 2-1 and two vertical connecting plates 2-2, the support bottom channel steel 2-1 comprises a first groove bottom plate 2-1-1 and two first side walls 2-1-2, the two first side walls 2-1-2 are vertically arranged at two ends of the first groove bottom plate 2-1, connecting plate horizontal transverse guide grooves 2-4 are respectively arranged on the two vertical connecting plates 2-2, and the inner surfaces of the two vertical connecting plates 2-2 are respectively attached to the outer surfaces of the corresponding keel side walls 1-2 and are connected through connecting plate bolts 2-3 penetrating through the connecting plate horizontal transverse guide grooves 2-4; a first groove bottom plate 2-1-1 is respectively provided with a channel steel vertical guide groove 2-7 and a channel steel T-shaped guide groove 2-5, the channel steel T-shaped guide groove 2-5 comprises a vertical groove and a horizontal longitudinal groove, the vertical groove and the horizontal longitudinal groove are communicated to form a T-shaped groove, the outer surface of the first groove bottom plate 2-1-1 is attached to the outer surface of a keel groove bottom plate 1-1 and is respectively connected with a first channel steel bolt 2-6 row through a second channel steel bolt 2-8 penetrating the channel steel vertical guide groove 2-7 and a first channel steel bolt 2-6 penetrating the channel steel T-shaped guide groove 2-5, the end parts, far away from the first groove bottom plate 2-1, of the two first side walls 2-1-2 are welded and fixed with a main body structure embedded part, the end parts, far away from the first groove bottom plate 2-1-1, of the two first side walls 2-1-2 are welded with the main body structure embedded part, namely, the back surfaces of the support bottom 2-1 and the channel steel embedded part are connected with the front side channel steel support curtain wall 2-1 through the channel steel bolt 2-5, and the front surface of the channel steel embedded part is welded with the channel steel structure embedded part 2-1, and the front surface of the channel steel assembly is welded with the channel steel embedded part 2-1-5. . The six-direction support 2 with the structure can provide X, Y, Z three-dimensional six-direction displacement for curtain wall glass connected to the outer curtain wall longitudinal keel 1, enhance the deformability of a curtain wall system and avoid curtain wall glass breakage accidents caused by deformation of the curtain wall glass.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the connecting plate horizontal transverse guide groove 2-4 formed on the six-way support 2 provides horizontal transverse displacement, i.e. Z-direction displacement, of the outer curtain wall longitudinal keel 1, the vertical guide groove provides vertical displacement, i.e. Y-direction displacement, of the longitudinal keel, and the channel steel T-shaped guide groove 2-5 provides horizontal longitudinal displacement, i.e. X-direction displacement, of the outer curtain wall longitudinal keel 1.
Preferably, in the construction method of the rapid-assembly building outer curtain wall system, the curtain wall glass connecting mechanism 3 comprises a connecting lug plate 3-1, a lug plate bolt 3-2, a connecting sleeve ring 3-3, a connecting bolt 3-4, a connecting nut 3-5 and a rubber gasket 3-6, wherein the connecting lug plate 3-1 is fixed on the outer curtain wall longitudinal keel 1 through a plurality of lug plate bolts 3-2, one end of the connecting lug plate 3-1 is fixedly connected with one end of the connecting sleeve ring 3-3, the connecting sleeve ring 3-3 is vertically arranged, and a screw part of the connecting bolt 3-4 sequentially penetrates through the connecting sleeve ring 3-3, the rubber gasket 3-6, a curtain wall glass connecting hole and another rubber gasket 3-6 and is locked through the connecting nut 3-5. The curtain wall glass connecting mechanism 3 with the structure can realize stable connection between the curtain wall glass 5 and the outer curtain wall longitudinal keel 1.
Compared with the prior art, the invention has the following advantages and positive effects due to the adoption of the technical scheme:
(1) High installation efficiency and low construction risk
The outer curtain wall prefabricated units are prefabricated by a processing plant and then transported to an assembly process of field installation, and a plurality of curtain wall glasses can be integrated on the outer curtain wall prefabricated units, so that the defects of complex construction and low efficiency of traditional installation workers in turn and block by block installation from top to bottom are avoided, and meanwhile, the construction safety risk of traditional hanging basket installation is avoided.
(2) The product is safe to use and has high quality reliability
When the curtain wall glass quality inspection device is used for engineering prefabrication, the curtain wall glass quality, the connection reliability and the assembly quality can be inspected, and the defects of construction quality, installation errors and the like in the traditional curtain wall field assembly process are avoided. Meanwhile, the six-way support 2 is connected with the main body of the building structure, so that safety accidents such as broken curtain wall glass, falling and hurting people caused by deformation of the curtain wall due to internal and external forces such as thermal stress and wind load can be effectively avoided.
The above description is only illustrative of the preferred embodiments of the present invention and is not intended to limit the scope of the present invention, and any alterations and modifications made by those skilled in the art based on the above disclosure shall fall within the scope of the appended claims.

Claims (6)

1. The construction method of the rapid assembly building outer curtain wall system is characterized by comprising the following steps of:
scheme 1: in a prefabrication factory, curtain wall glass connecting mechanisms for curtain wall glass are correspondingly arranged on opposite sides of two outer curtain wall longitudinal keels, two ends of the two outer curtain wall longitudinal keels are respectively connected with a six-way support, curtain wall glass with curtain wall glass connecting holes on two sides is sequentially connected to the two outer curtain wall longitudinal keels through the corresponding curtain wall glass connecting mechanisms, and sealant is arranged at a gap between the adjacent curtain wall glass to finish prefabrication of an outer curtain wall prefabrication unit;
scheme 2: transporting a plurality of outer curtain wall prefabricated units to a construction site;
scheme 3: hanging the outer curtain wall prefabricated unit to an outer elevation installation position of a building by adopting a hanging tool, and completing the installation work of the outer curtain wall prefabricated unit by welding a six-way support and an embedded part of a main structure of the building;
scheme 4: and (3) repeating the process 3, and installing the prefabricated units of the outer curtain wall one by one on the outer vertical surface of the building until all curtain wall installation works are completed.
2. The method of constructing a rapidly assembled building outer curtain wall system of claim 1, wherein the hexa-directional support is a structure connecting a building structural body embedment and an outer curtain wall longitudinal keel, the hexa-directional support being capable of providing a X, Y, Z three-dimensional hexa-directional displacement for curtain wall glass connected to the outer curtain wall longitudinal keel.
3. The method of constructing a rapidly assembled building outer curtain wall system of claim 2, wherein the outer curtain wall longitudinal keels are channel steel, the outer curtain wall longitudinal keels comprise keel groove bottom plates and two keel side walls, and the two keel side walls are vertically arranged at two ends of the keel groove bottom plates.
4. The construction method of the rapid-assembly building outer curtain wall system according to claim 3, wherein the six-way support comprises a support bottom channel steel and two vertical connecting plates, the support bottom channel steel comprises a first groove bottom plate and two first side walls, the two first side walls are vertically arranged at two ends of the first groove bottom plate, connecting plate horizontal transverse guide grooves are respectively arranged on the two vertical connecting plates, and the inner surfaces of the two vertical connecting plates are respectively attached to the outer surfaces of the corresponding keel side walls and are connected through connecting plate bolts penetrating through the connecting plate horizontal transverse guide grooves; a channel steel vertical guide groove and a channel steel T-shaped guide groove are respectively formed in the first groove bottom plate, the channel steel T-shaped guide groove comprises a vertical groove and a horizontal longitudinal groove, the vertical groove and the horizontal longitudinal groove are communicated to form a T-shaped groove, the outer surface of the first groove bottom plate is attached to the outer surface of the keel groove bottom plate and is connected with the first channel steel bolt line through a second channel steel bolt penetrating through the channel steel vertical guide groove and the channel steel T-shaped guide groove respectively, and the end portions, far away from the first groove bottom plate, of the two first side walls are welded and fixed with the embedded part of the main body structure.
5. The method for constructing a rapidly assembled building outer curtain wall system according to claim 4, wherein the connecting plate horizontal transverse guide groove formed on the six-way support provides horizontal transverse movement displacement of the outer curtain wall longitudinal keel, the vertical guide groove provides vertical movement displacement of the longitudinal keel, and the channel steel T-shaped guide groove provides horizontal longitudinal movement displacement of the outer curtain wall longitudinal keel; .
6. The construction method of the rapid-assembly building outer curtain wall system according to claim 1, wherein the curtain wall glass connecting mechanism comprises a connecting lug plate, lug plate bolts, a connecting lantern ring, connecting bolts, connecting nuts and rubber washers, the connecting lug plate is fixed on an outer curtain wall longitudinal keel through a plurality of lug plate bolts, one end of the connecting lug plate is fixedly connected with one end of the connecting lantern ring, the connecting lantern ring is vertically arranged, and a screw rod part of the connecting bolts sequentially penetrates through the connecting lantern ring, the rubber washers, a curtain wall glass connecting hole and another rubber washer and then is locked through the connecting nuts.
CN202211734716.5A 2022-12-30 2022-12-30 Construction method of rapid assembly building outer curtain wall Pending CN116220263A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211734716.5A CN116220263A (en) 2022-12-30 2022-12-30 Construction method of rapid assembly building outer curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211734716.5A CN116220263A (en) 2022-12-30 2022-12-30 Construction method of rapid assembly building outer curtain wall

Publications (1)

Publication Number Publication Date
CN116220263A true CN116220263A (en) 2023-06-06

Family

ID=86574126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211734716.5A Pending CN116220263A (en) 2022-12-30 2022-12-30 Construction method of rapid assembly building outer curtain wall

Country Status (1)

Country Link
CN (1) CN116220263A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926955A (en) * 2024-02-06 2024-04-26 浙江固耐建筑科技有限公司 Building outer elevation modularization curtain wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926955A (en) * 2024-02-06 2024-04-26 浙江固耐建筑科技有限公司 Building outer elevation modularization curtain wall

Similar Documents

Publication Publication Date Title
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN203583744U (en) Suspended ceiling structure
CN116220263A (en) Construction method of rapid assembly building outer curtain wall
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN213449034U (en) Assembled light composite function outer wall enclosure system
CN209941906U (en) PC (polycarbonate) external wallboard connecting structure
CN205557941U (en) Outer wall perforation aluminum curtain wall
CN204728482U (en) A kind of prefabricated sheet-pile mortise and tenon type connected node
CN105587058A (en) Perforated aluminum plate curtain wall of external wall
CN219011631U (en) Quick assembly building outer curtain wall system
CN110725412A (en) Integrated house system with embedded steel structure
CN110593457A (en) Assembled outer wall based on reinforced concrete frame structure and connecting method thereof
CN210134530U (en) Assembled wallboard system
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN203569833U (en) Novel dry hanging system for building outer decoration and insulation integrated boards
CN211472999U (en) Cable type glass curtain wall clamp structure form
CN200964643Y (en) Precast concrete outer wall ornamental hanging plate with hidden connection node
CN203654497U (en) Stone heat preservation composite board dry hanging system
CN201914798U (en) Lower mechanical stopping device for elevator
CN108343182B (en) Combined GRC double-layer curtain wall plate
CN220580291U (en) Unit type cement fiber board curtain wall mounting structure
CN216196538U (en) Steel pipe hinge mechanism for construction
CN217871549U (en) Assembled steel structure external wallboard connecting piece with bayonet
CN219671653U (en) Assembled heat-insulating integrated external wall panel node
CN220202331U (en) Top surface design structure with leveling function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination