CN115396338B - Load management terminal testing device and testing method - Google Patents

Load management terminal testing device and testing method Download PDF

Info

Publication number
CN115396338B
CN115396338B CN202210997062.9A CN202210997062A CN115396338B CN 115396338 B CN115396338 B CN 115396338B CN 202210997062 A CN202210997062 A CN 202210997062A CN 115396338 B CN115396338 B CN 115396338B
Authority
CN
China
Prior art keywords
terminal
load management
management terminal
unit
upper computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210997062.9A
Other languages
Chinese (zh)
Other versions
CN115396338A (en
Inventor
葛玉磊
薛健
王金利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Topscomm Communication Co Ltd
Original Assignee
Qingdao Topscomm Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Topscomm Communication Co Ltd filed Critical Qingdao Topscomm Communication Co Ltd
Priority to CN202210997062.9A priority Critical patent/CN115396338B/en
Publication of CN115396338A publication Critical patent/CN115396338A/en
Application granted granted Critical
Publication of CN115396338B publication Critical patent/CN115396338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C23/00Non-electrical signal transmission systems, e.g. optical systems
    • G08C23/04Non-electrical signal transmission systems, e.g. optical systems using light waves, e.g. infrared
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0876Network utilisation, e.g. volume of load or congestion level
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C2201/00Transmission systems of control signals via wireless link
    • G08C2201/10Power supply of remote control devices
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C2201/00Transmission systems of control signals via wireless link
    • G08C2201/90Additional features
    • G08C2201/92Universal remote control

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses a load management terminal testing device and a testing method. The testing device consists of eight parts, namely a crimping unit, a power supply control unit, an Ethernet communication unit, a relay control unit, an auxiliary terminal communication unit, a current analog output unit, a pulse metering unit and a virtual meter communication unit. Before the device is tested, the load management terminal is only required to be connected to the compression joint unit in a compression joint mode, the wiring of the strong current terminal voltage, the current and the weak current terminal remote control, remote signaling, pulse and RS485 is not needed to be completed manually, the power supply of the switch control device is controlled, the possibility of personal electric shock is avoided, and the device is time-saving, safe and easy to operate. The testing method is that the upper computer software at the PC end sends a testing instruction, the instruction is sent to the terminal through the testing device, the terminal returns an instruction execution result, the upper computer software automatically judges that the result is correct or incorrect, the processes of manually issuing the instruction and manually checking are omitted, and the testing efficiency is improved.

Description

Load management terminal testing device and testing method
Technical Field
The invention relates to the field of automatic testing of low-voltage power utilization terminals, in particular to a load management terminal testing device and a testing method.
Background
The load management terminal is a terminal device which is installed on the spot of a special transformer user and can realize the functions of remote meter reading, electric energy metering, equipment working condition, customer electricity load, electric energy monitoring and the like of the special transformer user. The load management terminal adopts a wall-mounted structure, the current laboratory performs detection on the load management terminal in a hanging platform mode, terminal wiring operations such as voltage, RS485, pulse, remote signaling and remote control are required before detection, the method has more manual wiring, and various parameters are required to be set by matching function test software, so that the method has more time consumption and complex operation.
Disclosure of Invention
The invention aims to solve the technical problems of the prior art, provides a load management terminal testing device and a testing method, and aims to solve the problems of more manual wiring, long time consumption, complex operation, safety and easiness in operation and improvement of testing efficiency in the prior art.
The embodiment of the invention provides a load management terminal testing device and a testing method, wherein the design method comprises the following steps:
the load management terminal testing device is characterized by comprising a crimping unit, a power supply control unit, an Ethernet communication unit, a relay control unit, an auxiliary terminal communication unit, a current analog output unit, a pulse metering unit and a virtual meter communication unit, and specifically comprises the following components:
the crimping unit provides voltage and current binding posts of the load management terminal and a binding bar of an auxiliary terminal of the load management terminal, and is used for terminal power-on and auxiliary terminal connection;
the power supply control unit provides power-off control for the load management terminal;
the Ethernet communication unit provides communication control between the testing device and PC end upper computer software and communication between the testing device and the load management terminal;
the relay control unit provides open circuit and short circuit control of the meter tail of the load management terminal;
the auxiliary terminal communication unit is used for connecting the terminal remote control terminal with the remote signaling terminal and testing the terminal control function and the remote signaling deflection;
the current analog output unit provides three-phase current output;
the pulse metering unit provides a metering function of outputting pulses to the load management terminal;
the virtual meter communication unit provides meter reading reply messages, and the test terminal has meter reading function.
The test method of the load management terminal test device is characterized by comprising the following steps of:
the load management terminal comprises a plurality of uplink communication interfaces of RS232, RS485-3, infrared, ethernet and 4G channels;
the load management terminal comprises an RS485-1 downlink meter reading communication interface and an RS485-2 downlink meter reading communication interface;
the load management terminal comprises 5 paths of remote control ports including a round 1, a round 2, a round 3, a round 4 and an alarm;
the load management terminal comprises 5 paths of remote signaling interfaces, namely a remote signaling 1, a remote signaling 2, a remote signaling 3, a remote signaling 4 and a door contact;
the load management terminal comprises a positive pulse output terminal, a negative pulse output terminal, a second pulse output terminal and a public pulse output terminal;
the testing device is connected with the load management terminal through the Ethernet, and verifies the Ethernet communication function of the load management terminal;
the testing device and the PC end upper computer are in communication connection through the Ethernet, and the PC and the testing device are connected by a network cable before detection;
the relay control unit controls the open and short circuit connection of the meter tail of the load management terminal, the open and short circuit state change is recognized by the traffic acquisition of the load management terminal, the ammeter state character is shifted, and the PC terminal upper computer software tests the open and short circuit recognition function through the transparent reading of the ammeter state character;
the current analog output unit is used for outputting small current, and the PC end upper computer monitors metering accuracy and alarm of the output test terminal by controlling the current;
the pulse metering unit converts the positive pulse, the negative pulse and the second pulse output by the load management terminal into power values, and the power values are compared with the alternating acquisition power values of the load management terminal to verify the correctness of pulse output;
the load management terminal provides RS485-1 and RS485-2 as downlink meter reading communication ports, and the virtual meter communication unit can reply meter reading messages sent by the load management terminal through the RS485 and is used for simulating actual meter reading reply on site;
the PC terminal upper computer software judges the correctness of reading and storing the terminal data by reading the data stored by the load management terminal;
when the result message returned by the load management terminal is different from the expected result message of the upper computer software, the upper computer software prompts the test failure;
when the result message returned by the load management terminal is the same as the expected result message of the upper computer software, the upper computer software can prompt that the test is successful.
Compared with the prior art, the invention has the following main beneficial effects:
according to the load management terminal testing device and the load management terminal testing method, before the device is tested, the load management terminal is only required to be pressed onto the pressing unit, and wiring of voltage, current, remote control, remote signaling, pulse and 485 ports is not needed to be completed manually, so that time and labor are saved; only the power supply of the equipment is controlled through a switch, so that the operation is safe and easy; the virtual meter communication unit can reply the meter reading message sent by the load management terminal through the RS485, is used for simulating the actual meter reading reply on site, is not connected through an actual electric meter, reduces manpower, material resources and resource occupation, and is more comprehensive in test. The function test result can be displayed through the upper computer software interface, and is convenient and visual. The automatic acquisition and detection of the test result omits the process of manually issuing instructions and manually checking, and improves the test efficiency.
Drawings
FIG. 1 is a diagram of a load management terminal test device according to an embodiment of the present invention;
fig. 2 is a front view of a testing device for a load management terminal according to an embodiment of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made more apparent and fully with reference to the detailed description given in the accompanying drawings. It will be apparent that the described embodiments are only some, but not all, embodiments of the invention. All other embodiments, which can be obtained by a person skilled in the art without creative efforts, based on the embodiments of the present invention, such as embodiments which are used only without changing the basic principle of the claims, are included in the scope of protection of the present invention.
The implementation of the present invention will be described in detail below with reference to specific embodiments.
Fig. 1 shows a structural diagram of a load management terminal test apparatus.
The device comprises eight parts of a crimping unit, a power supply control unit, an Ethernet communication unit, a relay control unit, an auxiliary terminal communication unit, a current analog output unit, a pulse metering unit and a virtual meter communication unit, and is specifically as follows:
the crimping unit provides voltage and current binding posts of the load management terminal and a binding bar of an auxiliary terminal of the load management terminal, is used for terminal power-on and remote control, remote signaling, pulse and RS485 connection physical connection of the auxiliary terminal, is provided with a telescopic auxiliary terminal binding post, and is also suitable for other types of terminals;
the power supply control unit provides power-off control for the load management terminal, and controls the power-on and power-off of the meter tail of the load management terminal through the control switch;
the Ethernet communication unit provides communication control between the testing device and PC end upper computer software and communication between the testing device and the load management terminal, the upper computer software sends communication messages to the testing device through the Ethernet, the Ethernet communication unit respectively forwards the received messages sent by the PC end upper computer software to three uplink communication ports, namely RS232, RS485-3 or infrared, of the load management terminal, and then forwards the messages returned by the ports back to the upper computer software;
the relay control unit provides open circuit and short circuit control of the meter tail of the load management terminal by controlling the relay to open and close, the terminal identifies open and short circuit signals and feeds the state back to the upper computer software, and the upper computer software can judge the correctness of state identification;
the auxiliary terminal communication unit is used for connecting the terminal remote control terminal with the remote signaling terminal, when the output state of the remote control terminal changes, the remote signaling is shifted, and the PC terminal upper computer software detects whether the shift of the terminal is normal or not by detecting the shift state of the remote signaling;
the current analog output unit provides three-phase current output, so that the current metering accuracy and alarm detection of the load management terminal can be tested;
the pulse metering unit provides a metering function of outputting pulses to the load management terminal, and the metering function comprises positive, negative and second pulses;
the virtual meter communication unit is used for simulating an actual ammeter reply message, and when the load management terminal sends out a meter reading message through RS485, the virtual meter communication unit receives the message and gives a reply.
The specific working flow of the testing method of the device is as follows:
fig. 2 shows a front view of a load management terminal testing device, the testing device comprises an insulating table 1, a terminal epitope 2, a device power-on control button 3, a crimping unit 4, a testing device 232 communication port 5, a testing device infrared communication port 6, a testing device and terminal ethernet communication port 7 and a testing device and PC ethernet communication port 8.
Placing the load management terminal at an epitope position, compacting the compression joint unit, and confirming that the terminal of the compression joint unit is in normal physical connection with the terminal auxiliary terminal, wherein the terminal turns 1, 2, 3 and 4 are respectively in alignment connection with the remote signaling 1, 2, 3 and 4;
connecting a terminal RS232 and an infrared port with a communication port and an infrared communication port of the testing device 232 through connecting wires, and connecting a terminal Ethernet port with an Ethernet communication port of the testing device through an Ethernet cable;
connecting the testing device with a PC end upper computer through an Ethernet;
opening a device power-on control button to supply power to the testing device;
the PC terminal upper computer software sends a power-on command, the power-on control unit controls the epitope to be electrified, and the terminal is electrified and started at the moment;
issuing control parameters and an electric energy meter file to the terminal through upper computer software;
the method comprises the steps that an ammeter reading command is issued to a terminal through upper computer software, an Ethernet communication unit sequentially forwards messages to a load management terminal RS232, RS485-3 and an infrared port, the terminal sends meter reading messages at the 485 port after receiving the messages, a virtual meter communication unit replies the meter reading messages, the terminal returns meter reading reply data to the upper computer software, and the software respectively judges whether the functions of the RS232, the RS485-3 and the infrared port are qualified by judging whether the messages are consistent with the reply data or not;
carrying out data point reading through a terminal screen button, checking screen display return data, and verifying the correctness of a reading function;
the method comprises the steps that a terminal power control starting command is sent through upper computer software, the terminal enters a control state according to power data returned by a reading virtual table, the virtual table reply data is kept unchanged, the terminal trips in a round 1 at first, at the moment, remote signaling 1 generates deflection, and the upper computer software judges whether a control function is qualified or not through reading the remote signaling state of the terminal;
the upper computer software controls the on-off state of the test state relay control unit and the current output by the current analog output unit, so that states such as open circuit, short circuit and the like are caused at the tail of the terminal, the terminal can recognize the states and generate an alarm event, and the upper computer software reads the state bit and the alarm content of the terminal to judge whether the alarm function is qualified or not;
the upper computer software controls the current analog output unit of the testing device to output current, the pulse metering unit meters the terminal to output a pulse power value, and the upper computer verifies whether the pulse output function is correct by reading the pulse metering unit power value and comparing the pulse metering unit power value with the terminal power;
according to the load management terminal testing device and the load management terminal testing method, before the device is tested, the load management terminal is only required to be pressed onto the pressing unit, and wiring of voltage, current, remote control, remote signaling, pulse and 485 ports is not needed to be completed manually, so that time and labor are saved; only the power supply of the equipment is controlled through a switch, so that the operation is safe and easy; the virtual meter communication unit can reply the meter reading message sent by the load management terminal through the RS485, is used for simulating the actual meter reading reply on site, is not connected through an actual electric meter, reduces manpower, material resources and resource occupation, and is more comprehensive in test. The function test result can be displayed through the upper computer software interface, and is convenient and visual. The automatic acquisition and detection of the test result omits the process of manually issuing instructions and manually checking, and improves the test efficiency.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (7)

1. The test method for the load management terminal test device is characterized by comprising eight parts, namely a crimping unit, a power supply control unit, an Ethernet communication unit, a relay control unit, an auxiliary terminal communication unit, a current analog output unit, a pulse metering unit and a virtual table communication unit, wherein the crimping unit provides voltage and current binding posts of a load management terminal and a binding post row of an auxiliary terminal of the load management terminal, and is used for terminal power-on and auxiliary terminal connection, and the test method comprises the following steps:
s1, placing a terminal at an epitope position, compacting the crimping unit, and confirming that the terminal of the crimping unit is normally connected with an auxiliary terminal of the terminal physically, wherein the terminal is in alignment connection with remote signaling 1, remote signaling 2, remote signaling 3 and remote signaling 4 respectively in turn 1, turn 2, turn 3 and turn 4; connecting a terminal RS232 and an infrared port with a communication port and an infrared communication port of the testing device 232 through connecting wires, and connecting a terminal Ethernet port with an Ethernet communication port of the testing device through an Ethernet cable;
s2, the testing device is connected with the PC end upper computer through the Ethernet communication unit;
s3, the upper computer software sends a power-on command, the power-on command controls the epitope to be electrified through the power supply control unit, and the terminal is electrified and started;
s4, the auxiliary terminal communication unit is connected with remote signaling and round number of the load management terminal, and judges the terminal control function;
s5, the upper computer software controls the relay control unit to be opened and closed, and the function of identifying the open and short circuit states of the terminal is verified;
s6, outputting current by a current analog output unit, measuring a terminal output pulse power value by a pulse measuring unit, and verifying the terminal pulse output accuracy; s7, the upper computer software issues a meter reading command to the terminal through the Ethernet communication unit, the Ethernet communication unit sequentially forwards messages generated corresponding to the received meter reading command to the RS232, RS485-3 and infrared ports of the terminal, the terminal sends meter reading messages at the 485 port after receiving the messages, the virtual meter communication unit simulates and generates a reply meter reading message corresponding to the meter reading messages, the terminal returns the received reply meter reading message to the upper computer software, and the upper computer software respectively judges whether the functions of the RS232, the RS485-3 and the infrared ports are qualified by judging whether the received reply meter reading message is consistent with the reply data corresponding to the meter reading command; and carrying out data point reading through a terminal screen button, checking screen display return data, and verifying the correctness of the reading function.
2. The test method for a load management terminal test apparatus according to claim 1, wherein the power supply control unit provides power-off control of the load management terminal.
3. The test method for the load management terminal test device according to claim 1, wherein the ethernet communication unit provides a communication connection between the test device and the PC-side host computer, and verifies the ethernet communication function of the load management terminal.
4. The test method for a load management terminal test apparatus according to claim 1, wherein the relay control unit is configured to control a tail open and short circuit connection of the load management terminal, and verify an open and short circuit recognition function of the load management terminal.
5. The test method for a load management terminal test apparatus according to claim 1, wherein the auxiliary terminal communication unit is configured to connect a remote signaling terminal and a remote control terminal of the load management terminal, and verify a control function of the load management terminal.
6. The test method for the load management terminal test device according to claim 1, wherein the current analog output unit is used for outputting small current, and the PC terminal upper computer tests the metering accuracy and alarm monitoring of the load management terminal by controlling the output of the current.
7. The test method for a load management terminal test apparatus according to claim 1, wherein the pulse metering unit is configured to convert the on-going, on-going and off-going pulses of the load management terminal output into power values, and verify the correctness of the pulse output of the load management terminal.
CN202210997062.9A 2022-08-18 2022-08-18 Load management terminal testing device and testing method Active CN115396338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210997062.9A CN115396338B (en) 2022-08-18 2022-08-18 Load management terminal testing device and testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210997062.9A CN115396338B (en) 2022-08-18 2022-08-18 Load management terminal testing device and testing method

Publications (2)

Publication Number Publication Date
CN115396338A CN115396338A (en) 2022-11-25
CN115396338B true CN115396338B (en) 2024-04-05

Family

ID=84120811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210997062.9A Active CN115396338B (en) 2022-08-18 2022-08-18 Load management terminal testing device and testing method

Country Status (1)

Country Link
CN (1) CN115396338B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030024730A (en) * 2003-02-17 2003-03-26 최승우 Automatic meter reading system comprising power line communication device
CN201327517Y (en) * 2008-12-12 2009-10-14 江苏省电力试验研究院有限公司 Integrated detection device of electric power terminal
CN101872003A (en) * 2010-05-25 2010-10-27 中国电力科学研究院 Multi-functional auxiliary testing device of collection terminal
CN102520298A (en) * 2012-01-05 2012-06-27 广西电网公司电力科学研究院 On-site detecting system for electrical power load management terminal and detecting method thereof
CN202443075U (en) * 2012-01-05 2012-09-19 广西电网公司电力科学研究院 Electric power load management terminal on-site detection system
CN104215930A (en) * 2014-08-21 2014-12-17 国家电网公司 Three-in-one acquisition terminal detection device
CN104749546A (en) * 2015-04-21 2015-07-01 国家电网公司 Novel type-III specific power transformer acquisition terminal testing device and testing method thereof
CN104833938A (en) * 2015-05-21 2015-08-12 国网重庆市电力公司 Terminal detection circuit device suitable for collection of multiple types of power utilization information
CN204613385U (en) * 2015-05-21 2015-09-02 国网重庆市电力公司 One is applicable to multiple power information acquisition terminal testing circuit device
KR101567007B1 (en) * 2015-03-13 2015-11-13 (주)가암테크 Remote meter reading method based on low-power and system thereof
CN105182107A (en) * 2015-07-29 2015-12-23 北京煜邦电力技术股份有限公司 Detection device, system and method
CN105445691A (en) * 2015-11-13 2016-03-30 国网山东省电力公司电力科学研究院 Power information collection equipment fault comprehensive diagnosis system
CN109274807A (en) * 2018-11-21 2019-01-25 Oppo(重庆)智能科技有限公司 Test method, apparatus and system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030024730A (en) * 2003-02-17 2003-03-26 최승우 Automatic meter reading system comprising power line communication device
CN201327517Y (en) * 2008-12-12 2009-10-14 江苏省电力试验研究院有限公司 Integrated detection device of electric power terminal
CN101872003A (en) * 2010-05-25 2010-10-27 中国电力科学研究院 Multi-functional auxiliary testing device of collection terminal
CN102520298A (en) * 2012-01-05 2012-06-27 广西电网公司电力科学研究院 On-site detecting system for electrical power load management terminal and detecting method thereof
CN202443075U (en) * 2012-01-05 2012-09-19 广西电网公司电力科学研究院 Electric power load management terminal on-site detection system
CN104215930A (en) * 2014-08-21 2014-12-17 国家电网公司 Three-in-one acquisition terminal detection device
KR101567007B1 (en) * 2015-03-13 2015-11-13 (주)가암테크 Remote meter reading method based on low-power and system thereof
CN104749546A (en) * 2015-04-21 2015-07-01 国家电网公司 Novel type-III specific power transformer acquisition terminal testing device and testing method thereof
CN104833938A (en) * 2015-05-21 2015-08-12 国网重庆市电力公司 Terminal detection circuit device suitable for collection of multiple types of power utilization information
CN204613385U (en) * 2015-05-21 2015-09-02 国网重庆市电力公司 One is applicable to multiple power information acquisition terminal testing circuit device
CN105182107A (en) * 2015-07-29 2015-12-23 北京煜邦电力技术股份有限公司 Detection device, system and method
CN105445691A (en) * 2015-11-13 2016-03-30 国网山东省电力公司电力科学研究院 Power information collection equipment fault comprehensive diagnosis system
CN109274807A (en) * 2018-11-21 2019-01-25 Oppo(重庆)智能科技有限公司 Test method, apparatus and system

Also Published As

Publication number Publication date
CN115396338A (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN201993444U (en) Relay testing device and system
CN111694288B (en) On-site feeder automation function closed-loop automatic test platform
CN108919002A (en) A kind of test macro of direct-current charging post
CN216013591U (en) Multifunctional handcart switch control loop tester
CN202736328U (en) Metering program control analog device
CN105336287A (en) Display screen testing method, device and system
CN108089083A (en) Alternating-current charging pile detecting system
CN112345931A (en) Modular intelligent testing device for medium-voltage switch of nuclear power station
CN217156672U (en) Intelligent traction power supply system simulation test verification device
CN216411535U (en) Distributed deployed portable current transformer polarity detection equipment
CN106291254B (en) Automatic intelligent line inspection device for intelligent substation
CN208384025U (en) A kind of test macro of direct-current charging post
CN209591246U (en) A kind of three-phase three-wire electric energy meter device for simulating false wiring with self-checking function
CN105182107A (en) Detection device, system and method
CN115396338B (en) Load management terminal testing device and testing method
CN108447360A (en) A kind of three-phase three-wire electric energy meter device for simulating false wiring
CN204882853U (en) Electric energy meter pressure resistance test installation
CN204807649U (en) Tester
CN112345960A (en) Scene-type spare power automatic switching logic verification system and method
CN212433304U (en) Novel relay protection device outlet simulation display instrument
CN215116483U (en) Remote diagnosis and debugging system for alternating-current charging pile
CN109342878A (en) A kind of Electrical Power Line Parameter detection auxiliary system based on Internet of Things
CN213457324U (en) Secondary circuit verifying device based on split-phase synchronous inspection
CN212646860U (en) Relay protection open-in and open-out test device
CN204332061U (en) A kind of carrier system electric power acquisition equipment and carrier test equipment thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant