CN115233874A CN202210881351.2A CN202210881351A CN115233874A CN 115233874 A CN115233874 A CN 115233874A CN 202210881351 A CN202210881351 A CN 202210881351A CN 115233874 A CN115233874 A CN 115233874A
Authority
CN
China
Prior art keywords
building curtain
curtain wall
building
wall
filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210881351.2A
Other languages
Chinese (zh)
Other versions
CN115233874B (en
Inventor
黄意柔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Rongda Construction Engineering Group Co ltd
Original Assignee
Jiangxi Rongda Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Rongda Construction Engineering Group Co ltd filed Critical Jiangxi Rongda Construction Engineering Group Co ltd
Priority to CN202210881351.2A priority Critical patent/CN115233874B/en
Publication of CN115233874A publication Critical patent/CN115233874A/en
Application granted granted Critical
Publication of CN115233874B publication Critical patent/CN115233874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47LDOMESTIC WASHING OR CLEANING; SUCTION CLEANERS IN GENERAL
    • A47L11/00Machines for cleaning floors, carpets, furniture, walls, or wall coverings
    • A47L11/38Machines, specially adapted for cleaning walls, ceilings, roofs, or the like
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47LDOMESTIC WASHING OR CLEANING; SUCTION CLEANERS IN GENERAL
    • A47L11/00Machines for cleaning floors, carpets, furniture, walls, or wall coverings
    • A47L11/40Parts or details of machines not provided for in groups A47L11/02 - A47L11/38, or not restricted to one of these groups, e.g. handles, arrangements of switches, skirts, buffers, levers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention relates to a curtain wall waterproof structure, in particular to a curtain wall waterproof structure of a building exceeding a roof. The invention provides a waterproof structure of a curtain wall of a building, which is characterized in that curtain walls are connected through clamping and waterproof sealing glue, so that the curtain walls and the wall are absolutely sealed, the condition of water leakage is avoided, and the curtain walls can be automatically cleaned in rainy days. The invention comprises a parapet wall, a house outer wall, a first building curtain wall and a second building curtain wall; first building curtain is installed to parapet top, and first building curtain is installed at parapet top with the form that hangs, and the outside of house outer wall is connected with second building curtain. The modeling of the first building curtain wall is designed into a hook shape, and the first building curtain wall is arranged on the first curtain wall in a hanging mode to fully cover the uppermost layer of the curtain wall, so that the first building curtain wall can be waterproof even if waterproof gel fails.

Description

Relate to and surpass roofing building curtain waterproof construction
Technical Field
The invention relates to a waterproof structure, in particular to a waterproof structure of a building curtain wall beyond a roof.
Background
In the construction process of the building curtain wall beyond the roof, how to ensure the waterproof quality of the building curtain wall is always an important topic needing discussion and research.
Current building curtain is through inside drainage system structure of establishing, adopts the decompression principle step by step, prevents that the rainwater from leaking to wall body and indoor, and the rethread uses waterproof material and annotates sealed glue at the binding off and reach water-proof effects. The complicated kneck of current curtain wall structure is many, and is up to the limit when sealed gluey life-span, and the rainwater flows into in the curtain wall and indoor from the kneck easily, and the installation of curtain is more troublesome to also do not dredge and maintain when the inside drainage system of curtain takes place to block up, also do not clean well.
In order to solve the problem that prior art exists, design one kind with connecting through joint and waterproof sealed glue between the curtain for absolute seal between the curtain and between curtain and the wall stops to fall the hourglass water condition, can also surpass roofing building curtain waterproof construction in the design of rainy day self-cleaning curtain.
Disclosure of Invention
In order to overcome the complicated kneck of structure many, when sealed gluey life-span to the limit, the rainwater flows into in the curtain wall and indoor from the kneck easily, and the installation of curtain is more troublesome to also do not good mediation and maintenance when the inside drainage system of curtain takes place to block up, also do not good clear shortcoming, technical problem: the utility model provides a connect through joint and waterproof sealed glue between with the curtain for absolute sealing between the curtain and between curtain and the wall stops the condition of leaking, can also surpass roofing building curtain waterproof construction in the design of rainy day self-cleaning curtain.
The technical scheme is as follows: the utility model provides a relate to surpass roofing building curtain waterproof construction, including the parapet, the house outer wall, first building curtain and second building curtain, first building curtain is installed at the parapet top, first building curtain installs at the parapet top with the form that hangs, the outside of house outer wall is connected with second building curtain, between first building curtain and the parapet, between second building curtain and the house outer wall and all through the adhesion of waterproof sealing glue film between first building curtain and the second building curtain, a serial communication port, still including first latch mechanism, second latch mechanism and self-cleaning mechanism, second building curtain top is equipped with at least one first latch mechanism, be equipped with at least one second latch mechanism on the house outer wall, first building curtain top is equipped with self-cleaning mechanism.
Optionally, the first clamping mechanism comprises a first fixing block, first wedge blocks and first springs, the top of the second building curtain wall is connected with at least one first fixing block, the first wedge blocks are arranged on two sides of the first fixing block in a sliding mode, the first springs are connected between the first fixing block and the first wedge blocks on two sides, at least one first clamping groove is formed in the bottom of the first building curtain wall, and the first wedge blocks are matched with the first clamping grooves.
Optionally, the second clamping mechanism comprises a second fixing block, a second wedge block and a second spring, at least one second fixing block is connected to the outer wall of the house, the second wedge block is arranged on the second fixing block in a sliding mode, the second spring is connected between the second fixing block and the second wedge block, at least one second clamping groove is formed in the inner side of the second building curtain wall, the second wedge block is matched with the second clamping groove, and at least one first clamping groove is formed in the bottom of the second building curtain wall.
Optionally, self-cleaning mechanism is including the fixed plate, the swash plate, the buckler, the filter screen, the dead lever, the cylinder brush, the connecting rod, the basin, the reel, the stay cord, spiral spring and breakwater, first building curtain top is connected with the fixed plate, the fixed plate top is equipped with the swash plate, fixed plate front side symmetrical formula is connected with two bucklers, be connected with the filter screen between the buckler, the inside equal rotary type of buckler is equipped with the reel, all be connected with spiral spring between reel both sides and the buckler inside wall, around there being the stay cord on the reel, be connected with the dead lever between the bottom of two stay cords, dead lever middle part rotary type is connected with the cylinder brush, the cylinder brush contacts with first building curtain and second building curtain, the bottom of dead lever both sides all is connected with the connecting rod, be connected with the basin between the connecting rod bottom, the basin bottom rotary type is connected with the breakwater.
Optionally, the building further comprises a filling mechanism, the filling mechanism comprises a first filler, an inclined block and a second filler, the first filler is installed at the corner of the parapet wall, the second filler is installed at the corner of the outer wall of the building, the inclined block is connected to the top of the first filler, and the top of the second filler on the uppermost layer of the building is connected with the first filler.
Optionally, the curtain wall structure further comprises a first bump and a second bump, at least one first bump is arranged on the right side of the first building curtain wall, at least one first bump is arranged on the right side of the first filler, at least one first socket is arranged on the left side of the first building curtain wall, at least one first socket is arranged on the left side of the first filler, the first bump on the first building curtain wall is matched with the first socket of the first building curtain wall on the adjacent side, at least one second bump is arranged on the right side of the second building curtain wall, at least one second socket is arranged on the left side of the second filler, the second bump between the second building curtain walls on two adjacent sides in the horizontal direction is matched with the second socket, the first building curtain wall is attached to the first filler, and the second building curtain wall is attached to the second filler.
Optionally, the building curtain wall further comprises a top plate, the bottom of the second building curtain wall at the lowest layer in the building process is provided with the top plate, and the top plate is matched with the water baffle.
Optionally, the first building curtain wall is a metal curtain wall, and the second building curtain wall is a glass curtain wall.
The invention has the beneficial effects that: 1. the modeling design of first building curtain is hook-shaped to install on first curtain wall in a mode of hanging and can carry out the full coverage to the curtain superiors, even if under the circumstances that waterproof gel became invalid, still can effectual waterproof.
2. The device simplifies the installation process of the curtain wall through the first clamping machine and the second clamping mechanism, reduces gaps between the curtain walls, is simple and convenient to install and labor-saving, and ensures the waterproof effect to the greatest extent.
3. When the automatic cleaning mechanism is in rainy days, particularly in wind and sand days accompanied by rainy days, the curtain wall can be brushed up and down repeatedly and continuously by the automatic cleaning mechanism.
4. This application makes the curtain of building corner connect through filling the mechanism, has guaranteed wholeness and leakproofness between the curtain on the not equidirectional wall to and the waterproof of corner.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
FIG. 2 is a schematic view of a first partial body structure according to the present invention.
Fig. 3 is a schematic diagram of a second partial body structure according to the present invention.
Fig. 4 is a schematic perspective view of the automatic cleaning mechanism of the present invention.
FIG. 5 is a schematic diagram of a first partially assembled body of the automatic cleaning mechanism of the present invention.
FIG. 6 is a schematic diagram of a second partial structure of the automatic cleaning mechanism of the present invention.
Fig. 7 is a schematic perspective view of the filling mechanism of the present invention.
Fig. 8 is an exploded view of the first clamping mechanism of the present invention.
FIG. 9 is an exploded view of a second clamping mechanism according to the present invention.
Fig. 10 is a schematic perspective view of a second building curtain wall and other components of the present invention.
Fig. 11 is a schematic perspective view of a first building curtain wall and other components of the present invention.
FIG. 12 is a schematic perspective view of a water tank and a water guard plate according to the present invention.
Reference numbers in the drawings: 1: parapet, 2: house outer wall, 3: first building curtain wall, 30: first socket, 31: first bump, 4: second building curtain wall, 40: second socket, 41: second bump, 5: waterproof sealant layer, 6: first latch mechanism, 60: first fixing block, 61: first wedge, 62: first spring, 63: first card slot, 7: second click mechanism, 70: second fixed block, 71: second wedge, 72: second spring, 73: second card slot, 8: automatic cleaning mechanism, 80: fixing plate, 81: swash plate, 82: waterproof cover, 83: filter screen, 84: fixing rod, 841: roller brush, 85: connecting rod, 86: water tank, 87: reel, 88: a pull cord, 89: scroll spring, 810: water guard plate, 9: filling mechanism, 90: first filler, 91: swash block, 92: second filler, 10: a top plate.
Detailed Description
Embodiments of the present invention will be described below with reference to the drawings.
Example 1
The utility model relates to a relate to and surpass roofing building curtain waterproof construction, as shown in fig. 1-6 and 8-12, including parapet 1, house outer wall 2, first building curtain 3 and second building curtain 4, first building curtain 3 is installed at parapet 1 top with the form that hangs, the outside of house outer wall 2 is connected with second building curtain 4, between first building curtain 3 and parapet 1, between second building curtain 4 and the house outer wall 2 and between first building curtain 3 and the second building curtain 4 all through the adhesion of waterproof sealant layer 5, still including first clamping mechanism 6, second clamping mechanism 7 and self-cleaning mechanism 8, second building curtain 4 top welding has four first clamping mechanism 6, house outer wall 2 welding has four second clamping mechanism 7, first building curtain 3 top is equipped with self-cleaning mechanism 8, first building curtain 3 is the metal curtain, second building curtain 4 is the glass curtain.
When the waterproof structure of the building curtain wall beyond the roof is required to be used, firstly, a second clamping mechanism 7 is cast and connected on the outer wall 2 of the house according to the position where the second building curtain wall 4 is pre-installed, then, a plurality of second building curtain walls 4 are spliced together according to the width of the house, waterproof gel is coated on the lowest layer of the outer wall 2 of the house where the second building curtain wall 4 needs to be connected, the waterproof gel is prevented from being coated in a glass area, then, the spliced second building curtain wall 4 is installed on the outer wall 2 of the house, and finally, the extruded waterproof gel is erased; after the second building curtain wall 4 of the lowermost floor is installed, the second building curtain wall 4 of the second floor is spliced by repeating the above operation, after waterproof gel is coated, the bottom of the second building curtain wall 4 of the second floor is slightly inclined inwards and pushed towards the first clamping mechanism 6 at the top of the second building curtain wall 4 of the lowermost floor until the first clamping mechanism 6 clamps the second building curtain wall 4, and at the moment, the second building curtain wall 4 of the second floor is righted and attached to the second clamping mechanism 7 on the outer wall 2 of the house. Afterwards, the second building curtain wall 4 is installed below the parapet wall 1 by repeating the operation, the first building curtain wall 3 is spliced together, waterproof gel is coated at a place where the outer wall of the parapet wall 1 needs to be connected with the first building curtain wall 3, then the spliced first building curtain wall 3 is aligned with the first clamping mechanism 6 at the top of the uppermost layer of second building curtain wall 4 and is vertically and downwards installed on the parapet wall 1 in a hanging mode, the first building curtain wall 3 can be clamped with the uppermost layer of second building curtain wall 4 and is tightly attached to the parapet wall 1 through the waterproof gel, the waterproof gel is also coated between the curtain walls, the stability and the waterproofness of the curtain walls are ensured by double fixation, and when raining occurs, the automatic cleaning mechanism 8 can automatically clean the first building curtain wall 3 and the second building curtain wall 4 by utilizing rainwater.
As shown in fig. 2, 8 and 10, the first clamping mechanism 6 includes a first fixing block 60, a first wedge block 61 and a first spring 62, four first fixing blocks 60 are fixedly connected to the top of the second building curtain wall 4, the first wedge block 61 is slidably disposed on two sides of the first fixing block 60, the first spring 62 is fixedly connected between the first fixing block 60 and the first wedge block 61 on the same side, four first clamping grooves 63 are formed in the bottom of the first building curtain wall 3, and the first wedge block 61 is matched with the first clamping grooves 63.
As shown in fig. 2, fig. 3 and fig. 9, the second clamping mechanism 7 includes a second fixing block 70, a second wedge block 71 and a second spring 72, four second fixing blocks 70 are fixedly connected to the outer wall 2 of the house, the second wedge block 71 is slidably disposed on the lower side of the second fixing block 70, the second spring 72 is fixedly connected between the second fixing block 70 and the second wedge block 71, four second clamping grooves 73 are formed in the inner side of the second building curtain wall 4, the second wedge block 71 is matched with the second clamping grooves 73, and four first clamping grooves 63 are also formed in the bottom of the second building curtain wall 4.
As shown in fig. 3, 7, 10 and 11, the curtain wall further comprises a first projection 31 and a second projection 41, four first projections 31 are arranged on the right side of the first building curtain wall 3, four first sockets 30 are arranged on the left side of the first building curtain wall 3, the first projection 31 on one first building curtain wall 3 is matched with the first socket 30 of the adjacent first building curtain wall 3 on the other side, four second projections 41 are welded on the right side of the second building curtain wall 4, four second sockets 40 are arranged on the left side of the second building curtain wall 4, and the second projection 41 between the two adjacent second building curtain walls 4 in the horizontal direction is matched with the second sockets 40.
When the structure is used, a plurality of second building curtain walls 4 are spliced together through the second convex blocks 41 and the second sockets 40, then the spliced second building curtain walls 4 are aligned with the second clamping grooves 73 through the second fixing blocks 70 and are installed on the outer wall 2 of the house, when the second wedge blocks 71 are contacted with the outer wall 2 of the house, the second springs 72 are compressed, when the second clamping mechanism 7 completely enters the second clamping grooves 73, the second springs 72 are reset to drive the second wedge blocks 71 to move outwards to clamp the second building curtain walls 4, when the second building curtain walls 4 of the second layer are installed, the first clamping grooves 63 at the bottom of the second building curtain walls 4 of the second layer are aligned with the first fixing blocks 60 at the tops of the second building curtain walls 4 of the lowest layer, then the bottoms of the second building curtain walls 4 of the second layer are slightly inclined inwards and are pushed towards the first fixing blocks 60 at the tops of the second building curtain walls 4 of the lowest layer, when the first clamping groove 63 at the bottom of the second layer of the second building curtain wall 4 is slowly attached to the first wedge block 61 at the top of the second building curtain wall 4 at the lowest layer, the first wedge block 61 is extruded to move inwards, the first spring 62 is compressed until the first clamping mechanism 6 completely enters the first clamping groove 63, the first spring 62 is reset to drive the first wedge block 61 to move outwards and reset to clamp the second building curtain wall 4, and because the outer frame of the second building curtain wall 4 is made of aluminum alloy and has certain ductility, the edge of the first clamping groove 63 can slightly deform at the moment, so that the second building curtain wall 4 at the second layer can continuously align, and the second clamping groove 73 on the second building curtain wall 4 can be attached to the second clamping mechanism 7 on the outer wall 2 of the house, and meanwhile, a gap can appear between the edge of the first clamping groove 63 and the first fixing block 60 as well as the first clamping groove 61, but enough waterproof gel is coated before installation, the waterproof gel will automatically fill into the gaps that occur during installation, ensuring complete closure. Finally splice together first building curtain 3 through first lug 31 and first socket 30 and scribble waterproof gel in parapet 1 outer wall needs with the place that first building curtain 3 is connected, then align the first draw-in groove 63 and the first fixed block 60 at the second building curtain 4 top of the superiors of the first building curtain 3 bottom that splices and install on parapet 1 with the vertical downward installation of the mode of hanging, first building curtain 3 can be with the second building curtain 4 chucking of the superiors and closely laminate through waterproof gel and parapet 1, waterproof gel has also been scribbled between the curtain, dual fixed stability and the waterproof nature of having guaranteed the curtain.
Example 2
On the basis of embodiment 1, as shown in fig. 1, 4, 5 and 6, the automatic cleaning mechanism 8 includes a fixing plate 80, an inclined plate 81, a waterproof cover 82, a filter screen 83, a fixing rod 84, a roller brush 841, a connecting rod 85, a water tank 86, a reel 87, a pull rope 88, a scroll spring 89 and a water baffle 810, the fixing plate 80 is connected to the top of the first building curtain wall 3, the inclined plate 81 is arranged on the top of the fixing plate 80, two waterproof covers 82 are symmetrically connected to the front side of the fixing plate 80 through bolts, the filter screen 83 is connected between the waterproof covers 82 through the bolts, the reel 87 is rotatably arranged inside the waterproof cover 82, rotary damping is arranged between the reel 87 and the inside of the waterproof cover 82, the scroll spring 89 is fixedly connected between the two sides of the reel 87 and the inside wall of the waterproof cover 82, the pull rope 88 is wound on the reel 87, the fixing rod 84 is connected between the extending ends of the two pull ropes 88, the roller brush 841 is rotatably connected to the middle of the fixing rod 84, the roller brush 841 is in contact with the curtain wall, the connecting rod 85 is welded to the bottom of the two sides of the fixing rod 84, the water tank 86 is connected with the water tank 86, and the water baffle 810 is connected to the bottom 810.
As shown in fig. 1-3 and 10, the curtain wall further comprises a top plate 10, the top plate 10 is fixedly installed on the lower outer side of the second building curtain wall 4 at the lowest layer in the building process, and the top plate 10 is matched with the water baffle 810.
When the rain falls in rainy days, particularly in windy and sandy days accompanied by rainy days, rainwater flows down along the inclined plate 81, the filter screen 83 can filter sediment in rainwater, the filtered rainwater falls downwards onto the roller brush 841 and then falls into the water tank 86, when the water in the water tank 86 is full, the gravity of the water tank 86 and the roller brush 841 is just greater than the elastic force of the scroll spring 89, the water tank 86 falls with the roller brush 841, the pull rope 88 is gradually drawn out, the roller brush 841 brushes curtain walls in the falling process, when the water tank 86 falls to the lowest point, the water baffle 810 at the bottom of the water tank 86 is in contact with the top plate 10 and is pushed up by the top plate 10 to rotate upwards to open, the water in the water tank 86 flows out and is quickly finished, at the moment, the gravity of the water tank 86 and the roller brush 841 is less than the elastic force of the scroll spring 89, the water tank 86 and the roller brush 841 start to reset, the water tank 86 and the roller brush 841 are driven to move upwards, the water tank 86 and the filter screen wall can be cleaned again after separating from the water tank 86 and the filter screen wall 83 can be cleaned again, when the filter screen 83 and the water tank 88 are cleaned again, and the filter screen can be cleaned again after the water tank 83 are removed again.
Example 3
Based on embodiment 2, as shown in fig. 7, the curtain wall building further includes a filling mechanism 9, the filling mechanism 9 includes a first filler 90, an inclined block 91 and a second filler 92, the first filler 90 is installed at a corner of the parapet wall 1, the second filler 92 is installed at a corner of the house outer wall 2, the inclined block 91 is connected to the top of the first filler 90, the top of the second filler 92 at the uppermost layer of the building is connected to the first filler 90, four first protrusions 31 are arranged on the right side of the first filler 90, four first sockets 30 are arranged on the left side of the first filler 90, four second protrusions 41 are arranged on the right side of the second filler 92, four second sockets 40 are arranged on the left side of the second filler 92, the first curtain wall 3 is attached to the first filler (90), and the second curtain wall 4 is attached to the second filler 92.
When the curtain needs to be connected at the corner of a building, the curtain wall in one direction can be completely installed, then the second filler 92 is connected with the second curtain wall at the bottommost layer through the second socket 40 and the second bump 41, the second filler 92 is installed upwards in sequence, the first filler 90 is connected with the first curtain wall through the first socket 30 and the first bump 31 to the topmost layer, the inclined block 91 is connected with the top of the first filler 90, the fillers and the curtain wall are connected through waterproof gel, so that the curtain wall on the wall surface after the inclined block 91 is turned can be installed, the integrity of the installation of the curtain wall is guaranteed, the inclined block 91 can drain rainwater downwards, and the water prevention of the corner is guaranteed.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model relates to a relate to and surpass roofing building curtain waterproof construction, including parapet (1), house outer wall (2), first building curtain (3) and second building curtain (4), first building curtain (3) are installed at parapet (1) top with the form that hangs, the outside of house outer wall (2) is connected with second building curtain (4), between first building curtain (3) and parapet (1), between second building curtain (4) and house outer wall (2) and between first building curtain (3) and second building curtain (4) all through waterproof sealant layer (5) adhesion, a serial communication port, still including first clamping mechanism (6), second clamping mechanism (7) and self-cleaning mechanism (8), second building curtain (4) top is equipped with at least one first clamping mechanism (6), be equipped with at least one second clamping mechanism (7) on house outer wall (2), first building curtain (3) top is equipped with self-cleaning mechanism (8).
2. The waterproof structure of the curtain wall of the building over the roof as claimed in claim 1, wherein the first clamping mechanism (6) comprises a first fixing block (60), a first wedge block (61) and a first spring (62), the top of the second building curtain wall (4) is connected with at least one first fixing block (60), the first wedge block (61) is arranged on two sides of the first fixing block (60) in a sliding manner, the first spring (62) is connected between the first fixing block (60) and the first wedge block (61) on the two sides, the bottom of the first building curtain wall (3) is provided with at least one first clamping groove (63), and the first wedge block (61) is matched with the first clamping groove (63).
3. The waterproof structure of the curtain wall of the building exceeding the roof as claimed in claim 2, wherein the second clamping mechanism (7) comprises a second fixing block (70), a second wedge block (71) and a second spring (72), the outer wall (2) of the building is connected with at least one second fixing block (70), the second fixing block (70) is slidably provided with the second wedge block (71), the second spring (72) is connected between the second fixing block (70) and the second wedge block (71), the inner side of the second building curtain wall (4) is provided with at least one second clamping groove (73), the second wedge block (71) is matched with the second clamping groove (73), and the bottom of the second building curtain wall (4) is also provided with at least one first clamping groove (63).
4. The waterproof structure of the curtain wall of the building exceeding the roof as claimed in claim 1 is characterized in that the automatic cleaning mechanism (8) comprises a fixing plate (80), an inclined plate (81), waterproof covers (82), a filter screen (83), fixing rods (84), a roller brush (841), a connecting rod (85), a water tank (86), a winding wheel (87), a pull rope (88), a volute spring (89) and a water baffle (810), the fixing plate (80) is connected to the top of the first building curtain wall (3), the inclined plate (81) is arranged at the top of the fixing plate (80), the two waterproof covers (82) are symmetrically connected to the front side of the fixing plate (80), the filter screen (83) is connected between the waterproof covers (82), the winding wheel (87) is arranged in the waterproof cover (82) in a rotating mode, the volute spring (89) is connected between the two sides of the winding wheel (87) and the inner side wall of the waterproof cover (82), the pull rope (88) is wound on the winding wheel (87), the fixing rods (84) are connected between the bottom ends of the two pull ropes (88), the rotary type roller brush (84) is connected with the fixing rods (84), the roller brush (841) is connected with the first building curtain wall (3) and the second building curtain wall (4), and the connecting rod (85), a water tank (86) is connected between the bottom ends of the connecting rods (85), and a water baffle (810) is rotatably connected to the bottom of the water tank (86).
5. The waterproof structure related to the curtain wall of the over-roof building is characterized by further comprising a filling mechanism (9), wherein the filling mechanism (9) comprises a first filler (90), an inclined block (91) and a second filler (92), the first filler (90) is installed at the corner of the parapet wall (1), the second filler (92) is installed at the corner of the outer wall (2) of the house, the inclined block (91) is connected to the top of the first filler (90), and the top of the second filler (92) at the uppermost layer of the building is connected with the first filler (90).
6. A waterproof structure of a building curtain wall over roof as claimed in claim 5, characterized in that it further comprises a first projection (31) and a second projection (41), the right side of the first building curtain wall (3) is provided with at least one first projection (31), the right side of the first filler (90) is provided with at least one first projection (31), the left side of the first building curtain wall (3) is provided with at least one first socket (30), the left side of the first filler (90) is provided with at least one first socket (30), the first projection (31) on the first building curtain wall (3) is fitted with the first socket (30) of the first building curtain wall (3) on the adjacent side, the right side of the second building curtain wall (4) is provided with at least one second projection (41), the right side of the second filler (92) is provided with at least one second projection (41), the left side of the second building curtain wall (4) is provided with at least one second socket (40), the left side of the second filler (92) is fitted with the second building curtain wall (40), the second plug (90) is fitted with the second socket (40) on the adjacent side of the building curtain wall (4), and the second filler (92).
7. The waterproof structure of the curtain wall of the building exceeding the roof is characterized by further comprising a top plate (10), wherein the top plate (10) is arranged at the bottom of the second building curtain wall (4) at the lowest layer in the building process, and the top plate (10) is matched with the water baffle plate (810).
8. A water-proof structure relating to building curtain walls beyond roofing according to claim 1, characterised in that the first building curtain wall (3) is a metal curtain wall and the second building curtain wall (4) is a glass curtain wall.
CN202210881351.2A 2022-07-26 2022-07-26 Waterproof structure for building curtain wall exceeding roof Active CN115233874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210881351.2A CN115233874B (en) 2022-07-26 2022-07-26 Waterproof structure for building curtain wall exceeding roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210881351.2A CN115233874B (en) 2022-07-26 2022-07-26 Waterproof structure for building curtain wall exceeding roof

Publications (2)

Publication Number Publication Date
CN115233874A true CN115233874A (en) 2022-10-25
CN115233874B CN115233874B (en) 2023-07-21

Family

ID=83675760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210881351.2A Active CN115233874B (en) 2022-07-26 2022-07-26 Waterproof structure for building curtain wall exceeding roof

Country Status (1)

Country Link
CN (1) CN115233874B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0710410D0 (en) * 2007-05-29 2007-07-11 Canavan Donald Facade rainwater harvesting system
CN211257452U (en) * 2019-08-21 2020-08-14 谢陶明 Building curtain wall with splicing and positioning structure
CN211861203U (en) * 2020-01-14 2020-11-06 安徽省宁国市鸿辉电力安装有限公司 Green building's afforestation curtain
CN213233927U (en) * 2020-08-17 2021-05-18 科思达工程技术有限公司 Building concatenation type curtain
CN113242008A (en) * 2021-06-21 2021-08-10 陈昶林 Photovoltaic module for photovoltaic curtain wall
CN213952639U (en) * 2020-11-04 2021-08-13 广东豪龙建设有限公司 Curtain wall for architectural decoration
CN213979484U (en) * 2020-10-28 2021-08-17 湖北恒瑞幕墙装饰材料有限公司 Curtain board for architectural decoration convenient to installation
CN214574963U (en) * 2021-01-15 2021-11-02 浙江搏鸿建设工程有限公司 Waterproof structure of building curtain wall over roof
CN113846783A (en) * 2021-11-10 2021-12-28 合肥诺焱科技有限公司 Intelligent building curtain wall
CN215368090U (en) * 2020-12-18 2021-12-31 深圳市金丰泰建筑装饰设计工程有限公司 Assembled building curtain
CN215563651U (en) * 2021-08-18 2022-01-18 广东凯宏建设工程有限公司 Stone curtain wall

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0710410D0 (en) * 2007-05-29 2007-07-11 Canavan Donald Facade rainwater harvesting system
CN211257452U (en) * 2019-08-21 2020-08-14 谢陶明 Building curtain wall with splicing and positioning structure
CN211861203U (en) * 2020-01-14 2020-11-06 安徽省宁国市鸿辉电力安装有限公司 Green building's afforestation curtain
CN213233927U (en) * 2020-08-17 2021-05-18 科思达工程技术有限公司 Building concatenation type curtain
CN213979484U (en) * 2020-10-28 2021-08-17 湖北恒瑞幕墙装饰材料有限公司 Curtain board for architectural decoration convenient to installation
CN213952639U (en) * 2020-11-04 2021-08-13 广东豪龙建设有限公司 Curtain wall for architectural decoration
CN215368090U (en) * 2020-12-18 2021-12-31 深圳市金丰泰建筑装饰设计工程有限公司 Assembled building curtain
CN214574963U (en) * 2021-01-15 2021-11-02 浙江搏鸿建设工程有限公司 Waterproof structure of building curtain wall over roof
CN113242008A (en) * 2021-06-21 2021-08-10 陈昶林 Photovoltaic module for photovoltaic curtain wall
CN215563651U (en) * 2021-08-18 2022-01-18 广东凯宏建设工程有限公司 Stone curtain wall
CN113846783A (en) * 2021-11-10 2021-12-28 合肥诺焱科技有限公司 Intelligent building curtain wall

Also Published As

Publication number Publication date
CN115233874B (en) 2023-07-21

Similar Documents

Publication Publication Date Title
CN211080809U (en) Architectural design roof eaves mouth waterproof construction
CN115233874A (en) Relate to and surpass roofing building curtain waterproof construction
CN2860008Y (en) Rack
CN112172581A (en) New energy automobile fills electric pile
CN109882033B (en) Waterproof structure for building door and window
CN213742914U (en) Outer window waterproof construction
CN207405893U (en) A kind of lighting roof for top of building
CN207919730U (en) A kind of urgent drainage equipment applied to underground tunnel project
CN214461885U (en) Daylighting top protrusion opening fan
CN207974398U (en) roof waterproof structure
CN212454189U (en) Flange device
CN207228888U (en) A kind of installation node of waterproof exterior window trim
CN212715688U (en) Skylight of various steel roofing
CN208363919U (en) Aluminium alloy windowsill apron flashing
CN210422400U (en) Waterproof structure of gap for building outer door and window
CN211018326U (en) Column water film deduster charging structure
CN204754609U (en) Window board
CN107630530A (en) A kind of new rain cover draining awning
CN210562878U (en) Curtain wall waterproof structure at girl wall eave
CN219061340U (en) Water seepage-proof aluminum alloy door and window
CN206844962U (en) A kind of glass sunlight house waterproof opening structure
CN214531550U (en) Daylighting skylight structure
CN219060401U (en) Assembled unit curtain wall drainage structures
CN213296920U (en) Aluminum curtain wall is towards waterproof structure of crowded glue of sky panel piece
CN220100417U (en) Daylighting well skylight structure flush with glass

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant