CN116191575A - Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service - Google Patents

Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service Download PDF

Info

Publication number
CN116191575A
CN116191575A CN202310283000.6A CN202310283000A CN116191575A CN 116191575 A CN116191575 A CN 116191575A CN 202310283000 A CN202310283000 A CN 202310283000A CN 116191575 A CN116191575 A CN 116191575A
Authority
CN
China
Prior art keywords
storage system
power
optical storage
power grid
operation control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310283000.6A
Other languages
Chinese (zh)
Other versions
CN116191575B (en
Inventor
康喆
纪方旭
陈杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changdian Xinneng Co ltd
Original Assignee
Changdian Xinneng Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changdian Xinneng Co ltd filed Critical Changdian Xinneng Co ltd
Priority to CN202310283000.6A priority Critical patent/CN116191575B/en
Publication of CN116191575A publication Critical patent/CN116191575A/en
Application granted granted Critical
Publication of CN116191575B publication Critical patent/CN116191575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/50Controlling the sharing of the out-of-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an operation control method and an operation control system for an optical storage system participating in power grid voltage regulation auxiliary service, and belongs to the field of new energy and electric power. Comprising the following steps: an interactive optimization model of the optical storage system participating in auxiliary service of the active power distribution network is established, and a distributed optimization solving method based on the model is provided based on a distributed alternating direction multiplier algorithm. The method can realize that the optical storage system with the multi-decision main body attribute of target conflict is connected into the power grid and participates in the power grid voltage regulation auxiliary service in a deep level, and meanwhile, the provided distributed optimization solving method can effectively solve the problems of high dimensionality and difficult solving of the interactive optimization model, and avoids the risks of complete data information, privacy leakage and the like in the traditional centralized optimization algorithm; in addition, the method provided by the invention can effectively mobilize the reactive-voltage and active-power supporting potential of the optical storage system, reduce the running loss of the power grid, improve the voltage running safety of the power grid and realize the goal agreement of the power grid and the optical storage system.

Description

Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service
Technical Field
The invention belongs to the field of new energy and electric power, and particularly relates to an operation control method and system for a light storage system to participate in power grid voltage regulation auxiliary service.
Background
With the rapid and rapid development of renewable energy sources such as distributed photovoltaic and the like and high penetration access of the renewable energy sources in a power grid, the inherent randomness and fluctuation of the renewable energy sources also bring serious risks and challenges to the power quality and the safety of the power grid. The construction of energy storage resources and the development of a more flexible optical storage system are powerful means for coping with the problems of randomness and fluctuation of the distributed photovoltaic output power, but the development of the optical storage system still faces the dilemma that the construction consumption resources are high, the safety problem is complex and the like at the present stage, so that the construction utilization efficiency of the optical storage system is still low, the growth speed and the growth scale are still limited, and therefore, how to improve the operation benefit of the optical storage system becomes a key problem to be solved urgently.
At present, aiming at the research and development of the value-added synergy of an optical storage system by participating in the interactive operation of a power grid, for example, (1) an evaluation system of the system is established through annual load electricity deficiency rate, energy wave rate, energy fluctuation rate and comprehensive consumption resource, and finally the annual load electricity deficiency rate is used as a constraint condition and the quantity constraint of each power generation unit is added, and the system is subjected to multi-objective optimization solution by a method combining a genetic algorithm and a weight coefficient change method, so that the optimal system configuration and operation scheme are obtained; (2) Taking the wind and light discarding penalty into consideration, consuming resources, establishing a day-ahead optimal scheduling model of the wind and light storage hydrogen production system, and optimally solving the optimal scheduling model by adopting a self-adaptive simulated annealing particle swarm algorithm; (3) The method comprises the steps of taking the minimum load variance at the power grid side, the minimum operation and maintenance consumption resource of an energy storage system and the minimum electricity purchasing cost to the power grid as objective functions, taking the power of the energy storage system, the state of charge and the power of the power grid side as constraint conditions, establishing a multi-objective optimization operation model of the energy storage system, and solving by adopting an NSGA-III algorithm to obtain a Pareto optimal solution set.
However, most of the optical storage systems researched by the method pay attention to the running of the power grid, the optical storage systems with multi-decision main attribute and the power grid are in interactive running, and in addition, the interactive running of the optical storage systems and the power grid is mostly focused on the problem of interactive running optimization in a fixed power environment in a power control mode, but the research on the deep participation of the optical storage systems in the interaction of power auxiliary services, especially the participation of the voltage control auxiliary services, is very involved, and the optical storage systems actually have better reactive-voltage and active-power supporting capability, so that the potential of the optical storage systems in the power grid voltage control auxiliary services needs to be further explored, the corresponding interactive optimization mode is explored, and the aim of the optical storage systems and the power grid under the multi-decision main attribute is achieved.
Disclosure of Invention
Aiming at the defects of the prior art, the invention aims to provide the operation control method and the system for the participation of the optical storage system in the power grid voltage regulation auxiliary service, and aims to solve the problems of high dimensionality and difficult solution of an interactive optimization model and avoid the risks of complete data information, privacy leakage and the like in the traditional centralized optimization algorithm.
In order to achieve the above object, in a first aspect, the present invention provides an operation control method for a light storage system participating in a grid voltage regulation auxiliary service, where the light storage system has a multi-decision main attribute of target conflict, the method includes:
s1, constructing an integral operation control model of the light storage system participating in power grid voltage regulation auxiliary service, wherein the integral operation control model comprises the following steps: the power grid side operation control model and the optical storage system operation control model; wherein,
the grid-side operation control model includes: the decision variable is expected operation power sent by the power grid to the optical storage system in each time period, the optimization target is to minimize operation consumption resources, the operation consumption resources consist of network damage consumption resources, auxiliary service consumption resources and power grid voltage out-of-limit cost, and the operation constraint comprises power grid node voltage constraint, power grid branch transmission power constraint and network power flow constraint;
the optical storage system operation control model comprises: the decision variable is the operation power of each optical storage system in each time period for responding to auxiliary service, the optimization target is the maximization of operation benefit, the operation benefit is composed of the consumption of resources of life loss and the participation of the optical storage system in the harvest of the auxiliary service, and the operation constraint comprises the charge and discharge power constraint of the energy storage equipment and the operation constraint of the energy storage SOC;
s2, carrying out augmented Lagrangian equivalent transformation on the integral operation control model by introducing Lagrangian multipliers, penalty coefficients and auxiliary variables to obtain a distributed optimization equivalent model of the power grid and each optical storage system;
s3, carrying out distributed alternate iterative solution on the power grid and the distributed optimization equivalent model of each optical storage system by adopting an alternate direction multiplier method, and obtaining the optimal interactive operation power of the optical storage system participating in the voltage regulation auxiliary service of the power grid.
Preferably, the objective function of the grid-side operation control model is specifically as follows:
Figure BDA0004141022510000031
Figure BDA0004141022510000032
Figure BDA0004141022510000033
Figure BDA0004141022510000034
wherein ,Xnet For controlling a variable X of a power grid side operation control model net =[X net (1),...,X net (t),...],X net (t) is a vector formed by expected active power and reactive power emitted by the power grid to the optical storage system in the t time period, C DN C, running total consumption resources for the power grid loss Consuming resources for network damages of the power grid, C bat For electric networkInvoking consumed resources of the optical storage system on the auxiliary service, C pen The voltage out-of-limit cost of the power grid node is calculated; t is the total time period number of the optimized operation control, P loss (t) is the total loss power of the power grid in the period of t, c t For the consumption item of t time period units, M is the number of the optical storage system, M is the set formed by all the optical storage systems, and P net,m (t),Q net,m (t) respectively expecting active power and reactive compensation power of the mth optical storage system in t time period for the power grid, wherein deltat is the unit time length, c bat (t) is a unit consumption term of the optical storage system in a t time period, and omega is a distribution proportionality coefficient of the unit consumption term of the optical storage system on active and reactive power;
Figure BDA0004141022510000035
respectively crossing upper limit parameters and lower limit parameters of voltage of all voltage nodes of the power grid in a t time period; lambda (lambda) pen And the grid cost coefficient is obtained after the voltage is out of limit.
Preferably, the operation constraint of the grid-side operation control model is specifically as follows:
Figure BDA0004141022510000041
P i min ≤P i (t)≤P i max
Q i min ≤Q i (t)≤Q i max
Figure BDA0004141022510000042
/>
Figure BDA0004141022510000043
wherein ,
Figure BDA0004141022510000044
the upper voltage limit crossing parameters of all voltage nodes of the power grid in the t time periodLower limit parameters, i is the grid node number, omega is the set formed by all the grid node numbers, U max ,U min Respectively the maximum value and the minimum value of the node voltage, U i (t) is the voltage of node i in time period t, P i (t),Q i (t) active power and reactive power limits of the grid node i in the t period, respectively,/->
Figure BDA0004141022510000045
The minimum active power and the maximum active power of node i respectively,
Figure BDA0004141022510000046
minimum reactive power and maximum reactive power of node i, P j ,Q j Active and reactive power, P, flowing respectively from node j to the node below ij ,Q ij Active power and reactive power flowing to a node j of the power grid node i respectively; r is (r) ij ,x ij Resistance and reactance between node i and node j, respectively, +.>
Figure BDA0004141022510000047
Active and reactive power of the load of node j, respectively,/->
Figure BDA0004141022510000048
Distributed photovoltaic output of node j, < >>
Figure BDA0004141022510000049
The active power and the reactive power of the optical storage system which are respectively called by the power grid to the node j are I as an absolute value operator.
Preferably, the objective function of the optical storage system operation control model is specifically as follows:
Figure BDA00041410225100000410
wherein ,Xm Optimizing control model control variables X for optical storage system m =[X m (1),...,X m (T)],X m (T) is a vector formed by active power and reactive power which are transmitted by the mth optical storage system to auxiliary service and are meant to participate, T is the total time period number of the optimal operation control,
Figure BDA00041410225100000411
harvesting of the mth optical storage system participating in grid auxiliary service, P m (t),Q m (t) respectively responding the active electric power and the reactive compensation power of the auxiliary service in the t time period for the mth optical storage system, c c Resource coefficients are consumed for the unit electric quantity of the optical storage system; Δt is the time interval, || is the absolute value operator.
Preferably, the operation constraint of the optical storage system operation control model is specifically as follows:
Figure BDA0004141022510000051
Figure BDA0004141022510000052
Figure BDA0004141022510000053
Figure BDA0004141022510000054
Figure BDA0004141022510000055
Figure BDA0004141022510000056
Figure BDA0004141022510000057
wherein ,Pm (t),Q m (t) respectively responding the active electric power and reactive compensation power of the auxiliary service in the t time period for the mth optical storage system,
Figure BDA0004141022510000058
reactive compensation power minimum and maximum values for the mth optical storage system in response to the auxiliary service in the t period,/for the mth optical storage system>
Figure BDA0004141022510000059
Respectively, the discharge power and the charge power of the energy stored in the mth optical storage system in the t time period,/->
Figure BDA00041410225100000510
Respectively, the maximum discharge power and the maximum charge power allowed by energy storage in the mth optical storage system, < +.>
Figure BDA00041410225100000511
For the charge state of energy stored in the mth optical storage system in the t time period, E bat,m Is the maximum capacity of energy storage in the mth optical storage system, delta t is the time interval, eta c,md,m Respectively the charging and discharging efficiency of the energy storage in the mth optical storage system,/for>
Figure BDA00041410225100000512
Maximum and minimum constraints of the state of charge of the stored energy in the mth optical storage system, respectively,/->
Figure BDA00041410225100000513
The initial charge state and the final charge state of the energy storage in the operation control in the mth optical storage system are respectively.
Preferably, step S2 includes:
s21, introducing Lagrangian multipliers
Figure BDA00041410225100000514
And penalty coefficient ρ, equivalent the grid-side operation control model to an augmented lagrangian optimization objective function form:
Figure BDA00041410225100000515
S22, introducing Lagrangian multipliers
Figure BDA00041410225100000516
And penalty coefficient ρ, equivalent the optical storage system operation control model to an augmented lagrangian optimization objective function form:
Figure BDA0004141022510000061
s23, will
Figure BDA0004141022510000062
and />
Figure BDA0004141022510000063
Unifying the obtained values to be Z, and constructing an extended Lagrangian function of the auxiliary variable Z:
Figure BDA0004141022510000064
wherein ,Xnet For controlling a variable X of a power grid side operation control model net =[X net (1),...,X net (t),...],X net (t)=[P net,1 (t),...,P net,m (t),Q net,1 (t),...,Q net,m (t)],P net,m (t),Q net,m (t) respectively obtaining active power and reactive compensation power of the power grid expected optical storage system m in t time period, C DN (X net ) The total consumption of resources for the operation of the power grid,
Figure BDA0004141022510000065
the Lagrangian multiplier corresponding to the kth iterative process after the equivalent conversion of the power grid operation control model is adopted, ρ is a punishment coefficient, T is an optimization time period number, T is an optimization operation control total time period number, and>
Figure BDA0004141022510000066
the method comprises the steps that the method is an auxiliary variable corresponding to a kth iterative process after the power grid operation control model is equivalently converted, and the I is a two-norm operator; x is X m Controlling a model control variable X for the operation of the optical storage system m =[X m (1),...,X m (T)],X m (t)=[P m (t),Q m (t)],P m (t),Q m (t) the intended active power and reactive compensation power respectively transmitted by the optical storage system m to the auxiliary service in the t period,/>
Figure BDA0004141022510000067
Harvesting of the mth optical storage system involved in the grid auxiliary service,/->
Figure BDA0004141022510000068
Lagrangian multiplier corresponding to the kth iterative process after equivalent transformation of the optical storage system control model is +.>
Figure BDA0004141022510000069
The auxiliary variable corresponding to the kth iteration process after the equivalent transformation of the optical storage system operation control model is adopted; z is Z k Is an auxiliary variable +.>
Figure BDA00041410225100000610
and />
Figure BDA00041410225100000611
The unified set X is the control variable X of the operation control model of the optical storage system m And grid optimization control model control variable X net Lambda of (x) k As auxiliary variable Z k The Lagrangian multiplier corresponding to the kth iterative updating process.
Preferably, step S3 includes:
s31, setting maximum iteration times and convergence accuracy, and setting upper and lower limits of unit consumption items between the optical storage system and the power grid
Figure BDA00041410225100000612
Initializing a unit compensation item of a power grid to a light storage system to be 0, initializing iteration number k to be 0 and initializing independent variables
Figure BDA00041410225100000613
Initializing auxiliary variable +.>
Figure BDA00041410225100000614
Initializing the augmented lagrangian multiplier +.>
Figure BDA00041410225100000615
And penalty coefficient ρ 0 Wherein T e [1,2, ], t.],m∈M;
S32, for the main body of the power grid, receiving the active power expected to be distributed to auxiliary services of the power grid from each optical storage system
Figure BDA0004141022510000071
And reactive power->
Figure BDA0004141022510000072
According to the augmentation Lagrangian optimization objective function and the operation constraint of the power grid side operation control model and the like, solving the distributed optimization model to obtain active power +.>
Figure BDA0004141022510000073
And reactive power
Figure BDA0004141022510000074
S33, for each optical storage system, receiving the expected active power of the optical storage system from the power grid
Figure BDA0004141022510000075
And reactive power->
Figure BDA0004141022510000076
The Lagrangian optimization objective function and the operation constraint are enhanced according to the operation control model of the optical storage system,solving a distributed optimization model to obtain the output quantity of the optical storage system m responding to the auxiliary service of the power grid +.>
Figure BDA0004141022510000077
And reactive compensation quantity->
Figure BDA0004141022510000078
S34, updating active power reference values of main bodies of all optical storage system power stations in response to auxiliary services of active power distribution network
Figure BDA0004141022510000079
And reactive power reference value->
Figure BDA00041410225100000710
Auxiliary variable->
Figure BDA00041410225100000711
Figure BDA00041410225100000712
Figure BDA00041410225100000713
S35, updating Lagrangian multiplier
Figure BDA00041410225100000714
Penalty coefficient ρ k+1 Update iteration number k=k+1:
Figure BDA00041410225100000715
Figure BDA00041410225100000716
wherein ,
Figure BDA00041410225100000717
for self-disability, add->
Figure BDA00041410225100000718
Is the mutual residual error;
s36, calculating the total power of the optical storage system participating in auxiliary service
Figure BDA00041410225100000719
Calculating unit compensation term of optical storage system
Figure BDA00041410225100000720
Figure BDA0004141022510000081
Figure BDA0004141022510000082
Where α is the attenuation coefficient.
S37, judging whether iteration termination conditions are met according to the mutual residual errors and the self-residual errors of the variables, if yes, ending, otherwise, returning to the step S32.
In order to achieve the above object, in a second aspect, the present invention provides an operation control system for a light storage system participating in a voltage regulation auxiliary service of a power grid, including: a processor and a memory; the memory is used for storing computer execution instructions; the processor is configured to execute the computer-executable instructions such that the method of the first aspect is performed.
In general, the above technical solutions conceived by the present invention have the following beneficial effects compared with the prior art:
the invention provides an operation control method and system for an optical storage system to participate in power grid voltage regulation auxiliary service, comprising the following steps: an interactive optimization model of the optical storage system participating in auxiliary service of the active power distribution network is established, and a distributed optimization solving method based on the model is provided based on a distributed alternating direction multiplier algorithm. The method can realize that the optical storage system with the multi-decision main body attribute of target conflict is connected into the power grid and participates in the power grid voltage regulation auxiliary service in a deep level, and meanwhile, the provided distributed optimization solving method can effectively solve the problems of high dimensionality and difficult solving of the interactive optimization model, and avoids the risks of complete data information, privacy leakage and the like in the traditional centralized optimization algorithm; in addition, the method provided by the invention can effectively mobilize the reactive-voltage and active-power supporting potential of the optical storage system, reduce the running loss of the power grid, improve the voltage running safety of the power grid and realize the goal agreement of the power grid and the optical storage system.
Drawings
Fig. 1 is a flowchart of an operation control method for a light storage system participating in a voltage regulation auxiliary service of a power grid.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
As shown in fig. 1, the invention provides an operation control method for a light storage system to participate in a voltage regulation auxiliary service of a power grid, comprising the following steps:
step 1, an operation control model of the optical storage system participating in the power grid voltage regulation auxiliary service is built, wherein the operation control model comprises an operation control model of a power grid side and an operation control model of the optical storage system.
1) The method comprises the steps of constructing a grid side optimization control model, wherein an optimization operation target is to minimize operation consumption resources, the optimization operation target mainly comprises network damage consumption resources, auxiliary service consumption resources and grid voltage out-of-limit cost, and operation constraints comprise grid node voltage constraints, grid branch transmission power constraints, network power flow constraints and the like. The operation optimization objective of the constructed grid-side control model is as follows:
Figure BDA0004141022510000091
Figure BDA0004141022510000092
Figure BDA0004141022510000093
Figure BDA0004141022510000094
/>
Figure BDA0004141022510000095
wherein ,Xnet Optimizing control variables of a control model for a power grid, expressed as X m =[X m (1),...,X m (T)],C DN C, running total consumption resources for the power grid loss Consuming resources for network damages of the power grid, C bat Invoking consumed resources of the optical storage system on auxiliary service for the power grid, C pen The voltage out-of-limit cost of the power grid node is calculated; t is the total time period number of the optimized operation control, and the invention adopts 24 hours and P loss (t) is the total loss power of the power grid in the period of t, c t Expending items for t time period units, P net,m (t),Q net,m (t) respectively obtaining active power and reactive compensation power of a power grid expected light storage system M in a t time period, wherein M is the number of the light storage system, M is a set formed by a plurality of light storage systems, deltat is the unit time length, and c bat (t) is a unit consumption term of the optical storage system in a t time period, and omega is a distribution proportionality coefficient of the unit consumption term of the optical storage system on active and reactive power;
Figure BDA0004141022510000101
respectively crossing upper limit parameters and lower limit parameters of voltage of all voltage nodes of the power grid in a t time period, wherein i is the number of the nodes of the power grid, omega is the set formed by the numbers of all the nodes of the power grid, and when ∈ ->
Figure BDA0004141022510000102
Node voltage out-of-limit is represented in time 1, and all nodes of the power grid meet safety constraint when the node voltage out-of-limit is 0; lambda (lambda) pen U is the cost coefficient of the power grid after the voltage is out of limit max ,U min Respectively the maximum value and the minimum value of the node voltage, U i And (t) is the voltage of node i in the t period.
The power flow constraint and the power limit constraint met by the power grid are as follows:
P i min ≤P i (t)≤P i max (6)
Q i min ≤Q i (t)≤Q i max (7)
Figure BDA0004141022510000103
Figure BDA0004141022510000104
wherein ,Pi (t),Q i (t) active power and reactive power limits of the grid node i in the t time period respectively,
Figure BDA0004141022510000105
minimum active power and maximum active power of node i, respectively, +.>
Figure BDA0004141022510000106
Minimum reactive power and maximum reactive power of node i, P ij ,Q ij Active and reactive power respectively flowing to node j for grid node i, P j ,Q j Active power and reactive power respectively flowing to a lower node for the node j; r is (r) ij ,x ij Resistance and reactance between node i and node j, respectively, +.>
Figure BDA0004141022510000107
Active and reactive power for node j loads, respectively,/>
Figure BDA0004141022510000108
Distributed photovoltaic output of node j, < >>
Figure BDA0004141022510000109
And respectively calling active power and reactive power of the optical storage system to the node j for the power grid.
2) An optical storage system operation optimization control model is built, an optimization operation target is to maximize operation benefit, the optimization target comprises life loss consumption resources and harvest of auxiliary services of the optical storage system, and operation constraints comprise charge and discharge power constraint of energy storage equipment, energy storage SOC operation constraint and the like. Wherein the optimization objective function is expressed as follows:
Figure BDA0004141022510000111
wherein ,Xm Optimizing control model control variable for optical storage system expressed as X m =[X m (1),...,X m (T)],
Figure BDA0004141022510000112
Harvesting of the mth optical storage system participating in grid auxiliary service, P m (t),Q m (t) respectively responding the active electric power and the reactive compensation power of the auxiliary service in the t time period for the mth optical storage system, c c Resource coefficients are consumed for the unit electric quantity of the optical storage system; Δt is the time interval, ||is the absolute value operator, and the number M epsilon M of the optical storage system.
The following constraints are satisfied for the operation of the optical storage system:
Figure BDA0004141022510000113
P m (t)=P dis,m (t)-P ch,m (t) (12)
Figure BDA0004141022510000114
Figure BDA0004141022510000115
Figure BDA0004141022510000116
Figure BDA0004141022510000117
Figure BDA0004141022510000118
wherein ,
Figure BDA0004141022510000119
respectively the discharge power and the charge power of the energy storage in the mth optical storage system in the t time period,
Figure BDA00041410225100001110
respectively, the maximum discharge power and the maximum charge power allowed by energy storage in the mth optical storage system, < +.>
Figure BDA00041410225100001111
For the state-of-charge (SOC) of energy storage in the mth optical storage system in the t period, E bat,m Is the maximum capacity of energy storage in the mth optical storage system, delta t is the time interval, eta c,m ,η d,m Respectively the charging and discharging efficiency of the energy storage in the mth optical storage system,/for>
Figure BDA00041410225100001112
Maximum and minimum constraints of the state of charge of the stored energy in the mth optical storage system, respectively,/->
Figure BDA00041410225100001113
The initial charge state and the final charge state of the energy storage in the operation control in the mth optical storage system are respectively. The essence of constraint (14): the energy storage is in the constraint of charging and discharging states, when the charging power is greater than 0, the discharging power is 0; conversely, when the discharge power is greater than 0, the charge power must be 0.
And step 2, introducing Lagrange multipliers, penalty coefficients and auxiliary variables, and performing augmentation Lagrange equivalent transformation on the model constructed in the step 1 to obtain a distributed optimization equivalent model of the power grid and each optical storage system.
1) For the constructed grid side optimization control model, lagrange multiplier lambda is introduced k And a penalty coefficient rho, the grid side optimization control model is transformed into an amplified Lagrange optimization objective function form, and the amplified objective function is shown as a formula (18):
Figure BDA0004141022510000121
wherein ,Xnet Optimizing control variables of a control model for a power grid, expressed as X net =[X net (1),...,X net (t),...]Refers to the expected active power and reactive power emitted by the power grid to the optical storage system, wherein X net (t)=[P net,1 (t),...,P net,m (t),Q net,1 (t),...,Q net,m (t)],P net,m (t),Q net,m (t) respectively obtaining active power and reactive compensation power of the power grid expected optical storage system m in t time period, C DN (X net ) The total consumption of resources for the operation of the power grid,
Figure BDA0004141022510000122
the Lagrangian multiplier corresponding to the kth iterative process after the equivalent conversion of the power grid operation control model is adopted, ρ is a punishment coefficient, T is an optimization time period number, T is an optimization operation control total time period number, and>
Figure BDA0004141022510000123
and (3) for auxiliary variables corresponding to the kth iterative process after the equivalent transformation of the power grid operation control model, the operation constraint to be met by the power grid operation control model after the equivalent transformation is shown in formulas (6) - (9), and the I is a two-norm operator. />
2) Introducing a distributed extended Lagrange function of each optical storage system to the constructed optical storage system optimization control model to obtain an extended Lagrange optimization objective function of each optical storage system, wherein the extended Lagrange optimization objective function is shown as a formula (19):
Figure BDA0004141022510000124
wherein ,Xm Optimizing control model control variable for optical storage system expressed as X m =[X m (1),...,X m (T)]Including active and reactive power, X, of intended participation by the optical storage system in the auxiliary service m (t)=[P m (t),Q m (t)],P m (t),Q m (t) the intended active power and reactive compensation power respectively transmitted by the optical storage system m to the auxiliary service in the t period,
Figure BDA0004141022510000125
harvesting of the mth optical storage system involved in the grid auxiliary service,/->
Figure BDA0004141022510000131
Lagrangian multiplier corresponding to the kth iterative process after equivalent transformation of the optimal control model of the optical storage system, ρ is a penalty coefficient, T is an optimal time period number, T is an optimal operation control total time period number, and->
Figure BDA0004141022510000132
For auxiliary variables corresponding to the kth iterative process after the equivalent transformation of the optimal control model of the optical storage system, the operation constraint which needs to be met by the optimal control model of the optical storage system is shown in formulas (11) - (17).
3) For introduced auxiliary variables
Figure BDA0004141022510000133
and />
Figure BDA0004141022510000134
Unifying the two values as Z, and constructing an extended Lagrangian function of an auxiliary variable Z as shown in a formula (20):
Figure BDA0004141022510000135
wherein ,Zk As an auxiliary variable
Figure BDA0004141022510000136
and />
Figure BDA0004141022510000137
Unified set, X is the control variable X of the optimal control model of the optical storage system m And grid optimization control model control variable X net Lambda of (x) k As auxiliary variable Z k Lagrangian multiplier corresponding to the kth iterative updating process, ρ is a penalty coefficient, T is an optimization time period number, and T is an optimization operation control total time period number.
And 3, carrying out distributed alternate iterative solution on the distributed optimization equivalent model based on the augmented Lagrangian function constructed in the step 2 by adopting an alternate direction multiplier method, and obtaining the optimal interactive operation power of the optical storage system participating in the grid voltage regulation auxiliary service.
1) Setting the maximum iteration number k max Convergence accuracy xi, setting upper and lower limits of unit consumption items between optical storage system and power grid
Figure BDA0004141022510000138
Initializing a unit compensation item of a power grid to a light storage system to be 0, initializing iteration number k to be 0 and initializing independent variables
Figure BDA0004141022510000139
Initializing auxiliary variable +.>
Figure BDA00041410225100001310
Initializing the augmented lagrangian multiplier +.>
Figure BDA00041410225100001311
And penalty coefficient ρ 0 Wherein T e [1,2, ], t.],m∈M;
2) For the main body of the power grid, the active power which is expected to be distributed to auxiliary services of the power grid is received from each optical storage system
Figure BDA00041410225100001312
And reactive power->
Figure BDA00041410225100001313
Solving a distributed optimization model according to a formula (18) and a constraint thereof to obtain active power +.>
Figure BDA00041410225100001314
And reactive power->
Figure BDA00041410225100001315
3) For optical storage system i, receiving an electrical grid desired optical storage system active power from an electrical grid
Figure BDA00041410225100001316
And reactive power
Figure BDA00041410225100001317
Solving a distributed optimization model according to a formula (19) and a constraint thereof to obtain the output quantity of the light storage system i responding to the auxiliary service of the power grid +.>
Figure BDA00041410225100001318
And reactive compensation quantity->
Figure BDA00041410225100001319
4) Updating the main body of each optical storage system power station to respond to the auxiliary service of the active power distribution network according to the formula (21)Active power
Figure BDA0004141022510000141
And reactive power->
Figure BDA0004141022510000142
Reference value, update auxiliary variable ++according to equation (22)>
Figure BDA0004141022510000143
/>
Figure BDA0004141022510000144
Figure BDA0004141022510000145
5) Updating Lagrangian multiplier according to equation (23)
Figure BDA0004141022510000146
Calculating mutual residual error and self residual error of variables according to formula (24), and updating penalty coefficient rho according to formula (25) k Updating the iteration number k=k+1;
Figure BDA0004141022510000147
Figure BDA0004141022510000148
Figure BDA0004141022510000149
wherein ,
Figure BDA00041410225100001410
for self-disability, add->
Figure BDA00041410225100001411
Is the mutual residual.
6) Calculating the total power of the optical storage system participating in auxiliary service according to a formula (26), and calculating and updating the unit compensation term of the optical storage system according to a formula (27)
Figure BDA00041410225100001412
Figure BDA00041410225100001413
Figure BDA00041410225100001414
Where α is the attenuation coefficient.
7) And (3) calculating the mutual residual error and the self-residual error of the variables according to the formula (24), judging the convergence condition of the algorithm, if the iteration termination condition shown in the formula (28) is met, exiting the loop, otherwise returning to the flow 2), and stopping until the convergence condition is met or the maximum iteration times are reached.
Figure BDA0004141022510000151
It will be readily appreciated by those skilled in the art that the foregoing description is merely a preferred embodiment of the invention and is not intended to limit the invention, but any modifications, equivalents, improvements or alternatives falling within the spirit and principles of the invention are intended to be included within the scope of the invention.

Claims (8)

1. An operation control method for a light storage system to participate in power grid voltage regulation auxiliary service is characterized in that the light storage system has a multi-decision main attribute of target conflict, and the method comprises the following steps:
s1, constructing an integral operation control model of the light storage system participating in power grid voltage regulation auxiliary service, wherein the integral operation control model comprises the following steps: the power grid side operation control model and the optical storage system operation control model; wherein,
the grid-side operation control model includes: the decision variable is expected operation power sent by the power grid to the optical storage system in each time period, the optimization target is to minimize operation consumption resources, the operation consumption resources consist of network damage consumption resources, auxiliary service consumption resources and power grid voltage out-of-limit cost, and the operation constraint comprises power grid node voltage constraint, power grid branch transmission power constraint and network power flow constraint;
the optical storage system operation control model comprises: the decision variable is the operation power of each optical storage system in each time period for responding to auxiliary service, the optimization target is the maximization of operation benefit, the operation benefit is composed of the consumption of resources of life loss and the participation of the optical storage system in the harvest of the auxiliary service, and the operation constraint comprises the charge and discharge power constraint of the energy storage equipment and the operation constraint of the energy storage SOC;
s2, carrying out augmented Lagrangian equivalent transformation on the integral operation control model by introducing Lagrangian multipliers, penalty coefficients and auxiliary variables to obtain a distributed optimization equivalent model of the power grid and each optical storage system;
s3, carrying out distributed alternate iterative solution on the power grid and the distributed optimization equivalent model of each optical storage system by adopting an alternate direction multiplier method, and obtaining the optimal interactive operation power of the optical storage system participating in the voltage regulation auxiliary service of the power grid.
2. The method according to claim 1, characterized in that the objective function of the grid-side operation control model is in particular as follows:
Figure FDA0004141022500000011
Figure FDA0004141022500000012
Figure FDA0004141022500000013
Figure FDA0004141022500000021
wherein ,Xnet For controlling a variable X of a power grid side operation control model net =[X net (1),...,X net (t),...],X net (t) is a vector formed by expected active power and reactive power emitted by the power grid to the optical storage system in the t time period, C DN C, running total consumption resources for the power grid loss Consuming resources for network damages of the power grid, C bat Invoking consumed resources of the optical storage system on auxiliary service for the power grid, C pen The voltage out-of-limit cost of the power grid node is calculated; t is the total time period number of the optimized operation control, P loss (t) is the total loss power of the power grid in the period of t, c t For the consumption item of t time period units, M is the number of the optical storage system, M is the set formed by all the optical storage systems, and P net,m (t),Q net,m (t) respectively expecting active power and reactive compensation power of the mth optical storage system in t time period for the power grid, wherein deltat is the unit time length, c bat (t) is a unit consumption term of the optical storage system in a t time period, and omega is a distribution proportionality coefficient of the unit consumption term of the optical storage system on active and reactive power;
Figure FDA0004141022500000022
respectively crossing upper limit parameters and lower limit parameters of voltage of all voltage nodes of the power grid in a t time period; lambda (lambda) pen And the grid cost coefficient is obtained after the voltage is out of limit.
3. The method according to claim 1, characterized in that the operational constraints of the grid-side operational control model are in particular as follows:
Figure FDA0004141022500000023
P i min ≤P i (t)≤P i max
Figure FDA0004141022500000024
Figure FDA0004141022500000025
Figure FDA0004141022500000026
wherein ,
Figure FDA0004141022500000027
respectively crossing upper limit parameters and lower limit parameters of voltage of all voltage nodes of the power grid in a t time period, wherein i is the number of the nodes of the power grid, omega is a set formed by the numbers of all the nodes of the power grid, and U is a set of the numbers of the nodes of the power grid max ,U min Respectively the maximum value and the minimum value of the node voltage, U i (t) is the voltage of node i in time period t, P i (t),Q i (t) active power and reactive power limits of the grid node i in the t period, respectively,/->
Figure FDA0004141022500000028
Minimum active power and maximum active power of node i, respectively, +.>
Figure FDA0004141022500000031
Minimum reactive power and maximum reactive power of node i, P j ,Q j Active and reactive power, P, flowing respectively from node j to the node below ij ,Q ij Active power and reactive power flowing to a node j of the power grid node i respectively; r is (r) ij ,x ij Resistance and reactance between node i and node j, respectively, +.>
Figure FDA0004141022500000032
Active and reactive power of the load of node j, respectively,/->
Figure FDA0004141022500000033
Distributed photovoltaic output of node j, < >>
Figure FDA0004141022500000034
The active power and the reactive power of the optical storage system which are respectively called by the power grid to the node j are I as an absolute value operator.
4. The method of claim 1, wherein the objective function of the optical storage system operation control model is specified as follows:
Figure FDA0004141022500000035
wherein ,Xm Optimizing control model control variables X for optical storage system m =[X m (1),...,X m (T)],X m (T) is a vector formed by active power and reactive power which are transmitted by the mth optical storage system to auxiliary service and are meant to participate, T is the total time period number of the optimal operation control,
Figure FDA0004141022500000036
harvesting of the mth optical storage system participating in grid auxiliary service, P m (t),Q m (t) respectively responding the active electric power and the reactive compensation power of the auxiliary service in the t time period for the mth optical storage system, c c Resource coefficients are consumed for the unit electric quantity of the optical storage system; Δt is the time interval, || is the absolute value operator.
5. The method of claim 1, wherein the operational constraints of the optical storage system operational control model are specified as follows:
Figure FDA0004141022500000037
Figure FDA0004141022500000038
Figure FDA0004141022500000039
Figure FDA00041410225000000310
/>
Figure FDA00041410225000000311
Figure FDA00041410225000000312
Figure FDA00041410225000000313
wherein ,Pm (t),Q m (t) respectively responding the active electric power and reactive compensation power of the auxiliary service in the t time period for the mth optical storage system,
Figure FDA0004141022500000041
reactive compensation power minimum and maximum values for the mth optical storage system in response to the auxiliary service in the t period,/for the mth optical storage system>
Figure FDA0004141022500000042
Respectively, the discharge power and the charge power of the energy stored in the mth optical storage system in the t time period,/->
Figure FDA0004141022500000043
Respectively, the maximum discharge power and the maximum charge power allowed by energy storage in the mth optical storage system, < +.>
Figure FDA0004141022500000044
For the charge state of energy stored in the mth optical storage system in the t time period, E bat,m Is the maximum capacity of energy storage in the mth optical storage system, delta t is the time interval, eta c,md,m Respectively the charging and discharging efficiency of the energy storage in the mth optical storage system,/for>
Figure FDA0004141022500000045
Maximum and minimum constraints of the state of charge of the stored energy in the mth optical storage system, respectively,/->
Figure FDA0004141022500000046
The initial charge state and the final charge state of the energy storage in the operation control in the mth optical storage system are respectively.
6. The method according to any one of claims 1 to 5, wherein step S2 comprises:
s21, introducing Lagrangian multipliers
Figure FDA0004141022500000047
And penalty coefficient ρ, equivalent the grid-side operation control model to an augmented lagrangian optimization objective function form:
Figure FDA0004141022500000048
s22, introducing Lagrangian multipliers
Figure FDA0004141022500000049
And penalty coefficient ρ, equivalent the optical storage system operation control model to an augmented lagrangian optimization objective function form:
Figure FDA00041410225000000410
s23, will
Figure FDA00041410225000000411
and />
Figure FDA00041410225000000412
Unifying the obtained values to be Z, and constructing an extended Lagrangian function of the auxiliary variable Z:
Figure FDA00041410225000000413
wherein ,Xnet For controlling a variable X of a power grid side operation control model net =[X net (1),...,X net (t),...],X net (t)=[P net,1 (t),...,P net,m (t),Q net,1 (t),...,Q net,m (t)],P net,m (t),Q net,m (t) respectively obtaining active power and reactive compensation power of the power grid expected optical storage system m in t time period, C DN (X net ) The total consumption of resources for the operation of the power grid,
Figure FDA00041410225000000414
the Lagrangian multiplier corresponding to the kth iterative process after the equivalent conversion of the power grid operation control model is adopted, ρ is a punishment coefficient, T is an optimization time period number, T is an optimization operation control total time period number, and>
Figure FDA0004141022500000051
the method comprises the steps that the method is an auxiliary variable corresponding to a kth iterative process after the power grid operation control model is equivalently converted, and the I is a two-norm operator; x is X m Controlling a model control variable X for the operation of the optical storage system m =[X m (1),...,X m (T)],X m (t)=[P m (t),Q m (t)],P m (t),Q m (t) the intended active power and reactive compensation power respectively transmitted by the optical storage system m to the auxiliary service in the t period,/>
Figure FDA0004141022500000052
Harvesting of the mth optical storage system involved in the grid auxiliary service,/->
Figure FDA0004141022500000053
Lagrangian multiplier corresponding to the kth iterative process after equivalent transformation of the optical storage system control model is +.>
Figure FDA0004141022500000054
The auxiliary variable corresponding to the kth iteration process after the equivalent transformation of the optical storage system operation control model is adopted; z is Z k Is an auxiliary variable +.>
Figure FDA0004141022500000055
and />
Figure FDA0004141022500000056
The unified set X is the control variable X of the operation control model of the optical storage system m And grid optimization control model control variable X net Lambda of (x) k As auxiliary variable Z k The Lagrangian multiplier corresponding to the kth iterative updating process.
7. The method of claim 6, wherein step S3 comprises:
s31, setting maximum iteration times and convergence accuracy, and setting upper and lower limits of unit consumption items between the optical storage system and the power grid
Figure FDA0004141022500000057
Initializing a unit compensation item of a power grid to a light storage system to be 0, initializing iteration number k to be 0 and initializing independent variables
Figure FDA0004141022500000058
Initializing auxiliary variable +.>
Figure FDA0004141022500000059
Initializing the augmented lagrangian multiplier +.>
Figure FDA00041410225000000510
And penalty coefficient ρ 0 Wherein T e [1,2, ], t.],m∈M;
S32, for the main body of the power grid, receiving the active power expected to be distributed to auxiliary services of the power grid from each optical storage system
Figure FDA00041410225000000511
And reactive power->
Figure FDA00041410225000000512
According to the power grid side operation control model, the Lagrangian optimization objective function and the operation constraint are amplified, the distributed optimization model is solved, and the active power +_ expected to be introduced on auxiliary service by the power grid is obtained>
Figure FDA00041410225000000513
And reactive power->
Figure FDA00041410225000000514
S33, for each optical storage system, receiving the expected active power of the optical storage system from the power grid
Figure FDA00041410225000000515
And reactive power
Figure FDA00041410225000000516
According to the operational control model of the optical storage system, the Lagrangian optimization objective function and operational constraint are enhanced, the distributed optimization model is solved, and the output quantity of the optical storage system m responding to the auxiliary service of the power grid is obtained>
Figure FDA00041410225000000517
And reactive compensation quantity->
Figure FDA00041410225000000518
S34, updating active power reference values of main bodies of all optical storage system power stations in response to auxiliary services of active power distribution network
Figure FDA00041410225000000519
And reactive power reference value->
Figure FDA00041410225000000520
Auxiliary variable->
Figure FDA00041410225000000521
Figure FDA0004141022500000061
Figure FDA0004141022500000062
S35, updating Lagrangian multiplier
Figure FDA0004141022500000063
Penalty coefficient ρ k+1 Update iteration number k=k+1:
Figure FDA0004141022500000064
Figure FDA0004141022500000065
/>
wherein ,
Figure FDA0004141022500000066
for self-disability, add->
Figure FDA0004141022500000067
Is the mutual residual error;
s36, calculating the total power of the optical storage system participating in auxiliary service
Figure FDA0004141022500000068
Calculating unit compensation term of optical storage system
Figure FDA0004141022500000069
Figure FDA00041410225000000610
Figure FDA00041410225000000611
Where α is the attenuation coefficient.
S37, judging whether iteration termination conditions are met according to the mutual residual errors and the self-residual errors of the variables, if yes, ending, otherwise, returning to the step S32.
8. An operation control system for a light storage system participating in a power grid voltage regulation auxiliary service, which is characterized by comprising: a processor and a memory;
the memory is used for storing computer execution instructions;
the processor for executing the computer-executable instructions such that the method of any of claims 1 to 7 is performed.
CN202310283000.6A 2023-03-17 2023-03-17 Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service Active CN116191575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310283000.6A CN116191575B (en) 2023-03-17 2023-03-17 Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310283000.6A CN116191575B (en) 2023-03-17 2023-03-17 Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service

Publications (2)

Publication Number Publication Date
CN116191575A true CN116191575A (en) 2023-05-30
CN116191575B CN116191575B (en) 2023-08-18

Family

ID=86438537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310283000.6A Active CN116191575B (en) 2023-03-17 2023-03-17 Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service

Country Status (1)

Country Link
CN (1) CN116191575B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116433225A (en) * 2023-06-12 2023-07-14 国网湖北省电力有限公司经济技术研究院 Multi-time scale fault recovery method, device and equipment for interconnected micro-grid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149651A (en) * 2018-10-19 2019-01-04 国网江苏省电力有限公司南通供电分公司 It is a kind of meter and pressure regulation ancillary service income light-preserved system optimizing operation method
CN110688744A (en) * 2019-09-16 2020-01-14 华南理工大学 Asynchronous distributed state estimation method applied to thermoelectric coupling network
CN113393126A (en) * 2021-06-16 2021-09-14 沈阳工程学院 High-energy-consumption park and power grid alternative parallel cooperative optimization scheduling method
CN115085293A (en) * 2022-06-21 2022-09-20 中国科学院电工研究所 Distributed energy interaction method for regional energy Internet and power distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149651A (en) * 2018-10-19 2019-01-04 国网江苏省电力有限公司南通供电分公司 It is a kind of meter and pressure regulation ancillary service income light-preserved system optimizing operation method
CN110688744A (en) * 2019-09-16 2020-01-14 华南理工大学 Asynchronous distributed state estimation method applied to thermoelectric coupling network
CN113393126A (en) * 2021-06-16 2021-09-14 沈阳工程学院 High-energy-consumption park and power grid alternative parallel cooperative optimization scheduling method
CN115085293A (en) * 2022-06-21 2022-09-20 中国科学院电工研究所 Distributed energy interaction method for regional energy Internet and power distribution network

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116433225A (en) * 2023-06-12 2023-07-14 国网湖北省电力有限公司经济技术研究院 Multi-time scale fault recovery method, device and equipment for interconnected micro-grid
CN116433225B (en) * 2023-06-12 2023-08-29 国网湖北省电力有限公司经济技术研究院 Multi-time scale fault recovery method, device and equipment for interconnected micro-grid

Also Published As

Publication number Publication date
CN116191575B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
WO2023274425A1 (en) Multi-energy capacity optimization configuration method for wind-solar-water-fire storage system
CN109980685B (en) Uncertainty-considered active power distribution network distributed optimization operation method
CN110266038B (en) Distributed coordination regulation and control method for multiple virtual power plants
CN110247438B (en) Active power distribution network resource optimization configuration based on longicorn whisker algorithm
CN112800658A (en) Active power distribution network scheduling method considering source storage load interaction
CN114977320A (en) Power distribution network source-network charge-storage multi-target collaborative planning method
CN116191575B (en) Operation control method and system for participation of optical storage system in power grid voltage regulation auxiliary service
CN112202206A (en) Multi-energy micro-grid distributed scheduling method based on potential game
CN116667325B (en) Micro-grid-connected operation optimization scheduling method based on improved cuckoo algorithm
Shi et al. Research on energy management of hydrogen electric coupling system based on deep reinforcement learning
CN117039882A (en) Resource aggregation regulation and control method and system based on binary consistency algorithm
CN115496273A (en) Renewable energy cluster distribution robustness optimization configuration method and system
CN114884110A (en) Power system energy storage optimization operation method under source-grid-load multi-constraint condition
CN117411085A (en) Grid-connected multi-microgrid optimal scheduling method considering external exchange power safety constraint
CN112598232A (en) Energy storage system optimal configuration method in VPP (virtual private Point) of improved quantum particle swarm
CN110322092B (en) Source-network-load multi-layer game economic dispatching method
Kai et al. Optimization for PV-ESS in Distribution Network Based on CSBO
CN113011718A (en) Harmony search algorithm-based active-reactive combined optimization scheduling method for power distribution network
CN113177860A (en) Improved ant lion algorithm-based micro-grid optimization scheduling method with electric automobile participation
Wang et al. Distributed game-theoretic interactive algorithm for microgrid optimization
Ye et al. Low carbon economic operation optimization method of micro electric network based on adaptive artificial bee colony algorithm
Liu et al. Optimal Aggregation Method of a Virtual Power Plant Based on a Nash-Stackelberg Game
Wang et al. Convexification Technique for Optimal Thermal-Wind-Photovoltaic Coordination Dispatch Incorporating an Energy Storage System
CN115940299B (en) Active and reactive collaborative optimization method for power distribution system source network load storage
Yang et al. Multi-source scheduling method on supply side of microgrid based on reinforcement learning algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant