CN115419300B - Integral bathroom with sewage utilization function - Google Patents

Integral bathroom with sewage utilization function Download PDF

Info

Publication number
CN115419300B
CN115419300B CN202211225898.3A CN202211225898A CN115419300B CN 115419300 B CN115419300 B CN 115419300B CN 202211225898 A CN202211225898 A CN 202211225898A CN 115419300 B CN115419300 B CN 115419300B
Authority
CN
China
Prior art keywords
sewage
pipe
water
communicated
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211225898.3A
Other languages
Chinese (zh)
Other versions
CN115419300A (en
Inventor
韩宇琪
陈起建
罗齐鸣
张根旺
张晓林
傅义铁
方碧锋
陈明
王强
李佛
李源
崔文涛
赵亚鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202211225898.3A priority Critical patent/CN115419300B/en
Publication of CN115419300A publication Critical patent/CN115419300A/en
Application granted granted Critical
Publication of CN115419300B publication Critical patent/CN115419300B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • E03B1/042Details thereof, e.g. valves or pumps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • E03C1/1222Arrangements of devices in domestic waste water pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • E03B2001/045Greywater supply systems using household water

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The invention discloses an integral bathroom with sewage utilization, which belongs to the technical field of integral bathroom structures, and utilizes the prefabrication of a base plate, a sewage tank is arranged in the base plate, and a flushing part for collecting sewage is directly added, the flushing part can be used for flushing a urinal with sewage and flushing the urinal with purified water through an adjusting valve, a large amount of stored sewage is reasonably utilized, the space on two sides of a piston block in a water storage cylinder is changed through the movement of the piston block in the water storage cylinder, the space on two sides of the piston block is respectively used for temporarily storing the sewage and the purified water, and finally the sewage or the purified water is output to the urinal through the pressure of water pressure, so that the effect of flushing the urinal is achieved; the integral bathroom can reasonably store and utilize sewage flowing down during bath, avoid waste of water resources and has great significance of environmental protection.

Description

Integral bathroom with sewage utilization function
Technical Field
The invention belongs to the technical field of integral bathroom structures, and particularly relates to an integral bathroom with sewage utilization.
Background
The traditional house and apartment bathroom wall body adopts the building block to build more, and the process construction such as additional plastering, waterproof, tiling, furred ceiling have construction process loaded down with trivial details, construction cycle is longer, the high grade shortcoming of construction cost, and integral complete sets bathroom is as a novel industrialization product, mainly comprises waterproof chassis, wallboard, roof and four parts of door frame section bar, and all materials are by the production and processing of specialized factory, and on-the-spot only need simply assemble can accomplish, have advantages such as safe pleasing to the eye, construction is convenient, green.
The existing integral bathroom is often installed in a large factory or a temporary multi-person place, has a large number of crowd use frequencies, and when people take a bath, a large amount of sewage is directly discharged through a sewer, and the sewage has a great practical utilization value and is directly discharged, so that the integral bathroom is a waste of water resources.
Disclosure of Invention
In view of the above, an object of the present invention is to provide an integrated bathroom with sewage utilization, which can utilize sewage from a bath and save water resources by providing a sewage tank and a flushing part.
In order to achieve the above purpose, the present invention provides the following technical solutions:
the bathroom comprises a base plate, a wall plate and a top plate, wherein a sewage tank is formed in the base plate, a sewer hole communicated with the sewage tank is formed in the base plate, a flushing part is communicated with the bottom of the sewage tank, the flushing part comprises a horizontally arranged cylindrical water storage barrel, a piston block matched with the inner side of the water storage barrel is movably arranged in the water storage barrel, a column pipe is communicated with the left end of the water storage barrel, a pushing column is movably arranged in the column pipe, the end part of the pushing column is provided with a piston head matched with the inner side of the column pipe, the tail end of the pushing column is communicated with a pressure water pipe and a pressure relief pipe, the top of the left end of the water storage barrel is also respectively communicated with a sewage pipe and a sewage output pipe, and the top of the right end of the water storage barrel is respectively communicated with a water purifying pipe and a water purifying output pipe;
the utility model discloses a sewage treatment device, including a water storage cylinder, a control valve, a pressure pipe, a pressure relief pipe, a sewage output pipe, a water purification pipe and a water purification output pipe all communicate on a control valve, the pressure pipe passes through the control valve communicates to the input water pipe, the pressure relief pipe passes through the control valve communicates to water storage cylinder left end top, the sewage pipe passes through the control valve communicates to the sewage groove, the sewage output pipe passes through the control valve communicates to the urinal, the water purification pipe passes through the control valve communicates to the input water pipe, the water purification output pipe passes through the control valve communicates to the urinal.
Further, the control valve comprises a driving part, a valve cylinder and a valve core, wherein the valve cylinder is cylindrical, the valve core is cylindrical, the valve cylinder is transversely arranged above the water storage cylinder, six vertical through pipes are respectively communicated with the upper side and the lower side of the valve cylinder, one end of the valve core is connected with a rotating shaft, three first through holes and three second through holes are formed in the valve core, the axes of the first through holes and the second through holes are arranged in a crossing mode and are perpendicular to the axis of the valve cylinder, the rotating shaft penetrates out of one end of the valve cylinder and drives the rotating shaft to rotate through the driving part, so that when three through pipes are simultaneously opened, the other three through pipes are simultaneously closed, the three synchronous through pipes are respectively connected to the pressure water pipe, the sewage pipe and the clean water flushing pipe, and the other three synchronous through pipes are respectively communicated with the pressure relief pipe, the sewage output pipe and the clean water pipe.
Further, the drive portion includes gear, rack and electric jar, the gear sets up the pivot tip, the gear with the rack intermeshing, the rack both ends are provided with the baffle, the electric jar rigid coupling is in the one end of rack and drive the rack reciprocating motion, the gear removes to the rack tip is supported when on the baffle, wherein three the siphunculus is opened.
Further, an electric control switch for controlling the electric cylinder to operate is also arranged on the surrounding wall plate.
Further, still be provided with foot switch on the enclosing wall board, foot switch includes the running-board, even post, spring and moves the board, move the board vertical movement and be in inside the bed plate, move and offer the guide way of slant on the board, the one end at the side edge of rack has set firmly the guide pin, the guide pin slides and establishes in the guide way, even the post is fixed move the board upper end, even the post is fixed even the post upper end, set up the board groove on the enclosing wall board, the running-board part is followed the board groove stretches out, spring coupling is in the running-board with between the board tank bottom.
Further, the water-proof device also comprises a water-proof plate, wherein the water-proof plate is embedded in the base plate and is positioned above the flushing part and the electric cylinder.
Further, the sewage tank is arranged inside the edge of the base plate in a surrounding mode, the bottom surface of the sewage tank is an inclined surface, the lower water hole is formed in the top surface of the highest point of the sewage tank, and the lowest point of the sewage tank is communicated with the flushing part.
Furthermore, two rings of baffle rings are further arranged in the water storage cylinder, the piston blocks are arranged between the two rings of baffle rings, and the communication positions on the water storage cylinder are all located at the outer sides of the baffle rings.
The invention has the beneficial effects that:
1. the invention utilizes the prefabrication of the base plate, a sewage tank is arranged in the base plate, and a flushing part for collecting sewage is directly added, the flushing part can realize the twice flushing of the sewage flushing urinal and the clean water flushing urinal through the regulating valve, a large amount of stored sewage is reasonably utilized, the space on two sides of a piston block in the water storage barrel is changed by the movement of the piston block in the water storage barrel, the space on two sides of the piston block respectively stores the sewage and the clean water temporarily, and finally the sewage or the clean water is output to the urinal through the pressure of water pressure, so that the effect of flushing the urinal is achieved; the integral bathroom can reasonably store and utilize sewage flowing down during bath, avoid waste of water resources and has great significance of environmental protection.
2. The invention also designs the control valve, which can realize the direct and rapid switching of the sewage storage state and the purified water storage state by rotating the rotating shaft left and right, and ensures the three-switch and three-switch states of the six through pipes along with the state of the rotating shaft in real time by synchronous rotation of the three first through holes and the three second through holes which are opened on the valve core, thereby ensuring the realization of the sewage storage state and the purified water storage state and avoiding the conflict of the two states caused by the asynchronous pipeline.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objects and other advantages of the invention may be realized and obtained by means of the instrumentalities and combinations particularly pointed out in the specification.
Drawings
In order to make the objects, technical solutions and advantageous effects of the present invention more clear, the present invention provides the following drawings for description:
FIG. 1 is an internal schematic view of an overall bathroom according to an embodiment of the present invention;
FIG. 2 is a first schematic view of a flush portion and a flush valve according to an embodiment of the present invention;
FIG. 3 is a second schematic view of a flush portion and a flush valve according to an embodiment of the present invention;
FIG. 4 is a cross-sectional view of an embodiment of the water reservoir of the present invention;
FIG. 5 is a schematic view of a valve cartridge according to an embodiment of the present invention;
FIG. 6 is a schematic diagram of a valve core according to an embodiment of the present invention;
fig. 7 is a schematic view showing the position of a waterproof board according to an embodiment of the present invention;
FIG. 8 is a schematic view of a sump according to an embodiment of the invention on a base plate;
the figures are marked as follows: 1. a base plate; 11. a sewage tank; 12. a water outlet hole; 2. wall panels; 21. a plate groove; 3. a top plate; 4. a flushing part; 41. a water storage cylinder; 411. a piston block; 412. a column tube; 4121. pushing a column; 4122. a piston head; 413. a baffle ring; 414. a pressure water pipe; 415. a pressure relief tube; 416. a sewage pipe; 417. a sewage output pipe; 418. a water purifying pipe; 419. purified water output pipe; 5. a control valve; 51. a driving section; 511. a gear; 512. a rack; 5121. a baffle; 5122. a guide pin; 513. an electric cylinder; 52. a valve cylinder; 521. a through pipe; 53. a valve core; 531. a rotating shaft; 532. a first through hole; 533. a second through hole; 54. an electric control switch; 55. a foot switch; 551. a foot pedal; 552. connecting columns; 553. a spring; 554. moving the plate; 5541. a guide groove; 6. and (3) a waterproof board.
Detailed Description
As shown in fig. 1-8, the invention provides an integral bathroom with sewage utilization, which comprises a bathroom formed by combining a base plate 1, a wall plate 2 and a top plate 3, wherein a sewage tank 11 is arranged in the base plate 1, as shown in fig. 8, the sewage tank 11 is arranged around the inside of the edge of the base plate 1, the bottom surface of the sewage tank 11 is a diagonal inclined surface, under the condition that the bearing capacity of the middle part of the base plate 1 is ensured, the edge of the base plate 1 is provided with the sewage tank 11 with a larger water storage space, the top surface of the highest point of the sewage tank 11 is provided with a lower water hole 12, the lowest point of the sewage tank 11 is communicated with a flushing part 4, sewage after bathing in the bathroom flows into the lower water hole 12, and is stored in the sewage tank 11, and is used for flushing a urinal by the flushing part 4, and referring to fig. 2, 3 and 4, the flushing part 4 comprises a cylinder-shaped water storage cylinder 41, the inside of the water storage cylinder 41 is movably provided with a piston 411 matched with the inside of the water storage cylinder 41, the left end 412 is communicated with a water storage cylinder 412 and the right end 412 is communicated with a water storage cylinder 4121, the top end of the water cylinder 4121 is communicated with the top end of the water storage cylinder 4121, and the top end of the water storage cylinder 4121 is communicated with the top end of the water cylinder 4121 is communicated with the top of the water cylinder 4121; two circles of baffle rings 413 are further arranged in the water storage cylinder 41, the piston blocks 411 are arranged between the two circles of baffle rings 413, and the communication positions on the water storage cylinder 41 are all located outside the baffle rings 413;
the pressure water pipe 414, the pressure relief pipe 415, the sewage pipe 416, the sewage output pipe 417, the water purifying pipe 418 and the water purifying output pipe 419 are all communicated on one control valve 5, the pressure water pipe 414 is communicated to an input water pipe through the control valve 5, the pressure relief pipe 415 is communicated to the top of the left end of the water storage cylinder 41 through the control valve 5, the sewage pipe 416 is communicated to the sewage tank 11 through the control valve 5, the sewage output pipe 417 is communicated to a urinal through the control valve 5, the water purifying pipe 418 is communicated to the input water pipe through the control valve 5, and the water purifying output pipe 419 is communicated to the urinal through the control valve 5.
When the flushing part 4 is used, the sewage flushing and the clear water flushing of the urinal can be controlled at one time through the control valve 5, the states of the pressure water pipe 414 which is opened, the pressure relief pipe 415 which is closed, the sewage pipe 416 which is opened, the sewage output pipe 417 which is closed, the purified water pipe 418 which is opened and the purified water pipe 418 which is closed are set to be sewage storage states, at the moment, the water pressure pushes the push column 4121 to move to the right of the water storage cylinder 41, the push column 4121 pushes the piston block 411 to move to the position of the baffle ring 413 at the rightmost end, at the moment, the left side of the piston block 411 forms a space for temporarily storing sewage, and the sewage is input into the water storage cylinder 41 through the opened sewage pipe 416; the state when the pressure water pipe 414 is closed, the pressure relief pipe 415 is opened, the sewage pipe 416 is closed, the sewage output pipe 417 is opened, the water purifying pipe 418 is closed, and the water purifying pipe 418 is opened is in a water purifying storage state, at this time, purified water is input into the right end of the water storage cylinder 41 from the opened water purifying pipe 418, and the piston block 411 is pushed by water pressure to move left to the position of the baffle ring 413 at the leftmost end of the water storage cylinder 41, at this time, the right side of the piston block 411 forms a space for temporarily storing purified water; when the sewage storage state is transferred to the purified water storage state by the regulating control valve 5, the piston block 411 moves left and outputs the left sewage to the urinal through the opened sewage output pipe 417, so as to achieve the effect of flushing the urinal with sewage; when the control valve 5 is adjusted to transfer the clean water storage state to the sewage storage state, the piston block 411 moves to the right and outputs the clean water on the right to the urinal through the opened clean water output pipe 419, thereby achieving the effect of flushing the urinal with clean water.
The integrated bathroom utilizes the prefabrication of the base plate 1, a sewage tank 11 is arranged in the base plate 1, and a flushing part for collecting sewage is directly added, the flushing part can realize the twice flushing of the sewage flushing urinal and the clean water flushing urinal through the regulating valve, a large amount of stored sewage is reasonably utilized, the space on two sides of a piston block 411 in the water storage barrel 41 is changed by the movement of the piston block 411 in the water storage barrel 41, the space on two sides of the piston block 411 is respectively used for temporarily storing the sewage and the clean water, and finally the sewage or the clean water is output to the urinal through the pressure of water pressure, so that the effect of flushing the urinal is achieved; the integral bathroom can reasonably store and utilize sewage flowing down during bath, avoid waste of water resources and has great significance of environmental protection.
In a further scheme, referring to fig. 3, 5 and 6, the control valve 5 includes a driving portion 51, a valve barrel 52 and a valve core 53, the valve barrel 52 is cylindrical, the valve core 53 is cylindrical, the valve barrel 52 is horizontally disposed above the water storage barrel 41, six vertical through pipes 521 are respectively connected to the upper side and the lower side of the valve barrel 52, one end of the valve core 53 is connected with a rotating shaft 531, three first through holes 532 and three second through holes 533 are formed in the valve core 53, axes of the first through holes 532 and the second through holes 533 are disposed in a crossing manner and are perpendicular to the axes of the valve barrel 52, axes of the first through holes 532 and the second through holes 533 are perpendicular to each other, the rotating shaft 531 penetrates out of one end of the valve barrel 52 and is driven to rotate by the driving portion 51, when three through pipes 521 are simultaneously opened, the other three through pipes 521 are simultaneously closed, and the three synchronous through pipes 521 are respectively connected to the pressure water pipe 414, the sewage pipe 416, the other three sewage pipe 418 and the clean water pipe 521 are simultaneously connected to the pressure relief pipe 417.
Through this control valve 5, can realize directly quick to sewage storage state and the state of storing of purifying water through the left and right sides rotation to pivot 531, through the synchronous rotation of three first through-holes 532 and three second through-holes 533 that open on the case 53, guarantee six siphunculus 521 and realize three states of opening and closing along with the state real time synchronization of pivot 531, guarantee the realization of sewage storage state and state of storing of purifying water and avoid the conflict of two states because of the asynchronous pipeline leads to.
In a further scheme, as shown in fig. 3, the driving portion 51 includes a gear 511, a rack 512 and an electric cylinder 513, the gear 511 is disposed at an end of the rotating shaft 531, the gear 511 and the rack 512 are meshed with each other, two ends of the rack 512 are provided with a baffle 5121, the electric cylinder 513 is fixedly connected to one end of the rack 512 and drives the rack 512 to reciprocate, and when the gear 511 moves to an end of the rack 512 and abuts against the baffle 5121, three through pipes 521 are opened, and referring to fig. 1, the enclosure board 2 is further provided with an electric control switch 54 for controlling the operation of the electric cylinder 513.
The structure realizes the convenience and the instant rapidity of the control valve 5, realizes the reciprocating movement of the rack 512 by controlling the reciprocating movement of the electric cylinder 513, and the movement of the rack 512 drives the rotation of the gear 511, and the gear 511 drives the rotation shaft 531 to rotate so as to realize the state switching; the length of the rack 512 and the baffle 5121 can control the rotation angle of the gear 511 to precisely control the rotation angle of the rotating shaft 531, so as to ensure that the first through hole 532 and the second through hole 533 rotate in place; finally, the operation is convenient by the control of the electric control switch 54.
In a further scheme, as shown in fig. 1 and 3, the enclosure board 2 is further provided with a foot switch 55, the foot switch 55 includes a foot pedal 551, a connecting column 552, a spring 553, and a moving plate 554, the moving plate 554 moves vertically inside the base board 1, an oblique guide groove 5541 is formed in the moving plate 554, a guide pin 5122 is fixedly provided at one end of a side edge of the rack 512, the guide pin 5122 is slidingly provided in the guide groove 5541, the connecting column 552 is fixed at an upper end of the moving plate 554, the connecting column 552 is fixed at an upper end of the connecting column 552, a plate groove 21 is formed in the enclosure board 2, a foot pedal 551 extends from the plate groove 21, and the spring 553 is connected between the foot pedal 551 and a bottom surface of the plate groove 21.
This structure increases the physical control structure to the control valve 5, through the elasticity of pedal and pedal homing, realizes moving the reciprocating of board 554, moves the reciprocating motion that guide pin 5122 can be guided to the guide groove 5541 on the board 554 to drive the reciprocating motion of rack 512, this foot switch 55 operation sanitation also avoids the uncontrollable condition that leads to because of the power failure.
In still further scheme, referring to fig. 7, the water-proof plate 6 is further included, the water-proof plate 6 is embedded in the base plate 1, the water-proof plate 6 is located above the flushing part 4 and the electric cylinder 513, the water-proof plate 6 is used for shielding the electric cylinder 513 and the flushing part 4, and corrosion of long-term water quality to the electric cylinder 513 and the flushing part 4 is avoided.
Finally, it is noted that the above-mentioned preferred embodiments are only intended to illustrate rather than limit the invention, and that, although the invention has been described in detail by means of the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (7)

1. The utility model provides a take whole bathroom of sewage utilization, includes bathroom that bed plate (1), enclosure board (2) and roof (3) combination formed, its characterized in that: the sewage treatment device is characterized in that a sewage tank (11) is formed in the base plate (1), a water outlet hole (12) communicated with the sewage tank (11) is formed in the base plate (1), a flushing part (4) is communicated with the bottom of the sewage tank (11), the flushing part (4) comprises a horizontal cylindrical water storage barrel (41), a piston block (411) matched with the inner side of the water storage barrel (41) is movably arranged in the water storage barrel (41), a column tube (412) is communicated with the left end of the water storage barrel (41), a pushing column (4121) is movably arranged in the column tube (412), the end part of the pushing column (4121) is communicated with a piston head (4122) matched with the inner side of the column tube (412), a pressure water pipe (414) and a pressure release pipe (415) are communicated with the tail end of the pushing column (4121), a sewage pipe (416) and a sewage output pipe (417) are also respectively communicated with the top of the left end of the water storage barrel (41), and a water purification pipe (418) and a water output pipe (419) are respectively communicated with the top of the right end of the water storage barrel (41).
The pressure water pipe (414), the pressure relief pipe (415), the sewage pipe (416), the sewage output pipe (417), the water purifying pipe (418) and the water purifying output pipe (419) are all communicated on one control valve (5), the pressure water pipe (414) is communicated to an input water pipe through the control valve (5), the pressure relief pipe (415) is communicated to the top of the left end of the water storage barrel (41) through the control valve (5), the sewage pipe (416) is communicated to the sewage tank (11) through the control valve (5), the sewage output pipe (417) is communicated to a urinal through the control valve (5), the water purifying pipe (418) is communicated to the input water pipe through the control valve (5), and the water purifying output pipe (419) is communicated to the urinal through the control valve (5);
the control valve (5) comprises a driving part (51), a valve barrel (52) and a valve core (53), wherein the valve barrel (52) is cylindrical, the valve core (53) is cylindrical, the valve barrel (52) is transversely arranged above the water storage barrel (41), six vertical through pipes (521) are respectively communicated with the upper side and the lower side of the valve barrel (52), one end of the valve core (53) is connected with a rotating shaft (531), three first through holes (532) and three second through holes (533) are formed in the valve core (53), the axes of the first through holes (532) and the second through holes (533) are arranged in a crossing mode and are perpendicular to the axes of the valve barrel (52), the rotating shaft (531) penetrates out of one end of the valve barrel (52) and rotates through the driving part (51), the rotating shaft (531) enables three through pipes (521) to be simultaneously closed when the three through pipes (521) are simultaneously opened, and the three synchronous through pipes (521) are respectively connected to the pressure pipe (414), the sewage pipe (521), the sewage pipe (416) and the sewage pipe (521) are respectively communicated with the sewage pipe (418), the sewage pipe (521) and the sewage pipe (417) respectively.
2. The integrated bathroom with sewage utilization according to claim 1, wherein: the driving part (51) comprises a gear (511), a rack (512) and an electric cylinder (513), the gear (511) is arranged at the end part of the rotating shaft (531), the gear (511) and the rack (512) are meshed with each other, a baffle (5121) is arranged at two ends of the rack (512), the electric cylinder (513) is fixedly connected with one end of the rack (512) and drives the rack (512) to reciprocate, and the gear (511) moves to the end part of the rack (512) and abuts against the baffle (5121), so that three through pipes (521) are opened.
3. The integrated bathroom with sewage utilization according to claim 2, wherein: an electric control switch (54) for controlling the electric cylinder (513) to operate is also arranged on the enclosure board (2).
4. A unitary bathroom with sewage utilization according to claim 3, wherein: still be provided with foot switch (55) on enclosure board (2), foot switch (55) include running-board (551), link post (552), spring (553) and move board (554), move board (554) vertical removal and be in inside bed plate (1), move and offer slant guide slot (5541) on board (554), the one end of the side of rack (512) has set firmly guide pin (5122), guide pin (5122) is slided to be established in guide slot (5541), link post (552) are fixed move board (554) upper end, link post (552) are fixed link post (552) upper end, offer board groove (21) on enclosure board (2), running-board (551) part follow board groove (21) are stretched out, spring (553) are connected between running-board (551) and board groove (21) bottom surface.
5. The integrated bathroom with sewage utilization according to claim 4, wherein: the water-proof device further comprises a water-proof plate (6), wherein the water-proof plate (6) is embedded in the base plate (1), and the water-proof plate (6) is positioned above the flushing part (4) and the electric cylinder (513).
6. The integrated bathroom with sewage utilization according to claim 1, wherein: the sewage tank (11) is arranged inside the edge of the base plate (1) in a surrounding mode, the bottom surface of the sewage tank (11) is an inclined surface, the water outlet hole (12) is formed in the top surface of the highest point of the sewage tank (11), and the lowest point of the sewage tank (11) is communicated with the flushing part (4).
7. The integrated bathroom with sewage utilization according to claim 1, wherein: two rings of baffle rings (413) are further arranged in the water storage barrel (41), the piston blocks (411) are arranged between the two rings of baffle rings (413), and the communication positions on the water storage barrel (41) are all located on the outer sides of the baffle rings (413).
CN202211225898.3A 2022-10-09 2022-10-09 Integral bathroom with sewage utilization function Active CN115419300B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211225898.3A CN115419300B (en) 2022-10-09 2022-10-09 Integral bathroom with sewage utilization function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211225898.3A CN115419300B (en) 2022-10-09 2022-10-09 Integral bathroom with sewage utilization function

Publications (2)

Publication Number Publication Date
CN115419300A CN115419300A (en) 2022-12-02
CN115419300B true CN115419300B (en) 2023-09-26

Family

ID=84206148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211225898.3A Active CN115419300B (en) 2022-10-09 2022-10-09 Integral bathroom with sewage utilization function

Country Status (1)

Country Link
CN (1) CN115419300B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005120610A (en) * 2003-10-14 2005-05-12 Fusao Yamada Movable unit vaporization lavatory
CN203701651U (en) * 2014-01-14 2014-07-09 鸡西市健鑫农业科技开发有限公司 Disaster emergency toilet
CN204875955U (en) * 2015-08-17 2015-12-16 深圳市洪涛装饰股份有限公司 Intelligent home bathroom system
CN107100226A (en) * 2017-05-11 2017-08-29 张维秀 A kind of water-saving bathroom device
CN108532692A (en) * 2018-06-23 2018-09-14 长沙清腾迈克智能科技有限公司 A kind of Intelligent bathroom water saving fixtures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005120610A (en) * 2003-10-14 2005-05-12 Fusao Yamada Movable unit vaporization lavatory
CN203701651U (en) * 2014-01-14 2014-07-09 鸡西市健鑫农业科技开发有限公司 Disaster emergency toilet
CN204875955U (en) * 2015-08-17 2015-12-16 深圳市洪涛装饰股份有限公司 Intelligent home bathroom system
CN107100226A (en) * 2017-05-11 2017-08-29 张维秀 A kind of water-saving bathroom device
CN108532692A (en) * 2018-06-23 2018-09-14 长沙清腾迈克智能科技有限公司 A kind of Intelligent bathroom water saving fixtures

Also Published As

Publication number Publication date
CN115419300A (en) 2022-12-02

Similar Documents

Publication Publication Date Title
CN104164907A (en) Toilet bowl and flushing system thereof
CN115419300B (en) Integral bathroom with sewage utilization function
CN204081008U (en) Toilet and flushing system thereof
CN208802862U (en) Drain separator
CN201671153U (en) Toilet integrated cabinet
CN218774358U (en) Mud scraper for sedimentation tank
CN217043195U (en) Ecological garden landscape with sewage filtering function
CN211189331U (en) Energy-saving and environment-friendly sewage treatment device
CN2754544Y (en) Non-flush double-piston toilet
CN200996176Y (en) Sealed automatic flushing mechanism of draining valve of cistern in toilet
CN2651303Y (en) Energy and water saving tank
CN216320218U (en) A sewage treatment device for municipal works
CN115126080A (en) Steel structure assembly type building for building engineering
CN102705153B (en) Running water pressure engine
CN220118753U (en) Professional control valve
CN209620192U (en) A kind of movable-type intelligent lavatory
CN221217811U (en) Leather soaking device for producing rugby
CN220991451U (en) Reclaimed water spray washing device
CN213863752U (en) Quantitative dosing device of sodium bisulfite
CN208792501U (en) A kind of movable plank house being easier to resettlement
CN213308256U (en) Furniture with freely-replaceable door plate
CN213742843U (en) Steel-plastic multilayer composite door and window installation clamping piece device
CN218161322U (en) Pump station low-voltage switchgear
CN209258079U (en) A kind of building site motor flusher
CN215952329U (en) Heat exchange device with waste heat utilization function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant