CN116029018A - BIM-based interior decoration design and dynamic optimization method - Google Patents

BIM-based interior decoration design and dynamic optimization method Download PDF

Info

Publication number
CN116029018A
CN116029018A CN202211497025.8A CN202211497025A CN116029018A CN 116029018 A CN116029018 A CN 116029018A CN 202211497025 A CN202211497025 A CN 202211497025A CN 116029018 A CN116029018 A CN 116029018A
Authority
CN
China
Prior art keywords
bim
module
design
modeling
end position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211497025.8A
Other languages
Chinese (zh)
Inventor
李长景
李娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Huibai's Decoration Engineering Co ltd
Original Assignee
Nanjing Huibai's Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Huibai's Decoration Engineering Co ltd filed Critical Nanjing Huibai's Decoration Engineering Co ltd
Priority to CN202211497025.8A priority Critical patent/CN116029018A/en
Publication of CN116029018A publication Critical patent/CN116029018A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a BIM-based indoor decoration design and dynamic optimization method, which comprises a BIM system design module, wherein a construction report verification drawing is arranged at the lower end position of the BIM system design module, a BIM design module is arranged at the lower end position of the construction report verification drawing, a BIM modeling module is arranged at the lower end position of the BIM design module, a BIM model calculation module is arranged at the lower end position of the BIM modeling module, a calculation result summarizing module is arranged at the lower end position of the BIM model calculation module, BIM firstly performs construction report verification drawing, then performs the BIM design module, and is provided with a planar design module and a professional BIM analysis module, so that the design is more accurate, then performs the BIM modeling module, and the BIM modeling module is provided with a live-action modeling module and a geological modeling module, thereby being beneficial to indoor decoration design during modeling.

Description

BIM-based interior decoration design and dynamic optimization method
Technical Field
The invention belongs to the technical field related to BIM (building information modeling) interior decoration design and dynamic optimization methods, and particularly relates to a BIM-based interior decoration design and dynamic optimization method.
Background
The BIM technology is generated in European and American countries at the earliest, is introduced into indoor design links of building engineering, can obviously improve indoor design efficiency, and under the support of the BIM technology, an indoor decoration designer only needs to input data information obtained through field measurement into corresponding technical software, so that the design in the aspect of indoor space decoration can be carried out through the design software, and the design efficiency is obviously improved.
Through searching, the patent document with the application number of CN202010136957.4 discloses an intelligent management system for indoor decoration engineering based on BIM, which comprises the following components: the system comprises a database management module, a man-machine interaction module, a BIM model construction module, a visual display module and a system management module. The invention provides an intelligent management system for indoor decoration engineering based on BIM, which is characterized in that according to modeling control instructions input by a man-machine interaction module, a BIM model construction module invokes corresponding resources from a database management module according to the modeling control instructions, so as to construct an indoor decoration environment model, and the indoor decoration environment model is displayed through a visual display module, so that a user can intuitively know an indoor decoration finished product map model obtained by adopting a selected decoration scheme, and meanwhile, through a system management module, the user can effectively supervise and manage the indoor decoration engineering, and can timely master and know the monitoring information of the indoor decoration engineering site;
in the use of the above patent, when the BIM performs modeling, if modeling deviation occurs, the later design is affected, so that a device is needed in the market to solve the current problems.
Summary of the invention
The invention aims to provide an interior decoration design and dynamic optimization method based on BIM, which aims to solve the problem that the BIM provided in the background art can influence the later design if modeling deviation occurs during modeling, so that a device is needed in the market to solve the current problems.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides an interior decoration design and dynamic optimization method based on BIM, includes BIM system design module, BIM system design module's lower extreme position department is provided with construction report and examines the drawing, construction report and examine drawing's lower extreme position department is provided with BIM design module, BIM design module's lower extreme position department is provided with BIM modeling module, BIM modeling module's lower extreme position department is provided with the calculated amount module, calculated amount result summarization module's lower extreme position department is provided with calculated amount evaluation module, calculated amount evaluation module's lower extreme position department is provided with BIM drawing module, BIM drawing module's left end position department is provided with BIM visual model, BIM visual model's upper end position department is provided with visual display platform, BIM drawing module's right-hand member position department is provided with the database.
Preferably, a construction report checking drawing is arranged at the lower end position of the BIM system design module, and the construction report checking drawing enters the BIM design module after receiving the instruction of the BIM system design module.
Preferably, the BIM design module is provided with a planar design module and a professional BIM analysis module, and the BIM design module enables the design to be more professional and accurate.
Preferably, the BIM modeling module is provided with a live-action modeling module and a geological modeling module, and the BIM modeling module enables modeling to be more accurate through two modeling modes.
Preferably, the calculation result summarizing module receives the instruction from the BIM model calculation module, and the calculation result summarizing module sends the calculation result to the calculation evaluation module for evaluation.
Preferably, the calculation amount evaluation module evaluates the result of the calculation amount result summarizing module, and the calculation amount evaluation module performs the BIM plotting module when the evaluation is completed.
Preferably, the BIM map module is respectively sent to a BIM visual model and a database, and the BIM visual model is transmitted to a visual display platform.
Preferably, the visual display platform is provided with material unloading precision, interior decoration design innovation, interior decoration design efficiency, assurance budget precision and auxiliary decision design module, the visual display platform has improved efficiency and has ensured the precision.
A BIM-based interior decoration design dynamic optimization method comprises the following steps:
step one: the BIM design module receives construction report and examination drawing paper for design, the BIM design module carries out accurate design through the plane design module and the professional BIM analysis module, the BIM modeling module carries out modeling after the design is finished, and the BIM modeling module carries out modeling through the live-action modeling module and the geological modeling module;
step two: and the calculation amount evaluation module is carried out, the BIM plotting module is carried out after the evaluation is finished, the BIM visual model is generated after the BIM plotting module, the BIM visual model is displayed on the visual display platform, and under the support of BIM technology, an interior decoration designer only needs to input data information obtained through field measurement into corresponding technical software, so that the design in the aspect of interior space decoration can be carried out through the design software, and the design efficiency is obviously improved.
Compared with the prior art, the invention provides a BIM-based interior decoration design and dynamic optimization method, which has the following beneficial effects:
the BIM is firstly constructed, reported and examined, and then is provided with a BIM design module, wherein the BIM design module is provided with a planar design module and a professional BIM analysis module, so that the design is more accurate, and then is provided with a BIM modeling module, and the BIM modeling module is provided with a live-action modeling module and a geological modeling module, so that the BIM design module can be beneficial to indoor decoration design during modeling.
Drawings
Fig. 1 is a schematic structural diagram of an interior decoration design and dynamic optimization method based on BIM according to the present invention.
In the figure: 1. a BIM system design module; 2. constructing a report and examination drawing; 3. a BIM design module; 4. a BIM modeling module; 5. a live-action modeling module; 6. a geological modeling module; 7. a BIM model calculation module; 8. the calculation result summarizing module; 9. a calculation amount evaluation module; 10. a BIM drawing module; 11. a database; 12. BIM visual model; 13. material blanking accuracy; 14. innovative indoor decoration design; 15. indoor decoration design efficiency; 16. ensuring accurate budget; 17. an auxiliary decision-making design module; 18. a visual display platform; 19. a professional BIM analysis module; 20. and (5) designing a module in a plane.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The invention provides an interior decoration design and dynamic optimization method based on BIM (building information modeling) as shown in figure 1, which comprises a BIM system design module 1, wherein a construction report drawing 2 is arranged at the lower end position of the BIM system design module 1, a BIM design module 3 is arranged at the lower end position of the construction report drawing 2, a BIM modeling module 4 is arranged at the lower end position of the BIM design module 3, a BIM model calculation module 7 is arranged at the lower end position of the BIM modeling module 4, a calculation result summarization module 8 is arranged at the lower end position of the BIM model calculation module 7, a calculation evaluation module 9 is arranged at the lower end position of the calculation result summarization module 8, a BIM drawing module 10 is arranged at the lower end position of the calculation evaluation module 9, a BIM visual model 12 is arranged at the left end position of the BIM drawing module 10, a visual platform 18 is arranged at the upper end position of the BIM visual model 12, and a database 11 is arranged at the right end position of the BIM drawing module 10.
As shown in fig. 1, in order to perform the BIM modeling module 4, a construction report review drawing 2 is disposed at a lower end position of the BIM system design module 1, the construction report review drawing 2 enters the BIM design module 3 when an instruction of the BIM system design module 1 is received, the BIM design module 3 is provided with a planar design module 20 and a professional BIM analysis module 19, the BIM design module 3 enables the design to be more professional and accurate, the BIM modeling module 4 is provided with a live-action modeling module 5 and a geological modeling module 6, the BIM modeling module 4 enables the modeling to be more accurate through two modeling modes, the calculated result summarization module 8 receives an instruction from the BIM model calculated module 7, the calculated result summarization module 8 sends a calculated result to the calculated result evaluation module 9 for evaluation, the calculated result evaluation module 9 evaluates the result of the calculated result summarization module 8, the calculated result evaluation module 9 carries out a BIM graphic module 10 when the evaluation is completed, the BIM graphic module 10 is respectively sent to the BIM visual model 12 and the database 11, and the BIM visual model 12 is transferred to the visual display platform 18, and the calculated result summarization module 3 carries out construction report 4.
As shown in fig. 1, in order to improve the indoor design efficiency, the visual display platform 18 is provided with a material discharging precision 13, an indoor decoration design innovation 14, an indoor decoration design efficiency 15, a guaranteed budget precision 16 and an auxiliary decision design module 17, and the visual display platform 18 improves the efficiency and ensures the precision, and the BIM visual model 12 is checked through the visual display platform 18, so that the indoor design is more precisely performed.
The working principle of the invention is as follows: the BIM design module 3 receives the construction report and examination drawing 2 for design, the BIM design module 3 carries out accurate design through the plane design modules 20 and 19 and the professional BIM analysis module 19, the BIM modeling module 4 carries out modeling through the live-action modeling module 5 and the geological modeling module 6 after the design is completed, then the calculation evaluation module 9 is carried out, the BIM drawing module 10 is carried out after the evaluation is completed, the BIM visual model 12 is generated after the BIM drawing module 10, the BIM visual model 12 is displayed on the visual display platform 18, under the support of BIM technology, the interior decoration designer only needs to input data information obtained through field measurement into corresponding technical software, the design in the aspect of interior space decoration can be carried out through design software, and the design efficiency is obviously improved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present invention, and although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present invention.

Claims (9)

1. The utility model provides an interior decoration design based on BIM, includes BIM system design module (1), its characterized in that: the construction report inspection drawing (2) is arranged at the lower end position of the BIM system design module (1), the BIM design module (3) is arranged at the lower end position of the construction report inspection drawing (2), the BIM modeling module (4) is arranged at the lower end position of the BIM design module (3), the BIM model calculation module (7) is arranged at the lower end position of the BIM modeling module (4), the calculation result summarizing module (8) is arranged at the lower end position of the BIM model calculation module (7), the calculation evaluation module (9) is arranged at the lower end position of the calculation result summarizing module (8), the BIM drawing module (10) is arranged at the lower end position of the calculation evaluation module (9), the BIM visual model (12) is arranged at the left end position of the BIM drawing module (10), the visual display platform (18) is arranged at the upper end position of the BIM visual model (12), and the database (11) is arranged at the right end position of the BIM drawing module (10).
2. The BIM-based interior decoration design of claim 1, wherein: the construction report examination paper (2) is arranged at the lower end of the BIM system design module (1), and the construction report examination paper (2) enters the BIM design module (3) after receiving the instruction of the BIM system design module (1).
3. The BIM-based interior decoration design of claim 1, wherein: BIM design module (3) are provided with planar design module (20) and specialty BIM analysis module (19), BIM design module (3) make the design more specialty accurate.
4. The BIM-based interior decoration design of claim 1, wherein: the BIM modeling module (4) is provided with a live-action modeling module (5) and a geological modeling module (6), and the BIM modeling module (4) enables modeling to be more accurate through two modeling modes.
5. The BIM-based interior decoration design of claim 1, wherein: the calculation result summarizing module (8) receives the instruction from the BIM model calculation module (7), and the calculation result summarizing module (8) sends the calculation result to the calculation evaluation module (9) for evaluation.
6. The BIM-based interior decoration design of claim 1, wherein: the calculation amount evaluation module (9) evaluates the result of the calculation amount result summarization module (8), and the calculation amount evaluation module (9) performs a BIM plotting module (10) when the evaluation is completed.
7. The BIM-based interior decoration design of claim 1, wherein: the BIM map module (10) is respectively sent to the BIM visual model (12) and the database (11), and the BIM visual model (12) is transmitted to the visual display platform (18).
8. The BIM-based interior decoration design and dynamic optimization method as claimed in claim 1, wherein: visual show platform (18) are provided with material unloading precision (13), interior decoration design innovation (14), interior decoration design efficiency (15), guarantee budget precision (16) and auxiliary decision design module (17), visual show platform (18) have improved efficiency and ensure the precision.
9. A BIM-based interior decoration design dynamic optimization method is characterized by comprising the following steps of: the method comprises the following steps:
step one: the BIM design module (3) receives a construction report and examination drawing (2) for design, the BIM design module (3) carries out accurate design through a plane design module (20) and a professional BIM analysis module (19), the BIM modeling module (4) carries out modeling after the design is finished, and the BIM modeling module (4) carries out modeling through a live-action modeling module (5) and a geological modeling module (6);
step two: the method comprises the steps of carrying out an amount evaluation module (9), carrying out a BIM plotting module (10) after the evaluation is finished, generating a BIM visual model (12) after the BIM plotting module (10), displaying the BIM visual model (12) on a visual display platform (18), and under the support of BIM technology, an interior decoration designer only needs to input data information obtained through field measurement into corresponding technical software, and can design the interior space decoration through design software, so that the design efficiency is obviously improved.
CN202211497025.8A 2022-11-25 2022-11-25 BIM-based interior decoration design and dynamic optimization method Withdrawn CN116029018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211497025.8A CN116029018A (en) 2022-11-25 2022-11-25 BIM-based interior decoration design and dynamic optimization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211497025.8A CN116029018A (en) 2022-11-25 2022-11-25 BIM-based interior decoration design and dynamic optimization method

Publications (1)

Publication Number Publication Date
CN116029018A true CN116029018A (en) 2023-04-28

Family

ID=86071295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211497025.8A Withdrawn CN116029018A (en) 2022-11-25 2022-11-25 BIM-based interior decoration design and dynamic optimization method

Country Status (1)

Country Link
CN (1) CN116029018A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116628800A (en) * 2023-05-09 2023-08-22 海南华筑国际工程设计咨询管理有限公司 Building design system based on BIM

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116628800A (en) * 2023-05-09 2023-08-22 海南华筑国际工程设计咨询管理有限公司 Building design system based on BIM

Similar Documents

Publication Publication Date Title
CN107844424B (en) Model-based testing system and method
Berg et al. Numerical manufacturing and design tool (NuMAD v2. 0) for wind turbine blades: user's guide.
CN107545349A (en) A kind of Data Quality Analysis evaluation model towards electric power big data
CN108595818B (en) Assembly type building management method and system based on BIM and cloud service
CN105718432B (en) It is a kind of for the information excavating of grid operation equipment and the method for calibration of the quality of data
CN108037970B (en) Tool and method for building man-machine interface rapid prototype of civil aircraft cockpit
CN107729582A (en) Component defect inspection and forecasting system based on TLS
CN103577651A (en) Method for generating and processing isoline cloud charts with sections in any shapes intelligently in batch mode
CN116029018A (en) BIM-based interior decoration design and dynamic optimization method
CN116257926B (en) BIM-based Internet of things data binding method, device, equipment and storage medium
CN113722797A (en) Lightweight BIM prefabricated part full life cycle comprehensive information management system
CN104715347A (en) Comprehensive data processing system for debugging work of nuclear power station
CN116596483A (en) Bridge construction organization method based on three-dimensional digital technology
CN110795848A (en) Large-scale commercial complex logistics intelligent operation and maintenance method based on building information model
CN111914439A (en) Modeling method and device of finite element model, storage medium and electronic equipment
CN111563700A (en) Intelligent station relay protection calibrator for graphically controlling GOOSE state
CN116305797A (en) Construction risk assessment system based on BIM and multisource quality information fusion
CN109447466B (en) Overall process visual management and control system based on power distribution network communication network construction
CN111191331A (en) Transformer substation graph-model data quality verification device and method based on CIM and SVG
CN112818562A (en) Design method of railway communication and information system
CN117829754A (en) Intelligent engineering construction whole process number management method and platform based on BIM and GIS
CN206959775U (en) A kind of program control static resistance deformeter of steel construction stress-strain measurement
Zhao Refined node data mining platform in the construction phase of building installation engineering based on BIM technology
CN112487534A (en) BIM technology-based method for analyzing net height of building
CN107704639B (en) System for realizing three-dimensional visual display of weight characteristics of aircraft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20230428