CN115439182A - Climbing frame management system and management method thereof - Google Patents

Climbing frame management system and management method thereof Download PDF

Info

Publication number
CN115439182A
CN115439182A CN202211033733.6A CN202211033733A CN115439182A CN 115439182 A CN115439182 A CN 115439182A CN 202211033733 A CN202211033733 A CN 202211033733A CN 115439182 A CN115439182 A CN 115439182A
Authority
CN
China
Prior art keywords
module
information
client
climbing
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211033733.6A
Other languages
Chinese (zh)
Inventor
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinshengteng Technology Development Co ltd
Original Assignee
Jiangsu Xinshengteng Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xinshengteng Technology Development Co ltd filed Critical Jiangsu Xinshengteng Technology Development Co ltd
Priority to CN202211033733.6A priority Critical patent/CN115439182A/en
Publication of CN115439182A publication Critical patent/CN115439182A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/13Receivers
    • G01S19/14Receivers specially adapted for specific applications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0204Market segmentation
    • G06Q30/0205Location or geographical consideration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Strategic Management (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Human Resources & Organizations (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Signal Processing (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a climbing frame management system, which comprises a client and an enterprise end, wherein the client is connected with the enterprise end; the enterprise end comprises a budget module and a climbing frame management module; the budget module comprises an information module I, a cost module and a sale module; the client comprises an information module II, a cost module, a use monitoring module, a GPS positioning module, a plurality of sensors and monitoring equipment; compared with the prior art, the method and the system have the advantages that data collection is carried out on the service regions, economic models of different regions are formed, cost is calculated according to local actual conditions, and management of climbing frames is more flexible; according to the conditions of different customers, different leasing modes are formed, so that the management and the money return of the climbing frame at the later stage are facilitated, and the income created by the fixed assets of the climbing frame is maximized; by evaluating the credit of the customer, hierarchical differentiation management is realized, and fund backflow is smoother.

Description

Climbing frame management system and management method thereof
Technical Field
The invention relates to the field of climbing management, in particular to a climbing management system and a climbing management method.
Background
With the development of the building industry, buildings of high floors become a normal state, the safety of a construction site is particularly important, and the integrated climbing frame is produced at the right moment; the climbing frame is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type buildings. It can climb up or down along the building. The system completely changes the scaffold technology, namely, the scaffold does not need to be turned over, and the scaffold is not required to be disassembled and assembled (the scaffold is used until the construction is finished after one-time assembly), is not limited by the height of a building, and greatly saves manpower and materials. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The frame of climbing that many building sites used leases the use to practice thrift the cost, corresponding frame lease company of climbing also should transport, the management that the frame lease company climbed the frame to fixed asset that has now climbs is supervised through GPS and sensor, but on the cost analysis and the maintenance of climbing the frame, and not too many supervision lead to comparatively solidifying on the lease mode, customer's demand is pressed close to that can not be fine, causes the difficult condition of repayment in later stage difficult, recovery difficult and maintenance.
Disclosure of Invention
In order to solve the defects of the prior art, the invention aims to provide a climbing frame management system and a climbing frame management method
In order to achieve the above object, the present invention adopts the following technical solutions:
a climbing frame management system comprises a client and an enterprise end, wherein the enterprise end comprises a budget module and a climbing frame management module, and the climbing frame management module comprises a total power control module, a monitoring module and a maintenance module;
the total power control module is used for controlling the work of the climbing frame;
the monitoring module is used for monitoring the use condition of the climbing frame;
the maintenance module is used for analyzing the abnormal information of the climbing frame and giving a solution; arranging maintenance personnel and daily maintenance;
the budget module comprises an information module I, a cost module and a sale module;
the information module I is used for collecting and summarizing information of a business expansion region;
the cost module is used for analyzing the data information to form an economic model;
the sales module is used for distributing business personnel, confirming a sales scheme, signing a contract and urging payment;
the client comprises an information module II, a cost module, a use monitoring module, a GPS positioning module, a plurality of sensors and monitoring equipment;
the information module II is used for filling out consultation information and order information;
the sensor and the monitoring equipment are used for monitoring the use condition and the abnormal condition of the climbing frame and reporting errors;
the GPS positioning module is used for monitoring the specific position of the climbing frame and positioning and monitoring the climbing frame when the climbing frame is used;
the fee module is used for reminding the client of the service life, expiration reminding and renewal management of the climbing frame;
the monitoring module is used for monitoring daily use of the climbing frame, forming a working log for uploading and storing, manually reporting errors and automatically reporting errors, and applying for maintenance.
A climbing frame management method comprises the following specific steps:
s1, an information module I of an enterprise terminal performs data acquisition and analysis on a business expansion region;
s2, training the acquired data, fitting the data of the business expansion region, namely constructing an economic model by means of mathematical modeling and machine learning, completing the data of the business expansion region, and fitting the data by a least square method to form the economic model of the region;
s3, repeating S1-S2 every half year or one year, and iterating the economic model to form a latest economic model;
s4, the client consults through the client, and signs a contract through the client after the scheme is confirmed;
s5, after the customer signs a contract, the climbing frame management module receives contract information, prepares for climbing frame packing and arranges transportation; repairing the climbing frame, and renovating the place needing renovation; the electric power control system is characterized in that the electric power control system is replaced when needing to be replaced, and a total electric power control module is installed in the electric power control system of the climbing frame after the maintenance is finished; the climbing frame needs networking when in use, the climbing frame can be normally used when in networking, and the main power control module controls the power-off of the climbing frame power control system in a non-networking state; when the customer arrearage is not paid or the customer is not paid for in an overdue period, the general power control module can control the power-off of the climbing power control system; installing a GPS positioning module, starting a positioning protection function when a climbing frame is transported to a construction site required by a contract, feeding a signal back to a master power control module when the GPS positioning module detects that the climbing frame is transported out of the site during the normal use period of the contract, controlling the power-off of the master power control module, forbidding use, sending an alarm prompt to an enterprise terminal, prompting a relevant responsible person through a client terminal, forbidding transport and sending back the responsible person as soon as possible, if the climbing frame use site needs to be changed in the contract period, changing the climbing frame use site through the client terminal, receiving the change information by a climbing frame management module, modifying information of the GPS positioning module under the networking condition, prompting the client to transport the climbing frame to the relevant site within a certain time, and otherwise, reactivating and starting the climbing frame; through work and the position of total power control module and GPS orientation module control climbing frame, the lease management of the frame of being convenient for climb avoids the management to appear climbing frame management badly, the economic loss who causes.
S6, installing a plurality of sensors and monitoring equipment on the climbing frame, and enabling the sensors and the monitoring equipment to form working logs of the use condition of the climbing frame and transmit the working logs to a client and an enterprise terminal for storage;
s7, when the abnormity occurs, the alarm module feeds the abnormity information back to the client and the enterprise terminal, the client maintenance module is started, and meanwhile, the climbing operation is stopped to wait for maintenance; after the enterprise receives the information through the climbing management module, the enterprise contacts with the telephone to inquire the condition and gives technical support;
s8, performing daily maintenance and inspection on the climbing frame by the client, and performing manual error reporting and application for maintenance by the client when a problem occurs;
s9, a fee module of the client prompts the service life of the climbing frame to the client and reminds the client to renew the fee;
s10, after the use of the climbing frame is finished, the customer finishes the use through the client; the enterprise end arranges personnel to climb the rack, recover and overhaul through the rack climbing management module, and selects a nearby warehouse to store;
s11, after the climbing frame is put in a warehouse, arranging personnel to overhaul the climbing frame by a climbing frame management module, and replacing easily damaged accessories such as an electric hoist and the like; meanwhile, other accessories are renovated and maintained to wait for next warehouse-out.
As a further preferable aspect of the present invention, the specific steps in step S1 are as follows:
s1.1, enterprise personnel collect climbing frame information on a service expansion region, wherein the climbing frame information comprises a local climbing frame supplier structure, whether workers capable of overhauling climbing frames exist, overhauling cost, local land development condition and local house price, and the received information is recorded into an information module I;
s1.2, collecting basic geographic information of a service expansion region and information of a climbing frame through a network by an information module I, and updating in time, wherein the basic geographic information comprises weather, temperature, soil and the like;
and S1.3, the information module I collects the information collected in S1 and S2 and analyzes the information.
As a further preferred aspect of the present invention, the specific steps in step S4 are as follows:
s4.1, the client fills in consultation information through a consultation module in an information module II of the client, wherein the consultation information comprises a climbing frame using city, the number of climbing frames and a contact way;
s4.2, the information module II uploads the consultation information to the sales module and the budget module, and the budget module calls an economic model of the area according to the consultation information to obtain the cost;
s4.3, forming a first scheme by the cost given by the budget module through the economic model and combining the actual condition, the basic cost and the lowest profit of the area, and transmitting the first scheme to the sales module;
s4.4, the sales module distributes an operator according to the consultation information and sends the first scheme to the operator; s4.5, after the first scheme is adjusted by the salesman, contacting the customer and knowing the actual requirements of the customer;
and S4.6, according to the self condition and the requirement of the client, the salesman makes a shelf-climbing lease mode to form a contract.
The economic conditions, the building conditions and the like of the customers are analyzed to form a plurality of reasonable leasing modes, so that the condition that the customers are multi-rented but the utilization rate is low is avoided; a good cooperation mode is formed, and both parties benefit;
as a further preferred aspect of the present invention, the specific steps of the overhaul in the steps S7 and S8 are as follows:
s1, transmitting abnormal information to a climbing frame management module, and checking the abnormal information by the climbing frame management module according to built-in common problems; and provides a relevant solution;
s2, if the problem is not a common problem or cannot be solved by a conventional scheme, informing a maintenance department of telephone or video communication, and if the problem can be solved, continuing working;
s3, if the problem cannot be solved, contacting a local maintenance point to perform door maintenance;
and S4, if the door-to-door maintenance cannot be solved, dispatching related technical personnel for maintenance.
The client and the enterprise supervise the abnormal conditions at the same time, so that the abnormity can be solved in time, and the safe production is ensured; meanwhile, enterprises can monitor clients, and the phenomenon of newspaper hiding and newspaper failure is avoided.
When the abnormity occurs, if the client cannot find the abnormity in time, the enterprise can control and inquire after sale, so that the overall safety production is improved.
As a further preferred aspect of the present invention, the specific steps of the overhaul in step S9 are as follows:
s9.1, the expense module of the client displays the use expiration time of the climbing frame to the client; and carrying out renewal reminding 7 days before the expiration of the service life; reminding with yellow light 4 days before the charge renewal reminding, and reminding with red light 3 days after the charge renewal reminding; s9.2, the expense module feeds back the information to the frame climbing management module, and 3 times of manual reminding are carried out 7 days before the expiration of the service life; day 7, day 3 and day of expiration, respectively;
s9.3, if the payment is not continued due, suspending the climbing work through the total power control module and marking the client;
and S9.4, if the N times of clients are not in time for renewal, performing abnormal client management.
Through reminding many times, it is more humanized to urge to pay, can guarantee the interests of enterprise simultaneously, makes the management of climbing the frame more reasonable.
As a further preferred embodiment of the present invention, the specific steps of the exception client management are as follows:
s1, setting a period of early renewal and a reminding period;
s2, changing a cooperation mode when the next round of cooperation is carried out; including increased cost, increased deposit, reduced life cycle, etc.;
and S3, when the abnormal client normally uses the abnormal client for 3-5 times, the abnormal client is marked and normally manages.
As a further preferable aspect of the present invention, the specific steps of the recovery and maintenance in step S10 are as follows:
s10.1, when the climbing frame is recovered, checking is carried out, and if no problem exists, the climbing frame is directly recovered;
s10.2, if the problem exists, judging whether the damage is considered;
s10.3, if the damage is considered, carrying out compensation;
and S10.4, if the artificial damage is not caused, recovering.
The invention has the advantages that: according to the invention, data collection is carried out on the business regions, so that economic models of different regions are formed, and cost is calculated according to the actual local conditions, so that the management of climbing frames is more flexible; according to the conditions of different customers, different leasing modes are formed, so that the management and the money return of the climbing frame at the later stage are facilitated, and the income created by the fixed assets of the climbing frame is maximized; by evaluating the credit of the customer, hierarchical differentiation management is realized, and fund backflow is smoother; through the GPS positioning module and the networking requirement, the position of the climbing frame can be better monitored, the climbing frame is prevented from being lost, and the assets of an enterprise are prevented from being damaged; through setting up and overhauling the module; the climbing frame is subjected to daily maintenance, regular maintenance and recovery and delivery maintenance, the quality of the climbing frame is ensured, and the safe use of the climbing frame is improved; the labor cost expenditure of enterprises can be controlled through cooperation with the maintainers climbing the shelf rental lot; by providing a sensor. The supervisory equipment monitors the daily use of climbing the frame, through two enterprise's end and the dual control of customer end, can improve unusual discovery probability, improves the safety in production nature, when appearing unusual, can supervise the maintenance the very first time.
Drawings
FIG. 1 is a system framework diagram of the present invention.
Detailed Description
The invention is described in detail below with reference to the figures and the embodiments.
The first embodiment is as follows:
with reference to fig. 1, a rack climbing management system includes a client and an enterprise.
The enterprise end comprises a budget module and a climbing frame management module, wherein the climbing frame management module comprises a total power control module, a monitoring module and a maintenance module; the main power control module is used for controlling the climbing frame to work; the monitoring module is used for monitoring the use condition of the climbing frame; the maintenance module is used for analyzing the abnormal information of the climbing frame and giving a solution; scheduling maintenance personnel and scheduling routine maintenance.
The budget module comprises an information module I, a cost module and a sale module; the information module I is used for collecting and summarizing information of a business expansion region; the cost module is used for analyzing the data information to form an economic model; the sales module is used for distributing business personnel, confirming a sales scheme, signing a contract and urging payment.
The client comprises an information module II, a cost module, a use monitoring module, a GPS positioning module, a plurality of sensors and monitoring equipment; the information module II is used for filling out consultation information and order information; the sensor and the monitoring equipment are used for monitoring the use condition and the abnormal condition of the climbing frame and reporting errors; the GPS positioning module is used for monitoring the specific position of the climbing frame and positioning and monitoring the climbing frame when the climbing frame is used; the fee module is used for reminding the client of the service life, expiration reminding and renewal management of the climbing frame; the monitoring module is used for monitoring daily use of the climbing frame, forming a working log for uploading and storing, manually reporting errors and automatically reporting errors, and applying for maintenance.
A climbing frame management method comprises the following specific steps:
s1, an information module I of an enterprise terminal performs data acquisition and analysis on a business expansion region.
The method comprises the following specific steps:
s1.1, enterprise personnel collect climbing frame information of a service expansion region, wherein the climbing frame information comprises a local climbing frame supplier structure, whether workers capable of overhauling climbing frames and overhauling cost, local land development conditions and local house price, and the received information is recorded into an information module I.
S1.2, collecting basic geographic information of a service expansion region and information of a climbing frame through a network by an information module I, and updating in time, wherein the basic geographic information comprises weather, temperature, soil and the like.
And S1.3, the information module I collects the information collected in S1 and S2 and analyzes the information.
S2, training the acquired data, fitting the data of the business expansion region, namely constructing an economic model through mathematical modeling and machine learning means, completing the data of the business expansion region, and fitting the data through a least square method to form the economic model of the region.
And S3, repeating S1-S2 every half year or one year, and iterating the economic model to form the latest economic model.
And S4, the client consults through the client, and signs a contract through the client after the scheme is confirmed.
The method comprises the following specific steps:
and S4.1, the client fills out the consultation information through a consultation module in the information module II of the client, wherein the consultation information comprises the city for climbing the shelves, the number of the climbing shelves and the contact way.
And S4.2, the information module II uploads the consultation information to the sales module and the budget module, and the budget module calls an economic model of the area according to the consultation information to obtain the cost.
And S4.3, forming a first scheme by combining the cost given by the economic model by the budget module and the actual situation, the basic cost and the lowest profit of the region, and transmitting the first scheme to the sales module.
And S4.4, the sales module allocates the salesman according to the consultation information and sends the first scheme to the salesman. And S4.5, after the first scheme is adjusted by the salesman, contacting the customer and knowing the actual requirements of the customer.
And S4.6, according to the self condition and the requirement of the customer, the salesman formulates a shelf-climbing leasing mode to form a contract.
The economic conditions, the building conditions and the like of the customers are analyzed to form a plurality of reasonable leasing modes, so that the condition that the customers rent more but have low utilization rate is avoided; and a good cooperation mode is formed, and the two parties benefit.
S5, after the customer signs a contract, the climbing frame management module receives contract information, prepares for climbing frame packing and arranges transportation; repairing the climbing frame, and renovating the places needing renovation; the electric power control system is characterized in that the electric power control system is replaced when needing to be replaced, and after the maintenance is finished, a total electric power control module is installed in the climbing frame electric power control system; the climbing frame needs networking when in use, the climbing frame can be normally used when in networking, and the main power control module controls the power-off of the climbing frame power control system in a non-networking state; when the customer arrearage is not paid or the customer is not paid for in an overdue period, the general power control module can control the power-off of the climbing power control system; installing a GPS positioning module, starting a positioning protection function when the climbing frame is transported to a construction site required by a contract, when the GPS positioning module detects that the climbing frame is transported out of the site during the normal use period of the contract, feeding a signal back to a total power control module, controlling the power off of the total power control module, forbidding use, sending an alarm prompt to an enterprise terminal, prompting a relevant responsible person through a client, forbidding transport and sending back the request as soon as possible, if the using land of the climbing frame needs to be changed in the contract period, changing the using land of the climbing frame by the client, after the climbing frame management module receives the change information, modifying the information of the GPS positioning module under the networking condition, prompting the client to transport the climbing frame to the relevant site within a certain time, and otherwise, reactivating the climbing frame; through work and the position of climbing the frame of total power control module and GPS orientation module control, the lease management of the frame of being convenient for climb avoids the management to appear climbing the frame management not good, the economic loss who causes.
And S6, installing a plurality of sensors and monitoring equipment on the climbing frame, and enabling the sensors and the monitoring equipment to form working logs of the use condition of the climbing frame and transmit the working logs to the client and the enterprise terminal for storage.
S7, when the abnormity occurs, the alarm module feeds the abnormity information back to the client and the enterprise terminal, the client maintenance module is started, and meanwhile, the climbing work is stopped to wait for maintenance; and after the enterprise terminal receives the information through the climbing management module, the enterprise terminal contacts with the telephone to inquire the condition and gives technical support.
And S8, performing daily maintenance and inspection on the climbing frame by the client, and manually reporting errors and applying for overhaul by the client when a problem occurs.
The specific steps of the overhaul in the steps S7 and S8 are as follows:
s1, transmitting the abnormal information to a climbing frame management module, checking the abnormal information by the climbing frame management module according to a built-in common problem pair, and giving a relevant solution.
And S2, if the problem is not a common problem or cannot be solved by the conventional scheme, informing a maintenance department of telephone or video communication, and if the problem can be solved, continuing working.
And S3, if the problem cannot be solved, contacting a local maintenance point to perform door-to-door maintenance.
And S4, if the door-to-door maintenance cannot be solved, dispatching related technical personnel for maintenance.
The client and the enterprise supervise abnormal conditions at the same time, so that the abnormity can be solved in time, and the safety production is ensured. Meanwhile, enterprises can monitor clients, and the phenomenon of newspaper hiding and newspaper failure is avoided.
When the abnormity appears, if the client fails to find in time, the enterprise can control and inquire after sale, so that the overall safety production is improved.
And S9, the expense module of the client prompts the service life of the climbing frame to the client and reminds the client to renew the expense.
The specific steps of the overhaul are as follows:
s9.1, the expense module of the client displays the use expiration time of the climbing frame to the client; and carrying out renewal reminding 7 days before the expiration of the service life; the reminding is carried out by yellow light 4 days before the charge renewal reminding, and by red light 3 days after the charge renewal reminding. S9.2, the expense module feeds back the information to the frame climbing management module, and 3 times of manual reminding are carried out 7 days before the expiration of the service life; day 7, day 3 and day of expiration, respectively.
And S9.3, if the payment is not continued due to the expiration, suspending the rack climbing work through the total power control module, and marking the client.
And S9.4, if the N times of clients are not in time for renewal, abnormal client management is carried out.
Through reminding many times, it is more humanized to urge to pay, can guarantee the interests of enterprise simultaneously, makes the management of climbing the frame more reasonable.
The specific steps of abnormal customer management are as follows:
s1, setting an early charging period and an increasing reminding period.
S2, changing a cooperation mode in the next round of cooperation; including increased cost, increased deposit, decreased life cycle, etc.
And S3, when the abnormal client normally uses the abnormal client for 3-5 times, the abnormal client is unmarked and is normally managed.
S10, after the use of the climbing frame is finished, the customer finishes the use through the client; the enterprise end arranges personnel through climbing a management module and climbs a frame and retrieve to select warehouse nearby and store.
The specific steps of recovery and maintenance are as follows:
s10.1, when the climbing frame is recovered, checking is carried out, and if no problem exists, the climbing frame is directly recovered.
S10.2, if the problem exists, judging whether the damage is considered.
And S10.3, if the damage is considered, carrying out compensation.
And S10.4, if the artificial damage is not caused, recovering.
S11, after the climbing frame is put in a warehouse, arranging personnel to overhaul the climbing frame by a climbing frame management module, and replacing easily damaged accessories such as an electric hoist and the like; meanwhile, other accessories are renovated and maintained to wait for next warehouse-out.
According to the climbing management system and the climbing management method, the economic models of different regions are formed by collecting data of service regions, and the cost is calculated according to the local actual condition, so that the climbing management is more flexible; according to the conditions of different customers, different leasing modes are formed, so that the management and the money return of the climbing frame at the later stage are facilitated, and the income created by the fixed assets of the climbing frame is maximized; by evaluating the credit of the customer, hierarchical differentiation management is realized, and fund backflow is smoother; through the GPS positioning module and the networking requirement, the position of the climbing frame can be better monitored, the climbing frame is prevented from being lost, and the assets of an enterprise are prevented from being damaged; through setting up and overhauling the module; the climbing frame is subjected to daily maintenance, regular maintenance and recovery and delivery maintenance, the quality of the climbing frame is ensured, and the safe use of the climbing frame is improved; the manpower cost expenditure of enterprises can be controlled by cooperation with the maintainers climbing the frame rental land; by providing a sensor. The supervisory equipment monitors the daily use of climbing the frame, through two enterprise's end and the dual control of customer end, can improve unusual discovery probability, improves the safety in production nature, when appearing unusual, can supervise the maintenance the very first time.
The foregoing shows and describes the general principles, principal features and advantages of the invention. It should be understood by those skilled in the art that the above embodiments do not limit the present invention in any way, and all technical solutions obtained by using equivalent alternatives or equivalent variations fall within the scope of the present invention.

Claims (8)

1. A climbing frame management system comprises a client and an enterprise end, and is characterized in that the enterprise end comprises a budget module and a climbing frame management module, and the climbing frame management module comprises a total power control module, a monitoring module and a maintenance module;
the total power control module is used for controlling the work of the climbing frame;
the monitoring module is used for monitoring the use condition of the climbing frame;
the maintenance module is used for analyzing the abnormal information of the climbing frame and giving a solution; arranging maintenance personnel and daily maintenance;
the budget module comprises an information module I, a cost module and a sales module;
the information module I is used for collecting and summarizing information of a business expansion region;
the cost module is used for analyzing the data information to form an economic model;
the sales module is used for distributing service personnel, confirming a sales scheme, signing a contract and expediting payment;
the client comprises an information module II, a cost module, a use monitoring module, a GPS positioning module, a plurality of sensors and monitoring equipment;
the information module II is used for filling out consultation information and order information;
the sensor and the monitoring equipment are used for monitoring the use condition and the abnormal condition of the climbing frame and reporting errors;
the GPS positioning module is used for monitoring the specific position of the climbing frame and positioning and monitoring the climbing frame when the climbing frame is used;
the fee module is used for reminding the client of the service life, expiration reminding and renewal management of the climbing frame;
the monitoring module is used for monitoring daily use of the climbing frame, forming a working log, uploading and storing the working log, reporting errors manually and automatically, and applying for maintenance.
2. A management method for climbing shelves is characterized by comprising the following specific steps:
s1, an information module I of an enterprise terminal performs data acquisition and analysis on a business expansion region;
s2, training the acquired data, fitting the data of the business expansion region, namely constructing an economic model through mathematical modeling and machine learning means;
s3, repeating S1-S2 every half year or one year, and iterating the economic model to form a latest economic model;
s4, the client consults through the client, and after the scheme is confirmed, a contract is signed through the client;
s5, after the client signs a contract, the climbing frame management module receives contract information, prepares climbing frame packaging and arranges transportation;
s6, installing a plurality of sensors and monitoring equipment on the climbing frame, and enabling the sensors and the monitoring equipment to form working logs of the use condition of the climbing frame and transmit the working logs to a client and an enterprise terminal for storage;
s7, when the abnormity occurs, the alarm module feeds the abnormity information back to the client and the enterprise terminal, the client maintenance module is started, and meanwhile, the climbing operation is stopped to wait for maintenance; after the enterprise receives the information through the climbing management module, the enterprise contacts with the telephone to inquire the condition and gives technical support;
s8, performing daily maintenance and inspection on the climbing frame by a client, and manually reporting errors and applying for maintenance by the client when a problem occurs;
s9, a fee module of the client prompts the service life of the climbing frame to the client and reminds the client to renew the fee;
s10, after the use of the climbing frame is finished, the customer finishes the use through the client; the enterprise end arranges personnel to climb the rack, recover and overhaul through the rack climbing management module, and selects a nearby warehouse to store;
s11, after the climbing frame enters the warehouse, the climbing frame management module arranges personnel to perform climbing frame maintenance.
3. The rack climbing management method according to claim 1, wherein the specific steps in the step S1 are as follows:
s1.1, enterprise personnel collect climbing information of a business expansion region and input received information into an information module I;
s1.2, collecting basic geographic information and climbing information of a service expansion region through a network by an information module I, and updating in time;
and S1.3, the information module I collects the information collected in S1 and S2 and analyzes the information.
4. The rack climbing management method according to claim 1, wherein the specific steps in the step S4 are as follows:
s4.1, the client fills out consultation information through a consultation module in an information module II of the client;
s4.2, the information module II uploads the consultation information to the sales module and the budget module, and the budget module calls an economic model of the area according to the consultation information to obtain the cost;
s4.3, forming a first scheme by the cost given by the budget module through the economic model and combining the actual situation, the basic cost and the lowest profit of the region, and transmitting the first scheme to the sales module;
s4.4, the sales module allocates an operator according to the consultation information and sends the first scheme to the operator; s4.5, after the first scheme is adjusted by the salesman, contacting the customer and knowing the actual requirements of the customer;
and S4.6, according to the self condition and the requirement of the customer, the salesman formulates a shelf-climbing leasing mode to form a contract.
5. The rack climbing management method according to claim 1, wherein the specific steps of the maintenance in steps S7 and S8 are as follows:
s1, transmitting abnormal information to a climbing frame management module, and checking the abnormal information by the climbing frame management module according to built-in common problems; and relevant solutions are given;
s2, if the common problems are not solved or the problems cannot be solved by the conventional scheme, informing a maintenance department of telephone or video communication, and if the problems can be solved, continuing working;
s3, if the problem cannot be solved, contacting a local maintenance point to perform door-to-door maintenance;
and S4, if the door-to-door maintenance cannot be solved, dispatching related technical personnel for maintenance.
6. The rack climbing management method according to claim 1, wherein the specific steps of the maintenance in the step S9 are as follows:
s9.1, a cost module of the client displays the use expiration time of the climbing frame to the client; and carrying out renewal reminding 7 days before the expiration of the service life; reminding with yellow light 4 days before the charge renewal reminding, and reminding with red light 3 days after the charge renewal reminding; s9.2, the expense module feeds back the information to the frame climbing management module, and 3 times of manual reminding are carried out 7 days before the expiration of the service life; day 7, day 3 and day of expiration, respectively;
s9.3, if the payment is not continued due, suspending the climbing work through the total power control module and marking the client;
and S9.4, if the N times of clients are not in time for renewal, performing abnormal client management.
7. The rack-climbing management method according to claim 6, wherein the specific steps of the abnormal customer management are as follows:
s1, setting an early charging period and an increasing reminding period;
s2, changing a cooperation mode in the next round of cooperation;
and S3, when the abnormal client normally uses the abnormal client for 3-5 times, the abnormal client is unmarked and is normally managed.
8. The rack climbing management method according to claim 1, wherein the specific steps of recovering and repairing in the step S10 are as follows:
s10.1, when the climbing frame is recovered, checking is carried out, and if no problem exists, the climbing frame is directly recovered;
s10.2, if the problem exists, judging whether the damage is considered;
s10.3, if the damage is considered, carrying out compensation;
and S10.4, if the artificial damage is not caused, recovering.
CN202211033733.6A 2022-08-26 2022-08-26 Climbing frame management system and management method thereof Withdrawn CN115439182A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211033733.6A CN115439182A (en) 2022-08-26 2022-08-26 Climbing frame management system and management method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211033733.6A CN115439182A (en) 2022-08-26 2022-08-26 Climbing frame management system and management method thereof

Publications (1)

Publication Number Publication Date
CN115439182A true CN115439182A (en) 2022-12-06

Family

ID=84243879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211033733.6A Withdrawn CN115439182A (en) 2022-08-26 2022-08-26 Climbing frame management system and management method thereof

Country Status (1)

Country Link
CN (1) CN115439182A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117115863A (en) * 2023-10-24 2023-11-24 中建三局集团华南有限公司 Intelligent monitoring method and system for climbing frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117115863A (en) * 2023-10-24 2023-11-24 中建三局集团华南有限公司 Intelligent monitoring method and system for climbing frame
CN117115863B (en) * 2023-10-24 2024-02-09 中建三局集团华南有限公司 Intelligent monitoring method and system for climbing frame

Similar Documents

Publication Publication Date Title
CN108915771B (en) Cloud control mine comprehensive management system
CN112016908A (en) BIM-based construction progress monitoring method and system, electronic equipment and storage medium
JP2002188183A (en) Management device for construction equipment
CN111932077A (en) TPM (trusted platform Module) whole-person production maintenance platform and method based on Internet of things
CN109214679A (en) A kind of projects management system based on Building Information Model
CN115439182A (en) Climbing frame management system and management method thereof
CN111507681A (en) Building engineering integrated management system
CN114254982A (en) Smart factory cloud management system
CN112286994A (en) Glass curtain wall integrated management platform
CN111784138A (en) Enterprise management system
CN112230617A (en) Integrated industrial intelligent management and control system
CN115759755A (en) Information management system of industrial internet double prevention mechanism
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN114677117A (en) Building engineering management system and device
CN110705725A (en) Elevator maintenance system, method and equipment
CN110599368A (en) DBM intelligent building management tool
CN112085523A (en) BIM engineering information management method and system
CN116579831A (en) Intelligent climbing frame management system
CN116227872A (en) Enterprise equipment management method and system based on project equipment actual use analysis
CN110825039A (en) Maintenance remote monitoring system for Popu equipment and control method thereof
CN113869887B (en) Cloud-built big data management system and method thereof
CN114022125A (en) Engineering quantity calculation method, storage medium, and apparatus
CN112801314A (en) Intelligent service method and system for coal mine enterprises
JP2002121775A (en) Display unit for work machine
CN114493138A (en) Land-air integrated intelligent construction system and management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20221206