CN115684787A - Closed-loop test system and method for relay protection equipment - Google Patents

Closed-loop test system and method for relay protection equipment Download PDF

Info

Publication number
CN115684787A
CN115684787A CN202211332622.5A CN202211332622A CN115684787A CN 115684787 A CN115684787 A CN 115684787A CN 202211332622 A CN202211332622 A CN 202211332622A CN 115684787 A CN115684787 A CN 115684787A
Authority
CN
China
Prior art keywords
test
module
scheme
report
relay protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211332622.5A
Other languages
Chinese (zh)
Other versions
CN115684787B (en
Inventor
黄代雄
戴金
袁俑斌
汪志军
汪林
吴叙卓
寇娟
余奕夫
刘楷文
许光
熊一
李潭
韩旺
周伟
李健
周雅静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hubei Transmission And Transformation Engineering Co ltd
Original Assignee
State Grid Hubei Transmission And Transformation Engineering Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hubei Transmission And Transformation Engineering Co ltd, State Grid Corp of China SGCC filed Critical State Grid Hubei Transmission And Transformation Engineering Co ltd
Priority to CN202211332622.5A priority Critical patent/CN115684787B/en
Publication of CN115684787A publication Critical patent/CN115684787A/en
Application granted granted Critical
Publication of CN115684787B publication Critical patent/CN115684787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a closed loop test system and a closed loop test method for relay protection equipment, wherein the test system comprises the relay protection equipment, secondary equipment connected with the relay protection equipment through a cable, a tester connected with the secondary equipment through a cable, and an intelligent test platform in communication connection with the tester through a network cable; the intelligent test platform is in communication connection with the relay protection device MMS, and comprises a test scheme generation system, an automatic test system and an operation interface module. The system and the method of the invention improve the testing efficiency of the relay protection equipment, the testing process is highly automatic, and a large amount of manual operation is reduced; meanwhile, the test can be realized without using a switch, and the test time is shortened.

Description

Closed-loop test system and method for relay protection equipment
Technical Field
The invention belongs to the technical field of relay protection equipment testing, and particularly relates to a closed-loop testing system and method for relay protection equipment.
Background
The relay protection equipment test is mainly a test performed on a relay protection device of a transformer substation and used for improving the safety of field power operation, and the test of the relay protection equipment generally needs manual execution of a large amount of operations, so that time and labor are wasted, a large amount of labor cost is caused, and the problem of low test efficiency of the relay protection equipment exists.
In addition, the relay protection equipment is added with a protection function in the test, but the automatic test function is not provided, and meanwhile, a switch still needs to be used in the test process, so that the test time is prolonged, and further the test efficiency of the relay protection equipment is low.
Disclosure of Invention
In order to solve the technical problems, the invention provides a closed-loop test system and a closed-loop test method for relay protection equipment, which improve the test efficiency of the relay protection equipment, have high automation in the test process and reduce a large amount of manual operation; meanwhile, the test can be realized without using a switch, and the test time is shortened.
The technical scheme adopted by the invention is as follows:
a closed-loop test system of relay protection equipment comprises the relay protection equipment, secondary equipment connected with the relay protection equipment through a cable, a tester connected with the secondary equipment through a cable, and an intelligent test platform in communication connection with the tester through a network cable; the intelligent test platform is in communication connection with the relay protection device MMS, and comprises a test scheme generation system, an automatic test system and an operation interface module; the test scheme generation system is used for generating a scheme required by the test; the automatic test system is used for reading the test scheme and advancing the test process, automatically judging the test result data, filling the data and the conclusion into the test report and outputting the test report; the operation interface module is used for providing a human-computer interaction interface for the test scheme generation system and the automatic test system; the automatic test system comprises a scheme matching module, a single test module, an automatic test module, a test stopping module, a result judging module, a program output module, a signal output module, a report previewing module and a report generating module; the single test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the automatic test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the program output module and the signal output module are respectively and electrically connected with the result judging module, the report previewing module is respectively and electrically connected with the program output module and the signal output module, and the report generating module is respectively and electrically connected with the program output module and the signal output module; the scheme matching module is used for automatically matching a test scheme according to the model of the secondary equipment; the single item test module is used for selecting single item test contents in the test scheme to test; the automatic test module is used for starting to execute all the test programs from the beginning according to the selected test scheme; the stop test module is used for stopping the test process; the result judging module is used for displaying the result of each test in the tree-shaped column; the program output module is used for displaying operation information, prompt information and error reporting information; the signal output module is used for displaying MMS report information in the test item, and the report information comprises receiving time, action description, fault phase and action relative time; the report previewing module is used for displaying a test result report; and the report generation module is used for generating a report and storing the current report.
Preferably, the test scheme generation system comprises a scheme navigation module, a numerical value setting module, a model file module and a tool navigation module which are electrically connected with each other; the scheme navigation module is used for displaying all test items, sub-test items and operations in a form of a tree list; the numerical value setting module is used for displaying specific contents of each test item, each sub-test item and each operation; the model file module is used for displaying the read contents of the model file, including various contents and specific numerical values of the relay protection test; the tool navigation module is used for forming a tool navigation area in the operation interface module.
Preferably, the tool navigation module comprises a new scheme creating unit, a scheme opening unit, a scheme saving unit and a model opening unit; the new scheme unit is used for creating a new test scheme; the opening scheme unit is used for opening the existing scheme; the storage scheme unit is used for storing the created test scheme and can additionally store the created test scheme for a folder; the opening model unit is used for opening the model to be used.
Preferably, the scheme navigation module, the value setting module and the model file module respectively form a scheme navigation area, a value setting display area and a model file area on the operation interface module.
Preferably, the content of the model file area is associated with the content of the numerical value setting display area, and is used for moving the operation item of the model file area to the numerical value setting display area for parameter editing.
The other technical scheme adopted by the invention is as follows:
a testing method of a closed loop testing system of relay protection equipment comprises the following specific steps:
s1, entering a main interface of an automatic test system and matching a test scheme;
s2, if the test scheme meets the test requirement, directly performing report registration; if the test scheme does not meet the test requirements, modifying the test scheme through the test scheme generation system, copying the new test scheme into a scheme library after the configuration is finished, and then performing report registration;
s3, carrying out automatic testing: starting a report, remotely controlling a pressure plate control word, controlling the output of a tester, automatically judging a result and resetting relay protection equipment;
and S4, generating a test report and storing the test report in a specified folder.
Preferably, the specific working process of step S3 is as follows:
s31, sequentially executing all test items according to the test item sequence in the test scheme;
s32, calling a tester interface module to control the tester to output the test quantity and collecting the action behavior of the secondary equipment;
s33, calling the protection communication module to realize communication with the secondary equipment, realizing operation of various communication commands and acquiring operation results of the communication commands;
s34, automatically judging whether the test is qualified or not according to the result;
and S35, the automatic test execution module fills the test parameters and the test results into the test report template according to the test requirements and outputs a standard report.
The beneficial effects of the invention are:
1) The intelligent test platform is in communication connection with the tester, so that the problem of single network port of a single PC is solved, and the test can be realized without a switch;
2) The test scheme can be flexibly configured, so that the state quantity can be automatically calculated according to the fixed value, and the applicability is strong;
3) After the configuration of the test scheme is completed, the automatic test on the relay protection equipment can be automatically completed through the automatic test system, and a standard report is output, so that the automation degree is high, and the test efficiency is high;
4) Through the establishment of the scheme library, the same scheme is shared by the secondary devices of the same model, the process of manually configuring the scheme is reduced, and the test efficiency is further improved.
Drawings
FIG. 1 is a schematic structural diagram of a first embodiment of the present invention;
FIG. 2 is a schematic diagram of the connection of the intelligent test platform, the tester, the secondary equipment and the relay protection equipment in the present invention;
FIG. 3 is a main interface display of the test protocol generation system of the present invention;
FIG. 4 is a main interface display of the automatic test system of the present invention;
fig. 5 is a flowchart of a testing method of a closed-loop testing system for relay protection equipment in the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
Example one
As shown in fig. 1 to 4, a closed-loop test system for relay protection equipment includes relay protection equipment, secondary equipment connected to a cable of the relay protection equipment, a tester connected to a cable of the secondary equipment, and an intelligent test platform in communication connection with the tester through a network cable; the intelligent test platform is in communication connection with the relay protection device MMS, and comprises a test scheme generation system, an automatic test system and an operation interface module; the test scheme generation system is used for generating a scheme required by the test; the automatic test system is used for reading the test scheme and advancing the test process, automatically judging the test result data, filling the data and the conclusion into the test report and outputting the test report; the operation interface module is used for providing a human-computer interaction interface for the test scheme generation system and the automatic test system; the automatic test system comprises a scheme matching module, a single test module, an automatic test module, a test stopping module, a result judging module, a program output module, a signal output module, a report previewing module and a report generating module; the single test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the automatic test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the program output module and the signal output module are respectively and electrically connected with the result judging module, the report previewing module is respectively and electrically connected with the program output module and the signal output module, and the report generating module is respectively and electrically connected with the program output module and the signal output module; the scheme matching module is used for automatically matching a test scheme according to the model of the secondary equipment; the single item test module is used for selecting single item test contents in the test scheme to test; the automatic test module is used for starting to execute all the test programs from the beginning according to the selected test scheme; the stop test module is used for stopping the test process; the result judging module is used for displaying the result of each test in the tree-shaped column; the program output module is used for displaying operation information, prompt information and error reporting information; the signal output module is used for displaying MMS report information in the test item, and the report information comprises receiving time, action description, fault phase and action relative time; the report previewing module is used for displaying a test result report; the report generating module is used for generating a report and storing the current report.
As a further technical solution of this embodiment, the test scenario generation system includes a scenario navigation module, a numerical value setting module, a model file module, and a tool navigation module, which are electrically connected to each other; the scheme navigation module is used for displaying each test item, each sub-test item and each operation in a tree list form; the numerical value setting module is used for displaying specific contents of each test item, each sub-test item and each operation; the model file module is used for displaying the read contents of the model file, including various contents and specific numerical values of the relay protection test; the tool navigation module is used for forming a tool navigation area on the operation interface module;
as a further technical solution of this embodiment, the tool navigation module includes a new project creation unit, a project opening unit, a project saving unit, and a model opening unit; the new scheme unit is used for creating a new test scheme; the opening scheme unit is used for opening the existing scheme; the storage scheme unit is used for storing the created test scheme and can additionally store the created test scheme for a folder; the opening model unit is used for opening the model to be used.
As a further technical solution of this embodiment, the plan navigation module, the numerical value setting module, and the model file module respectively form a plan navigation area, a numerical value setting display area, and a model file area on the operation interface module.
As a further technical solution of this embodiment, the content of the model file area is associated with the content of the value setting display area, and is used to move the operation item of the model file area to the value setting display area for parameter editing.
In this embodiment, when the secondary device adopts the intelligent station digital device, an analog quantity needs to be applied to the front end of the merging unit through a cable; when the secondary equipment adopts conventional station digital equipment, analog quantity is applied through a cable behind the relay protection equipment, and the analog quantity is used for rapidly and accurately testing the relay protection equipment.
Example two
As shown in fig. 1 to 5, a testing method of a closed-loop testing system of a relay protection device includes the following specific steps:
s1, entering a main interface of an automatic test system and matching a test scheme;
s2, if the test scheme meets the test requirement, directly performing report registration; if the test scheme does not meet the test requirements, modifying the test scheme through the test scheme generation system, copying the new test scheme into a scheme library after the configuration is finished, and then performing report registration;
s3, carrying out automatic testing: starting a report, remotely controlling a pressure plate control word, controlling the output of a tester, automatically judging a result and resetting relay protection equipment;
and S4, generating a test report and storing the test report in a specified folder.
As a further technical solution of this embodiment, the specific working process of step S3 is as follows:
s31, sequentially executing all test items according to the test item sequence in the test scheme;
s32, calling a tester interface module to control the tester to output the test quantity and collecting the action behavior of the secondary equipment;
s33, calling the protection communication module to realize communication with the secondary equipment, realizing operation of various communication commands and acquiring operation results of the communication commands;
s34, automatically judging whether the test is qualified according to the result;
and S35, the automatic test execution module fills the test parameters and the test results into the test report template according to the test requirements and outputs a standard report.
According to the invention, the scheme required by the test is generated by the test scheme generation system, then the automatic test system automatically tests the relay protection equipment according to the test scheme, and the test report is output after the test is finished, so that the test efficiency of the relay protection equipment is high, a switch is not required, the test process is highly automatic, and a large amount of manual operation is reduced; the test scheme can be flexibly configured, so that the state quantity can be automatically calculated according to the fixed value, and the applicability is strong; and the same scheme can be shared by secondary equipment of the same type through the establishment of the scheme library, so that the process of manually configuring the scheme is reduced, and the test efficiency is further improved.
The above-mentioned embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the scope of the present invention, and various modifications and improvements of the technical solution of the present invention can be made by those skilled in the art without departing from the principle and spirit of the present invention, and the scope of the present invention is defined by the appended claims.

Claims (7)

1. A closed-loop test system of relay protection equipment comprises the relay protection equipment, secondary equipment connected with a cable of the relay protection equipment, a tester connected with the cable of the secondary equipment, and an intelligent test platform in communication connection with the tester through a network cable;
the intelligent test platform is in communication connection with the relay protection device MMS, and comprises a test scheme generation system, an automatic test system and an operation interface module; the test scheme generation system is used for generating a scheme required by the test; the automatic test system is used for reading the test scheme and advancing the test process, automatically judging the test result data, filling the data and the conclusion into the test report and outputting the test report; the operation interface module is used for providing a human-computer interaction interface for the test scheme generation system and the automatic test system;
the automatic test system comprises a scheme matching module, a single test module, an automatic test module, a test stopping module, a result judging module, a program output module, a signal output module, a report previewing module and a report generating module; the single test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the automatic test module is respectively and electrically connected with the scheme matching module, the test stopping module and the result judging module, the program output module and the signal output module are respectively and electrically connected with the result judging module, the report previewing module is respectively and electrically connected with the program output module and the signal output module, and the report generating module is respectively and electrically connected with the program output module and the signal output module; the scheme matching module is used for automatically matching a test scheme according to the model of the secondary equipment; the single item test module is used for selecting single item test contents in the test scheme to test; the automatic test module is used for starting to execute all the test programs from the beginning according to the selected test scheme; the stop test module is used for stopping the test process; the result judging module is used for displaying the result of each test in the tree column; the program output module is used for displaying operation information, prompt information and error reporting information; the signal output module is used for displaying MMS report information in the test item, and the report information comprises receiving time, action description, fault phase and action relative time; the report previewing module is used for displaying a test result report; and the report generation module is used for generating a report and storing the current report.
2. The closed-loop test system of relay protection equipment according to claim 1, wherein the test solution generating system comprises a solution navigation module, a value setting module, a model file module and a tool navigation module which are electrically connected with each other; the scheme navigation module is used for displaying all test items, sub-test items and operations in a form of a tree list; the numerical value setting module is used for displaying specific contents of each test item, each sub-test item and each operation; the model file module is used for displaying the read contents of the model file, including various contents and specific numerical values of the relay protection test; the tool navigation module is used for forming a tool navigation area in the operation interface module.
3. The closed-loop test system of the relay protection device according to claim 2, wherein the tool navigation module comprises a new project creation unit, an open project creation unit, a save project creation unit, and an open model creation unit; the new scheme unit is used for creating a new test scheme; the opening scheme unit is used for opening the existing scheme; the storage scheme unit is used for storing the created test scheme and can additionally store the created test scheme for a folder; the open model unit is used for opening the model to be used.
4. The closed-loop test system of relay protection equipment according to claim 2, wherein the plan navigation module, the value setting module and the model file module respectively form a plan navigation area, a value setting display area and a model file area on the operation interface module.
5. The relay protection device closed-loop test system according to claim 4, wherein the content of the model file region is associated with the content of the value setting display region, and is used for moving an operation item of the model file region to the value setting display region for parameter editing.
6. The testing method of the relay protection equipment closed-loop testing system according to any one of claims 1 to 5, characterized by comprising the following specific steps:
s1, entering a main interface of an automatic test system, and matching a test scheme;
s2, if the test scheme meets the test requirement, directly performing report registration; if the test scheme does not meet the test requirements, modifying the test scheme through the test scheme generation system, copying the new test scheme into a scheme library after the configuration is finished, and then performing report registration;
s3, carrying out automatic testing: starting a report, remotely controlling a pressure plate control word, controlling the output of a tester, automatically judging a result and resetting relay protection equipment;
and S4, generating a test report and storing the test report in a specified folder.
7. The method for testing the closed-loop test system of the relay protection device according to claim 6, wherein the specific working process of step S3 is as follows:
s31, sequentially executing all test items according to the test item sequence in the test scheme;
s32, calling a tester interface module to control the tester to output the test quantity and collecting the action behavior of the secondary equipment;
s33, calling the protection communication module to realize communication with the secondary equipment, realizing operation of various communication commands and acquiring operation results of the communication commands;
s34, automatically judging whether the test is qualified or not according to the result;
and S35, the automatic test execution module fills the 'test parameters' and the 'test results' in the test report template according to the inspection requirements and outputs a standard report.
CN202211332622.5A 2022-10-28 2022-10-28 Relay protection equipment closed loop test system and method Active CN115684787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211332622.5A CN115684787B (en) 2022-10-28 2022-10-28 Relay protection equipment closed loop test system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211332622.5A CN115684787B (en) 2022-10-28 2022-10-28 Relay protection equipment closed loop test system and method

Publications (2)

Publication Number Publication Date
CN115684787A true CN115684787A (en) 2023-02-03
CN115684787B CN115684787B (en) 2024-07-02

Family

ID=85046293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211332622.5A Active CN115684787B (en) 2022-10-28 2022-10-28 Relay protection equipment closed loop test system and method

Country Status (1)

Country Link
CN (1) CN115684787B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166399A (en) * 2014-09-05 2014-11-26 国家电网公司 Moving die simulation test system and method for intelligent substation protection device
US20190170822A1 (en) * 2017-12-05 2019-06-06 State Grid Hebei Electric Power Research Institute Fully-automatic closed-loop detection method and device for intelligent substation
CN111624427A (en) * 2020-06-09 2020-09-04 南方电网科学研究院有限责任公司 Detection method and system of relay protection device
CN112180897A (en) * 2020-09-25 2021-01-05 国网湖南省电力有限公司 Relay protection/measurement and control device automatic test system and method based on universal test template
CN112630565A (en) * 2020-12-08 2021-04-09 浙江省送变电工程有限公司 Automatic testing and analyzing system and method for relay protection of intelligent substation
KR102402548B1 (en) * 2021-11-15 2022-05-30 이에스피 주식회사 An Automatic Monitoring and Analyzing Type of a Diagnosing System for a Protection System a Power Facility

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166399A (en) * 2014-09-05 2014-11-26 国家电网公司 Moving die simulation test system and method for intelligent substation protection device
US20190170822A1 (en) * 2017-12-05 2019-06-06 State Grid Hebei Electric Power Research Institute Fully-automatic closed-loop detection method and device for intelligent substation
CN111624427A (en) * 2020-06-09 2020-09-04 南方电网科学研究院有限责任公司 Detection method and system of relay protection device
CN112180897A (en) * 2020-09-25 2021-01-05 国网湖南省电力有限公司 Relay protection/measurement and control device automatic test system and method based on universal test template
CN112630565A (en) * 2020-12-08 2021-04-09 浙江省送变电工程有限公司 Automatic testing and analyzing system and method for relay protection of intelligent substation
KR102402548B1 (en) * 2021-11-15 2022-05-30 이에스피 주식회사 An Automatic Monitoring and Analyzing Type of a Diagnosing System for a Protection System a Power Facility

Also Published As

Publication number Publication date
CN115684787B (en) 2024-07-02

Similar Documents

Publication Publication Date Title
CN202533519U (en) Fully automatic closed loop test system of protective relaying device
CN111579982B (en) Relay protection automatic test system and test method thereof
CN104793076B (en) Intelligent Auto-Test System and method of testing
CN108366067B (en) System and method for testing consistency of universal service protocol of power system
CN101923126B (en) Automatic closed loop test method
CN101718841B (en) Automatic checking system and method of relaying protection device
CN105824001B (en) Method and system for testing IEC61850 conformance of digital electric energy meter
CN105629180A (en) Test method, test device and controller
CN103323714A (en) Automatic test method based on report template technology in intelligent substation test system
CN112630565A (en) Automatic testing and analyzing system and method for relay protection of intelligent substation
CN111221269A (en) Multi-loop direct current power grid stability simulation test system and method
CN112286811A (en) Intelligent station relay protection equipment testing method and system and readable storage medium
CN112540266A (en) Distribution network feeder automation field test system
CN103353857A (en) Communication test method of integrated monitoring unit in substation
CN110672945A (en) Line protection automatic test system based on real-time digital simulation system
CN107247827B (en) Virtual terminal model modeling and automatic wiring method based on machine learning
CN103308808A (en) System and method for testing secondary device of intelligent substation automatically
CN204392274U (en) A kind of intelligent substation test system
CN113281604A (en) RT-LAB-based power distribution network self-healing function test system
CN111708700B (en) Intelligent remote machine closed loop comprehensive test method
CN115684787B (en) Relay protection equipment closed loop test system and method
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN113281594A (en) System and method for realizing remote intelligent automatic test aiming at relay protection
CN112485599A (en) Feeder terminal FTU automatic checkout device of embedding RTDS platform
Di et al. Research on automatic test technology for field operation and maintenance of intelligent substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100000 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Applicant after: STATE GRID HUBEI TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 100000 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: STATE GRID HUBEI TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20231005

Address after: Yang Yuansheng 430000 Hubei province Wuhan city Wuchang District Road No. 5

Applicant after: STATE GRID HUBEI TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

Address before: 100000 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing