CN115829297A - Method and device for generating work package of assembly type building, terminal and storage medium - Google Patents

Method and device for generating work package of assembly type building, terminal and storage medium Download PDF

Info

Publication number
CN115829297A
CN115829297A CN202310086235.6A CN202310086235A CN115829297A CN 115829297 A CN115829297 A CN 115829297A CN 202310086235 A CN202310086235 A CN 202310086235A CN 115829297 A CN115829297 A CN 115829297A
Authority
CN
China
Prior art keywords
component unit
neighborhood
building
process flow
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310086235.6A
Other languages
Chinese (zh)
Other versions
CN115829297B (en
Inventor
方舟
卜磊
靳程锐
曹秀伟
雷俊
田璐璐
刘峻佑
齐株锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Technology Group Co Ltd
Original Assignee
China Construction Science and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Technology Group Co Ltd filed Critical China Construction Science and Technology Group Co Ltd
Priority to CN202310086235.6A priority Critical patent/CN115829297B/en
Publication of CN115829297A publication Critical patent/CN115829297A/en
Application granted granted Critical
Publication of CN115829297B publication Critical patent/CN115829297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method, a device, a terminal and a storage medium for generating a work package of an assembly type building, wherein the method comprises the following steps: acquiring a building information model and an integral process flow chart of the assembly type building, wherein the building information model comprises a plurality of component units of prefabricated parts; determining local area process information and neighborhood process information of each component unit according to the building information model and the whole process flow chart; clustering each component unit according to the local domain process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters; and determining a sub-packaging strategy of the assembly type building according to each cluster. According to the method, the work package distribution result of the assembly type building is automatically generated without manual intervention by analyzing the building information model and the whole process flow diagram of the assembly type building. The problem of use work package management technique mainly rely on project manager's work experience in the production process of assembly type structure at present, be difficult to guarantee the reliability of work package distribution result is solved.

Description

Method and device for generating work package of assembly type building, terminal and storage medium
Technical Field
The invention relates to the technical field of work packages, in particular to a method, a device, a terminal and a storage medium for generating a work package of an assembly type building.
Background
The work package management technology is a method for uniformly executing and managing a plurality of work units/tasks with high dependence degree by packaging the work units/tasks into a whole. The work package management technology can realize scale effect and reduce the management cost of resource repeated scheduling. The fabricated building is a building fabricated on site by using prefabricated parts. The work package management technology used in the production process of the assembly type building mainly depends on the work experience of a project manager, and the reliability of the work package distribution result is difficult to guarantee.
Thus, there is still a need for improvement and development of the prior art.
Disclosure of Invention
The present invention provides a method, an apparatus, a terminal and a storage medium for generating a work package of an assembly building, aiming at solving the problem that the reliability of the work package distribution result is difficult to be ensured because the work package management technology used in the production process of the assembly building mainly depends on the work experience of a project manager.
The technical scheme adopted by the invention for solving the problems is as follows:
in a first aspect, an embodiment of the present invention provides a method for generating a work package of an assembly type building, where the method includes:
acquiring a building information model and an integral process flow chart corresponding to the assembly type building, wherein the building information model comprises component units corresponding to a plurality of prefabricated parts respectively;
determining local process information and neighborhood process information respectively corresponding to each component unit according to the building information model and the overall process flow diagram;
clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and determining a sub-packaging strategy corresponding to the fabricated building according to each clustering cluster, wherein the sub-packaging strategy is used for generating a plurality of work packages, and each component unit in the same work package is jointly managed.
In one embodiment, the method for determining the local process information and the neighborhood process information respectively corresponding to each of the component units comprises:
determining a local process flow chart corresponding to the component unit according to the overall process flow chart, and taking the local process flow chart of the component unit as the local process information of the component unit;
determining a plurality of neighborhood component units corresponding to the component unit according to the building information model;
determining local process flow charts corresponding to the neighborhood component units respectively according to the overall process flow chart;
and determining neighborhood consistency of each neighborhood component unit according to the local process flow chart of the neighborhood component unit, and taking the neighborhood consistency as the neighborhood process information of the component unit.
In one embodiment, the determining the neighborhood identity of each neighborhood component unit according to the local process flow diagram of the component unit comprises:
determining a fusion process flow chart according to the local process flow chart of each neighborhood component unit;
respectively acquiring a local process flow chart of each neighborhood component unit and an offset value of the fusion process flow chart;
determining the neighborhood identity based on each of the bias values.
In one embodiment, the clustering process of each of the component units comprises:
determining local characteristics of the component unit according to the local process information of the component unit;
acquiring the local domain characteristics of the previous clustering component unit, and calculating the characteristic similarity of the local domain characteristics of the previous component unit and the local domain characteristics of the component unit;
judging whether the feature similarity is higher than a similarity threshold, and when the feature similarity is higher than the similarity threshold, incorporating the component unit into the current cluster;
and judging whether the neighborhood consistency of the component unit is higher than a consistency threshold value, and when the neighborhood consistency of the component unit is higher than the consistency threshold value, bringing each neighborhood component unit corresponding to the component unit into the current cluster.
In one embodiment, the method further comprises:
and when the neighborhood consistency of the component unit is lower than or equal to the consistency threshold, taking the neighborhood component unit of the component unit as the next component unit to be clustered.
In one embodiment, the determining, according to each cluster, a grouping policy corresponding to the prefabricated building includes:
inputting each clustering cluster into an agent to obtain an initial sub-packaging strategy;
managing the production process of the fabricated building based on the initial sub-packaging strategy through a simulation technology, and randomly disturbing the production process of one component unit;
acquiring the abnormal detection time length of the production process of the interfered component unit;
judging whether the abnormal detection time length is less than a preset time length or not;
when the abnormal detection duration is greater than or equal to the preset duration, determining the reward value of the intelligent agent according to the abnormal detection duration;
and updating parameters of the intelligent agent according to the reward value, and continuing to execute the step of inputting each cluster into the intelligent agent until the abnormal detection time length is less than the preset time length to obtain the sub-packet strategy.
In one embodiment, the method further comprises:
acquiring the number of updating rounds of the agent;
when the number of the updating rounds reaches a preset number of rounds, adjusting the similarity threshold and the consistency threshold;
and clustering the component units again according to the adjusted similarity threshold and the adjusted consistency threshold.
In a second aspect, an embodiment of the present invention further provides a device for generating a work package of an assembly type building, where the device includes:
the system comprises an acquisition module, a display module and a display module, wherein the acquisition module is used for acquiring a building information model and an integral process flow chart corresponding to an assembly type building, and the building information model comprises component units corresponding to a plurality of prefabricated component parts respectively;
the determining module is used for determining local process information and neighborhood process information which respectively correspond to each component unit according to the building information model and the whole process flow chart;
the clustering module is used for clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and the sub-packaging module is used for determining a sub-packaging strategy corresponding to the assembly type building according to each clustering cluster, wherein the sub-packaging strategy is used for generating a plurality of working packages, and each component unit in the same working package is jointly managed.
In a third aspect, an embodiment of the present invention further provides a terminal, where the terminal includes a memory and more than one processor; the memory stores more than one program; the program comprises instructions for performing a method of generating a work package for a fabricated building as described in any one of the above; the processor is configured to execute the program.
In a fourth aspect, the present invention further provides a computer-readable storage medium, on which a plurality of instructions are stored, wherein the instructions are adapted to be loaded and executed by a processor to implement any of the steps of the method for generating a work package of an assembly type building.
The invention has the beneficial effects that: according to the embodiment of the invention, a building information model and an integral process flow chart of an assembly type building are obtained, wherein the building information model comprises a plurality of component units of prefabricated parts; determining local area process information and neighborhood process information of each component unit according to the building information model and the whole process flow chart; clustering each component unit according to the local domain process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters; and determining a sub-packaging strategy of the assembly type building according to each cluster. According to the method, the work package distribution result of the assembly type building is automatically generated without manual intervention by analyzing the building information model and the whole process flow diagram of the assembly type building. The problem of use work package management technique mainly rely on project manager's work experience in the production process of assembly type structure at present, be difficult to guarantee the reliability of work package distribution result is solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments described in the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a method for generating a work package of an assembly building according to an embodiment of the present invention.
Fig. 2 is a schematic block diagram of a work package generation apparatus for a prefabricated building according to an embodiment of the present invention.
Fig. 3 is a schematic block diagram of a terminal according to an embodiment of the present invention.
Detailed Description
The invention discloses a method, a device, a terminal and a storage medium for generating a work package of an assembly type building, and in order to make the purpose, the technical scheme and the effect of the invention clearer and clearer, the invention is further described in detail by referring to the attached drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and do not limit the invention.
As used herein, the singular forms "a", "an", "the" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. It will be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element or intervening elements may also be present. Further, "connected" or "coupled" as used herein may include wirelessly connected or wirelessly coupled. As used herein, the term "and/or" includes all or any element and all combinations of one or more of the associated listed items.
It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
The work package management technology is a method for uniformly executing and managing a plurality of work units/tasks with high dependence degree by packaging the work units/tasks into a whole. The work package management technology can realize scale effect and reduce the management cost of resource repeated scheduling. The prefabricated building is formed by assembling prefabricated parts on a construction site. The work package management technology used in the production process of the assembly type building mainly depends on the work experience of a project manager, and the reliability of the work package distribution result is difficult to guarantee.
In view of the above-mentioned drawbacks of the prior art, the present invention provides a method for generating a work package of an assembly type building, the method comprising: acquiring a building information model and an integral process flow chart corresponding to the assembly type building, wherein the building information model comprises component units corresponding to a plurality of prefabricated parts respectively; determining local process information and neighborhood process information respectively corresponding to each component unit according to the building information model and the overall process flow diagram; clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters; and determining a sub-packaging strategy corresponding to the fabricated building according to each clustering cluster, wherein the sub-packaging strategy is used for generating a plurality of work packages, and each component unit in the same work package is jointly managed. According to the method, the work package distribution result of the assembly type building is automatically generated without manual intervention by analyzing the building information model and the whole process flow diagram of the assembly type building. The problem of use work package management technique mainly rely on project manager's work experience in the production process of assembly type structure at present, be difficult to guarantee the reliability of work package distribution result is solved.
As shown in fig. 1, the method includes:
s100, obtaining a building information model and an integral process flow chart corresponding to the assembly type building, wherein the building information model comprises component units corresponding to a plurality of prefabricated component parts respectively;
s200, determining local process information and neighborhood process information respectively corresponding to each component unit according to the building information model and the overall process flow diagram;
s300, clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and S400, determining a sub-packaging strategy corresponding to the assembly type building according to each cluster, wherein the sub-packaging strategy is used for generating a plurality of work packages, and each component unit in the same work package is managed jointly.
Specifically, the building information model is composed of a plurality of component units, each of which represents one prefabricated component constituting the fabricated building. The whole process flow chart comprises the process flow of all prefabricated parts, all the prefabricated parts required by the prefabricated building can be produced according to the whole process flow chart, and the prefabricated building is assembled by the prefabricated parts. In order to improve the production efficiency of the prefabricated building, the embodiment needs to use the work package management technology in the production process of the prefabricated parts, package a plurality of highly dependent process flows into a whole, and implement and manage the process flows uniformly. For each component unit, local process information and neighborhood process information of the component unit are determined based on the building information model and the overall process flow diagram. And then clustering each component unit according to the local domain process information and the neighborhood process information to obtain a plurality of cluster clusters. The distribution positions of all the parts in the same cluster in the model are similar, and the process characteristics are similar, so that the sub-package strategy of the work package can be accurately generated based on all the clusters. All the parts in the same work package are managed jointly, and the production efficiency of the fabricated building can be greatly improved.
In one implementation, the method for determining the local process information and the neighborhood process information respectively corresponding to each component unit includes:
step S201, determining a local process flow diagram corresponding to the component unit according to the overall process flow diagram, and using the local process flow diagram of the component unit as the local process information of the component unit;
step S202, determining a plurality of neighborhood component units corresponding to the component unit according to the building information model;
step S203, determining local process flow charts corresponding to the neighborhood component units respectively according to the overall process flow chart;
step S204, according to the local process flow chart of each neighborhood component unit, determining the neighborhood consistency of the component unit, and taking the neighborhood consistency as the neighborhood process information of the component unit.
Specifically, for each component unit, a local process flow diagram related to the component unit in the overall process flow diagram is intercepted, and local process information of the component unit is obtained. And determining the component units in the neighborhood of the component through the building information model to obtain a plurality of neighborhood component units corresponding to the component units. In one implementation, the neighborhood may be determined based on a predetermined distance or a predetermined range. And then respectively intercepting local process flow charts related to the neighborhood component units in the overall process flow chart, and judging the overall similarity degree of the local process flow charts of the neighborhood component units to obtain the neighborhood consistency of the component units, wherein the higher the overall similarity degree is, the higher the neighborhood consistency is. And finally, taking the neighborhood consistency as neighborhood process information of the component unit. In short, the process information in the present domain reflects the process characteristics of the component unit itself, and the process information in the neighborhood reflects the degree of similarity of the process characteristics of the component units around the component unit.
In one implementation, the overall process flow diagram includes a plurality of process units, for example, when the fabricated building is a steel structure module room, the overall process flow diagram includes process units of steel material loading, cutting, bending, welding, polishing, and the like. Each process unit has specific production tasks, resource types, usage, functional attributes, such as welding including spot welding, full welding, repair welding, etc. The process units are connected by connecting lines with arrow directions and used for reflecting the execution sequence (space-time relation) among the processes.
In an implementation manner, the step S204 specifically includes:
step S2041, determining a fusion process flow chart according to the local process flow chart of each neighborhood component unit;
step S2042, obtaining a local process flow diagram of each neighborhood component unit and a deviation value of the fusion process flow diagram respectively;
step S2043, determining the neighborhood consistency according to each deviation value.
Specifically, determining the overall similarity degree of each local process flow diagram by sequentially comparing two local process flow diagrams consumes a large amount of calculation overhead, so in this embodiment, image fusion is performed on each local process flow diagram to obtain a fusion process flow diagram. Because the fusion process flow chart contains the image characteristics of each local process flow chart, the local process flow charts are only needed to be compared with the fusion process flow chart respectively to obtain deviation values of the local process flow charts and the fusion process flow chart, the overall similarity degree of the local process flow charts can be determined through all the deviation values, and the neighborhood consistency is obtained.
In one implementation, the clustering process of each of the component units includes:
step S301, determining local characteristics of the component unit according to the local process information of the component unit;
step S302, local domain characteristics of a previous clustering component unit are obtained, and the characteristic similarity of the local domain characteristics of the previous component unit and the local domain characteristics of the component unit is calculated;
step S303, judging whether the feature similarity is higher than a similarity threshold, and when the feature similarity is higher than the similarity threshold, incorporating the component unit into the current cluster;
step S304, judging whether the neighborhood consistency of the component unit is higher than a consistency threshold value, and when the neighborhood consistency of the component unit is higher than the consistency threshold value, incorporating each neighborhood component unit corresponding to the component unit into the current cluster.
Specifically, the conventional clustering method analyzes and clusters each component unit in turn, and once the number of the component units is too large, a large amount of time cost is consumed. Therefore, the embodiment adopts an improved clustering method, for each component unit, feature extraction is performed on the basis of the local domain process information of the component unit to obtain local domain features, then the local domain features of the component unit are compared with the local domain features of a previous component unit (i.e., a previous component unit incorporated into the current cluster), and if the feature similarity is higher than the similarity threshold, it indicates that the process features of the component unit are similar to the process features of the previous component unit, the component unit is incorporated into the current cluster. And detecting neighborhood consistency of the component unit, and if the neighborhood consistency is higher than a preset consistency threshold value, indicating that the process characteristics of all the component units in the neighborhood of the component unit are highly similar, directly incorporating all the component units in the neighborhood of the component unit into the current cluster without cluster analysis. And then taking the nearest component unit outside the neighborhood of the component unit as the next component unit for clustering.
In one implementation, a repository may be constructed in advance to store the local process information and the neighborhood process information of each of the component units. In actual application, local area process information and neighborhood process information of the component unit are obtained from the storage library based on the component name.
In one implementation, the local domain features of the component units may be represented using a numerical vector output by a pre-trained semantic model. The pre-training semantic model is trained in advance, distance similarity cosine calculation is carried out according to the numerical vectors output by the model and the real numerical vectors during training, and model parameters are updated through similarity difference back propagation.
In one implementation, the method further comprises:
and S305, when the neighborhood consistency of the component unit is lower than or equal to the consistency threshold, taking the neighborhood component unit of the component unit as a next component unit for clustering.
Specifically, if the neighborhood consistency of the component unit is lower than or equal to the consistency threshold, it indicates that the difference between the process characteristics of each component unit in the neighborhood of the component unit is large, and in order to ensure the reliability of the distribution result of the work package, batch clustering is not suitable, and the neighborhood component units of the component unit need to be clustered in sequence.
In one implementation, the step S400 specifically includes:
s401, inputting each clustering cluster into an agent to obtain an initial sub-packaging strategy;
step S402, managing the production process of the fabricated building based on the initial sub-package strategy through a simulation technology, and randomly interfering the production process of one component unit;
step S403, acquiring the abnormal detection duration of the production process of the interfered component unit;
step S404, judging whether the abnormal detection time length is less than a preset time length;
step S405, when the abnormal detection duration is greater than or equal to the preset duration, determining the reward value of the intelligent agent according to the abnormal detection duration;
and S406, updating parameters of the intelligent agent according to the reward value, and continuing to execute the step of inputting each cluster into the intelligent agent until the abnormal detection time length is less than the preset time length to obtain the sub-packet strategy.
In this embodiment, an agent is pre-constructed, and the agent may automatically generate a corresponding sub-packaging policy based on a plurality of input clustering clusters, and perform simulation detection based on the generated sub-packaging policy to evaluate the quality of the sub-packaging policy. And then calculating the reward value according to the evaluation result, and automatically updating the parameters of the intelligent agent through the reward value so as to expect to obtain a higher reward value next time. Through multiple rounds of parameter updating, the output result of the intelligent agent is more and more reliable, and finally a better sub-package strategy can be output. Specifically, each cluster is input into the agent to obtain an initial subpackaging strategy, and the initial subpackaging strategy is low in reliability because the agent is not trained at the moment. Managing the production process of the fabricated building based on an initial sub-package strategy through a simulation technology, randomly selecting the production process of one component unit for interference, and calculating the time interval from interference to abnormal detection in the production process of the component unit, namely the abnormal detection time. When the anomaly detection duration is longer than or equal to the preset duration, the process flows of all the component units are managed jointly according to the initial sub-packaging strategy, the anomaly cannot be detected in time, and the initial sub-packaging strategy needs to be further improved. And then determining the reward value of the intelligent agent according to the abnormal detection duration, so that the intelligent agent automatically updates the parameters based on the reward value. And repeating the steps until the abnormal detection time length is less than the preset time length, indicating that the currently obtained subpackage strategy meets the management requirement and taking the obtained subpackage strategy as a final subpackage strategy.
In one implementation, the method further comprises:
s500, acquiring the number of updating rounds of the agent;
step S501, when the number of the updating rounds reaches a preset number, adjusting the similarity threshold and the consistency threshold;
and step S502, clustering each component unit again according to the adjusted similarity threshold and consistency threshold.
Specifically, when the number of update rounds of the agent reaches the preset number of rounds, the parameter indicating that the agent has been updated many times but the output packetization policy still does not meet the management requirement, and it may be that there is an error in the input data, that is, the clustering result is inaccurate. For example, a similarity threshold setting that is too low or a consistency threshold setting that is too low, results in the resulting cluster being too large. Therefore, in order to avoid endless cyclic updating and waste of calculation cost, when the number of updating rounds of the agent reaches the preset number of rounds, the similarity threshold and the consistency threshold are adjusted, each component unit is clustered again after adjustment, and then each cluster generated again is input into the agent again.
Based on the above embodiment, the present invention further provides a work package generating device for an assembly type building, as shown in fig. 2, the device includes:
the system comprises an acquisition module 01, a display module and a display module, wherein the acquisition module is used for acquiring a building information model and an overall process flow chart corresponding to an assembly type building, and the building information model comprises component units corresponding to a plurality of prefabricated component parts respectively;
a determining module 02, configured to determine local process information and neighborhood process information corresponding to each component unit according to the building information model and the overall process flow diagram;
the clustering module 03 is configured to cluster each component unit according to the local domain process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and the sub-packaging module 04 is used for determining a sub-packaging strategy corresponding to the assembly type building according to each cluster, wherein the sub-packaging strategy is used for generating a plurality of working packages, and each component unit in the same working package is jointly managed.
Based on the above embodiments, the present invention further provides a terminal, and a schematic block diagram thereof may be as shown in fig. 3. The terminal comprises a processor, a memory, a network interface and a display screen which are connected through a system bus. Wherein the processor of the terminal is configured to provide computing and control capabilities. The memory of the terminal comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The network interface of the terminal is used for connecting and communicating with an external terminal through a network. The computer program is executed by a processor to implement a method of generating a work package for a fabricated building. The display screen of the terminal can be a liquid crystal display screen or an electronic ink display screen.
It will be understood by those skilled in the art that the block diagram shown in fig. 3 is a block diagram of only a portion of the structure associated with the inventive arrangements and is not intended to limit the terminals to which the inventive arrangements may be applied, and that a particular terminal may include more or less components than those shown, or may have some components combined, or may have a different arrangement of components.
In one implementation, one or more programs are stored in a memory of the terminal and configured to be executed by one or more processors, including instructions for performing a work package generation method for an assembly building.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, databases, or other media used in embodiments provided herein may include non-volatile and/or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), rambus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
In summary, the present invention discloses a method, an apparatus, a terminal and a storage medium for generating a work package of an assembly type building, wherein the method comprises: acquiring a building information model and an integral process flow chart corresponding to the assembly type building, wherein the building information model comprises component units corresponding to a plurality of prefabricated parts respectively; determining local process information and neighborhood process information respectively corresponding to each component unit according to the building information model and the overall process flow diagram; clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters; and determining a sub-packaging strategy corresponding to the fabricated building according to each clustering cluster, wherein the sub-packaging strategy is used for generating a plurality of work packages, and each component unit in the same work package is jointly managed. According to the method, the work package distribution result of the assembly type building is automatically generated without manual intervention by analyzing the building information model and the whole process flow diagram of the assembly type building. The problem of use work package management technique mainly rely on project manager's work experience in the production process of assembly type structure at present, be difficult to guarantee the reliability of work package distribution result is solved.
It will be understood that the invention is not limited to the examples described above, but that modifications and variations will occur to those skilled in the art in light of the above teachings, and that all such modifications and variations are considered to be within the scope of the invention as defined by the appended claims.

Claims (10)

1. A method of generating a work package for an assembly building, the method comprising:
acquiring a building information model and an integral process flow chart corresponding to the assembly type building, wherein the building information model comprises component units corresponding to a plurality of prefabricated parts respectively;
determining local process information and neighborhood process information respectively corresponding to each component unit according to the building information model and the overall process flow diagram;
clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and determining a sub-packaging strategy corresponding to the assembly type building according to each cluster, wherein the sub-packaging strategy is used for generating a plurality of work packages, and each component unit in the same work package is jointly managed.
2. The method for generating a work package of an assembly type building according to claim 1, wherein the method for determining the local process information and the neighborhood process information respectively corresponding to each component unit comprises:
determining a local process flow chart corresponding to the component unit according to the overall process flow chart, and taking the local process flow chart of the component unit as the local process information of the component unit;
determining a plurality of neighborhood component units corresponding to the component unit according to the building information model;
determining local process flow charts corresponding to the neighborhood component units respectively according to the overall process flow chart;
and determining neighborhood consistency of each neighborhood component unit according to the local process flow chart of the neighborhood component unit, and taking the neighborhood consistency as the neighborhood process information of the component unit.
3. The method of generating a work package for an assembly building of claim 2, wherein determining the neighborhood identity of each neighborhood component unit based on the local process flow graph for that component unit comprises:
determining a fusion process flow chart according to the local process flow chart of each neighborhood component unit;
respectively acquiring the local process flow diagram of each neighborhood component unit and the deviation value of the fusion process flow diagram;
and determining the neighborhood consistency according to each deviation value.
4. The method of generating a work package for an assembly type building of claim 2, wherein the clustering process of each of the component units comprises:
determining local characteristics of the component unit according to the local process information of the component unit;
acquiring the local domain characteristics of the previous clustering component unit, and calculating the characteristic similarity of the local domain characteristics of the previous component unit and the local domain characteristics of the component unit;
judging whether the feature similarity is higher than a similarity threshold, and when the feature similarity is higher than the similarity threshold, incorporating the component unit into the current cluster;
and judging whether the neighborhood consistency of the component unit is higher than a consistency threshold value, and when the neighborhood consistency of the component unit is higher than the consistency threshold value, bringing each neighborhood component unit corresponding to the component unit into the current cluster.
5. The assembly building work package generation method of claim 4, further comprising:
when the neighborhood consistency of the component unit is lower than or equal to the consistency threshold, taking the neighborhood component unit of the component unit as a next component unit for clustering.
6. The method for generating the work package of the assembly type building according to claim 4, wherein the determining the sub-package strategy corresponding to the assembly type building according to each cluster comprises:
inputting each clustering cluster into an agent to obtain an initial sub-packaging strategy;
managing the production process of the fabricated building based on the initial sub-packaging strategy through a simulation technology, and randomly disturbing the production process of one component unit;
acquiring the abnormal detection time length of the production process of the interfered component unit;
judging whether the abnormal detection time length is less than a preset time length or not;
when the abnormal detection duration is greater than or equal to the preset duration, determining the reward value of the intelligent agent according to the abnormal detection duration;
and updating parameters of the intelligent agent according to the reward value, and continuing to execute the step of inputting each cluster into the intelligent agent until the abnormal detection time length is less than the preset time length to obtain the sub-packet strategy.
7. The method of generating a work package for an assembly building of claim 6, further comprising:
acquiring the number of updating rounds of the agent;
when the number of the updating rounds reaches a preset number of rounds, adjusting the similarity threshold and the consistency threshold;
and clustering the component units again according to the adjusted similarity threshold and the adjusted consistency threshold.
8. A work package generating apparatus for a fabricated building, the apparatus comprising:
the system comprises an acquisition module, a display module and a display module, wherein the acquisition module is used for acquiring a building information model and an integral process flow chart corresponding to an assembly type building, and the building information model comprises component units corresponding to a plurality of prefabricated component parts respectively;
the determining module is used for determining local process information and neighborhood process information which respectively correspond to each component unit according to the building information model and the whole process flow chart;
the clustering module is used for clustering each component unit according to the local area process information and the neighborhood process information of each component unit to obtain a plurality of clustering clusters;
and the sub-packaging module is used for determining a sub-packaging strategy corresponding to the assembly type building according to each clustering cluster, wherein the sub-packaging strategy is used for generating a plurality of working packages, and each component unit in the same working package is jointly managed.
9. A terminal, characterized in that the terminal comprises a memory and more than one processor; the memory stores more than one program; the program comprising instructions for performing a work package generation method for an assembly building according to any one of claims 1-7; the processor is configured to execute the program.
10. A computer readable storage medium having stored thereon a plurality of instructions adapted to be loaded and executed by a processor to perform the steps of the method for generating a work package for a prefabricated building according to any of claims 1 to 7.
CN202310086235.6A 2023-02-09 2023-02-09 Work package generation method, device, terminal and storage medium for assembly type building Active CN115829297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310086235.6A CN115829297B (en) 2023-02-09 2023-02-09 Work package generation method, device, terminal and storage medium for assembly type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310086235.6A CN115829297B (en) 2023-02-09 2023-02-09 Work package generation method, device, terminal and storage medium for assembly type building

Publications (2)

Publication Number Publication Date
CN115829297A true CN115829297A (en) 2023-03-21
CN115829297B CN115829297B (en) 2023-05-23

Family

ID=85520936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310086235.6A Active CN115829297B (en) 2023-02-09 2023-02-09 Work package generation method, device, terminal and storage medium for assembly type building

Country Status (1)

Country Link
CN (1) CN115829297B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116187738A (en) * 2023-04-27 2023-05-30 中建科技集团有限公司 Automatic generation method of work package based on execution sequence and position distribution
CN117556864A (en) * 2024-01-12 2024-02-13 阿里云计算有限公司 Information processing method, electronic device, and storage medium
CN118296412A (en) * 2024-06-06 2024-07-05 杭州富星印刷有限公司 Production data processing method and system for color printing package

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103661372A (en) * 2013-12-26 2014-03-26 江苏大学 Multi-agent optimization control device and method for automatic parking system
CN110991732A (en) * 2019-11-28 2020-04-10 武汉理工大学 Building material equipment manufacturing process optimization scheduling method based on energy consumption clustering
CN113761724A (en) * 2021-08-18 2021-12-07 淮阴工学院 Assembly type building construction organization and progress management method based on BIM technology
CN114116620A (en) * 2021-10-26 2022-03-01 深圳市华阳国际工程设计股份有限公司 Building data processing method and device, terminal and storage medium
CN115019924A (en) * 2022-08-08 2022-09-06 北京国安广传网络科技有限公司 Health data acquisition and analysis method applying artificial intelligence health robot
CN115577971A (en) * 2022-11-03 2023-01-06 四川启睿克科技有限公司 Staff ability dynamic value evaluation system based on algorithm model

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103661372A (en) * 2013-12-26 2014-03-26 江苏大学 Multi-agent optimization control device and method for automatic parking system
CN110991732A (en) * 2019-11-28 2020-04-10 武汉理工大学 Building material equipment manufacturing process optimization scheduling method based on energy consumption clustering
CN113761724A (en) * 2021-08-18 2021-12-07 淮阴工学院 Assembly type building construction organization and progress management method based on BIM technology
CN114116620A (en) * 2021-10-26 2022-03-01 深圳市华阳国际工程设计股份有限公司 Building data processing method and device, terminal and storage medium
CN115019924A (en) * 2022-08-08 2022-09-06 北京国安广传网络科技有限公司 Health data acquisition and analysis method applying artificial intelligence health robot
CN115577971A (en) * 2022-11-03 2023-01-06 四川启睿克科技有限公司 Staff ability dynamic value evaluation system based on algorithm model

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116187738A (en) * 2023-04-27 2023-05-30 中建科技集团有限公司 Automatic generation method of work package based on execution sequence and position distribution
CN116187738B (en) * 2023-04-27 2023-08-29 中建科技集团有限公司 Automatic generation method of work package based on execution sequence and position distribution
CN117556864A (en) * 2024-01-12 2024-02-13 阿里云计算有限公司 Information processing method, electronic device, and storage medium
CN117556864B (en) * 2024-01-12 2024-04-16 阿里云计算有限公司 Information processing method, electronic device, and storage medium
CN118296412A (en) * 2024-06-06 2024-07-05 杭州富星印刷有限公司 Production data processing method and system for color printing package

Also Published As

Publication number Publication date
CN115829297B (en) 2023-05-23

Similar Documents

Publication Publication Date Title
CN115829297A (en) Method and device for generating work package of assembly type building, terminal and storage medium
CN111580874B (en) System safety control method and system for data application and computer equipment
CN108958843A (en) Plug-in unit construction method, system, equipment and medium based on lightweight script
KR102607808B1 (en) Dynamic reallocating resources for optimized job performance in distributed heterogeneous computer system
CN115310562B (en) Fault prediction model generation method suitable for energy storage equipment in extreme state
CN111240976A (en) Software testing method and device, computer equipment and storage medium
CN114679341A (en) Network intrusion attack analysis method, equipment and medium combined with ERP system
CN113268335B (en) Model training and execution duration estimation method, device, equipment and storage medium
CN101142559B (en) Monitoring computer-controlled processes and systems
CN110737548A (en) Data request method and server
CN111162946B (en) Method for constructing model inference network, data processing method, data processing device and storage medium
CN112379913B (en) Software optimization method, device, equipment and storage medium based on risk identification
KR102195605B1 (en) Method for adjusting work unit price based on work runout rate of crowdsourcing based project for artificial intelligence training data generation
CN109859038B (en) Method and device for taking block chain intelligent contract into effect
CN108599976B (en) Network quality evaluation model construction method and device and computer equipment
CN114138634B (en) Test case selection method and device, computer equipment and storage medium
CN113808727B (en) Device monitoring method, device, computer device and readable storage medium
CN114676601A (en) Emission cost calculation method and device, computer equipment and storage medium
CN113608962A (en) Method, device and equipment for predicting abnormal application interface and storage medium
CN113158497A (en) Online service experiment method and device, computer equipment and storage medium
CN110599620A (en) Data processing method and device, computer equipment and readable storage medium
CN115085198B (en) Perception decision method based on edge calculation
CN115756797B (en) Queuing system scheduling detection method and device
CN102902825B (en) A kind of database optimizing method and device
CN110874612B (en) Time interval prediction method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant