Prior art keywords
layer
steel structure
scaffold
attic
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310087440.4A
Other languages
Chinese (zh)
Other versions
CN115773001B (en
Inventor
李春龙
高兴宽
王宝峰
张有维
周建忠
张飞
孙亮
张弛
文亚丽
崔正茂
邓磊
伍晶晶
刘安民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 3 Construction Engineering Co Ltd
Original Assignee
Beijing No 3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 3 Construction Engineering Co Ltd filed Critical Beijing No 3 Construction Engineering Co Ltd
Priority to CN202310087440.4A priority Critical patent/CN115773001B/en
Publication of CN115773001A publication Critical patent/CN115773001A/en
Application granted granted Critical
Publication of CN115773001B publication Critical patent/CN115773001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a steel structure archaizing attic construction method, which comprises the following steps: step 1: erecting scaffolds layer by layer around the periphery of the antique attic, and installing steel structure eaves layer by taking each layer of scaffold as a platform along with the erection of each layer of scaffold; step 2: after the installation of the steel structure cornice on the uppermost layer is finished, the steel structure cornice glazed tile roof is firstly constructed by adopting a reverse construction method from top to bottom to chisel the roof, then the steel structure cornice glazed tile roof construction and the steel structure cornice lower curtain wall installation construction are carried out layer by layer, and the scaffold is dismantled layer by layer from top to bottom after the construction of each layer of steel structure cornice glazed tile roof and the steel structure cornice lower curtain wall is finished. This application adopts to combine together in the same direction as construction method and reverse construction method, avoids the member and the steel construction cornice of scaffold frame to collide with each other, influences the structure construction.

Description

Steel structure antique attic construction method
Technical Field
The invention relates to the technical field of steel structure attic construction, in particular to a steel structure antique attic construction method.
Background
Along with the development of archaize building, the application of steel construction archaize building is more and more, and in certain engineering, a steel construction archaize attic building, it is the inward shrinkage's of successive layer structural style, need set up the scaffold frame outside the steel construction and be used for steel construction cornice erection construction, chisel roof and cornice glazed tiles roof construction, steel construction cornice under curtain erection construction and the construction during operation personnel pass.
The existing structural construction usually includes that a scaffold is erected on the periphery of a structure, and then the scaffold is stood on the scaffold for structural construction, the existing scaffold is mostly arranged around the through length of the periphery of the structure and is connected with an outer wall of a building through a wall connecting piece, the scaffold is only suitable for a vertical building structure, and cannot be applied to steel structure antique attic buildings which shrink inwards layer by layer, the installation of the wall connecting piece cannot be applied, and the arrangement difficulty of the wall connecting piece in the steel structure is high; in addition, because the outer eaves of every layer of roofing is the steel construction component of encorbelmenting, every layer of eaves structure diverse and steel component are intensive, and the successive layer shrinks, and outer eaves structure and scaffold frame collide with each other, influence the structural mounting.
Disclosure of Invention
The invention provides a steel structure archaizing attic construction method, which combines a forward construction method and a reverse construction method to avoid the structural construction influence caused by mutual collision between a rod piece of a scaffold and a steel structure eave.
The technical problem to be solved is that: because the outer eaves of every layer of roofing are the steel construction component of encorbelmenting, every layer of eaves structure diverse and steel construction component are intensive, and the successive layer shrinks, and outer eaves structure and scaffold frame collide with each other, influence the structural mounting.
In order to solve the technical problem, the invention adopts the following technical scheme:
the invention relates to a construction method of an antique attic with a steel structure, which comprises the following steps:
step 1: building an antique attic and a three-dimensional model drawing of a scaffold at the periphery of the antique attic by using BIM, and determining the installation position of a rod piece of the scaffold to enable the position of the rod piece of the scaffold to avoid the position of a steel member of an eave;
and 2, step: erecting scaffolds layer by layer around the periphery of the antique attic, and installing steel structure cornices layer by adopting a sequential method with each layer of scaffold as a platform along with the erection of each layer of scaffold;
the scaffold erecting step comprises: a plurality of rows of upright posts are arranged by taking each floor of the loft building as a supporting point, transverse horizontal rods and longitudinal horizontal rods are connected and arranged among the upright posts through fasteners, wherein the lower upright post serving as an upper upright post support extends upwards to the upper layer, and the lower upright post not serving as an upper upright post support extends to a position between two steel structure cornices; the inclined pull rods are horizontally and obliquely tied with steel columns of the archaized building from the vertical rods at the outermost sides, and the inclined pull rods are connected with each row of vertical rods, transverse horizontal rods or longitudinal horizontal rods;
and step 3: after the installation of the steel structure cornice on the uppermost layer is finished, the steel structure cornice glazed tile roof is firstly constructed by adopting a reverse construction method from top to bottom to chisel the roof, then the steel structure cornice glazed tile roof construction and the steel structure cornice lower curtain wall installation construction are carried out layer by layer, and the scaffold is dismantled layer by layer from top to bottom after the construction of each layer of steel structure cornice glazed tile roof and the steel structure cornice lower curtain wall is finished.
The invention relates to a construction method of a steel structure archaizing attic, which is characterized in that four short steel pipes arranged in a # -shape are embraced outside a steel column, every two of the four short steel pipes are connected through a fastener, and a diagonal draw bar is connected with the short steel pipes through the fasteners.
The invention relates to a construction method of a steel structure archaized attic, and further a safe dense mesh net is hung on the outer side of a scaffold structure on vertical rods and horizontal rods.
The invention relates to a construction method of an antique attic with a steel structure.
The invention relates to a construction method of an antique attic with a steel structure, and further, the horizontal inclination angle of a diagonal draw bar is not more than 45 degrees.
The invention relates to a construction method of a steel structure archaizing attic, which is characterized in that cross braces are arranged on the outer side of a scaffold structure at intervals, the cross braces are arranged along the height direction of the scaffold in a through manner, and the cross braces are connected with vertical rods and horizontal rods.
The invention relates to a construction method of an antique attic with a steel structure, and further, the distance between adjacent cross braces does not exceed 15m.
The invention relates to a construction method of an antique attic with a steel structure.
The invention relates to a construction method of an antique attic with a steel structure.
The invention relates to a construction method of a steel structure archaizing attic, and further a safety pocket net is arranged below a scaffold board.
Compared with the prior art, the invention has the following beneficial effects:
1. the method combines a forward construction method and a reverse construction method, and steel structure cornice installation construction, roof and cornice glazed tile roof construction and curtain wall installation construction under the steel structure cornice are carried out layer by layer, so that the condition that a rod piece of a scaffold and the steel structure cornice collide with each other to influence the structure construction is avoided;
2. utilize every floor structure of archaize loft to set up the tower scaffold structure of upwards shrink to be suitable for the construction of archaize loft building, replace wall spare and steel column drawknot through the diagonal draw bar, and with diagonal draw bar and every row of scaffold structure connection, solve the great problem of steel column interval, guarantee the stability of scaffold frame.
The invention will be further described with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partial structural view of the scaffold of the present invention;
FIG. 3 is a schematic view of the diagonal member connection according to the present invention;
fig. 4 is a schematic view of a cross brace mounting structure of the present invention.
Reference numerals:
1. archaizing attics; 2. a floor slab; 3. erecting a rod; 4. a transverse horizontal bar; 5. a longitudinal horizontal bar; 6. a diagonal member; 7. a steel column; 8. short steel pipes; 9. a scissor support; 10. and (5) a steel structure cornice.
Detailed Description
As shown in fig. 1-4, the invention relates to a construction method of an antique attic with a steel structure, which comprises the following steps:
step 1: the method comprises the steps of establishing an antique attic 1 and a three-dimensional model drawing of a scaffold at the periphery of the antique attic 1 by using BIM, determining a rod piece installation position of the scaffold, and enabling the position of a rod piece of the scaffold to be kept away from the position of a steel member of an eave.
Step 2: and erecting scaffolds layer by layer around the periphery of the antique attic 1, and installing the steel structure cornice 10 layer by adopting a sequential method with each layer of scaffold as a platform along with the erection of each layer of scaffold.
The scaffold erecting step is as follows: with every layer of floor 2 of loft building set up multirow pole setting 3 as the strong point, connect through the fastener between pole setting 3 and set up horizontal pole 4 and vertical horizontal pole 5, pole setting 3, interval between horizontal pole 4 and the vertical horizontal pole 5 sets up according to scaffold frame requirement and construction needs, wherein upwards extend to the upper strata as the lower floor pole setting 3 of 3 supports of upper pole setting, the lower floor pole setting 3 that does not regard as 3 supports of upper pole setting extends to between the two-layer steel construction eaves 10, preferentially set up 1.5m upwards to this layer of steel construction eaves 10 mouth, thereby avoid lower floor pole setting 3 to influence the construction of upper steel construction eaves 10. Utilize to draw to one side 6 from 3 horizontal slants of beginning of outside pole setting and the 7 drawknot of steel column of archaize building to one side 6 every two steps of three strides set up one, the horizontal inclination of draw to one side 6 is no longer than 45, draw to one side 6 and every row of pole setting 3 pass through the fastener be connected, can't be connected with pole setting 3 junction to one side 6 and horizontal horizon bar 4 or vertical horizon bar 5 are connected.
And 3, step 3: after the installation of the uppermost steel structure cornice 10 is completed, the roof is firstly constructed and engraved by adopting a reverse construction method from top to bottom, then the construction of the steel structure cornice 10 glazed tile roof and the installation construction of the steel structure cornice 10 lower curtain wall are carried out layer by layer, and after the construction of each layer of steel structure cornice 10 glazed tile roof and the steel structure cornice 10 lower curtain wall is completed, the scaffolds are dismantled layer by layer from top to bottom, so that a construction operation surface is provided for the construction of each layer of steel structure cornice 10.
Further, because steel column 7 can't be directly connected with diagonal draw bar 6, embrace four short steel pipes 8 that are the groined type and arrange outside steel column 7, four two liang of short steel pipes 8 are connected through the fastener, and diagonal draw bar 6 is connected through two fasteners with short steel pipe 8.
Safe dense meshes are hung on the vertical rods 3 and the transverse horizontal rods 4 on the outer sides of the scaffold. Set up the backing plate on every floor 2, pole setting 3 stands on the backing plate, protects floor 2, avoids the scaffold frame to set up and causes the destruction to archaize loft 1.
Set up multichannel bridging 9 at scaffold frame outside both ends, corner and middle interval no longer than 15m, bridging 9 leads to long the setting along scaffold frame direction of height, and bridging 9 passes through the fastener with pole setting 3 and horizontal pole 4 and is connected.
The scaffold boards are laid on each layer of operation layer by the transverse horizontal rods 4 and the longitudinal horizontal rods 5, the protective handrails are arranged above the scaffold boards at positions 1.2m above each layer of operation layer, and the protective handrails are connected with the vertical rods 3.
A safety pocket net is arranged below the scaffold board, so that construction safety is guaranteed, and falling objects and personnel are prevented from falling.
This application adopts to combine to the method of doing in the same direction as doing the way and reverse construction, and the successive layer carries out under steel construction cornice 10 erection construction, the roof of carving on gold or silver on the crest roofing and the construction of cornice glazed tiles roofing, the steel construction cornice 10 curtain wall erection construction, avoids the member and the steel construction cornice 10 of scaffold frame to collide each other, influences the structure construction.
In addition, utilize 2 structures on every layer of floor of 1 ancient imitation attic to set up the tower scaffold structure of upwards contracting to be suitable for the construction of 1 buildings in ancient imitation attic, replace wall spare and steel column 7 drawknot through diagonal draw bar 6, and with diagonal draw bar 6 and every row of scaffold structural connection, solve the great problem of 7 intervals of steel column, guarantee the stability of scaffold.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the scope of the present invention, and various modifications and improvements made to the technical solution of the present invention by those skilled in the art without departing from the spirit of the present invention should fall within the protection scope defined by the claims of the present invention.

Claims (10)

1. The construction method of the steel structure archaizing attic is characterized by comprising the following steps:
step 1: building an antique attic (1) and a three-dimensional model drawing of a scaffold at the periphery of the antique attic (1) by using BIM, and determining the installation position of a rod piece of the scaffold to enable the position of the rod piece of the scaffold to avoid the position of a steel member with an eave;
and 2, step: erecting scaffolds layer by layer around the periphery of the antique attic (1), and installing steel structure cornices (10) layer by adopting a sequential method with each layer of scaffold as a platform;
the scaffold erecting step comprises: the method comprises the following steps that a plurality of rows of upright posts (3) are arranged by taking each floor (2) of the loft building as a supporting point, transverse horizontal rods (4) and longitudinal horizontal rods (5) are connected and arranged among the upright posts (3) through fasteners, wherein the lower upright post (3) serving as a support of the upper upright post (3) extends upwards to the upper layer, and the lower upright post (3) not serving as the support of the upper upright post (3) extends to a position between two steel structure cornices (10); the inclined pull rods (6) are utilized to be horizontally and obliquely tied with steel columns (7) of the archaized buildings from the outermost vertical rods (3), and the inclined pull rods (6) are connected with each row of vertical rods (3), the transverse horizontal rods (4) or the longitudinal horizontal rods (5);
and 3, step 3: after the installation of the steel structure cornice (10) on the uppermost layer is finished, the roof is firstly constructed and engraved by adopting a reverse construction method from top to bottom, then the construction of the steel structure cornice (10) glazed tile roof and the installation construction of the curtain wall under the steel structure cornice (10) are carried out layer by layer, and the scaffold is dismantled layer by layer from top to bottom after the construction of each layer of the steel structure cornice (10) glazed tile roof and the curtain wall under the steel structure cornice (10) is finished.
2. The steel structure archaizing attic construction method according to claim 1, wherein: four short steel pipes (8) arranged in a groined shape are embraced outside the steel column (7), every two of the four short steel pipes (8) are connected through fasteners, and the diagonal draw bar (6) is connected with the short steel pipes (8) through the fasteners.
3. The steel structure archaizing attic construction method according to claim 1, wherein: safe dense meshes are hung on the outer sides of the scaffold structures on the vertical rods (3) and the transverse horizontal rods (4).
4. The construction method of the steel structure archaizing attic according to claim 1, wherein: a base plate is arranged on each floor (2), and the upright stanchion (3) is erected on the base plate.
5. The construction method of the steel structure archaizing attic according to claim 1, wherein: the horizontal inclination angle of the diagonal draw bar (6) is not more than 45 degrees.
6. The steel structure archaizing attic construction method according to claim 1, wherein: set up bridging (9) at scaffold structure outside interval, bridging (9) lead to long the setting along scaffold height direction, and bridging (9) are connected with pole setting (3) and horizon bar.
7. The steel structure archaizing attic construction method according to claim 6, wherein: the distance between adjacent cross braces (9) is not more than 15m.
8. The steel structure archaizing attic construction method according to claim 1, wherein: scaffold boards are laid on each layer of operation layer on the transverse horizontal rods (4) and the longitudinal horizontal rods (5).
9. The construction method of the steel structure archaizing attic according to claim 8, wherein: a protective railing is arranged between the upright posts (3) above the scaffold board.
10. The steel structure archaizing attic construction method according to claim 8, wherein: a safety pocket net is arranged below the scaffold board.
CN202310087440.4A 2023-02-09 2023-02-09 Steel structure archaizing attic construction method Active CN115773001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310087440.4A CN115773001B (en) 2023-02-09 2023-02-09 Steel structure archaizing attic construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310087440.4A CN115773001B (en) 2023-02-09 2023-02-09 Steel structure archaizing attic construction method

Publications (2)

Publication Number Publication Date
CN115773001A true CN115773001A (en) 2023-03-10
CN115773001B CN115773001B (en) 2023-05-05

Family

ID=85393383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310087440.4A Active CN115773001B (en) 2023-02-09 2023-02-09 Steel structure archaizing attic construction method

Country Status (1)

Country Link
CN (1) CN115773001B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07286436A (en) * 1994-04-19 1995-10-31 Japan Steels Internatl Kk Roofed stage of suspended scaffold
CN102021997A (en) * 2010-11-29 2011-04-20 南通四建集团有限公司 Method for building platform at bottom of suspended scaffold
CN103669845A (en) * 2013-12-26 2014-03-26 常州第一建筑集团有限公司 High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN107762127A (en) * 2017-11-20 2018-03-06 北京房修建筑工程有限公司 A kind of console mode scaffold for point building construction
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN211666206U (en) * 2020-01-19 2020-10-13 遂宁市博弘建设工程有限公司 Overhanging and landing dual-purpose scaffold
CN111764621A (en) * 2020-07-09 2020-10-13 王进 Overhanging scaffold and construction method
CN113089820A (en) * 2021-04-09 2021-07-09 上海通正铝结构建设科技有限公司 Construction method of single-layer oblique-crossing special-shaped curved surface aluminum alloy structure in limited space
CN114351853A (en) * 2021-12-27 2022-04-15 中国建筑第八工程局有限公司 Complex antique attic steel-wood combined structure and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07286436A (en) * 1994-04-19 1995-10-31 Japan Steels Internatl Kk Roofed stage of suspended scaffold
CN102021997A (en) * 2010-11-29 2011-04-20 南通四建集团有限公司 Method for building platform at bottom of suspended scaffold
CN103669845A (en) * 2013-12-26 2014-03-26 常州第一建筑集团有限公司 High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN107762127A (en) * 2017-11-20 2018-03-06 北京房修建筑工程有限公司 A kind of console mode scaffold for point building construction
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN211666206U (en) * 2020-01-19 2020-10-13 遂宁市博弘建设工程有限公司 Overhanging and landing dual-purpose scaffold
CN111764621A (en) * 2020-07-09 2020-10-13 王进 Overhanging scaffold and construction method
CN113089820A (en) * 2021-04-09 2021-07-09 上海通正铝结构建设科技有限公司 Construction method of single-layer oblique-crossing special-shaped curved surface aluminum alloy structure in limited space
CN114351853A (en) * 2021-12-27 2022-04-15 中国建筑第八工程局有限公司 Complex antique attic steel-wood combined structure and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
毛长国;江国强;: "仿古塔落地式施工脚手架的应用", 建筑技术 *
王永卿;王越;: "在保护性历史建筑内进行改扩建工程的逆作法施工组织", 建筑施工 *

Also Published As

Publication number Publication date
CN115773001B (en) 2023-05-05

Similar Documents

Publication Publication Date Title
CN110670867B (en) Construction method of scaffold for improving outer vertical surface of existing building
TWI689652B (en) Beam-slab structure and construction method
CN103276886A (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN102888979A (en) Joint processing and constructing method of overhanging scaffold at large cantilever balcony
CN211899558U (en) Handling frame encorbelments
CN111005547B (en) Construction method of outer scaffold of two-way bending and twisting staggered floor elevation
CN212507296U (en) High formwork system
CN105863233A (en) Scaffold for outer curtain wall of arc-shaped building and mounting method
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN115773001A (en) Steel structure antique attic construction method
CN107227839B (en) Integrated support construction safety platform and installation method
CN107059641B (en) Goods shelf type pier body outer scaffold
CN216616835U (en) Ultrahigh ultralimit combined formwork system
CN219387103U (en) Outer frame structure for steel structure archaizing attic building
CN113982235A (en) Multi-section scaffold with externally-arranged upright rods being collected in sections and use method
CN210086818U (en) Roof wafting plate formwork structure
CN114427295A (en) Pre-buried ground anchor pulling connection and holding column combined ultrahigh and ultralimit formwork system and construction method thereof
CN113047594A (en) Movable climbing frame for elevator shaft and erection method thereof
CN212642081U (en) Special-shaped multifunctional scaffold
CN216616787U (en) Multi-section scaffold with externally-arranged upright rods collected in segmented manner
CN115126233B (en) Construction method for using cantilever beam plate high formwork with complex outer vertical surface as outer wall scaffold
CN210828320U (en) High braced system of floor
CN110259120B (en) Cornice template supporting device
CN217106068U (en) External scaffold connecting structure for large operation surface of roof layer
CN218843687U (en) Portable handling frame for dismantling overhanging I-shaped steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant