CN115765054A - 考虑风光无功调节的配电网分布式电源双层规划方法 - Google Patents
考虑风光无功调节的配电网分布式电源双层规划方法 Download PDFInfo
- Publication number
- CN115765054A CN115765054A CN202211225705.4A CN202211225705A CN115765054A CN 115765054 A CN115765054 A CN 115765054A CN 202211225705 A CN202211225705 A CN 202211225705A CN 115765054 A CN115765054 A CN 115765054A
- Authority
- CN
- China
- Prior art keywords
- power
- layer
- model
- node
- capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 42
- 239000002245 particle Substances 0.000 claims abstract description 34
- 238000011217 control strategy Methods 0.000 claims abstract description 23
- 238000009434 installation Methods 0.000 claims abstract description 12
- 238000004364 calculation method Methods 0.000 claims description 17
- 238000005457 optimization Methods 0.000 claims description 15
- 238000013486 operation strategy Methods 0.000 claims description 10
- 238000012423 maintenance Methods 0.000 claims description 9
- 230000005611 electricity Effects 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 4
- 230000003044 adaptive effect Effects 0.000 claims description 3
- 238000010248 power generation Methods 0.000 claims description 3
- 238000004513 sizing Methods 0.000 claims description 3
- 238000006467 substitution reaction Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 230000008569 process Effects 0.000 description 5
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 3
- 229910052799 carbon Inorganic materials 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004146 energy storage Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- PXFBZOLANLWPMH-UHFFFAOYSA-N 16-Epiaffinine Natural products C1C(C2=CC=CC=C2N2)=C2C(=O)CC2C(=CC)CN(C)C1C2CO PXFBZOLANLWPMH-UHFFFAOYSA-N 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211225705.4A CN115765054A (zh) | 2022-10-09 | 2022-10-09 | 考虑风光无功调节的配电网分布式电源双层规划方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211225705.4A CN115765054A (zh) | 2022-10-09 | 2022-10-09 | 考虑风光无功调节的配电网分布式电源双层规划方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115765054A true CN115765054A (zh) | 2023-03-07 |
Family
ID=85350822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211225705.4A Pending CN115765054A (zh) | 2022-10-09 | 2022-10-09 | 考虑风光无功调节的配电网分布式电源双层规划方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115765054A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116526589A (zh) * | 2023-05-25 | 2023-08-01 | 国网江苏省电力有限公司电力科学研究院 | 考虑源荷多时序联合场景的无功配置方法、设备及介质 |
-
2022
- 2022-10-09 CN CN202211225705.4A patent/CN115765054A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116526589A (zh) * | 2023-05-25 | 2023-08-01 | 国网江苏省电力有限公司电力科学研究院 | 考虑源荷多时序联合场景的无功配置方法、设备及介质 |
CN116526589B (zh) * | 2023-05-25 | 2023-12-05 | 国网江苏省电力有限公司电力科学研究院 | 考虑源荷多时序联合场景的无功配置方法、设备及介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pandey et al. | A literature survey on load–frequency control for conventional and distribution generation power systems | |
CN114069687B (zh) | 一种计及逆变器无功调节作用的分布式光伏规划方法 | |
CN112561273B (zh) | 一种基于改进pso的主动配电网可再生dg规划方法 | |
CN113937825A (zh) | 一种基于E-C-Kmeans聚类和SOP优化的DG双层优化配置方法 | |
Desalegn et al. | Wind energy-harvesting technologies and recent research progresses in wind farm control models | |
Bakir et al. | Experimental evaluation of water cycle technique for control parameters optimization of double-fed induction generator-based wind turbine | |
CN115765054A (zh) | 考虑风光无功调节的配电网分布式电源双层规划方法 | |
Johnson et al. | Feasibility study of a 200 kW solar wind hybrid system | |
CN108667071B (zh) | 一种主动配电网负荷精准控制计算方法 | |
CN109638886B (zh) | 一种基于CVaR的风电日前出力申报优化方法 | |
Chhor et al. | Operation and control strategies for wind energy conversion systems: Review and simulation study | |
Moness et al. | A critical review of research trends for wind energy in Egypt: recent progress and promising opportunities | |
CN116316884A (zh) | 一种适用于高比例新能源电网多源协同的调频控制方法 | |
CN114240203A (zh) | 一种包含热泵的配电网与分布式风电协同规划方法和装置 | |
Wang et al. | Capacity Optimization of Island Integrated Energy System Considering Hydrogen Energy Access | |
El-Fouly | Wind farms production: Control and prediction | |
CN117748622B (zh) | 一种微电网多态协调控制方法及*** | |
CN117748628B (zh) | 一种面向风电机组输出功率平滑的有功功率优化调度方法 | |
CN114709836B (zh) | 基于ag-mopso的含风电配电网无功优化方法 | |
CN112906928B (zh) | 一种风电场集群有功功率预测方法及*** | |
Siniscalchi Minna | Advanced wind farm control strategies for enhancing grid support | |
Yao et al. | Stochastic Economic Dispatch of High Renewable Penetration Power System with Solar Thermal Power | |
Onawale et al. | AC OPF Studies for Smart Grid with Renewable Energy Integration | |
Zhang et al. | A Flexibility Assessment Method for Active Distribution System considering Time-Coupling Constraints | |
Zhao et al. | Research on Grid Connection Control of Wind-Solar Energy Storage Hybrid Power Generation System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20231121 Address after: 750002 CBD building of State Grid at the intersection of Houhai road and Fengwu street, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region Applicant after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER CO.,LTD. Address before: 750002 CBD building of State Grid at the intersection of Houhai road and Fengwu street, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region Applicant before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER CO.,LTD. Applicant before: Tianjin University |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20240725 Address after: 750002 CBD building of State Grid at the intersection of Houhai road and Fengwu street, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region Applicant after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER CO.,LTD. Country or region after: China Applicant after: STATE GRID NINGXIA ELECTRIC POWER Co.,Ltd. Address before: 750002 CBD building of State Grid at the intersection of Houhai road and Fengwu street, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region Applicant before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER CO.,LTD. Country or region before: China |