CN115795768B - Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration - Google Patents

Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration Download PDF

Info

Publication number
CN115795768B
CN115795768B CN202310080836.6A CN202310080836A CN115795768B CN 115795768 B CN115795768 B CN 115795768B CN 202310080836 A CN202310080836 A CN 202310080836A CN 115795768 B CN115795768 B CN 115795768B
Authority
CN
China
Prior art keywords
pipeline
data
dimensional
updating
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310080836.6A
Other languages
Chinese (zh)
Other versions
CN115795768A (en
Inventor
王履华
高权忠
张飞
秦雨姝
杜永乐
黎大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING GUOTU INFORMATION INDUSTRY CO LTD
Original Assignee
NANJING GUOTU INFORMATION INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING GUOTU INFORMATION INDUSTRY CO LTD filed Critical NANJING GUOTU INFORMATION INDUSTRY CO LTD
Priority to CN202310080836.6A priority Critical patent/CN115795768B/en
Publication of CN115795768A publication Critical patent/CN115795768A/en
Application granted granted Critical
Publication of CN115795768B publication Critical patent/CN115795768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a three-dimensional modeling and data updating method and system for a pipe network taking entity forms into consideration, and belongs to the technical field of pipe network data updating; the method comprises the following steps: obtaining the range of an underground pipeline construction engineering area, and leading out the current data of the pipeline in the area to serve as a working base map so as to assist the planning and design of pipeline engineering; integrating and establishing quality inspection rules, and inspecting a pipeline engineering planning design scheme; configuring quality inspection rule items according to pipeline engineering completion measurement data, and generating a quality inspection report; judging an update state of completion measurement data passing quality inspection, and inserting elements with the update state of deletion and attribute update into a history library for data backup; a range-level incremental updating method is adopted to update and store two-dimensional data; adopting an automatic parameter modeling method taking the entity form into consideration to finish the construction of a three-dimensional model of the underground pipeline on the two-dimensional data in storage; and establishing an urban underground comprehensive pipe network information system to realize management, application and sharing of a pipeline database.

Description

Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration
Technical Field
The invention belongs to the technical field of pipe network data updating, and particularly relates to a pipe network three-dimensional modeling and data updating method and system considering entity forms.
Background
The urban underground pipeline is an important infrastructure and a life line for guaranteeing urban operation, pipeline data provides accurate space information for construction units and management departments, lays a solid data foundation for reasonable development and utilization of urban underground space, comprehensive management, urban digitization, smart city construction and the like, and relates to the quality of life of people and the economic and social security development of cities. Along with the gradual completion of urban underground pipeline census work, ensuring the dynamic updating of underground pipeline data and maintaining the appearance of pipeline data has become the key of effective application of pipeline census results. The current updating mode of the urban underground comprehensive pipe network mainly comprises the following steps:
and firstly, an element level updating mode is adopted, only a small part of pipe network element data is updated, and the relation and edge connection constraint between the pipe network element data and other pipes are not considered. But is only suitable for updating a small amount of data on the drawing, and is not suitable for updating the data in a large range (newly added roads and road transformation) of the actual urban underground comprehensive pipeline construction engineering;
secondly, adopting a full-range whole-warehouse replacement updating mode, carrying out underground pipeline general survey once every 5 years or 10 years by a pipeline administration department, directly writing the existing data in the current database into a historical database, and then totally updating and warehousing the latest general survey data to carry out whole-warehouse replacement updating. However, the method has the advantages of huge investment of manpower and financial resources, overlong updating period, lower efficiency of updating pipeline data and very difficult history backtracking inquiry and updating revocation;
thirdly, adopting a repair measurement period updating mode, regularly developing pipeline vector data formed by repairing and measuring the underground pipeline by a pipeline main department, comparing the pipeline vector data with pipe network data in a repair measurement range in a current database, modifying and checking quality based on a comparison result, and carrying out data warehouse entry updating after determining that the data has no quality problem. However, by adopting the method, workers are required to manually compare, modify and check the pipeline, the working efficiency is low, the real-time dynamic update of the pipeline data cannot be realized, and the timeliness of the pipeline data cannot be ensured.
The pipeline data is a foundation stone for informatization construction of the urban underground pipe network, timely and efficiently updates and maintains the urban underground comprehensive pipe network database achievements established by general investigation, and has important value and significance for urban digital and intelligent management. However, the traditional pipeline updating mode depends on regular pipeline general investigation or repair and measurement of the jurisdiction by government departments, the investment of manpower and financial resources is huge, the working efficiency is low, the pipeline data updating period is overlong, and meanwhile, the automatic construction and updating of the three-dimensional pipe network data are lacking, so that the three-dimensional expression and application requirements of the pipeline cannot be met.
Disclosure of Invention
Aiming at the defects of the prior art, the invention aims to provide a pipe network three-dimensional modeling and data updating method and system considering entity forms.
The aim of the invention can be achieved by the following technical scheme:
a pipe network three-dimensional modeling and data updating method taking entity forms into consideration comprises the following steps:
s1, acquiring the area range of an underground pipeline construction project, and leading out the current data of the pipeline in the area to serve as a working base map to assist in pipeline engineering planning and design;
s2, integrating and establishing a quality inspection rule engine, establishing a quality inspection rule base, and checking a pipeline engineering planning design scheme submitted by a construction unit;
s3, configuring quality inspection rule items according to pipeline completion measurement data submitted by a construction unit, and generating a quality inspection report;
s4, judging an update state of completion measurement data passing quality inspection, inserting elements with the update state of deletion and attribute update into corresponding layers in a history base for data backup, marking backup data with the update state and update date, and supporting history backtracking and update revocation;
s5, based on the judging result of the updating state of the pipeline network element, a range-level incremental updating method is adopted to update and store the two-dimensional data;
s6, adopting an automatic parameter modeling method taking the entity form into consideration, completing the construction and coupling of the three-dimensional model of the underground pipeline for updating the two-dimensional data in storage, and realizing the synchronous updating of the two-dimensional pipeline data;
s7, establishing an urban underground comprehensive pipe network information system to realize management, application and sharing of a pipeline database.
Further, in S1, the process of deriving engineering area pipeline current status data includes the steps of:
s11, determining an extraction area according to an underground pipeline construction engineering area range layer, searching and recording pipeline point records in the extraction area and located at the boundary, classifying pipeline points according to the pipeline points in the boundary, the pipeline points in the boundary and the pipeline points in the outer pipe of the boundary, and establishing a corresponding relation table of the pipeline points in the boundary;
s12, recording export information of the underground pipeline, exporting an underground pipeline database file stored in an MDB format and a graphic file stored in a dwg format, and carrying out engineering design planning and design by using the export information as a basic reference diagram by a design unit.
Further, in S2, the process of intelligently inspecting the planning scheme includes the following steps:
s21, constructing an urban underground pipe network data quality inspection rule engine, extracting inspection rules and establishing a quality inspection rule base;
s22, for pipeline engineering planning and design proposal results submitted by a construction unit and stored in dwg format, automatically analyzing by adopting a SuperMap GIS basic platform, extracting design data of pipeline points and pipelines, respectively importing the design data into temporary layers SJGD and SJGX, loading current pipeline data, and configuring required quality inspection rule items, including laying standardization inspection, isolated pipeline point pipeline inspection, pipeline section overlength inspection and the like;
s23, generating a pipeline planning design examination report, and judging whether the pipeline planning design scheme is qualified or not; if the pipeline is qualified, pipeline engineering construction can be performed; if the pipeline planning scheme is not qualified, the planning and design unit modifies the pipeline planning scheme according to the inspection report until the pipeline planning scheme passes the inspection report, and pipeline engineering construction is carried out.
Further, the quality inspection rule item in S3 includes: lay normalization check, pipe point data correctness check, pipeline data correctness check, topology relation check between pipe lines.
Further, in S4, the process of backing up the historical data includes the following steps:
s41, comparing the completion measurement data passing the quality inspection with the exported pipeline point pipelines, and dividing the updating states of the pipeline point pipeline element graphs and the attributes into: new addition, deletion, attribute update and no change;
s42, after confirming the update state of the elements in the engineering construction scope by the user, inserting the elements with the update state of deletion and attribute update into the corresponding layers in the history base for data backup, and marking the backup data by the engineering number, the update state and the update date.
Further, in S5, the process of updating and warehousing the two-dimensional data includes: and updating, fusing and warehousing the two-dimensional pipeline point elements with the updated states of new addition and attribute update, deleting the elements with the updated states of deletion, recording an update log, and finishing updating and warehousing of the two-dimensional pipeline point.
Further, in S6, the updating process of the three-dimensional modeling includes:
s61, the space object of the urban underground pipe network consists of pipe segments, pipe characteristic points, pipe wells and auxiliary facilities, abstraction and certain simplification are carried out aiming at the actual size of the space object of various pipe networks, and a pipe point and pipe line three-dimensional model library is constructed;
s62, aiming at updating the two-dimensional pipeline point data in storage, calling the three-dimensional model library of the pipeline point pipeline constructed in S61 to construct a three-dimensional model of the pipeline network, and automatically generating the pipeline and auxiliary facilities thereof; and the optimal self-adaptive adjustment of the physical form of the pipeline point is realized through modeling parameters such as rotation angle, scaling and the like, the automatic nesting of the pipeline, the characteristic points and the auxiliary facilities is realized, and the synchronous updating of the two-dimensional pipeline data is completed.
Further, in S62, the specific steps of synchronous updating of the two-dimensional pipeline data are:
s621, adding field information such as rotation angle, scaling, model coding, color coding and the like in three dimensions of X, Y, Z to updated two-dimensional pipeline point data in an engineering range, establishing a conversion relation between the model coding, the color coding and pipeline element types of the pipeline points, and calculating modeling parameters such as rotation angle, scaling and the like after the model is led into a network;
s622, converting the two-dimensional pipeline point pipeline data set into a three-dimensional pipeline point pipeline data set based on the elevation value, and establishing a three-dimensional pipeline point network data set by judging the consistency of the point number of the pipeline point map layer, the starting point number and the end point number of the pipeline map layer to form a three-dimensional topological network;
s623, for the three-dimensional pipeline point network data set constructed in the S622, calling modeling parameters such as rotation angle, scaling, model coding, color coding and the like to perform batch parameterization modeling and pipeline point entity form adjustment, and completing three-dimensional model construction coupling and three-dimensional pipeline data updating for updating and warehousing two-dimensional data in an engineering range.
Further, in S7, the content of the urban underground integrated network information system includes:
1) Unified management and update maintenance are carried out on the urban underground pipeline management point data, and an integrated management, information inquiry, data quality inspection and statistical analysis module of various achievements is provided;
2) Providing pipe network transverse and longitudinal section analysis, flag pulling analysis, excavation analysis and pipe bursting valve closing analysis, and providing decision support for emergency repair;
3) And providing data production, result release, sharing portal, authority management and application service interface modules, and providing data services of different levels for government authorities, scientific research institutions and the public society.
A system for three-dimensional modeling and data updating of a pipe network taking into account physical morphology, comprising:
a data acquisition unit: obtaining the range of an underground pipeline construction engineering area, and leading out the current data of the pipeline in the area to serve as a working base map so as to assist the planning and design of pipeline engineering;
and (3) an inspection unit: integrating and establishing a quality inspection rule engine, establishing a quality inspection rule base, and checking a pipeline engineering planning design scheme submitted by a construction unit;
quality inspection unit: configuring quality inspection rule items according to pipeline engineering completion measurement data submitted by a construction unit, and generating a quality inspection report;
historical data backup unit: judging an update state of completion measurement data passing quality inspection, inserting elements with the update state of deletion and attribute update into corresponding layers in a history base for data backup, marking backup data with the update state and update date, and supporting history backtracking and update revocation;
two-dimensional data updating unit: based on the judging result of the updating state of the pipeline network element, a range-level incremental updating method is adopted to realize two-dimensional data updating and warehousing;
two three-dimensional pipeline data synchronous updating units: adopting an automatic parameter modeling method taking the entity form into consideration, completing the construction and coupling of an underground pipeline three-dimensional model for the two-dimensional data updated and put in storage, and realizing the synchronous update of the two-dimensional pipeline data;
the pipe network information system building unit: and establishing an urban underground comprehensive pipe network information system to realize management, application and sharing of a pipeline database.
The invention has the beneficial effects that:
1. firstly, exporting regional pipeline current state data as a working base map, assisting pipeline engineering planning and design, intelligently examining a planning scheme, and guiding pipeline safety specification construction; secondly, receiving completion measurement data for quality inspection, realizing incremental update and warehousing of two-dimensional data, completing automatic construction and coupling of a three-dimensional model taking into account entity forms, and realizing management, application and sharing of a pipeline database on the basis;
2. the invention effectively merges pipeline engineering construction with updating warehouse-in and management application, so that pipeline updating can be supported by engineering projects, management is convenient, the whole process of checking and updating the two-dimensional pipe network can be rapidly and automatically completed under little manual intervention, historical data can be backed up and traced back, data updating safety and controllability are ensured, working complexity and labor cost are reduced, and the invention has good practical application value.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described, and it will be obvious to those skilled in the art that other drawings can be obtained according to these drawings without inventive effort.
FIG. 1 is a schematic flow diagram of the method of the present invention;
FIG. 2 is a schematic diagram of a two-dimensional data update warehousing flow;
FIG. 3 is a schematic diagram of a two-dimensional current point pipeline distribution within an engineering construction area prior to an update;
FIG. 4 is a schematic illustration of as built measurement data distribution within an engineering construction area passing quality inspection;
FIG. 5 is a schematic diagram of determining a pipeline update state during a two-dimensional data update and warehousing process;
FIG. 6 is a schematic diagram of the self-adaptive adjustment of the physical form of the pipe; fig. 6 (a) is a schematic diagram of the valve after adjustment, and fig. 6 (b) is a schematic diagram of the pipe point at the connection point after adjustment;
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
As shown in fig. 1, a method for three-dimensional modeling and data updating of a pipe network taking into account entity morphology includes the following steps:
s1, acquiring the area range of an underground pipeline construction project, and leading out the current data of the pipeline in the area to serve as a working base map to assist in pipeline engineering planning and design;
wherein, the process of deriving engineering area pipeline current status data comprises the following steps:
s11, determining an extraction area according to an underground pipeline construction engineering area range layer, searching and recording pipeline point records in the extraction area and at the boundary, classifying pipeline points according to the pipeline points in the boundary, pipeline points in the boundary and pipeline points in the outer pipe of the boundary, establishing a corresponding relation table of pipeline points in the boundary, and providing parameters for subsequent data updating and fusionAs shown in FIG. 3, wherein the point of pipe
Figure SMS_3
、/>
Figure SMS_6
、/>
Figure SMS_7
Is the boundary inner pipe point, pipeline->
Figure SMS_2
、/>
Figure SMS_4
For an intra-boundary pipeline, for a pipeline section crossing a boundary +.>
Figure SMS_8
、/>
Figure SMS_9
And the line point outside the boundary connected thereto>
Figure SMS_1
And line point->
Figure SMS_5
The line segments are completely cut and submitted together, so that the artificial interruption of the line segments and the generation of hanging points are avoided;
s12, recording the export information of the underground pipeline, wherein the content comprises the following components in table 1: the engineering number, project name, area code, area name, export time, exporter, engineering surveying and mapping unit related information and space range are marked in a database according to the engineering number, the inquiry of export records is supported, the underground pipeline database file stored in MDB format and the graphic file stored in dwg format are exported, and the planning and designing unit uses the project number, the project name, the area code, the area name, the export time, the exporter, the engineering surveying and mapping unit related information and the space range to carry out engineering planning and designing on pipeline.
Table 1 table of underground pipeline export information
Figure SMS_10
S2, integrating and establishing a quality inspection rule engine, establishing a quality inspection rule base for checking and verifying the whole flow of a pipeline before and after construction, intelligently inspecting a pipeline engineering planning design scheme submitted by a construction unit, and enabling an inspection passing party to perform pipeline engineering construction;
the intelligent examination process for the planning scheme comprises the following steps:
s21, constructing a city underground pipe network data quality inspection rule engine, extracting 29 inspection rules such as pipeline laying standardization, data correctness and topology relation inspection, and establishing a quality inspection rule base (shown in a table 2);
table 2 pipeline data quality inspection rule base
Figure SMS_11
Pipeline laying standardization checks include a covering depth check, a horizontal clearance check and a vertical clearance check;
the content of the earthing depth inspection is as follows: calculating whether the starting point burial depth and the ending point burial depth of the pipeline are larger than the minimum earthing depth standard of the engineering pipeline according to the starting point elevation, the ending point elevation and the corresponding ground elevation of the pipeline;
the content of the horizontal clear distance check is: establishing a buffer zone around each pipeline to be analyzed by taking the maximum value of the horizontal clear distance standard of each pipeline as a buffer value, calculating the horizontal clear distance between the analysis pipeline and the peripheral pipeline in the buffer zone by adopting an underground pipeline clear distance algorithm based on a projection surface, and checking whether the horizontal clear distance between the analysis pipeline and the peripheral pipeline is greater than the minimum horizontal clear distance standard between engineering pipelines;
the contents of the vertical clear distance check are: establishing a buffer zone around each pipeline to be analyzed by taking the maximum value of the vertical clear distance standard of each pipeline as a buffer value, calculating the vertical clear distance between the analysis pipeline and the peripheral pipeline in the buffer zone by adopting an underground pipeline clear distance algorithm based on a projection surface, and checking whether the vertical clear distance between the analysis pipeline and the peripheral pipeline is larger than the minimum vertical clear distance standard between engineering pipelines;
s22, for pipeline engineering planning and design proposal results submitted by construction units and stored in dwg format, automatically analyzing by adopting a SuperMap GIS basic platform, extracting pipeline point and pipeline design data, respectively importing the pipeline point and pipeline design data into temporary layers SJGD and SJGX, loading current pipeline data, and configuring required quality inspection rule items, including laying normalization inspection, isolated pipeline point pipeline inspection, pipeline section overlength inspection and the like;
s23, generating a pipeline planning design examination report, and judging whether the pipeline planning design scheme is qualified or not. If the pipeline is qualified, pipeline engineering construction can be performed; if the pipeline planning scheme is not qualified, the planning and design unit modifies the pipeline planning scheme according to the inspection report until the pipeline planning scheme passes the inspection report, and pipeline engineering construction is carried out.
And S3, configuring quality inspection rule items according to pipeline completion measurement data submitted by a construction unit, wherein the quality inspection rule items comprise laying standardization inspection, pipeline point data correctness inspection, pipeline data correctness inspection and pipeline line topological relation inspection, and generating a quality inspection report.
S4, as shown in FIG. 2, judging an update state of completion measurement data passing quality inspection, inserting elements with the update state of deletion and attribute update into corresponding layers in a history base for data backup, marking backup data with the update state and update date, and supporting history backtracking and update revocation;
the process of the historical data backup comprises the following steps:
s41, through the completion measurement data distribution in the engineering area range of quality inspection as shown in fig. 4, the completion measurement data and the exported pipeline point pipelines are compared, and the updating data entity and the original layer are compared and identified one by utilizing the element comparison and identification technology, so that the updating states of the element graph and the attribute of the pipeline point pipelines are divided into: the new, delete, attribute update and unchanged four types, display each updated state with different symbol colors on the map, the coding rule of the field 'updated state' GXZT and the corresponding colors on the map are shown in table 3;
table 3 update status encoding table
Figure SMS_12
For example, the analysis results show that the "updated state" GXZT values of each pipe point and pipeline in the updated area are shown in tables 4 and 5, and are shown in fig. 5 (color is omitted in fig. 5) on the map;
TABLE 4 pipe update status
Figure SMS_13
Table 5 pipeline update status
Figure SMS_14
The specific steps of S41 are as follows:
s411, traversing completion measurement pipeline data, and comparing the completion measurement pipeline data with current data in an updating range in position; for the line data (or point data), if no record with the same line segment number (or point number) exists and no bit line (or point) exists, the update state is judged to be newly increased;
s412, traversing the current pipeline data in the updating range, and comparing the current pipeline data with completion measurement data in position; for line data (or point data), if there is no record with the same line segment number (or point number) and there is no bit line (or point), the update status is determined to be deleted;
s413, traversing the current pipeline data in the updating range, and comparing the current pipeline data with completion measurement data in position; for line data (or point data), if the records with the same pipeline segment numbers (or pipeline point numbers) and the same positions exist, comparing whether the attributes are the same or not, and if the attributes are the same, updating the state to be unchanged; if the update states are different, the update states are attribute updates.
S42, after confirming the update state of the elements in the engineering construction scope by the user, the GXZT value of the update state is 2 and 3Pipeline point elements (i.e. pipeline point elements whose update status is delete and attribute update) are inserted into corresponding layers in the history base for data backup, including pipeline points
Figure SMS_15
、/>
Figure SMS_16
Pipeline->
Figure SMS_17
、/>
Figure SMS_18
And the backup data is marked by the field of the engineering number GCBH, the update state GXZT and the update date GXRQ.
S5, based on the judging result of the updating state of the pipeline network element, a range-level incremental updating method is adopted to update and store the two-dimensional data;
the two-dimensional data updating and warehousing process comprises the following steps:
and updating, fusing and warehousing pipeline point elements with the GXZT values of 1 and 3 (namely pipeline point elements with the GXZT values of new and attribute updating), deleting the element with the GXZT value of 2 (namely pipeline point elements with the GXZT value of deleting), recording an update log, and finishing updating and warehousing of the two-dimensional pipeline point.
S6, adopting an automatic parameter modeling method taking the entity form into consideration, completing the construction and coupling of the three-dimensional model of the underground pipeline for updating the two-dimensional data in storage, and realizing the synchronous updating of the two-dimensional pipeline data.
The updating process of the three-dimensional modeling comprises the following steps:
s61, the space object of the urban underground pipe network consists of pipe segments, pipe characteristic points, pipe wells and auxiliary facilities, abstraction and certain simplification are carried out aiming at the actual size of the space object of various pipe networks, and a pipe point and pipe line three-dimensional model library is constructed;
s62, aiming at updating the two-dimensional pipeline point data in storage, calling the three-dimensional model library of the pipeline point pipeline constructed in S61 to construct a three-dimensional model of the pipeline network, and automatically generating the pipeline and auxiliary facilities thereof; the optimal self-adaptive adjustment of the physical form of the pipeline point is realized through modeling parameters such as rotation angle, scaling and the like, the automatic nesting of the pipeline and the characteristic point and auxiliary facilities is realized, and the synchronous update of two three-dimensional pipeline data is completed;
in S62, the specific steps of synchronous update of the two-dimensional pipeline data are as follows:
s621, adding field information such as rotation angle, scaling, model coding, color coding and the like in three dimensions of X, Y, Z to updated two-dimensional pipeline point data in an engineering range, establishing a conversion relation between the model coding, the color coding and pipeline element types of the pipeline points, and calculating modeling parameters such as rotation angle, scaling and the like after the model is led into a network;
s622, converting the two-dimensional pipeline point pipeline data set into a three-dimensional pipeline point pipeline data set based on the elevation value, and establishing a three-dimensional pipeline point network data set by judging the consistency of the point number of the pipeline point map layer, the starting point number and the end point number of the pipeline map layer to form a three-dimensional topological network;
s623, for the three-dimensional pipeline point network data set constructed in the S622, calling modeling parameters such as rotation angle, scaling, model coding, color coding and the like to perform batch parameterization modeling and pipeline point entity form adjustment, and completing three-dimensional model construction coupling and three-dimensional pipeline data updating for updating and warehousing two-dimensional data in an engineering range.
If the valve can be adaptively adjusted according to the pipeline trend, the valve switch direction is always perpendicular to the pipeline trend, and meanwhile, the symbol scaling ratio is automatically adjusted according to the pipeline radius, so that the valve size is completely consistent with the pipeline where the valve is positioned, as shown in (a) of fig. 6; similarly, for the characteristic points of the pipelines such as inflection points, crossing points, branching points and the like, the physical form of the pipeline points at the communicating position can be adjusted according to the topological relation between the pipeline points and the pipelines, and as shown in (b) of fig. 6, the perfect anastomosis of the pipeline point model and the pipeline interfaces is realized.
S7, establishing an urban underground comprehensive pipe network information system to realize management, application and sharing of a pipeline database;
the urban underground comprehensive pipe network information system comprises the following contents:
1) Unified management, updating and maintenance are carried out on the urban underground pipeline management point data, and functional modules such as integrated management, information inquiry, data quality inspection, statistical analysis and the like of various achievements are provided;
2) Advanced space analysis functions such as pipe network transverse and longitudinal section analysis, flag pulling analysis, excavation analysis, pipe explosion valve closing analysis and the like are provided, and decision support is provided for emergency repair;
3) Functional modules such as data production, result release, sharing portal, authority management, application service interface and the like are provided, and data services of different levels are provided for government authorities, scientific research institutions and the public society.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present invention. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present invention, and various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined in the appended claims.

Claims (7)

1. The three-dimensional modeling and data updating method for the pipe network taking the entity form into consideration is characterized by comprising the following steps of:
s1, acquiring an underground pipeline construction engineering area range, and leading out current pipeline data of an engineering area as a working base map to assist pipeline engineering planning and design;
s2, integrating and establishing a quality inspection rule engine, establishing a quality inspection rule base, and checking a pipeline engineering planning design scheme submitted by a construction unit;
s3, configuring quality inspection rule items according to pipeline completion measurement data submitted by a construction unit, and generating a quality inspection report;
s4, judging an update state of completion measurement data passing quality inspection, inserting elements with the update state of deletion and attribute update into corresponding layers in a history base for data backup, marking backup data with the update state and update date, and supporting history backtracking and update revocation;
s5, based on the judging result of the updating state of the pipeline network element, a range-level incremental updating method is adopted to update and store the two-dimensional data;
s6, adopting an automatic parameter modeling method taking the entity form into consideration, and completing construction and coupling of a three-dimensional model of the underground pipe network for updating the two-dimensional data in storage to realize synchronous updating of the two-dimensional pipeline data;
s7, establishing an urban underground comprehensive pipe network information system to realize management, application and sharing of a pipeline database;
in S6, the process of updating the three-dimensional model includes:
s61, the space object of the urban underground pipe network consists of pipe segments, pipe characteristic points, pipe wells and auxiliary facilities, abstraction and certain simplification are carried out aiming at the actual size of the space object of various pipe networks, and a pipe point and pipe line three-dimensional model library is constructed;
s62, aiming at updating the two-dimensional pipeline point data in storage, calling the three-dimensional model library of the pipeline point pipeline constructed in S61 to construct a three-dimensional model of the pipeline network, and automatically generating the pipeline and auxiliary facilities thereof; the optimal self-adaptive adjustment of the physical form of the pipeline point is realized through the modeling parameters of the rotation angle and the scaling, the automatic nesting of the pipeline segment, the pipeline characteristic point and the accessory facilities is realized, and the synchronous update of two three-dimensional pipeline data is completed;
in S62, the specific steps of synchronous update of the two-dimensional pipeline data are:
s621, adding X, Y, Z rotation angle, scaling, model coding and color coding field information in three dimensions for updated two-dimensional pipeline point data in an engineering area range, establishing a conversion relation between the model coding, the color coding and pipeline element types of the pipeline points, and calculating rotation angle and scaling modeling parameters of the model after the model is led into a pipeline;
s622, converting the two-dimensional pipeline point data set into a three-dimensional pipeline point data set based on the elevation value, and establishing a three-dimensional pipeline point network data set by judging the consistency of the point number of the pipeline point data layer, the starting point number and the end point number of the pipeline layer to perform three-dimensional topology networking;
s623, for the three-dimensional pipeline point network data set constructed in S622, calling rotation angle, scaling, model coding and color coding modeling parameters to perform batch parameterization modeling and pipeline point entity form adjustment, and completing three-dimensional model construction coupling and three-dimensional pipeline data updating for updating and warehousing two-dimensional data in the engineering area range.
2. The method for three-dimensional modeling and data updating of a pipe network taking into account physical forms according to claim 1, wherein in S1, the process of deriving current data of a pipeline in an engineering area comprises the following steps:
s11, determining an extraction area according to an underground pipeline construction engineering area range layer, searching and recording pipeline point records in the extraction area and at the boundary, classifying pipeline points according to the pipeline points in the boundary, pipeline points in the boundary and pipeline points in the outer pipe, and establishing a corresponding relation table of pipeline points in the boundary;
s12, recording export information of the underground pipeline, exporting an underground pipeline database file stored in an MDB format and a graphic file stored in a dwg format, and carrying out engineering planning and design of the pipeline by using the export information as a basic reference diagram by a construction unit.
3. The method for three-dimensional modeling and data updating of a pipe network taking into account physical forms according to claim 1, wherein in S2, the process of inspecting the planning design scheme comprises the following steps:
s21, constructing an urban underground pipe network quality rule engine, extracting checking rules and establishing a quality inspection rule base;
s22, for pipeline engineering planning and design proposal results submitted by a construction unit and stored in dwg format, automatically analyzing by adopting a SuperMap GIS basic platform, extracting design data of pipeline points and pipelines, respectively importing the design data into temporary layers SJGD and SJGX, loading current data of the pipelines, and configuring required quality inspection rule items, including laying standardization inspection, isolated pipeline point pipeline inspection and pipeline section overlength inspection;
s23, generating a pipeline planning design examination report, and judging whether the pipeline engineering planning design scheme is qualified or not; if the pipeline is qualified, pipeline engineering construction can be performed; and if the pipeline project is not qualified, the construction unit modifies the pipeline project planning design scheme according to the pipeline planning design examination report until the pipeline project planning design scheme passes examination, and performs pipeline project construction.
4. The method for three-dimensional modeling and data updating of a pipe network taking into account entity morphology according to claim 1, wherein the quality inspection rule item in S3 comprises: lay normalization check, pipe point data correctness check, pipeline data correctness check, and topology relation check between pipe points and pipelines.
5. The method for three-dimensional modeling and data updating of a pipe network taking into account physical forms according to claim 1, wherein in S4, the process of data backup comprises the following steps:
s41, comparing the completion measurement data passing the quality inspection with the exported pipeline point pipelines, and dividing the updating states of the pipeline point pipeline element graphs and the attributes into: new addition, deletion, attribute update and no change;
s42, after confirming the updating state of the elements in the engineering area range by the user, inserting the elements with the updating state of deletion and attribute updating into the corresponding layers in the history base for data backup, and marking the backup data by the engineering number, the updating state and the updating date.
6. The method for three-dimensional modeling and data updating of a pipe network taking into account physical forms according to claim 1, wherein in S5, the process of two-dimensional data updating and warehousing comprises: and updating, fusing and warehousing the two-dimensional pipeline point elements with the updated states of new addition and attribute update, deleting the elements with the updated states of deletion, recording an update log, and finishing updating and warehousing of the two-dimensional pipeline point.
7. The method for three-dimensional modeling and data updating of a pipe network taking into account physical forms according to claim 1, wherein in S7, the content of the urban underground integrated pipe network information system comprises:
1) Unified management and update maintenance are carried out on the urban underground pipeline management point data, and an integrated management, information inquiry, data quality inspection and statistical analysis module of various achievements is provided;
2) Providing pipe network transverse and longitudinal section analysis, flag pulling analysis, excavation analysis and pipe bursting valve closing analysis, and providing decision support for emergency repair;
3) And providing data production, result release, sharing portal, authority management and application service interface modules, and providing data services of different levels for government authorities, scientific research institutions and the public society.
CN202310080836.6A 2023-02-08 2023-02-08 Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration Active CN115795768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310080836.6A CN115795768B (en) 2023-02-08 2023-02-08 Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310080836.6A CN115795768B (en) 2023-02-08 2023-02-08 Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration

Publications (2)

Publication Number Publication Date
CN115795768A CN115795768A (en) 2023-03-14
CN115795768B true CN115795768B (en) 2023-04-25

Family

ID=85430466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310080836.6A Active CN115795768B (en) 2023-02-08 2023-02-08 Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration

Country Status (1)

Country Link
CN (1) CN115795768B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117436221B (en) * 2023-12-20 2024-04-12 中冶南方工程技术有限公司 Method and system for intelligently matching special-shaped non-standard pipeline space

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104090827B (en) * 2014-06-27 2017-05-10 西安煤航信息产业有限公司 Two-dimensional platform and three-dimensional platform integrated pipeline data synchronization and linkage method
CN106407540B (en) * 2016-09-08 2019-06-14 北京市测绘设计研究院 A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology
CN111177832A (en) * 2019-12-27 2020-05-19 江苏数链建筑科学研究院有限公司 Electromechanical pipeline comprehensive specification automatic inspection system based on BIM
CN113190937A (en) * 2021-01-25 2021-07-30 中国电建集团华东勘测设计研究院有限公司 Automatic construction method for three-dimensional model of drainage pipe network

Also Published As

Publication number Publication date
CN115795768A (en) 2023-03-14

Similar Documents

Publication Publication Date Title
CN105117573B (en) Auto hydraulic model building method based on CAD drainage pipeline networks drawing informations
CN101477549B (en) Knowledge base supported spatial database design method and system
CN112035983A (en) Urban medium-voltage power grid planning and designing platform based on three-dimensional real scene
CN115795768B (en) Pipe network three-dimensional modeling and data updating method and system taking entity form into consideration
CN109190174B (en) Method and system for establishing pipe network data model
CN113159698A (en) Forestry data coprocessing system
CN103077215B (en) Event driven three dimensional urban model data storehouse dynamic updating method
CN113204329A (en) Control method for driving business application by unified data model and application system thereof
CN113312736B (en) River network hydrodynamic simulation implementation method and system based on cloud platform
CN112347215B (en) Construction method of three-dimensional railway construction organization design management system
CN201820263U (en) Field pipeline data acquisition and update system based on topological relation
CN101770614A (en) Safe management method for three-dimensional pipe network
CN116205399A (en) Cable channel resource management system
Zhang et al. Monitoring and Maintenance of Highway Super‐Large Bridge Based on BIM Technology
Aboushal Regenerative design of a defined urban space using CityGML model
CN114492093A (en) City visualization method and system
CN114860891A (en) Method and device for constructing space-time map of intelligent pipe network
Guo et al. Research on digital management system of transport infrastructure in the era of big data
Zheleznov et al. Analysis of international experience in the field of building information modelling of transport infrastructure objects
CN111753110A (en) Urban construction map statistical implementation method
Lu Database design base on GIS gas management network
AU2021105175A4 (en) Auxiliary planning auditing method for underground pipelines based on three-dimensional GIS technology
CN108170720A (en) Plan display system
Wang et al. The design of water supply network based on GIS
CN107230176A (en) A kind of history resource points Relational Evaluation method based on envelope chart analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant