CN115600888A - Power system power failure plan refined circulation system - Google Patents

Power system power failure plan refined circulation system Download PDF

Info

Publication number
CN115600888A
CN115600888A CN202211364203.XA CN202211364203A CN115600888A CN 115600888 A CN115600888 A CN 115600888A CN 202211364203 A CN202211364203 A CN 202211364203A CN 115600888 A CN115600888 A CN 115600888A
Authority
CN
China
Prior art keywords
plan
module
power failure
management
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211364203.XA
Other languages
Chinese (zh)
Inventor
胡恒智
李秋冬
王祥羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Qianneng Information Engineering Co ltd
Original Assignee
Nanjing Qianneng Information Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Qianneng Information Engineering Co ltd filed Critical Nanjing Qianneng Information Engineering Co ltd
Priority to CN202211364203.XA priority Critical patent/CN115600888A/en
Publication of CN115600888A publication Critical patent/CN115600888A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of power management, in particular to a power failure plan refined circulation system of a power system. The system comprises an infrastructure unit, a user platform unit, a plan management unit and a statistical analysis unit; the infrastructure unit is used for providing a software and hardware foundation for supporting the operation of the system; the user platform unit is used for carrying out classification management on users accessing the system and distributing corresponding operation authorities; the plan management unit is used for performing various management operations on the power failure plan in the management area; the statistical analysis unit is used for carrying out periodic statistical analysis on the power failure plan so as to obtain large data of the power failure plan. The design of the invention can realize plan pre-balance, so that the plan can be traced in real time, a power failure plan big data display platform is constructed through panoramic display, and the power failure plan circulation execution efficiency is improved through multi-dimensional analysis, thereby reducing repeated power failure, reducing the power failure range, improving each assessment index of the power failure plan and improving the power failure plan management level.

Description

Power system power failure plan refined circulation system
Technical Field
The invention relates to the technical field of power management, in particular to a power failure plan refined circulation system of a power system.
Background
Planned power failure refers to a measure that power supply of a power line in a certain area is interrupted due to a certain reason, and a power company performs power failure in a specific area in a certain time period according to a superior instruction. The power failure of the power system inevitably brings inconvenience to life and production of people, and particularly for industrial producers, the frequent power failure can cause great economic loss. However, in the current planned outage management, there are many limitations, such as long outage plan circulation time, delayed plan information, easy occurrence of repeated blackouts, and failure of tracing of the outage plan, which results in a decrease in the efficiency of executing the outage plan circulation. If a power outage plan database can be built by combining power outage plans and various related service data in an area, the management level of the power outage plans can be effectively improved, and a relatively complete power outage plan circulation management system does not exist at present.
Disclosure of Invention
The invention aims to provide a power failure plan refined circulation system of an electric power system, so as to solve the problems in the background technology.
In order to solve the above technical problems, an object of the present invention is to provide a power outage plan refinement circulation system for an electric power system, including
The system comprises an infrastructure unit, a user platform unit, a plan management unit and a statistical analysis unit; the signal output end of the infrastructure unit is connected with the signal input end of the user platform unit, the signal output end of the user platform unit is connected with the signal input end of the plan management unit, and the signal output end of the plan management unit is connected with the signal input end of the statistical analysis unit; the infrastructure unit is used for providing hardware equipment foundation, platform service, intelligent technology and the like for supporting system operation; the user platform unit is used for carrying out classification management on users accessing the system and distributing corresponding operation authorities; the plan management unit is used for performing management operations such as reporting, adding, canceling, inquiring and the like on the power failure plan in the management area; the statistical analysis unit is used for carrying out periodic statistical analysis on the power failure plan, acquiring big data of the power failure plan and accordingly enabling the power failure plan to be traceable in real time;
the infrastructure unit comprises a hardware equipment module, a service support module, a basic application module and a regulation and control management module;
the user platform unit comprises a user type module, an authority distribution module, a management regulation module and an operation guide module;
the plan management unit comprises a plan overview module, a plan reporting module, an unplanned newly-added module, a plan canceling module and a plan query module;
the statistical analysis unit comprises a panoramic monitoring module, a multidimensional analysis module, a monthly report module and a report management module.
As a further improvement of the technical solution, a signal output end of the hardware device module is connected to a signal input end of the service support module, a signal output end of the service support module is connected to a signal input end of the basic application module, and a signal output end of the basic application module is connected to a signal input end of the regulation and control management module; the hardware equipment module is used for providing communication service, storage service, information interaction service, information security service and the like for the system through hardware equipment such as an application server, a database server and the like; the service support module is used for providing service functions such as a database, authority management, user management, interface service and the like for the system and providing an application layer standardized support platform comprising various service data models of a power failure plan and the like; the basic application module is used for providing componentized services and scene applications for the system so as to realize the customized combination, seamless integration and dynamic expansion of the functional modules; the regulation and control management module is used for establishing a regulation and control branch center in each divided region on the basis of the system platform and allocating corresponding scheduling personnel.
The hardware devices include, but are not limited to, a processor, a display, a hard disk, a network communicator, and the like.
As a further improvement of the technical solution, the management range of the regulation and control management module adopts an euclidean distance calculation method, and the calculation formula is as follows:
Figure BDA0003923211470000021
wherein d is 12 In order to regulate and control the Euclidean distance (x) of the maximum radius of the sub-center management range 1 ,y 1 ) To adjust the sub-centered position coordinates, (x) 2 ,y 2 ) The position coordinates of the farthest power station in the sub-center management range are regulated and controlled.
As a further improvement of the technical solution, a signal output end of the user type module is connected with a signal input end of the authority assignment module, a signal output end of the authority assignment module is connected with a signal input end of the management provision module and a signal input end of the operation guidance module, and the management provision module and the operation guidance module run in parallel; the user type module is used for providing different access channels and display modes according to the identity of the user; the authority distribution module is used for opening different operation authorities for the user according to the identity of the user accessing the system; the management regulation module is used for providing management regulation rules which are consistent with the user access identity so as to be read and known by the user; the operation guide module is used for providing an operation guide file which is consistent with the access identity and the operation authority of the user.
The identity of the user includes, but is not limited to, an administrator, a registered user, a guest, etc. Specifically, the system can be actually operated by entering the system in a user login mode, and the system cannot be actually operated except for query by entering the system in a visitor login mode.
As a further improvement of the technical scheme, the plan overview module, the plan report module, the unplanned newly-added module, the plan cancel module and the plan query module are sequentially connected through wireless digital signals and run in parallel; the plan overview module is used for providing all power failure plan display lists in a period of time in an area; the plan reporting module is used for filling and reporting a normal power failure plan; the unplanned newly-added module is used for adding a newly-added operation flow to a plan provided by a power failure plan temporarily on the premise that a power failure plan application department wants to add a power failure plan on the premise that a dispatching and transporting party already issues a next-month power failure plan; the plan canceling module is used for providing a plan canceling declaration operation option in the declaration details of the plan on the premise that the normal declaration flow is completely finished and plan information is issued by the regulation and control branch center sender; the plan query module is used for providing an on-demand query channel for a user to carry out whole planning and 110kv planning according to different conditions in a plan overview interface.
When a normal power failure plan is filled, contents such as "voltage class", "belonging substation", "power failure plan starting time", "power failure plan ending time", "plan starting working time", "plan ending working time", "power failure equipment", "back-supply scheme", "plan power failure time", "working content and working name", "power failure number", "plan time number", "construction department", "application unit", "influence communication protection channel" and the like are required items for plan application, and the "plan time number of households" is calculated through the "plan power failure time" and the "power failure number of households". Meanwhile, if the 'power failure equipment' is filled, the system can be repeatedly researched and judged, and whether a repeated power failure plan exists or not is automatically judged. The plan reporting mode comprises a pre-filling plan declaration mode and a direct declaration mode, wherein the direct declaration mode is that a power failure plan automatically enters the next node, and the current user process is finished; the 'prefill plan declaration' enters the prefill monthly plan list for the power failure plan, the prefill monthly plan list can be checked on a prefill monthly plan interface, and the plan can be edited and modified again.
Two newly-added plan entries are provided, and the two newly-added plan entries are respectively added to the shortcut click in the department plan page and the extra plan of the power failure.
As a further improvement of the technical scheme, the plan overview module comprises an overview interface module, a classification display module, a statistics display module and a function entry module; the signal output end of the overview interface module is connected with the signal input end of the classified display module, the signal output end of the classified display module is connected with the signal input end of the statistics display module, and the signal output end of the statistics display module is connected with the signal input end of the function entry module; the overview interface module displays all power failure plans through a standard integral table, and plan query can be carried out on the interface according to conditions by clicking a query button; the classification display module is used for performing classification display on different plans according to a certain distinguishing means such as colors; the statistical display module is used for displaying all power failure plans filled by individuals on a department plan interface of a current login user according to a certain sequence standard; the function entrance module is used for attaching power failure plan declaration to a department plan interface and adding a function entrance outside the power failure plan so that a user can click a button to quickly enter corresponding category power failure plan declaration.
The different plans are preferably represented by backgrounds with different colors, for example, a power failure plan with a red background is a newly-added power failure plan, a yellow background represents a power failure cancellation plan, a blue background represents a repeated power failure plan, and a green background represents a weather and rain cancellation plan.
The display ordering rule of the personal plan can be time, scale, urgency and the like.
As a further improvement of the technical solution, the display ordering method of the statistical display module adopts an operation priority algorithm, and the calculation expression thereof is as follows:
Pj[i]=Po[i]+N*Twait
where Po [ i ] is the priority assigned when the job is submitted, twait is the time the job waits in the queue, N is a constant factor, and as the waiting time increases, the job priority dynamically increases until it increases to a threshold, i.e., the highest priority.
As a further improvement of the technical scheme, the plan reporting module comprises an equipment accountability module, a regulation and verification module, a scheduling and transporting module and a batched plan module; the signal output end of the equipment accountability module is connected with the signal input end of the regulation and control auditing module, the signal output end of the regulation and control auditing module is connected with the signal input end of the dispatching and transporting module, and the signal output end of the dispatching and transporting module is connected with the signal input end of the batched planning module; the equipment accountability module is used for performing detail checking on the submitted and reported power failure plan and performing two operations of passing or rejecting auditing opinions by an equipment department approval accountability role; the regulation and control auditing module is used for checking the details of the power failure plan which passes the approval and accountability auditing of the equipment department by a regulation and control main role and performing two auditing suggestion operations of passing or refusing; the dispatching and transporting party module is used for the dispatching and transporting party to check the details of the power failure plan which passes the audit of the regulating and controlling master and to issue or reject two audit opinions; the approved plan module is used for providing a display for checking all approved power failure plan lists and details thereof for an auditing user.
The scheduling and transporting party auditing is a final auditing program, when the scheduling and transporting party can modify the power failure plan and input a passing reason after the modification is finished, the power failure plan flow is ended, and plan publishing is to be executed; if the rejection operation is performed, the rejection is planned, not released, and not executed.
As a further improvement of the technical scheme, the panoramic monitoring module, the multidimensional analysis module, the monthly report module and the report management module are sequentially connected through wireless digital signals and independently operate; the panoramic monitoring module is used for carrying out panoramic display on the power failure plan in a visual mode and carrying out reliability and safety monitoring operation on the power system according to the panoramic display; the multi-dimensional analysis module is used for carrying out statistical analysis on the power failure plan from different dimensions; the monthly report module is used for displaying the overall regulation and control operation condition of the time period according to the months and checking the regulation and control operation condition of different months by selecting; the report management module is used for managing the generated monthly analysis report through planning basic indexes, reliability, scheduling and the like and providing different exportable forms for users.
The second objective of the present invention is to provide an operation method for a power outage plan refinement circulation system of an electric power system, which comprises the following steps:
s1, a user enters a system login interface to log in a system with a legal identity, and management regulations and operation instructions corresponding to the identity can be checked at the lower part of the login interface; wherein, the user can only carry out inquiry operation when logging in with the identity of the tourist; if the user logs in with the registered user identity, the operations of inquiry, declaration, addition, cancellation and the like can be carried out; when the user logs in with the identity of the administrator, plan approval operation can be carried out outside plan declaration;
s2, the user can perform all planned query operations on the overview interface;
s3, the user can perform plan declaration operation on a department plan interface, fill in the contents of plan declaration, select 'direct declaration' or 'pre-filling plan declaration' as required, and on the basis, the user can perform extra-plan addition operation, plan cancellation operation and the like on the issued plan;
s4, the administrator can check details of the declared plan in the system, and the detail contents are examined and approved in sequence according to the levels, the examined and approved plan is automatically issued and waits to be executed, and the rejected plan is automatically stopped and stored in a historical database;
s5, the system automatically counts all plans every month, generates monthly analysis reports after carrying out multi-dimensional statistical analysis, and automatically uploads all report forms to the power failure plan big data and stores the data in the cloud;
and S6, the user logs in the system, can select the content, form and format of the report form as required, and conducts export and other operations.
The invention also provides an operation device of the power system power failure plan refined circulation system, which comprises a processor, a memory and a computer program stored in the memory and operated on the processor, wherein the processor is used for realizing any one of the power system power failure plan refined circulation systems when executing the computer program.
A fourth object of the present invention is to provide a computer-readable storage medium storing a computer program which, when executed by a processor, realizes any one of the above-described power system blackout plan refinement and circulation systems.
Compared with the prior art, the invention has the beneficial effects that: in the power failure plan refined circulation system of the power system, plan pre-balance is achieved by introducing a pre-declaration mechanism, repeated declaration is reduced, power failure plan declaration content is optimized, the use complexity of an operation user is reduced, meanwhile, power failure plan circulation is finely controlled, plan real-time traceability is achieved, a visual mode is adopted to conduct panoramic display on a power failure plan, a power failure plan big data display platform is built, the power failure plan management level, power supply reliability and safety are achieved, the power operator environment is supported and optimized, in addition, through power failure plan multi-dimensional analysis, intelligent decision making is assisted, power failure plan circulation execution efficiency is improved, repeated power failure is reduced, the power failure range is reduced, various assessment indexes of the power failure plan are improved, long-term plan in scientific arrangement is facilitated, the power failure plan management level is improved, power grid power supply safety is facilitated, and high-quality service is improved for the user.
Drawings
FIG. 1 is an exemplary architectural block diagram of the present invention;
FIG. 2 is a block diagram of the overall system apparatus of the present invention;
FIG. 3 is a diagram of one embodiment of a local system device architecture;
FIG. 4 is a second block diagram of a local system apparatus according to the present invention;
FIG. 5 is a third block diagram of a local system apparatus according to the present invention;
FIG. 6 is a fourth embodiment of the present invention;
FIG. 7 is a fifth embodiment of the present invention;
FIG. 8 is a sixth embodiment of the present invention;
fig. 9 is a block diagram of an exemplary computer product device of the present invention.
The various reference numbers in the figures mean:
100. an infrastructure unit; 101. a hardware device module; 102. a service support module; 103. a base application module; 104. a regulation and control management module;
200. a user platform unit; 201. a user type module; 202. an authority distribution module; 203. a management provision module; 204. an operation guide module;
300. a plan management unit; 301. a plan overview module; 3011. an overview interface module; 3012. a classification display module; 3013. a statistics display module; 3014. a functional inlet module; 302. a plan reporting module; 3021. a device accountability module; 3022. a regulation and control auditing module; 3023. a dispatch square module; 3024. a batched plan module; 303. adding a module outside the plan; 304. a plan cancellation module; 305. a plan query module;
400. a statistical analysis unit; 401. a panoramic monitoring module; 402. a multi-dimensional analysis module; 403. a monthly report module; 404. and a report management module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
As shown in fig. 1 to 9, the present embodiment provides a power outage plan refinement circulation system for an electric power system, which includes
An infrastructure unit 100, a user platform unit 200, a plan management unit 300, and a statistical analysis unit 400; the signal output end of the infrastructure unit 100 is connected with the signal input end of the user platform unit 200, the signal output end of the user platform unit 200 is connected with the signal input end of the plan management unit 300, and the signal output end of the plan management unit 300 is connected with the signal input end of the statistical analysis unit 400; the infrastructure unit 100 is configured to provide a hardware device foundation, a platform service, an intelligent technology, and the like, which support system operation; the user platform unit 200 is used for performing classification management on users accessing the system and allocating corresponding operation authorities; the plan management unit 300 is configured to perform management operations such as reporting, adding, canceling, and querying a power outage plan in a management area; the statistical analysis unit 400 is used for performing periodic statistical analysis on the power failure plan, acquiring big data of the power failure plan and accordingly enabling the power failure plan to be traceable in real time;
the infrastructure unit 100 comprises a hardware equipment module 101, a service support module 102, a basic application module 103 and a regulation and control management module 104;
the user platform unit 200 comprises a user type module 201, a right distribution module 202, a management regulation module 203 and an operation guide module 204;
the plan management unit 300 comprises a plan overview module 301, a plan report module 302, an unplanned addition module 303, a plan cancel module 304 and a plan query module 305;
the statistical analysis unit 400 includes a panorama monitoring module 401, a multi-dimensional analysis module 402, a monthly report module 403, and a report management module 404.
In this embodiment, the signal output end of the hardware device module 101 is connected to the signal input end of the service support module 102, the signal output end of the service support module 102 is connected to the signal input end of the basic application module 103, and the signal output end of the basic application module 103 is connected to the signal input end of the regulation and control management module 104; the hardware device module 101 is configured to provide a communication service, a storage service, an information interaction service, an information security service, and the like for the system through hardware devices such as an application server and a database server; the service support module 102 is used for providing service functions such as a database, authority management, user management and interface service for the system, and an application layer standard support platform including various service data models of a power failure plan; the basic application module 103 is used for providing componentized services and scene applications for the system so as to realize the customized combination, seamless integration and dynamic expansion of the functional modules; the regulation and control management module 104 is used for establishing regulation and control branch centers in each divided region and allocating corresponding dispatching personnel on the basis of the system platform.
The hardware devices include, but are not limited to, a processor, a display, a hard disk, a network communicator, and the like.
Specifically, the management range of the regulation and control management module 104 adopts an euclidean distance calculation method, and the calculation formula is as follows:
Figure BDA0003923211470000091
wherein d is 12 To regulate the Euclidean distance (x) of the maximum radius of the sub-center management range 1 ,y 1 ) To adjust the sub-centered position coordinates, (x) 2 ,y 2 ) The position coordinates of the farthest power station in the sub-center management range are regulated and controlled.
In this embodiment, the signal output end of the user type module 201 is connected to the signal input end of the authority assignment module 202, the signal output end of the authority assignment module 202 is connected to the signal input ends of the management provision module 203 and the operation guidance module 204, and the management provision module 203 and the operation guidance module 204 operate in parallel; the user type module 201 is used for providing different access channels and display modes according to the identity of the user; the authority distribution module 202 is used for opening different operation authorities for the user according to the identity of the user accessing the system; the management regulation module 203 is used for providing management regulation rules conforming to the user access identity for the user to read and know; the operation guidance module 204 is used for providing the user with an operation guidance file corresponding to the access identity and the operation authority of the user.
The identity of the user includes, but is not limited to, an administrator, a registered user, a guest, etc. Specifically, the system can be accessed in a user login manner for actual operation, and the system can be accessed in a guest login manner for actual operation except for query.
In this embodiment, the plan overview module 301, the plan report module 302, the unplanned addition module 303, the plan cancel module 304, and the plan query module 305 are connected in sequence by wireless digital signals and run in parallel; the plan overview module 301 is used for providing all blackout plan display lists in a region for a period of time; the plan reporting module 302 is used for filling and reporting a normal power failure plan; the unplanned adding module 303 is used for adding a new operation flow to the plan provided by the power failure plan temporarily when the power failure plan applying department wants to add a new power failure plan on the premise that the dispatching and transporting party has issued the next-month power failure plan; the plan canceling module 304 is configured to provide a plan canceling declaration operation option in the declaration details of the plan on the premise that the normal declaration flow is completely finished and plan information is issued by the control center provider; the plan query module 305 is used for providing a user with an on-demand query channel for performing overall planning and 110kv planning according to different conditions in a plan overview interface.
When a normal power failure plan is filled, contents such as "voltage class", "belonging substation", "power failure plan starting time", "power failure plan ending time", "plan starting working time", "plan ending working time", "power failure equipment", "back-supply scheme", "plan power failure time", "working content and working name", "power failure number", "plan time number", "construction department", "application unit", "influence communication protection channel" and the like are required items for plan application, and the "plan time number of households" is calculated through the "plan power failure time" and the "power failure number of households". Meanwhile, if the 'power failure equipment' is filled, the system can repeatedly study and judge, and whether a repeated power failure plan exists or not is automatically judged.
The plan reporting mode comprises a pre-filling plan declaration mode and a direct declaration mode, wherein the direct declaration mode is that a power failure plan automatically enters the next node, and the current user process is finished; the 'prefill plan declaration' enters a prefill monthly plan list for the power failure plan, the prefill monthly plan list can be checked on a prefill monthly plan interface, and the plan can be edited and modified again.
Two newly-added plan entries are provided, and are respectively added to the quick click and the power failure plan in the department plan page.
Further, the plan overview module 301 includes an overview interface module 3011, a classification display module 3012, a statistics display module 3013, and a function entry module 3014; a signal output end of the overview interface module 3011 is connected to a signal input end of the classification display module 3012, a signal output end of the classification display module 3012 is connected to a signal input end of the statistics display module 3013, and a signal output end of the statistics display module 3013 is connected to a signal input end of the function entry module 3014; the overview interface module 3011 displays all blackout plans through a standard overall table, and plan query can be performed on the interface according to conditions by clicking a query button; the classification display module 3012 is used to display different plans in a classification manner according to a certain distinguishing means, such as color; the statistics display module 3013 is configured to display all power outage plans filled by individuals on a department plan interface of a currently logged-in user according to a certain sequence standard; the function entry module 3014 is configured to attach a power outage plan declaration to the department plan interface and add a function entry outside the power outage plan so that a user can click a button to quickly enter a power outage plan declaration of a corresponding category.
The different plans are preferably represented by backgrounds with different colors, for example, a power failure plan with a red background is a newly-added power failure plan, a yellow background represents a power failure cancellation plan, a blue background represents a repeated power failure plan, and a green background represents a weather and rain cancellation plan.
The display ordering rule of the personal plan can be time, scale, urgency and the like.
Specifically, the display sorting method of the statistical display module 3013 adopts a job priority algorithm, and its calculation expression is:
Pj[i]=Po[i]+N*Twait
where Po [ i ] is the priority assigned when the job is submitted, twait is the time the job waits in the queue, N is a constant factor, and as the waiting time increases, the job priority dynamically increases until it increases to a threshold, i.e., the highest priority.
Further, the plan reporting module 302 includes a device accountability module 3021, a regulation and control auditing module 3022, a scheduling and transportation module 3023, and a batched plan module 3024; the signal output end of the equipment accountability module 3021 is connected to the signal input end of the regulation and control auditing module 3022, the signal output end of the regulation and control auditing module 3022 is connected to the signal input end of the scheduling party module 3023, and the signal output end of the scheduling party module 3023 is connected to the signal input end of the batched plan module 3024; the equipment accountability module 3021 is configured to examine details of the power failure plan submitted and reported by the equipment department through an approval accountability role and perform two auditing opinion operations of passing or refusing; the regulation and control auditing module 3022 is used for the regulation and control principal role to check the details of the power failure plan which has passed the examination and approval accountability audit of the equipment department and to perform two auditing opinion operations of passing or rejecting; the dispatching and transporting party module 3023 is used for the dispatching and transporting party to check the details of the blackout plan which has passed the audit of the regulating and controlling master and to issue or reject two audit opinions; the approved plan module 3024 is used to provide a presentation to the audit user to view all approved blackout plan listings and their details.
The scheduling and transporting party is used for checking the power failure plan and the power failure plan, wherein the checking is a final checking program, when the scheduling and transporting party can modify the power failure plan and the power failure plan, and performs issuing operation and inputting a passing reason after the modification is completed, the power failure plan flow is ended, and the plan issuing is to be executed; if the rejection operation is performed, the rejection is planned, not released, and not executed.
In addition, it should be noted that the audit flow of adding and canceling outside the plan is slightly different from the audit flow of reporting the plan, and needs to be adjusted according to the plan type and the corresponding operation.
In this embodiment, the panoramic monitoring module 401, the multidimensional analysis module 402, the monthly report module 403, and the report management module 404 are connected in sequence by wireless digital signals and operate independently; the panoramic monitoring module 401 is configured to perform panoramic display on the power failure plan in a visual manner, and perform reliability and security monitoring operation on the power system accordingly; the multidimensional analysis module 402 is used for performing statistical analysis on the power failure plan from different dimensions; the monthly report module 403 is used for displaying the overall regulation and control operation conditions of the time period according to the month, and can check the regulation and control operation conditions of different months by selecting; the report management module 404 is configured to manage the generated monthly analysis report through planning basic indexes, reliability, scheduling, and the like, and provide different exportable forms to the user.
The embodiment also provides an operation method for the power failure plan refined circulation system of the power system, which comprises the following steps:
s1, a user enters a system login interface to login a system with a legal identity, and management regulations and operation instructions corresponding to the identity can be checked on the lower portion of the login interface; wherein, the user can only carry out the inquiry operation when logging in with the identity of the tourist; if the user logs in with the registered user identity, the operations of inquiry, declaration, addition, cancellation and the like can be carried out; when the user logs in with the identity of the administrator, plan approval operation can be carried out outside plan declaration;
s2, the user can perform all planned query operations on the overview interface;
s3, the user can perform plan declaration operation on a department plan interface, fill in contents of the plan declaration, and select 'direct declaration' or 'pre-filling plan declaration' as required, and on the basis, the user can perform extra-plan addition operation, plan cancellation operation and the like on a published plan;
s4, the administrator can check details of the declared plan in the system, and the detail contents are examined and approved in sequence according to the levels, the examined and approved plan is automatically issued and waits to be executed, and the rejected plan is automatically stopped and stored in a historical database;
s5, the system automatically counts all plans every month, generates monthly analysis reports after carrying out multi-dimensional statistical analysis, and automatically uploads all report forms to the power failure plan big data and stores the data in the cloud;
and S6, the user logs in the system, can select the content, form and format of the report form as required, and conducts export and other operations.
As shown in fig. 9, the present embodiment further provides an operating apparatus for refining the circulation system in the power system blackout plan, where the apparatus includes a processor, a memory, and a computer program stored in the memory and running on the processor.
The processor comprises one or more than one processing core, the processor is connected with the processor through a bus, the memory is used for storing program instructions, and the power system power failure plan refining circulation system is realized when the processor executes the program instructions in the memory.
Alternatively, the memory may be implemented by any type or combination of volatile or non-volatile memory devices, such as Static Random Access Memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic or optical disks.
In addition, the invention also provides a computer readable storage medium, wherein a computer program is stored in the computer readable storage medium, and when the computer program is executed by the processor, the refined circulation system of the power system power failure plan is realized.
Optionally, the present invention further provides a computer program product containing instructions, which when run on a computer, causes the computer to execute the above aspects of the power system outage plan refinement circulation system.
It will be understood by those skilled in the art that all or part of the steps for implementing the above embodiments may be implemented by hardware, or may be implemented by a program instructing relevant hardware, and the program may be stored in a computer-readable storage medium, where the above-mentioned storage medium may be a read-only memory, a magnetic disk or an optical disk.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and the preferred embodiments of the present invention are described in the above embodiments and the description, and are not intended to limit the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1. The utility model provides a system that circulates that becomes more meticulous of power system power failure plan which characterized in that: comprises that
The system comprises an infrastructure unit (100), a user platform unit (200), a plan management unit (300) and a statistical analysis unit (400); the signal output end of the infrastructure unit (100) is connected with the signal input end of the user platform unit (200), the signal output end of the user platform unit (200) is connected with the signal input end of the plan management unit (300), and the signal output end of the plan management unit (300) is connected with the signal input end of the statistical analysis unit (400); the infrastructure unit (100) is used for providing hardware equipment foundation, platform service, intelligent technology and the like for supporting system operation; the user platform unit (200) is used for carrying out classification management on users accessing the system and distributing corresponding operation authorities; the plan management unit (300) is used for performing management operations such as reporting, adding, canceling, inquiring and the like on the power failure plan in the management area; the statistical analysis unit (400) is used for carrying out periodic statistical analysis on the power failure plan, acquiring big data of the power failure plan and accordingly enabling the power failure plan to be traceable in real time;
the infrastructure unit (100) comprises a hardware equipment module (101), a service support module (102), a basic application module (103) and a regulation and control management module (104);
the user platform unit (200) comprises a user type module (201), a right distribution module (202), a management regulation module (203) and an operation guide module (204);
the plan management unit (300) comprises a plan overview module (301), a plan report module (302), an unplanned addition module (303), a plan cancel module (304) and a plan query module (305);
the statistical analysis unit (400) comprises a panoramic monitoring module (401), a multi-dimensional analysis module (402), a monthly report module (403) and a report management module (404).
2. The power system outage plan refinement circulation system according to claim 1, characterized in that: a signal output end of the hardware device module (101) is connected with a signal input end of the service support module (102), a signal output end of the service support module (102) is connected with a signal input end of the basic application module (103), and a signal output end of the basic application module (103) is connected with a signal input end of the regulation and control management module (104); the hardware equipment module (101) is used for providing communication service, storage service, information interaction service, information security service and the like for a system through hardware equipment such as an application server, a database server and the like; the service support module (102) is used for providing service functions such as a database, authority management, user management, interface service and the like for the system and providing an application layer standard support platform comprising various service data models of a power failure plan and the like; the basic application module (103) is used for providing componentized services and scene applications for the system so as to realize the customized combination, seamless integration and dynamic expansion of the functional modules; the regulation and control management module (104) is used for establishing a regulation and control branch center in each divided region on the basis of the system platform and allocating corresponding scheduling personnel.
3. The power system outage plan refinement circulation system according to claim 2, characterized in that: the management range of the regulation and control management module (104) adopts an Euclidean distance calculation method, and the calculation formula is as follows:
Figure FDA0003923211460000021
wherein d is 12 In order to regulate and control the Euclidean distance (x) of the maximum radius of the sub-center management range 1 ,y 1 ) To adjust the sub-centered position coordinates, (x) 2 ,y 2 ) The position coordinates of the farthest power station in the sub-center management range are regulated and controlled.
4. The power system outage plan refinement circulation system according to claim 1, characterized in that: the signal output end of the user type module (201) is connected with the signal input end of the authority distribution module (202), the signal output end of the authority distribution module (202) is connected with the signal input ends of the management regulation module (203) and the operation guide module (204), and the management regulation module (203) and the operation guide module (204) run in parallel; the user type module (201) is used for providing different access channels and display modes according to the identity of a user; the authority distribution module (202) is used for opening different operation authorities for the user according to the identity of the user accessing the system; the management regulation module (203) is used for providing management regulation rules conforming to the user access identity for the user to read and know; the operation guide module (204) is used for providing the operation guide file corresponding to the access identity and the operation authority of the user.
5. The power system outage plan refinement circulation system according to claim 1, characterized in that: the plan overview module (301), the plan report module (302), the unplanned newly-added module (303), the plan cancel module (304) and the plan query module (305) are sequentially connected through wireless digital signals and run in parallel; the plan overview module (301) is used for providing a list of all power outage plan displays in a region for a period of time; the plan reporting module (302) is used for filling and reporting a normal power failure plan; the unplanned adding module (303) is used for adding a new operation flow to the plan provided by the power failure plan application department when the power failure plan application department wants to temporarily add a power failure plan on the premise that the dispatching and transporting party has issued the next month power failure plan; the plan canceling module (304) is used for providing a plan canceling declaration operation option in the declaration details of the plan on the premise that the normal declaration process is completely finished and plan information is issued by the control branch center delivery party; the plan query module (305) is used for providing a user with an on-demand query channel for carrying out overall planning and 110kv planning according to different conditions in a plan overview interface.
6. The power system outage plan refinement circulation system according to claim 5, characterized in that: the plan overview module (301) comprises an overview interface module (3011), a classification display module (3012), a statistic display module (3013) and a function entry module (3014); the signal output end of the overview interface module (3011) is connected with the signal input end of the classified display module (3012), the signal output end of the classified display module (3012) is connected with the signal input end of the statistic display module (3013), and the signal output end of the statistic display module (3013) is connected with the signal input end of the function entry module (3014); the overview interface module (3011) displays all power failure plans through a standard integral table, and plan query can be carried out on the interface according to conditions by clicking a query button; the classification display module (3012) is used for classifying and displaying different plans according to a certain distinguishing means such as color; the statistics display module (3013) is used for displaying all power-off plans of the personal filling on a department plan interface of a current login user according to a certain sequence standard; the function entry module (3014) is used for attaching power failure plan declaration to a department plan interface and adding a function entry outside the power failure plan so that a user can click a button to quickly enter the power failure plan declaration of the corresponding category.
7. The power system outage plan refinement circulation system according to claim 6, characterized in that: the display sorting method of the statistical display module (3013) adopts an operation priority algorithm, and the calculation expression is as follows:
Pj[i]=Po[i]+N*Twait
where Po [ i ] is the priority assigned when the job is submitted, twait is the time the job waits in the queue, N is a constant factor, and as the waiting time increases, the job priority dynamically increases until it increases to a threshold, i.e., the highest priority.
8. The power system outage plan refinement circulation system according to claim 5, characterized in that: the plan reporting module (302) comprises an equipment accountability module (3021), a regulation and control auditing module (3022), a scheduling and transporting module (3023) and a batched plan module (3024); the signal output end of the equipment special responsibility module (3021) is connected with the signal input end of the regulation and control auditing module (3022), the signal output end of the regulation and control auditing module (3022) is connected with the signal input end of the dispatching party module (3023), and the signal output end of the dispatching party module (3023) is connected with the signal input end of the batched plan module (3024); the equipment special responsibility module (3021) is used for performing detail checking on the submitted and reported power failure plan and performing two operations of passing or refusing an audit opinion by an equipment department approval special responsibility role; the regulation and control auditing module (3022) is used for the regulation and control principal role to check the details of the power failure plan which passes the examination and approval accountability audit of the equipment department and to perform two auditing opinion operations of passing or rejecting; the dispatching carrier module (3023) is used for the dispatching carrier to check the details of the power failure plan which passes the audit of the regulating and controlling master and to issue or reject two audit opinions; the approved plan module (3024) is used for providing a show for an audit user to view all approved blackout plan lists and details thereof.
9. The power system outage plan refinement circulation system according to claim 1, characterized in that: the panoramic monitoring module (401), the multidimensional analysis module (402), the monthly report module (403) and the report management module (404) are connected in sequence through wireless digital signals and operate independently; the panoramic monitoring module (401) is used for carrying out panoramic display on the power failure plan in a visualization mode and carrying out reliability and safety monitoring operation on the power system according to the panoramic display; the multi-dimensional analysis module (402) is used for performing statistical analysis on power failure plans from different dimensions; the monthly report module (403) is used for displaying the overall regulation and control operation condition of the time period according to the month, and can check the regulation and control operation condition of different months by selecting; the report management module (404) is used for managing the generated monthly analysis report through planning the aspects of basic indexes, reliability, scheduling and the like and providing different exportable forms for users.
10. The power system outage plan refinement circulation system according to claim 1, characterized in that: the method of operation of the system comprises the steps of:
s1, a user enters a system login interface to login a system with a legal identity, and management regulations and operation instructions corresponding to the identity can be checked on the lower portion of the login interface; wherein, the user can only carry out inquiry operation when logging in with the identity of the tourist; if the user logs in with the registered user identity, the operations of inquiry, declaration, addition, cancellation and the like can be carried out; when a user logs in with the identity of an administrator, plan approval operation can be carried out outside plan declaration;
s2, the user can perform all planned query operations on the overview interface;
s3, the user can perform plan declaration operation on a department plan interface, fill in contents of the plan declaration, and select 'direct declaration' or 'pre-filling plan declaration' as required, and on the basis, the user can perform extra-plan addition operation, plan cancellation operation and the like on a published plan;
s4, the administrator can check details of the declared plan in the system, and the detail contents are examined and approved in sequence according to the levels, the examined and approved plan is automatically issued and waits to be executed, and the rejected plan is automatically stopped and stored in a historical database;
s5, the system automatically counts all plans every month, generates monthly analysis reports after carrying out multi-dimensional statistical analysis, and automatically uploads all report forms to the power failure plan big data and stores the data in the cloud;
and S6, the user logs in the system, can select the content, form and format of the report form as required, and conducts export and other operations.
CN202211364203.XA 2022-11-02 2022-11-02 Power system power failure plan refined circulation system Pending CN115600888A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211364203.XA CN115600888A (en) 2022-11-02 2022-11-02 Power system power failure plan refined circulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211364203.XA CN115600888A (en) 2022-11-02 2022-11-02 Power system power failure plan refined circulation system

Publications (1)

Publication Number Publication Date
CN115600888A true CN115600888A (en) 2023-01-13

Family

ID=84851792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211364203.XA Pending CN115600888A (en) 2022-11-02 2022-11-02 Power system power failure plan refined circulation system

Country Status (1)

Country Link
CN (1) CN115600888A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968691A (en) * 2012-11-20 2013-03-13 广东电网公司 Power-cut scheme decision making system and application method thereof
CN104219580A (en) * 2014-08-20 2014-12-17 北京奇艺世纪科技有限公司 Data display method and data display device
CN106251052A (en) * 2016-07-25 2016-12-21 国网安徽省电力公司宿州供电公司 The county's grid power blackout management and control of a kind of ground and analysis decision plateform system
CN106600110A (en) * 2016-11-18 2017-04-26 中国电力科学研究院 Improving method and system for lean management of multi-cycle integrated outage plan of large power grid
CN108389026A (en) * 2017-12-28 2018-08-10 广州建软科技股份有限公司 A kind of power failure planning management system and method
CN111064773A (en) * 2019-11-28 2020-04-24 北京口袋时尚科技有限公司 Session priority determination method and device
CN112132443A (en) * 2020-09-18 2020-12-25 国网青海省电力公司海东供电公司 Reliability distribution network power supply management and control system
CN112734185A (en) * 2020-12-30 2021-04-30 中国人寿保险股份有限公司上海数据中心 Intelligent queuing scheduling method
CN113163452A (en) * 2021-04-02 2021-07-23 深圳市晨北科技有限公司 Information processing method, system, information processing terminal and storage medium

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968691A (en) * 2012-11-20 2013-03-13 广东电网公司 Power-cut scheme decision making system and application method thereof
CN104219580A (en) * 2014-08-20 2014-12-17 北京奇艺世纪科技有限公司 Data display method and data display device
CN106251052A (en) * 2016-07-25 2016-12-21 国网安徽省电力公司宿州供电公司 The county's grid power blackout management and control of a kind of ground and analysis decision plateform system
CN106600110A (en) * 2016-11-18 2017-04-26 中国电力科学研究院 Improving method and system for lean management of multi-cycle integrated outage plan of large power grid
CN108389026A (en) * 2017-12-28 2018-08-10 广州建软科技股份有限公司 A kind of power failure planning management system and method
CN111064773A (en) * 2019-11-28 2020-04-24 北京口袋时尚科技有限公司 Session priority determination method and device
CN112132443A (en) * 2020-09-18 2020-12-25 国网青海省电力公司海东供电公司 Reliability distribution network power supply management and control system
CN112734185A (en) * 2020-12-30 2021-04-30 中国人寿保险股份有限公司上海数据中心 Intelligent queuing scheduling method
CN113163452A (en) * 2021-04-02 2021-07-23 深圳市晨北科技有限公司 Information processing method, system, information processing terminal and storage medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杜明: ""基于J2EE平台的停电计划管理***的研究与实现"", 《中国优秀博硕士学位论文全文数据库 (硕士)工程科技Ⅱ辑》, pages 1 - 5 *
王志坚: ""深圳供电局配网停电计划管理***的研究与分析"", 《中国优秀硕士学位论文全文数据库信息科技辑》, pages 1 - 2 *

Similar Documents

Publication Publication Date Title
CN105574652B (en) Intelligent power distribution network planning big data management and control system and method
CN106815709B (en) Service quick response center support system and method
CN105303306B (en) Electric power material dispatching platform system
CN112132327A (en) Multi-source data fusion-oriented intelligent planning system for power distribution network
CN102646224A (en) Management integrating system of enterprise standardization
CN117521969B (en) Intelligent park operation index calculation system based on digital twinning
CN112836922A (en) Evaluation system based on enterprise management
CN106845855A (en) A kind of system on paying taxes service integrated management
CN111277515A (en) Source network load storage ubiquitous adjustable resource pool system and construction method
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
CN104899725A (en) Intelligent workflow system for decision support and event feedback and circulation method of intelligent workflow system
CN116991678A (en) Intelligent operation and maintenance system of data center
CN112613623A (en) Operation and maintenance flow operation management auxiliary system applied to early warning system
CN115600888A (en) Power system power failure plan refined circulation system
CN115016902B (en) Industrial flow digital management system and method
TWI811925B (en) Method for planning production capacity allocation and planning apparatus
Lu [Retracted] Data Protection Software for Civil Aviation Control Flight Information System Based on FPE Algorithm
CN114490585A (en) Open standardized digital economic general data configuration for power grid data sharing
CN107565579B (en) Multi-source cooperative management and control system and method for improving reactive voltage control level
Yuan Intelligent logistics management application relying on the internet of things
CN108335081B (en) Scientific research big data closed-loop information management method
Cui et al. Design and implementation of intelligent building engineering information management system
US11093876B2 (en) System and methods employed for accountability of an asset
Zhida et al. Development and Application of Project Management System for Power Grid Informationization Equipment Localization
Boff et al. Waiting in Queue: A Historical Evaluation of Interconnection Policy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination