CN115573513A - Bolt connection structure of precast beam and precast column and construction method - Google Patents

Bolt connection structure of precast beam and precast column and construction method Download PDF

Info

Publication number
CN115573513A
CN115573513A CN202211175977.8A CN202211175977A CN115573513A CN 115573513 A CN115573513 A CN 115573513A CN 202211175977 A CN202211175977 A CN 202211175977A CN 115573513 A CN115573513 A CN 115573513A
Authority
CN
China
Prior art keywords
precast
plate
column
bolt
precast beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211175977.8A
Other languages
Chinese (zh)
Inventor
黄世晅
舒恺
朱云祥
任雷
王朴炎
周剑
侯全胜
李然
朱礼敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
China Academy of Building Research CABR
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
China Academy of Building Research CABR
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, China Academy of Building Research CABR, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN202211175977.8A priority Critical patent/CN115573513A/en
Publication of CN115573513A publication Critical patent/CN115573513A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/22Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/025Structures with concrete columns

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a bolt connection structure and a construction method of a precast beam and a precast column, wherein the end part of the precast beam is provided with a beam end connecting piece, the precast column is provided with a column connecting plate, the beam end connecting piece is provided with an end plate and a web plate, the end plate is connected with the precast column by adopting a first bolt component, and the column connecting plate is connected with the web plate by adopting a second bolt component; grouting materials are poured into the beam end grouting area; the construction method comprises the following steps: firstly, hoisting a precast beam to a height position connected with a precast column, and then moving the precast beam along the horizontal direction to enable webs of beam end connecting pieces at two ends of the precast beam to be in contact with column connecting plates of the connected precast columns, wherein bolt holes on the webs are in one-to-one correspondence; then, sequentially installing a second bolt assembly and a first bolt assembly; and finally, pouring high-strength grouting material in the beam end grouting area. The invention does not need to arrange temporary support during on-site construction, does not have concrete wet operation, can avoid adopting traditional construction measures, reduces the construction cost and quickens the construction period.

Description

Bolt connection structure of precast beam and precast column and construction method
[ technical field ] A method for producing a semiconductor device
The invention belongs to the technical field of assembly type structures.
[ background ] A method for producing a semiconductor device
At present, for an assembly type concrete frame structure, a common frame column adopts a single-layer prefabricated column, a frame beam adopts a superposed beam, and the frame beam and the frame column are rigidly connected through a post-pouring node. The integral frame structure for assembling of post-cast of the node area is equivalent to a cast-in-place structure in terms of stress performance, and is good in anti-seismic performance, but in field construction, wet operation is more, more temporary supports need to be arranged below beams and plates, so that the assembling degree and the industrialization level are still not high, the adverse effect on the environment is large, and the advantages of the assembled structure cannot be fully exerted.
For the low multi-layer concrete frame structure, because the floor standardization degree is lower, the traditional assembled integral frame structure can generate the problems of low construction efficiency, high cost, complex construction measures and the like which are more prominent. For a low multi-layer fabricated concrete structure, in addition to a traditional node post-cast fabricated integral frame structure, the standard 'fabricated multi-layer concrete structure technical specification' T/CECS 604-2019 of the standardization institute of engineering construction of China gives basic design requirements of a dry-type connected fabricated structure mainly based on bolt connection and welding, and gives a typical bolt connection frame structure form provided with brackets. However, the bolt connection in the standard has the following problems:
1) The bracket is arranged to provide a supporting condition for the precast beam end, so that the precast column protrudes outwards, and particularly when the bracket is required to be arranged on three sides or four sides of the precast column, the production process of the precast column is complex and the precast column is inconvenient to transport;
2) The vertical shearing force of the beam end is resisted by the bracket extending outwards from the prefabricated column, but the bracket can only bear the vertical downward shearing force and cannot bear the vertical upward shearing force, and a reliable shearing mechanism is not provided for a structure with the vertical upward shearing force at the beam end under the action of earthquake or wind load;
3) A connector for tie-beam indulges muscle and precast column, it all sets up to need every muscle of indulging, to indulging the more roof beam of muscle quantity, the connector of adoption is more, causes to arrange and installs the difficulty, and the cost is also on the high side.
[ summary of the invention ]
Aiming at the defects of the prior art, the invention aims to provide a bolt connection structure of a precast beam and a precast column and a construction method thereof, which can solve the problems of complex construction process, need of arranging temporary supports and templates and large wet operation amount in the traditional wet connection structure and construction method.
In order to solve the technical problem, the invention adopts the following technical scheme:
a bolt connection structure of a precast beam and a precast column is characterized in that a beam end connecting piece is arranged at the end part of the precast beam, a column connecting plate is arranged at the connection part of the precast column and the precast beam, the beam end connecting piece is provided with an end plate and a web plate, the end plate is connected with the precast column through a first bolt assembly, and the column connecting plate is connected with the web plate through a second bolt assembly; the area between the end face of the precast beam and the side face of the precast column is a beam end grouting area, and grouting materials for coating the beam end connecting piece, the column connecting piece, the first bolt assembly and the second bolt assembly are poured into the beam end grouting area; the beam end connecting piece is integrally formed by combining and welding steel plates, the thickness of the web plate is not less than 10mm, and the thickness of the column connecting plate is not less than 10mm.
Preferably, the beam-ends connecting piece still includes upper flange plate, lower flange plate and the web of parallel and the level setting from top to bottom, the web is connected perpendicularly between upper flange plate and lower flange plate, and first end plate is connected perpendicularly to the upper flange plate, and the second end plate is connected perpendicularly to the lower flange plate, is connected with the floor perpendicularly between upper flange plate and the first end plate, is connected with the floor perpendicularly between lower flange plate and the second end plate.
Preferably, two first ribbed slabs are arranged between the first end plate and the upper surface of the upper flange plate, two second ribbed slabs are arranged between the first end plate and the lower surface of the upper flange plate, two third ribbed slabs are arranged between the second end plate and the lower surface of the lower flange plate, and two fourth ribbed slabs are arranged between the second end plate and the upper surface of the lower flange plate.
Preferably, the area of the web plate far away from the end plate is embedded in the precast beam and is vertically provided with a welding nail.
Preferably, the upper flange plate and the lower flange plate are locally embedded in the precast beam and welded with the longitudinal ribs in the precast beam.
Preferably, a web bolt hole is formed in the area, close to the end plate, of the web, and the web bolt hole is a horizontal long round hole.
Preferably, the prefabricated column is provided with an embedded sleeve at a position corresponding to the first bolt assembly.
Preferably, for the side node, the embedded sleeve is anchored in the prefabricated column through an anchoring rod; for the middle joint, the embedded sleeves on two sides of the prefabricated column are connected through the opposite pull rods.
Preferably, the column connecting plate is connected with the prefabricated column through an embedded part.
According to the technical scheme, in the construction stage, the precast beam is connected with the column connecting plate through the web plate of the beam end connecting piece through the bolts, so that reliable supporting is realized, and the beam end shearing force is borne by the column connecting plate; meanwhile, the end plate of the beam end connecting piece is connected with the prefabricated column through the first bolt assembly, so that the beam end connecting piece can bear tension and pressure simultaneously, and the prefabricated beam and the prefabricated column form a temporary rigid connection structure, namely can bear bending moment of a beam end. That is to say, when grouting is not performed in the beam end grouting area or the strength of grouting material does not meet the design requirement, the temporary rigid connection structure formed by the precast columns and the precast beams can support the precast beams, the beam end shearing force and the beam end bending moment are transmitted, the stress requirements of the structure under the action of gravity load and wind load in the construction stage can be met through design calculation, and the construction safety is ensured;
in the using stage, the strength of the grouting material in the beam end grouting area reaches the design requirement, the connection area of the precast beam and the precast column can be guaranteed to be larger in rigidity and higher in bearing capacity than the area outside the connection area through calculation during design, so that strong connection is guaranteed, the precast beam forms a plastic hinge outside the connection area under the earthquake action, the plastic hinge range is still a reinforced concrete section, the ductility and the energy consumption capacity of the precast beam are equal to those of a cast-in-place structure, and the whole structure is guaranteed to have good earthquake resistance.
Therefore, the invention has the following advantages:
(1) Temporary supports are not needed to be arranged during site construction, concrete wet operation is not needed, traditional construction measures can be avoided, construction cost is reduced, and construction period is shortened;
(2) The adopted beam-end connecting piece integrates the functions of supporting, connecting and shearing resistance, realizes 'one device and multiple functions', and avoids the problems of more quantity, difficult arrangement and higher cost of the traditional steel bar connector;
(3) In the construction stage, the beam columns are in temporary rigid connection, so that the effects of gravity load and wind load can be completely resisted, and the construction safety is effectively ensured;
(4) The site construction process is simple, the operation is easy, the operation is convenient for operators to master, and the construction quality is easy to ensure.
These features and advantages of the present invention will be disclosed in more detail in the following detailed description and the accompanying drawings.
[ description of the drawings ]
The invention is further described with reference to the accompanying drawings in which:
fig. 1 is a three-dimensional schematic view of a bolted construction of a precast beam and a precast column according to an embodiment of the present invention;
FIG. 2a is a three-dimensional schematic view of a beam-end connector;
FIG. 2b is a front view of a beam-end connector;
FIG. 3a is a front view of a bolt connection structure of the edge node precast beam and the precast column;
FIG. 3b isbase:Sub>A detail view of section A-A of FIG. 3base:Sub>A;
FIG. 3c is a detail view of section B-B of FIG. 3 a;
FIG. 4 is a front view of a bolt connection structure of a middle-node precast beam and a precast column;
fig. 5 is a schematic view of a precast beam end grouting area.
Reference numerals: the prefabricated beam comprises a prefabricated beam 100, a beam longitudinal rib 101, a beam stirrup 102, a prefabricated column 200, an embedded sleeve 201, an anchor rod 202, an embedded part 203, a tie rod 204, a beam end connecting piece 1, an upper flange plate 11, a lower flange plate 12, a first end plate 13, a second end plate 14, an end plate bolt hole 131, a web 15, a web bolt hole 151, a welding nail 152, a first rib plate 16, a second rib plate 17, a third rib plate 18, a fourth rib plate 19, a column connecting plate 2, a first bolt assembly 3, a first nut 31, a second nut 32, a short screw rod 33, a second bolt assembly 4 and grouting material 300.
[ detailed description ] A
The technical solutions of the embodiments of the present invention are explained and illustrated below with reference to the drawings of the embodiments of the present invention, but the embodiments described below are only preferred embodiments of the present invention, and not all of them. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative effort belong to the protection scope of the present invention.
It will be appreciated by those skilled in the art that features from the examples and embodiments described below may be combined with each other without conflict.
In the present invention, unless expressly stated or limited otherwise, the recitation of a first feature "on" or "under" a second feature may include the recitation of the first and second features being in direct contact, and may also include the recitation that the first and second features are not in direct contact, but are in contact via another feature between them. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. "beneath," "under" and "beneath" a first feature includes the first feature being directly beneath and obliquely beneath the second feature, or simply indicating that the first feature is at a lesser elevation than the second feature.
Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or to implicitly indicate a number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the feature.
The invention provides a novel bolt connection structure of a precast beam and a precast column and a construction method thereof aiming at a low multi-layer assembled frame structure based on a mode that the precast column is 2-3 layers as a section, and the invention not only solves the problems of complex construction process, need of arranging temporary supports and templates, large wet operation amount and the like existing in the traditional wet connection structure and construction method, but also solves the problems of inconvenient component production, imperfect stress mechanism, more connectors, higher cost and the like existing in the existing dry connection structure and construction method.
Example one
Referring to fig. 1, according to the bolt connection structure of the precast beam 100 and the precast column 200 provided by the present invention, a beam end connector 1 is disposed at an end of the precast beam 100, a column connection plate 2 is disposed at a connection portion of the precast column 200 and the precast beam, and the precast beam 100 and the precast column 200 are connected by bolts through a first bolt assembly 3 and a second bolt assembly 4.
Wherein beam-ends connecting piece is makeed in the mill, and when making precast beam, pre-buried in precast beam, promptly with precast beam formation whole. The column connector is typically connected to the prefabricated column after the prefabricated column is formed. In fig. 1, the precast beams are shown on only one side of the precast column, and when the precast column has beams on the other side, the beams and the precast column may be connected using the same connection structure as shown in fig. 1.
Referring to fig. 2a and 2b, the beam-end connector 1 is composed of an upper flange plate 11, a lower flange plate 12, a web 15, a first end plate 13, a second end plate 14, two first rib plates 16, two second rib plates 17, two third rib plates 18 and two fourth rib plates 19, has the functions of connection, support and shear resistance, and can be integrally welded and fixed into a whole. The thicknesses of the upper flange plate 11 and the lower flange plate 12 are calculated and determined according to the number of the longitudinal ribs at the end of the precast beam and the bending bearing capacity requirement of connection, and are not less than 12mm. The thickness of the web 15 is calculated and determined according to the requirements of the bending bearing capacity, the shearing bearing capacity and the like of the beam end connection, and is not less than 10mm; a web bolt hole 151 is formed in the area, close to the end plate, of the web 15, the web bolt hole 151 is a horizontal long round hole, and the size of the long round hole is comprehensively determined according to the size requirement and the installation deviation adjusting requirement of the second bolt assembly 4; the welding nails 152 are arranged on the area of the web 15 far away from the end plate, and the number and the size of the welding nails 152 are determined according to the anchoring force requirement of the web 15 in the precast beam 100. The widths of the first end plate 13 and the second end plate 14 are respectively the same as those of the upper flange plate 11 and the lower flange plate 12, and the thicknesses of the first end plate and the second end plate are calculated and determined according to the stress requirements of the first bolt assembly 3; the end plate is provided with an end plate bolt hole 131, and the diameter of the end plate bolt hole 131 should be at least 5mm larger than that of the short screw in the first bolt assembly 3, so that the screw can be conveniently installed and can be guaranteed to only bear tension and pressure without bearing shearing force. Two first ribbed plates 16 set up side by side and perpendicular welding between first end plate 13 and upper flange plate 11 upper surface, two second ribbed plates 17 set up side by side and perpendicular welding between first end plate 13 and upper flange plate 11 lower surface, two third ribbed plates 18 set up and perpendicular welding between second end plate 14 and lower flange plate 12 lower surface, two fourth ribbed plates 19 set up and perpendicular welding between second end plate 14 and lower flange plate 12 upper surface, the thickness of each ribbed plate should be calculated according to first bolt assembly 3's atress requirement and confirm, and be not less than 6mm.
Referring to fig. 3a, 3b and 3c, a beam longitudinal rib 101 and a beam stirrup 102 are arranged in a precast beam 100, an upper flange plate 11 and a lower flange plate 12 of a beam end connecting piece 1 extending into the precast beam 100 are respectively welded with the beam upper longitudinal rib and the beam lower longitudinal rib, when the beam longitudinal ribs are in two rows, the beam end connecting piece is respectively welded with the upper surface and the lower surface of the flange plate, the welding requirement is in accordance with the requirement of lap welding of a steel bar and a steel plate, when a double-sided welding seam is adopted, the lap length is not less than 5 times of the diameter of the steel bar, when a single-sided welding seam is adopted, the lap length is not less than 10 times of the diameter of the steel bar, and the length of the beam end connecting piece 1 extending into the precast beam 100 is in accordance with the stress requirement and is not less than 150mm; the welding nails 152 on the web 15 need to be located entirely within the precast beam 100. The end face of the precast beam 100 at the joint is provided with a rough surface, and the concave-convex depth of the rough surface is not less than 6mm.
Further, pre-embedded sleeves 201 are arranged on the prefabricated columns at positions corresponding to the first end plate 13, the second end plate 14 and the first bolt assembly 3 of the beam-end connecting piece, and the specifications of the pre-embedded sleeves 201 are matched with the specifications of the short screws 33 in the first bolt assembly 3; the embedded sleeve 201 is reliably anchored in the prefabricated column 200 through an anchoring rod 202, and the anchoring rod 202 can adopt a steel bar with an anchoring plate or a hook, and can also adopt a screw rod with an end head and the like; the side surface of the joint of the precast column 200 and the precast beam 100 is provided with a rough surface, and the concave-convex depth of the rough surface is not less than 6mm.
Further, a column connecting plate 2 is arranged on the precast column 200 at a position corresponding to the web 15 of the beam-end connecting piece, and the thickness of the column connecting plate 2 is calculated and determined according to the requirement of the shear bearing capacity of the beam end and is not less than 10mm; a bolt hole corresponding to the second bolt assembly 4 is formed in the column connecting plate 2, the bolt hole is a standard round hole, and the specification of the bolt hole is matched with that of the bolt of the second bolt assembly 4; the column connecting plate 2 is connected with the precast column 200 through an embedded part 203.
Further, the first bolt assembly 3 is composed of a short screw 33, a first nut 31 and a gasket, and a second nut 32 and a gasket, the specification of the short screw 33 should be determined by calculation according to the beam-end bending bearing capacity requirement, the short screw 33 passes through an end plate bolt hole 131 of the beam-end connecting piece, and is screwed into the embedded sleeve 201; gaps are reserved among the first end plate 13, the second end plate 14 and the embedded sleeve 201, and the width of the gaps is not less than 30mm; the first nut 31 and the gasket are arranged in the gap and are tightly contacted and fastened with the end plate; and a second nut 32 and a gasket are arranged at one end of the short screw 33 close to the precast beam, and are tightly contacted and fastened with the end plate.
Furthermore, the second bolt assembly 4 consists of a common bolt, a matched nut and a gasket, and the number and specification of the bolts are calculated and determined according to the requirement of the shear bearing capacity of the beam end; the second bolt assemblies 4 are disposed and fastened at web bolt holes 151 of the beam-end connector web and corresponding bolt holes on the column connection plate.
Referring to fig. 4, for the middle node, compared with the edge node, the precast beams 100 on both sides of the precast column 200 have the same structure, except that the pre-embedded sleeves 201 on both sides of the precast column 200 are connected by the counter-pull rods 204, that is, the counter-pull rods 204 are used instead of the anchor rods 202, the material of the counter-pull rods 204 is the same as that of the anchor rods, reinforcing steel bars or screw rods can be used, and threads are required for screwing both ends into the pre-embedded sleeves.
Referring to fig. 5, a region between an end surface of the precast beam 100 end and a side surface of the precast column 200 is a beam end grouting region, and the beam end connection member 1, the column connection plate 2, the first bolt assembly 3, and the second bolt assembly 4 are all exposed in this region when the precast beam 100 is installed. After the precast beam 100 is installed in place and the first bolt assembly 3 and the second bolt assembly 4 are installed and fastened, the beam end grouting area is densely filled by adopting the high-strength grouting material 300.
Example two
The invention also provides a construction method matched with the precast beam and precast column bolt connection structure, which specifically comprises the following steps:
firstly, hoisting the precast beam 100 to the height of the precast column 200, and then horizontally moving the precast beam 100 to enable the web plates 15 of the beam end connecting pieces 1 at the two ends of the precast beam to be in contact with the column connecting plates 2 of the connected precast columns, wherein the bolt holes on the web plates are in one-to-one correspondence;
then, installing a second bolt assembly 4, namely, penetrating bolts through corresponding bolt holes on the beam-end connecting piece web 15 and the column connecting plate 2, and fastening the bolts by adopting gaskets and nuts; in the installation process, because the web bolt holes 151 are horizontal long round holes, the manufacturing deviation of the precast beam 100 can be eliminated through small-amount movement, and the precast beam 100 is ensured to be installed in place;
then, installing the first bolt assembly 3, namely screwing the short screw 33 into the embedded sleeve 201, and installing the first nut 31 and the gasket at the same time; after the short screw 33 is screwed into place, the second nut 32 and the gasket are installed; simultaneously fastening the first nut 31 and the gasket, and fastening the second nut 32 and the gasket; for a plurality of groups of first bolt assemblies 3 at the connecting part, fastening is performed from top to bottom in sequence, and then screwing is performed respectively after one round of fastening is completed, so as to ensure reliable fastening;
and finally, after all the bolt connecting parts are reliably connected, erecting a template around the exposed area of the beam end, pouring high-strength grouting material 300 into the area, standing for 24 hours, and removing the template to finish the connection construction of the precast beam and the precast column.
The invention can realize that the precast beam and the precast column form a temporary rigid connection structure in the construction stage, without arranging a bracket and a temporary support, can bear various loads in the construction stage, realizes support-free construction, and effectively improves the construction efficiency; and meanwhile, grouting materials are poured into local areas of beam ends, so that strong connection is realized, and the structure is guaranteed to have good anti-seismic performance in the use stage, so that the precast beams and the precast columns are safely and efficiently connected, and the advantages of the assembled structure in the aspects of improving quality and benefits, saving energy and reducing emission are fully exerted.
While the foregoing is directed to embodiments of the present invention, the scope of the invention should not be limited thereby, and it will be apparent to those skilled in the art that the invention includes, but is not limited to, those illustrated in the drawings and described in the foregoing detailed description. Any modification which does not depart from the functional and structural principles of the invention is intended to be included within the scope of the claims.

Claims (10)

1. A bolt connection structure of a precast beam and a precast column is characterized in that a beam end connecting piece is arranged at the end part of the precast beam, a column connecting plate is arranged at the connection part of the precast column and the precast beam, the beam end connecting piece is provided with an end plate and a web plate, the end plate is connected with the precast column through a first bolt assembly, and the column connecting plate is connected with the web plate through a second bolt assembly; the area between the end face of the precast beam and the side face of the precast column is a beam end grouting area, and grouting materials for coating the beam end connecting piece, the column connecting piece, the first bolt assembly and the second bolt assembly are poured into the beam end grouting area; the beam end connecting piece is integrally formed by combining and welding steel plates, the thickness of the web plate is not less than 10mm, and the thickness of the column connecting plate is not less than 10mm.
2. The bolted connection structure of precast beam and precast column according to claim 1, characterized in that the beam end connection piece further comprises an upper flange plate, a lower flange plate and a web plate, which are arranged in parallel and horizontally up and down, the web plate is vertically connected between the upper flange plate and the lower flange plate, the upper flange plate is vertically connected with the first end plate, the lower flange plate is vertically connected with the second end plate, a rib plate is vertically connected between the upper flange plate and the first end plate, and a rib plate is vertically connected between the lower flange plate and the second end plate.
3. The bolted connection structure of precast beam and precast column according to claim 2, characterized in that two first ribs are provided between the first end plate and the upper surface of the upper flange plate, two second ribs are provided between the first end plate and the lower surface of the upper flange plate, two third ribs are provided between the second end plate and the lower surface of the lower flange plate, and two fourth ribs are provided between the second end plate and the upper surface of the lower flange plate.
4. A precast beam and precast column bolting configuration according to claim 3, wherein the area of said web far from the end plate is embedded in the precast beam and vertically provided with welding nails.
5. The bolted connection structure of precast beam and precast column according to claim 3, characterized in that the local of upper flange plate and lower flange plate is pre-buried in precast beam and welded with the precast beam inner longitudinal bar.
6. The bolted connection structure of precast beam and precast column according to claim 1, wherein a web bolt hole is provided in the area of the web plate close to the end plate, and the web bolt hole is a horizontal slotted hole.
7. The bolted connection structure of precast beam and precast column of claim 1, characterized in that, the precast column sets up pre-buried sleeve with first bolt assembly corresponding to the position.
8. The bolted connection structure of the precast beam and the precast column according to claim 7, wherein for the edge node, the embedded sleeve is anchored in the precast column through an anchoring rod; for the middle joint, the embedded sleeves on two sides of the prefabricated column are connected through the opposite pull rods.
9. The precast beam and precast column bolting configuration according to claim 1, wherein said column connecting plate is connected to the precast column by an embedment.
10. A construction method of a bolt connection structure of a precast beam and a precast column is characterized by comprising the following steps:
firstly, hoisting a precast beam to a height position connected with a precast column, and then moving the precast beam along the horizontal direction to enable webs of beam end connecting pieces at two ends of the precast beam to be in contact with column connecting plates of the connected precast columns, wherein bolt holes on the webs are in one-to-one correspondence;
then, sequentially installing a second bolt assembly and a first bolt assembly;
and finally, erecting a template around the beam end grouting area, pouring high-strength grouting material, standing for 24 hours, and removing the template to finish the connection construction of the precast beam and the precast column.
CN202211175977.8A 2022-09-26 2022-09-26 Bolt connection structure of precast beam and precast column and construction method Pending CN115573513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211175977.8A CN115573513A (en) 2022-09-26 2022-09-26 Bolt connection structure of precast beam and precast column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211175977.8A CN115573513A (en) 2022-09-26 2022-09-26 Bolt connection structure of precast beam and precast column and construction method

Publications (1)

Publication Number Publication Date
CN115573513A true CN115573513A (en) 2023-01-06

Family

ID=84583989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211175977.8A Pending CN115573513A (en) 2022-09-26 2022-09-26 Bolt connection structure of precast beam and precast column and construction method

Country Status (1)

Country Link
CN (1) CN115573513A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005990A (en) * 2023-02-08 2023-04-25 上海市城市建设设计研究总院(集团)有限公司 Construction method for reforming basement roof of girderless floor system into beam-slab system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005990A (en) * 2023-02-08 2023-04-25 上海市城市建设设计研究总院(集团)有限公司 Construction method for reforming basement roof of girderless floor system into beam-slab system
CN116005990B (en) * 2023-02-08 2024-06-25 上海市城市建设设计研究总院(集团)有限公司 Construction method for reforming basement roof of girderless floor system into beam-slab system

Similar Documents

Publication Publication Date Title
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN103195170A (en) Prefabricated reinforced concrete frame structure system
CN112854443B (en) Assembly type concrete self-resetting beam-column combined node connecting structure and assembling method
CN110725525A (en) Supporting device of assembled cantilever scaffold and construction method thereof
CN113482208A (en) Dry-wet combined connecting structure of precast concrete floor slab and construction method
CN115573513A (en) Bolt connection structure of precast beam and precast column and construction method
CN111851737A (en) Assembled concrete frame beam column trunk type connecting joint
CN218757991U (en) Connecting structure of precast beam and precast column
CN111622380B (en) Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall
CN211872631U (en) Connecting device for bridge panels
CN112709349A (en) Assembled shear force wall of longitudinal tie bar in both sides of circular steel tube concrete
CN113216386A (en) Full-assembly steel-concrete combined frame-support building structure system
CN109403523B (en) Prefabricated assembled laminated slab suspension type supporting structure and laminated slab construction method
CN112832385A (en) Round steel tube concrete longitudinal connecting device of assembled shear wall
CN112832110A (en) Steel-concrete combined bridge structure
CN115030383B (en) Bolt type node connecting device of fully assembled floor system
CN114319583B (en) Connection structure of prefabricated frame beam and prefabricated frame column
CN212317149U (en) Assembled concrete frame beam column trunk type connecting joint
CN215829739U (en) Superposed plate position overhanging type steel anchor ring reinforcing structure
CN221422393U (en) Concrete laminated slab
CN221219112U (en) Concrete column and concrete beam connection structure
CN218441029U (en) Comprehensive support connecting device
CN217027671U (en) Connecting structure of precast beam and floor support plate
CN110306664B (en) Assembled low-rise residential structure system and construction method thereof
CN215053988U (en) Connecting piece and connecting structure of prefabricated part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination