CN115506608A - Intelligent construction integrated platform and factory building construction method based on platform - Google Patents

Intelligent construction integrated platform and factory building construction method based on platform Download PDF

Info

Publication number
CN115506608A
CN115506608A CN202211181755.7A CN202211181755A CN115506608A CN 115506608 A CN115506608 A CN 115506608A CN 202211181755 A CN202211181755 A CN 202211181755A CN 115506608 A CN115506608 A CN 115506608A
Authority
CN
China
Prior art keywords
platform
construction
integrated
bearing platform
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211181755.7A
Other languages
Chinese (zh)
Inventor
潘寒
廖峰
王创
彭长长
余嘉俊
曾庆
周丙浩
李俊宏
李明威
陈泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Yungou Robot Co ltd
Original Assignee
China Construction Third Engineering Bureau Science and Innovation Industry Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Science and Innovation Industry Development Co Ltd filed Critical China Construction Third Engineering Bureau Science and Innovation Industry Development Co Ltd
Priority to CN202211181755.7A priority Critical patent/CN115506608A/en
Priority to PCT/CN2022/130694 priority patent/WO2024065964A1/en
Publication of CN115506608A publication Critical patent/CN115506608A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G1/152Platforms made of metal or with metal-supporting frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/157Extensible platforms, e.g. telescopic platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • E04G2001/244Scaffolds movable on wheels or tracks mechanically operated

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an intelligent construction integrated platform, which comprises a bearing platform; the lifting devices are hinged at two ends below the bearing platform and are used for driving the bearing platform to lift; the traveling devices are arranged at the bottoms of the lifting devices and are used for driving the bearing platform to move; and the lifting device is arranged on the lifting device. The invention has the beneficial effects that: through the bearing platform be convenient for constructor to stand and carry out construction operation on bearing platform, and at the in-process of construction, according to the construction height, go on bearing platform through elevating gear, conveniently construct at steel construction factory building not co-altitude, bearing platform, elevating gear, running gear and hoisting accessory collaborative operation replace former self-control hanging flower basket, derrick, car of ascending a height, a plurality of auxiliary device such as steel cat ladder, reduce the operation degree of difficulty, convenient construction tissue, and the constructor of being convenient for carries out the factory building construction.

Description

Intelligent construction integrated platform and factory building construction method based on platform
Technical Field
The invention relates to the technical field of steel structure factory building construction equipment, in particular to an intelligent construction integrated platform and a factory building construction method based on the platform.
Background
When the current steel construction industry factory building was built, main part engineering divides a plurality of district sections to be under construction, and a plurality of auxiliary device such as self-control hanging flower basket, derrick, climbing car, steel cat ladder that high altitude construction adopted carry out the auxiliary operation.
When the steel structure factory building is built, the auxiliary devices are multiple, construction organization is not facilitated, and the operation difficulty of constructors is high.
Therefore, the scheme especially provides an intelligent building integrated platform to solve the problems.
Disclosure of Invention
The invention mainly aims to provide an intelligent construction integrated platform, and aims to solve the technical problems that the existing auxiliary devices are more and are not beneficial to construction organization.
In order to achieve the purpose, the technical scheme of the invention is realized as follows: an intelligent building integrated platform comprises
A load-bearing platform;
the lifting devices are hinged at two ends below the bearing platform and are used for driving the bearing platform to lift;
the traveling devices are arranged at the bottoms of the lifting devices and are used for driving the bearing platform to move;
and the lifting device is arranged on the lifting device.
Furthermore, the bearing platform comprises a main platform and a telescopic platform arranged at the end part of the main platform, and the telescopic platform can stretch out and draw back along the length direction of the main platform on the main platform.
Furthermore, the bearing platform comprises a main platform and overturning platforms arranged on two sides of the main platform, and the overturning platforms are rotatably connected with the main platform and can overturn up and down relative to the main platform.
Further, the lifting device comprises an inner support frame, an outer support frame and a telescopic component, wherein the inner support frame is arranged in the outer support frame in a sliding mode, and the telescopic component is located between the outer support frame and the inner support frame.
Furthermore, the walking device comprises a crawler walking chassis and a rotary supporting connecting seat, and the crawler walking chassis is connected with the lifting device through the rotary supporting connecting seat.
Furthermore, telescopic support legs are arranged around the walking device and connected with the rotary support connecting seat.
And the control system is used for controlling the lifting device, the walking device and the lifting device to execute relevant command actions.
Further, a plant building method comprises the intelligent building integrated platform, and the method comprises the following steps:
a plurality of intelligent building integrated platforms are sequentially arranged along the width direction of the intelligent building integrated platforms to form a plant building platform; and after the corresponding process of the current position is completed, the intelligent construction integrated platform corresponding to the process is moved to the next position, and the constructor of the corresponding process of the next position is carried out.
Furthermore, in the multi-span plant, one plant building platform is correspondingly arranged in each span, and each plant building platform is constructed simultaneously.
Furthermore, gangboards are laid between the intelligent construction integrated platforms.
The invention has the beneficial effects that: through the load-bearing platform be convenient for constructor to stand and carry out construction operation on load-bearing platform, and at the in-process of construction, according to the construction height, go on load-bearing platform through elevating gear, conveniently construct at steel construction factory building not co-altitude, make whole integrated platform go to next station after accomplishing station work through running gear, conveniently carry out constructor and carry out pipelined construction, be convenient for lift by crane the heavy object through hoisting gear, make things convenient for the transportation of material, load-bearing platform, elevating gear, running gear and hoisting gear collaborative work, replace former self-control hanging flower basket, the derrick, the car of ascending a height, a plurality of auxiliary device such as steel cat ladder, reduce the operation degree of difficulty, make things convenient for the construction organization, and the constructor of being convenient for carries out the factory building construction.
Drawings
FIG. 1 is a schematic perspective view of an embodiment of the present invention;
FIG. 2 is a schematic perspective view of a walking device according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of an integrated platform construction structure according to an embodiment of the present invention;
fig. 4 is a schematic view of an integrated platform assembly construction structure according to an embodiment of the present invention.
Description of reference numerals:
1. a load-bearing platform; 101. a main platform; 102. a telescopic platform; 103. overturning the platform; 2. a lifting device; 201. an inner support frame; 202. an outer support frame; 3. a traveling device; 301. a crawler traveling chassis; 302. a rotary support connecting seat; 303. a telescopic support leg; 4. a hoisting device.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. The embodiments and features of the embodiments in the present application may be combined with each other without conflict. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that, if directional indications (such as upper, lower, left, right, front, rear, 8230; \8230;) are involved in the embodiments of the present invention, the directional indications are only used to explain the relative position relationship between the components, the motion situation, etc. under a specific posture (as shown in the attached drawings), and if the specific posture is changed, the directional indications are correspondingly contradictory to the combination of the change schemes, or cannot be realized, the combination of the technical schemes should not exist.
Referring to fig. 1 to 4: an intelligent building integrated platform comprises
A load-bearing platform 1;
the lifting devices 2 are hinged at two ends below the bearing platform 1 and are used for driving the bearing platform 1 to lift;
the traveling devices 3 are arranged at the bottoms of the lifting devices 2 and are used for driving the bearing platform 1 to move;
and the hoisting device 4 is arranged on the lifting device 2, and the bearing platform 1 is provided with a storage port for placing the suspension arm.
According to the invention, a construction worker can conveniently stand on the bearing platform 1 to perform construction operation through the bearing platform, in the construction process, the bearing platform 1 can be subjected to height adjustment through the lifting device 2 according to the construction height, construction at different heights of a steel structure workshop is facilitated, the whole integrated platform can go to the next station after the work of the stations is completed through the traveling device 3, the streamline construction of the construction worker is facilitated, a heavy object is conveniently lifted through the lifting device 4, and the transportation of materials is facilitated, the bearing platform 1, the lifting device 2, the traveling device 3 and the lifting device 4 work in a coordinated mode, a plurality of auxiliary devices such as original hanging baskets, cross-shaped frames, climbing cars and steel ladders are replaced, the operation difficulty is reduced, the construction organization is facilitated, and the construction worker can conveniently perform workshop construction.
In an embodiment, the load-bearing platform 1 includes the main platform 101 and sets up the flexible platform 102 at the main platform 101 tip, and flexible platform 102 can stretch out and draw back along the length direction of main platform 101 on the main platform 101, makes equipment can freely adjust the length of load-bearing platform 1 according to the width of factory building through flexible platform 102, makes load-bearing platform 1 can reach the construction edge of factory building.
Meanwhile, the arrangement of the telescopic platform 102 can improve the applicability of the equipment, so that the equipment can be suitable for workshops with various widths.
The telescopic platform 102 can be retracted when not in use, so that the storage space of the device is reduced, and the transportation is facilitated.
In an embodiment, the carrying platform 1 comprises a main platform 101 and a turnover platform 103 arranged on two sides of the main platform 101, one side of the turnover platform 103 is connected with the main platform 101 in a rotating mode, the other side of the turnover platform 103 can be turned over relative to the main platform 101, a telescopic turnover table is arranged on one side of the turnover platform 103 and used for synchronous operation of the telescopic platform 102 in cooperation, the operation range of constructors is increased through the turnover platform 103 and the telescopic turnover table, the carrying platform 1 is convenient to fold and store when not used, and the storage space is reduced.
In an embodiment, the lifting device 2 includes an inner support frame 201, an outer support frame 202 and a telescopic component, the inner support frame 201 is slidably disposed in the outer support frame 202, the telescopic component is located between the outer support frame 202 and the inner support frame 201, the bearing platform 1 is conveniently adjusted to a suitable construction height through the lifting device 2, and a certain inclination angle of the bearing platform 1 can be realized through the lifting device 2 according to a construction environment, so that the bearing platform 1 is kept parallel to a roof, and construction is convenient for constructors.
In one embodiment, the traveling device 3 includes a crawler traveling chassis 301 and a rotation support connection seat 302, the crawler traveling chassis 301 is connected to the lifting device 2 through the rotation support connection seat 302, and the crawler traveling chassis 301 facilitates the movement of the whole integrated platform, i.e., the whole integrated platform can be moved without disassembling the integrated platform.
In an embodiment, the periphery of the walking device 3 is provided with the telescopic support legs 303, and the whole integrated platform is conveniently supported and fixed in the construction process of the integrated platform through the telescopic support legs 303, so that the phenomenon of movement in the construction process is avoided.
In one embodiment, the telescoping support legs 303 are connected to the pivoting support connection base 302.
When the crawler traveling chassis 301 needs to turn to, the crawler traveling chassis 301 can be supported and suspended through the telescopic support legs 303 at the moment, then the crawler traveling chassis 301 is turned to by the rotary support connecting seat 302, after the crawler traveling chassis 301 is turned to, the telescopic support legs 303 reset to enable the crawler traveling chassis 301 to land, the in-situ turning of the crawler traveling chassis 301 is achieved, and the overall turning flexibility of the intelligent building integrated platform is improved.
In an embodiment, the system further comprises a control system, and the control system is used for controlling the lifting device 2, the walking device 3 and the lifting device 4 to execute relevant command actions. By the design, the equipment is more convenient to control through the control system.
In one embodiment, a plant building method comprises an intelligent building integrated platform, and the method comprises the following steps:
a plurality of intelligent building integrated platforms are sequentially arranged along the width direction of the intelligent building integrated platforms to form a plant building platform; and after the corresponding process of the current position is completed, the intelligent building integrated platform corresponding to the process is moved to the next position, and the construction of the corresponding process of the next position is carried out.
In the factory building of many strides formula, correspond respectively in every stride and be equipped with one the factory building platform, each factory building platform is under construction simultaneously.
In the construction process, four intelligent construction integrated platforms are sequentially arranged along the width direction to form a factory building construction platform, and are respectively and sequentially used for column beam frame installation, purlin installation, roof enclosing structure installation and electromechanical pipeline installation, the four intelligent construction integrated platforms are definite in division and are operated in a coordinated mode, the construction progress is improved, meanwhile, the whole integrated platform is convenient to organize, constructors can stand on the combined factory building construction platform to carry out construction operation, convenience is brought to the constructors,
in the construction process, the lifting device 4 of the integrated platform for installing the roof enclosure structure and the electromechanical pipeline can be selected according to the use requirement, if the lifting arm 4 is installed, the lifting arm 4 needs to be retracted and horizontally placed at the storage opening of the lifting arm so as not to collide with the roof when in use, and the roof is prevented from being damaged by the lifting device 4.
In one embodiment, gangboards are laid between the intelligent construction integrated platforms, so that the operation of constructors on the intelligent construction integrated platforms is convenient.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent replacements, improvements, etc. within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. An integrated platform is built to intelligence which characterized in that: comprises that
A load-bearing platform (1);
the lifting devices (2) are hinged to two ends below the bearing platform (1) and are used for driving the bearing platform (1) to lift;
the walking devices (3) are arranged at the bottoms of the lifting devices (2) and are used for driving the bearing platform (1) to move;
and the lifting device (4) is arranged on the lifting device (2).
2. An intelligent building integrated platform according to claim 1, wherein the load-bearing platform (1) comprises a main platform (101) and a telescopic platform (102) arranged at the end of the main platform (101), and the telescopic platform (102) can be telescopic on the main platform (101) along the length direction of the main platform (101).
3. The intelligent construction integrated platform as claimed in claim 1, wherein the carrying platform (1) comprises a main platform (101) and turning platforms (103) arranged on two sides of the main platform (101), and the turning platforms (103) are rotatably connected with the main platform (101) and can be turned up and down relative to the main platform (101).
4. The smart building integrated platform according to claim 1 or 2 or 3, wherein the lifting device (2) comprises an inner support frame (201), an outer support frame (202), the inner support frame (201) being slidably arranged within the outer support frame (202), and a telescopic member between the outer support frame (202) and the inner support frame (201).
5. The intelligent building integrated platform according to claim 1, 2 or 3, wherein the walking device (3) comprises a crawler walking chassis (301) and a slewing support connection base (302), and the crawler walking chassis (301) is connected with the lifting device (2) through the slewing support connection base (302).
6. The integrated platform is built to intelligence of claim 5, characterized in that, running gear (3) is provided with telescopic support leg (303) all around, telescopic support leg (303) with gyration support connecting seat (302) are connected.
7. The integrated platform of claim 6, further comprising a control system for controlling the lifting device (2), the walking device (3) and the lifting device (4) to perform relevant command actions.
8. A plant building method, characterized in that it comprises the intelligent building integrated platform according to any one of claims 1 to 7, said method comprising:
a plurality of intelligent building integrated platforms are sequentially arranged along the width direction of the intelligent building integrated platforms to form a plant building platform; and after the corresponding process of the current position is completed, the intelligent construction integrated platform corresponding to the process is moved to the next position, and the construction of the corresponding process of the next position is carried out.
9. The method for building a factory building according to claim 8, wherein in the multi-span factory building, one factory building platform is correspondingly arranged in each span, and all factory building platforms are constructed simultaneously.
10. The plant building method according to claim 8 or 9, wherein gangboards are laid between the intelligent building integrated platforms.
CN202211181755.7A 2022-09-27 2022-09-27 Intelligent construction integrated platform and factory building construction method based on platform Pending CN115506608A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202211181755.7A CN115506608A (en) 2022-09-27 2022-09-27 Intelligent construction integrated platform and factory building construction method based on platform
PCT/CN2022/130694 WO2024065964A1 (en) 2022-09-27 2022-11-08 Intelligent construction integrated platform and factory building construction method based on same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211181755.7A CN115506608A (en) 2022-09-27 2022-09-27 Intelligent construction integrated platform and factory building construction method based on platform

Publications (1)

Publication Number Publication Date
CN115506608A true CN115506608A (en) 2022-12-23

Family

ID=84505139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211181755.7A Pending CN115506608A (en) 2022-09-27 2022-09-27 Intelligent construction integrated platform and factory building construction method based on platform

Country Status (2)

Country Link
CN (1) CN115506608A (en)
WO (1) WO2024065964A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090020362A1 (en) * 2007-07-18 2009-01-22 Paramount Builders Supply Folding construction platform
JP2010275821A (en) * 2009-05-29 2010-12-09 Hitachi Plant Technologies Ltd Modular construction method for plant facility construction and surface plate for modular construction method
CN103498549A (en) * 2013-09-23 2014-01-08 河南天工建设集团有限公司 Aerial work platform for decoration in industrial factory building
CN208747510U (en) * 2018-07-18 2019-04-16 湖南进军隧道智能装备有限公司 A kind of excavation stand sling cart
CN209469446U (en) * 2018-12-12 2019-10-08 中铁工程装备集团有限公司 Tunnel gantry type automates trolley
CN215594810U (en) * 2021-09-16 2022-01-21 中青宏发集团有限公司 Construction work platform is built in room
CN217297219U (en) * 2022-04-29 2022-08-26 山东鑫顺装备制造有限公司 Special equipment for steel structure installation

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2985537B2 (en) * 1992-11-25 1999-12-06 株式会社大林組 Building construction platform
JPH0949334A (en) * 1995-08-09 1997-02-18 Fujita Corp Traveling carriage to carry building member and carrying method of building member
CN208122245U (en) * 2018-03-28 2018-11-20 中大建设股份有限公司 Truss operating platform suitable for large space construction
CN209907953U (en) * 2019-03-22 2020-01-07 台州宏丰建设有限公司 House concrete placement platform convenient to control
CN209723559U (en) * 2019-04-03 2019-12-03 南京林业大学 A kind of adjustable construction platform
CN210482950U (en) * 2019-05-06 2020-05-08 中国建筑第二工程局有限公司 Portable building construction platform
CN111422795A (en) * 2020-04-15 2020-07-17 上海核工程研究设计院有限公司 Interim top cap lift platform of reactor factory building
CN216785653U (en) * 2021-04-19 2022-06-21 中国石油大学(华东) Crawler-type rescue platform applied to flood disaster rescue

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090020362A1 (en) * 2007-07-18 2009-01-22 Paramount Builders Supply Folding construction platform
JP2010275821A (en) * 2009-05-29 2010-12-09 Hitachi Plant Technologies Ltd Modular construction method for plant facility construction and surface plate for modular construction method
CN103498549A (en) * 2013-09-23 2014-01-08 河南天工建设集团有限公司 Aerial work platform for decoration in industrial factory building
CN208747510U (en) * 2018-07-18 2019-04-16 湖南进军隧道智能装备有限公司 A kind of excavation stand sling cart
CN209469446U (en) * 2018-12-12 2019-10-08 中铁工程装备集团有限公司 Tunnel gantry type automates trolley
CN215594810U (en) * 2021-09-16 2022-01-21 中青宏发集团有限公司 Construction work platform is built in room
CN217297219U (en) * 2022-04-29 2022-08-26 山东鑫顺装备制造有限公司 Special equipment for steel structure installation

Also Published As

Publication number Publication date
WO2024065964A1 (en) 2024-04-04

Similar Documents

Publication Publication Date Title
KR102073180B1 (en) A High Place Working Vehicle
CN113874314A (en) Construction and/or material handling machine and method for guiding and moving a working head
US20020084238A1 (en) Portable lifting device
US5371993A (en) Frame construction method
US20210347614A1 (en) Cable robot
CN208843685U (en) A wide range of hydraulic three-level hoistable platform
JP2971042B2 (en) Girder transporter and girder transport method
CN115506608A (en) Intelligent construction integrated platform and factory building construction method based on platform
CN215291292U (en) Lifting device for housing construction
RU2465191C2 (en) Self-propelled double-jib crane
JP2014001034A (en) Lift vehicle
JPH0519280U (en) Overhead traveling crane device
JPH092780A (en) Jib-type traveling crane provided with jack up device
CN219620825U (en) Multifunctional overhead working truck
JPH05311867A (en) Temporarily installed beam assembly device for building construction
JP3718783B2 (en) Horizontal jib crane and traveling horizontal jib crane
CN219058310U (en) Folding door frame lifting device
JPH06286881A (en) Wind and rain preventing device in cargo handling facility
KR200354660Y1 (en) Outrigger variable Apparatus of Vehicle for Industry
JPH07300297A (en) Laterally stretchable bucket-operating platform
JPH10194676A (en) Boom crane provided with luffing jib
JPH07252094A (en) High-lift work vehicle
JPH0940382A (en) Vehicle for high lift work
JPH0720152Y2 (en) Aerial work vehicle
JPH05147887A (en) Crane truck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230801

Address after: 518107 903, Building A2, Building A1A2, China Merchants Guangming Science Park, Sightseeing Road, Fenghuang Community, Guangming District, Shenzhen, Guangdong

Applicant after: China Construction Third Engineering Bureau Yungou Robot Co.,Ltd.

Address before: 3301, Office Building 3B, Vanke Times Square, No. 85, Longcheng Avenue, Shangjing Community, Longcheng Street, Longgang District, Shenzhen, Guangdong 518000

Applicant before: China Construction Third Engineering Bureau Science and Innovation Industry Development Co.,Ltd.

TA01 Transfer of patent application right