CN115323104B CN202210870539.7A CN202210870539A CN115323104B CN 115323104 B CN115323104 B CN 115323104B CN 202210870539 A CN202210870539 A CN 202210870539A CN 115323104 B CN115323104 B CN 115323104B
Authority
CN
China
Prior art keywords
slag
converter
splashing
nitrogen
steps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210870539.7A
Other languages
Chinese (zh)
Other versions
CN115323104A (en
Inventor
杨林
赵龙
肖毅鹏
潘佳
王世杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangchun New Iron and Steel Co Ltd
Original Assignee
Yangchun New Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangchun New Iron and Steel Co Ltd filed Critical Yangchun New Iron and Steel Co Ltd
Priority to CN202210870539.7A priority Critical patent/CN115323104B/en
Publication of CN115323104A publication Critical patent/CN115323104A/en
Application granted granted Critical
Publication of CN115323104B publication Critical patent/CN115323104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/44Refractory linings
    • C21C5/441Equipment used for making or repairing linings
    • C21C5/443Hot fettling; Flame gunning
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/36Processes yielding slags of special composition
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention discloses a method for protecting a converter by automatically splashing slag, which is characterized by comprising the following steps of: the method comprises the following steps: step one: controlling the quantity of slag in the converter after tapping; step two: adjusting the internal components of slag in the converter; step three: slag splashing protection for the first time; step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1000mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s; step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 800mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 100s; step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 700mm, and blowing nitrogen for 100s; step seven: checking slag splashing condition of furnace lining. The automatic slag splashing furnace protection mode of the converter adopts a scientific slag splashing furnace protection technology, and through repeated slag splashing operations for a plurality of times, not only is the phenomenon that slag is leaked from the inner wall of the converter avoided when the converter goes out, but also the uniformity of the slag hanging thickness is ensured because of the progressive mode for a plurality of times.

Description

Automatic slag splashing furnace protection method for converter
Technical Field
The invention relates to the technical field of converter steelmaking, in particular to a method for automatically splashing slag and protecting a converter.
Background
The slag splashing furnace protection is to spray out the high-pressure nitrogen from the copper mouth of the oxygen gun, to utilize the MgO content in the final slag to reach the saturated or supersaturated end slag, to cool and solidify the slag on the furnace lining by high-pressure nitrogen blowing, to form a slag splashing layer with high melting point, to protect the furnace lining brick. The current new steel converter workshop in spring establishes a slag splashing protection control technology matched with the current end point slag remaining amount by precisely controlling the height of the oxygen lance position in the slag splashing process and precisely setting the control of the nitrogen blowing time of each oxygen lance position, thereby achieving the effect of full-automatic slag splashing.
The traditional slag splashing furnace protection technology is characterized in that the height of an oxygen lance position in the slag splashing furnace protection process is manually controlled, the skill level difference of post staff in an experience mode influences the slag splashing furnace protection effect, the control of the oxygen lance position and the nitrogen blowing time control of the lance position in the 'furnace body' and the 'furnace bottom' of a converter are not standard, the high-pressure nitrogen pressure and the flow directly influence the slag splashing furnace protection effect, the slag splashing furnace protection effect is difficult to be ensured, the analysis is carried out in the traditional manual slag splashing mode, the requirement suitable for the current slag splashing furnace protection technology is found, and the manual intervention is reduced.
The purpose of the technology is to achieve the effect of automatic slag splashing and furnace protection through standardized operation, mainly cool final slag in a furnace in the early stage of nitrogen blowing, and the final slag is in a thinner state in the period of time, even if the adhesion capability of the final slag splashed onto a furnace lining is limited, the longer the slag splashing time is found in practice, the more slag hanging quantity of the furnace lining is found, but the slag splashing caused by long-time fixed gun position slag splashing can cause excessive slag dipping at the bottom of a converter, so that the rising of the bottom of the converter is too fast, and the overlong slag splashing time affects the production rhythm, so that the finding of an automatic slag splashing system matched with a converter workshop is particularly critical.
So we propose a method for automatically splashing slag for protecting the converter so as to solve the problems.
Disclosure of Invention
The invention aims to provide a method for automatically splashing slag for protecting a converter, which aims to solve the problem that the effect of splashing slag for protecting the converter in the current market is poor in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: a method for protecting a converter by automatically splashing slag comprises the following steps:
step one: controlling the quantity of slag in the converter after tapping;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to be 600mm, blowing nitrogen for 20S, and removing ferrous oxide;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1500mm, and blowing nitrogen; the nitrogen blowing time was controlled to 20s.
Step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1000mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 800mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 100s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 700mm, and blowing nitrogen for 100s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
Preferably, the formula of the slag control amount in the first step is as follows:
QS=0.301×W 0.583
wherein: QS is the proper slag remaining amount of the converter, t
W is the nominal tonnage of the converter and t.
Preferably, the slag control amount of the medium-small converter is controlled to be 10-20mm in thickness of the slag layer.
Preferably, the slag composition in the second step is controlled as follows:
FeO:18.49%-22.68%;
Si02:10.69%-17.95%;
Cao:46.91%-52.11%;
MgO:8.3%-15.04%;
R:2.8%-3.2%。
preferably, in the second step, the height range of the oxygen lance is 500-700mm, and the nitrogen blowing time is controlled to be 18-22s.
Preferably, the height range of the oxygen lance in the second step is 1400-1800mm, and the nitrogen blowing time is controlled to be 18-25s.
Preferably, the height range of the oxygen lance in the second step is 900-1200mm, and the nitrogen blowing time is controlled to be 18-22s.
Preferably, the height range of the oxygen lance in the second step is 750-850mm, and the nitrogen blowing time is controlled to be 80-120s.
Preferably, the height range of the oxygen lance in the second step is 600-700mm, and the nitrogen blowing time is controlled to be 90-130s.
Compared with the prior art, the invention has the beneficial effects that:
the automatic slag splashing furnace protection mode of the converter adopts a scientific slag splashing furnace protection technology, through repeated slag splashing operations for a plurality of times, not only is the phenomenon of slag leakage and hanging on the inner wall of the converter avoided, but also the uniformity of the thickness of the hanging slag is ensured because of the progressive mode for a plurality of times, the slag flies out of the converter during slag splashing is also effectively avoided, the safety is increased, the slag splashing wall hanging is stable, the service life of the converter can be greatly improved, the consumption of refractory materials is reduced, the times of bricking the converter are reduced, the operation rate of the converter is improved, the steel yield is improved, and great positive economic benefits are provided for steelmaking of the converter.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely, and it is apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
The invention provides a technical scheme that: a method for protecting a converter by automatically splashing slag comprises the following steps:
step one: after tapping, the amount of slag in the converter is controlled, according to qs=0.301×w 0.583 Calculating to obtain 3t;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to be 600mm, blowing nitrogen for 20S, and removing ferrous oxide;
the slag composition is controlled as follows:
FeO:22.68%;
Si02:17.95%;
Cao:47.37%;
MgO:9%;
R:3.0%;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1500mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1000mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 800mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 100s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 700mm, and blowing nitrogen for 100s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
Example two
The invention provides a technical scheme that: a method for protecting a converter by automatically splashing slag comprises the following steps:
step one: after tapping, controlling the quantity of slag in the converter, wherein the thickness of the slag is controlled to be 15mm;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to 630mm, blowing nitrogen for 22S, and removing ferrous oxide;
the slag composition is controlled as follows:
FeO:20%;
Si02:16%;
Cao:50%;
MgO:11.2%;
R:2.8%;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1480mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 19s;
step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 980mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 19s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 790mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 105s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 650mm, and blowing nitrogen for 98s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
Example III
The invention provides a technical scheme that: a method for protecting a converter by automatically splashing slag comprises the following steps:
step one: after tapping, controlling the quantity of slag in the converter, wherein the thickness of the slag is controlled to be 19mm;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to 640mm, blowing nitrogen for 23S, and removing ferrous oxide;
the slag composition is controlled as follows:
FeO:19%;
Si02:17.37%;
Cao:48.63%;
MgO:11.89%;
R:3.11%;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1500mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 990mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 19s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 800mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 105s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 640mm, blowing nitrogen, and controlling the nitrogen blowing time to be 100s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
Example IV
The invention provides a technical scheme that: a method for protecting a converter by automatically splashing slag comprises the following steps:
step one: after tapping, controlling the quantity of slag in the converter, wherein the thickness of the slag is controlled to be 20mm;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to 620mm, blowing nitrogen for 23S, and removing ferrous oxide;
the slag composition is controlled as follows:
FeO:21.5%;
Si02:12.3%;
Cao:50.2%;
MgO:12.8%;
R:3.2%;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1480mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 19s;
step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1000mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 21s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 790mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 110s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 690mm, and blowing nitrogen for 115s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
Although the present invention has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present invention.

Claims (1)

1. A method for automatically splashing slag to protect a converter is characterized in that: the method comprises the following steps:
step one: after tapping, controlling the quantity of slag in the converter, controlling the slag control quantity of the small and medium-sized converter to be 10-20mm in thickness of the slag layer, and calculating to obtain 3t, wherein the slag control quantity formula is as follows:
QS=0.301×W 0.583
wherein: QS is the proper slag remaining amount of the converter, and the unit is t; w is the nominal tonnage of the converter, and the unit is t;
step two: the internal components of the slag in the converter are adjusted, so that the subsequent slag splashing is facilitated, and the slag components are controlled as follows:
FeO:22.68%;
Si02:17.95%;
Cao:47.37%;
MgO:9%;
R:3.0%;
the method comprises the following specific steps:
s1, adding a slag splashing slag adjusting agent to deoxidize slag;
s2, adjusting the height of the oxygen lance to be 600mm, blowing nitrogen for 20S, and removing ferrous oxide;
step three: the first slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1500mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step four: the secondary slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 1000mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 20s;
step five: the method comprises the following steps of: adjusting the height of the oxygen lance to 800mm, and blowing nitrogen; the nitrogen blowing time is controlled to be 100s;
step six: the last slag splashing furnace protection comprises the following steps: adjusting the height of the oxygen lance to 700mm, and blowing nitrogen for 100s;
step seven: checking the slag splashing condition of the furnace lining, and if the slag splashing condition is needed to be locally sprayed, pouring the slag into a slag tank if the slag splashing condition is met, and ending the slag splashing operation.
CN202210870539.7A 2022-07-23 2022-07-23 Automatic slag splashing furnace protection method for converter Active CN115323104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210870539.7A CN115323104B (en) 2022-07-23 2022-07-23 Automatic slag splashing furnace protection method for converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210870539.7A CN115323104B (en) 2022-07-23 2022-07-23 Automatic slag splashing furnace protection method for converter

Publications (2)

Publication Number Publication Date
CN115323104A CN115323104A (en) 2022-11-11
CN115323104B true CN115323104B (en) 2024-03-19

Family

ID=83919975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210870539.7A Active CN115323104B (en) 2022-07-23 2022-07-23 Automatic slag splashing furnace protection method for converter

Country Status (1)

Country Link
CN (1) CN115323104B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103937927A (en) * 2014-03-21 2014-07-23 宝钢集团新疆八一钢铁有限公司 Slag regulating agent for converter
CN106591531A (en) * 2016-12-09 2017-04-26 河钢股份有限公司承德分公司 Method for preventing converter oxygen lances from adhering to steel slag
CN112708717A (en) * 2020-12-15 2021-04-27 阳春新钢铁有限责任公司 Method for smelting low-phosphorus molten steel by single-converter duplex method
CN112981033A (en) * 2021-02-04 2021-06-18 新余钢铁股份有限公司 Automatic slag splashing control method and system for converter
CN113186369A (en) * 2021-04-01 2021-07-30 邢台钢铁有限责任公司 Slag splashing furnace protection method
WO2022001874A1 (en) * 2020-06-29 2022-01-06 宝山钢铁股份有限公司 Slag-splashing fettling method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103937927A (en) * 2014-03-21 2014-07-23 宝钢集团新疆八一钢铁有限公司 Slag regulating agent for converter
CN106591531A (en) * 2016-12-09 2017-04-26 河钢股份有限公司承德分公司 Method for preventing converter oxygen lances from adhering to steel slag
WO2022001874A1 (en) * 2020-06-29 2022-01-06 宝山钢铁股份有限公司 Slag-splashing fettling method
CN112708717A (en) * 2020-12-15 2021-04-27 阳春新钢铁有限责任公司 Method for smelting low-phosphorus molten steel by single-converter duplex method
CN112981033A (en) * 2021-02-04 2021-06-18 新余钢铁股份有限公司 Automatic slag splashing control method and system for converter
CN113186369A (en) * 2021-04-01 2021-07-30 邢台钢铁有限责任公司 Slag splashing furnace protection method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗莉萍等.《转炉炼钢实训指导书》.北京:冶金工业出版社,2016,第194-195页. *

Also Published As

Publication number Publication date
CN115323104A (en) 2022-11-11

Similar Documents

Publication Publication Date Title
CN107058672B (en) A method of using hot metal containing low silicon converter smelting Low-phosphorus Steel
CN113930574A (en) Slag splashing fettling method beneficial to furnace bottom maintenance
CN106636534B (en) The method for controlling Automobile Plate ladle top slag calcium aluminium ratio 1.2-1.8
CN115323104B (en) Automatic slag splashing furnace protection method for converter
CN113652515A (en) Method for adjusting furnace burden of furnace protection by splashing high-oxidability furnace slag
JP4207820B2 (en) How to use vacuum degassing equipment
CN104109727A (en) Method for smelting low-phosphorous steel by using semisteel through converter
CN110564916A (en) Method for shortening refining time of SPHC steel grade
CN103305655B (en) Method for manufacturing ultra low carbon steel by melting techniques using vacuum-degassing system
CN113699314B (en) Control method for tapping slag condition of high-carbon and high-alloy steel 90t converter
CN113122672A (en) Method for dephosphorizing semisteel steelmaking converter after furnace
CN112760449A (en) Smelting method of slag steel used by Consteel electric furnace
CN104928432A (en) Method for removing phosphorus in converter through blowing nitrogen
JP2002332513A (en) Method for removing metal on nose of melting vessel furnace
CN114737026B (en) Method for prolonging service life of RH dip pipe
CN115341068B (en) Slag splashing furnace protection method
CN112981046B (en) Treatment method for controlling tapping and slag discharging of high-temperature peroxide converter
CN114058769A (en) Method for reducing converter bottom under high-iron-steel ratio smelting condition of converter
JP3764543B2 (en) Method of melting iron-containing cold material
CN116065098A (en) Method for inhibiting blockage of ultra-low carbon steel pouring nozzle
CN117683964A (en) Method for treating slag deposited below inside of converter back furnace cap
CN115786626A (en) Method for reducing oxygen of industrial material molten steel entering station
JPH11140525A (en) Converter blowing method restraining deposition of metal of furnace opening hole part and side wall in furnace and lance device for converter
CN116397072A (en) Ladle repairing method by LF refining electrode slag splashing
CN118256674A (en) Smelting method for preventing explosion venting of converter dry dedusting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant