Prior art keywords
wire rope
steel wire
hanging
support frame
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210981350.5A
Other languages
Chinese (zh)
Inventor
赵华颖
刘宇超
林林
甘英杰
陈凯
李安青
李阳
陈浩
付建武
裴卫昶
李海龙
唐红旭
熊佳康
杨萌
熊磊晋
沈传东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202210981350.5A priority Critical patent/CN115217314A/en
Publication of CN115217314A publication Critical patent/CN115217314A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/041Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffolds on roof frameworks or on roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a hanging basket track restraining device of a building facade with a complex shape and a construction method thereof, wherein the restraining device comprises: the hanging basket hanging mechanism, the first support frame, the second support frame, the ground fixing plate, the hanging basket hanging platform, the guide steel wire rope and the working steel wire rope are arranged on the hanging basket hanging mechanism; the hanging basket hanging mechanism is arranged at the top of a first floor layer, the ground fixing plate is fixedly arranged on the ground, the first support frame is fixedly arranged on the first floor layer, and the second support frame is fixedly arranged on a second floor layer; one end of the guide steel wire rope is fixedly arranged on the first support frame, and the other end of the guide steel wire rope penetrates through the second support frame to be fixedly connected with the ground fixing plate; work wire rope's one end is connected with hanging flower basket suspension mechanism, and work wire rope's the other end passes first support frame and hangs the platform with the hanging flower basket and be connected, and the hanging flower basket hangs the platform and is connected with direction wire rope. The invention can keep the constant distance between the hanging basket and the operation surface, and improves the dilemma that the conventional hanging basket can only vertically lift for operation.

Description

Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a hanging basket rail restraining device for a building outer vertical surface with a complex shape and a construction method thereof.
Background
The hanging basket is widely applied to the field of building construction, is a commonly-used mode for the construction of the outer wall of the high-rise building at present due to the advantages of economy, practicality, safety, reliability, convenient operation, lower cost and the like, but the conventional hanging basket can only be used for vertical lifting operation. When the outer vertical face of the building is complex in shape, the vertical lifting operation mode of a conventional hanging basket is difficult to meet the use requirement, at the moment, a frequently-replaced hanging basket hanging mechanism is usually adopted for placing floors on a construction site, or an operation frame is erected to replace the hanging basket operation mode, the construction difficulty of any kind of construction mode is higher, and the construction efficiency is lower.
Patent 202111440846.3 discloses a slope curtain wall rail mounted hanging flower basket construction system, conveniently sets up hanging flower basket operation platform, improves the installation rate of slope curtain, avoids the curtain surface course damaged, and it is including hanging mechanism, hanging flower basket operation platform, work rope, wire rope, top support and anchor assembly, hang mechanism and top support setting at slope curtain top, anchor assembly sets up near the bottom position at slope curtain, wire rope one end is connected on the fixed bolster, the other end is connected on the anchor assembly; the hanging mechanism is characterized in that one end of the working rope is connected to the front end of the hanging mechanism, the other end of the working rope is connected to the hanging basket operation platform, and the hanging basket operation platform is connected to the steel wire rope and can move up and down along the steel wire rope.
The above patent can only solve the lifting operation of the slope type building outer vertical surface hanging basket, but can not be used when other hanging basket lifting operation with complex building outer vertical surface modeling is carried out. The problem that the hanging basket is lifted and lowered under the condition that the outer vertical surface of the building is complex in shape at the present stage cannot be solved, and therefore a device capable of solving the problem is needed.
Disclosure of Invention
Aiming at the defects of the prior art, the invention designs a hanging basket track restraining device for a building facade with a complex shape, which comprises: the hanging basket hanging mechanism, the first support frame, the second support frame, the ground fixing plate, the hanging basket hanging platform, the guide steel wire rope and the working steel wire rope are arranged on the hanging basket hanging mechanism; the hanging basket hanging mechanism is arranged at the top of a first floor layer, the ground fixing plate is fixedly arranged on the ground, the first support frame is fixedly arranged on the first floor layer, and the second support frame is fixedly arranged on a second floor layer; one end of the guide steel wire rope is fixedly arranged on the first support frame, and the other end of the guide steel wire rope penetrates through the second support frame to be fixedly connected with the ground fixing plate; the one end of work wire rope hangs the mechanism with the hanging flower basket and is connected, and work wire rope's the other end passes first support frame and is connected with hanging flower basket suspension platform, and hanging flower basket suspension platform is connected with direction wire rope.
Preferably, the hanging basket hanging platform is provided with a T-shaped frame and a temporary hook; the bottom of the T-shaped frame is fixedly connected with the hanging basket suspension platform, and two ends of the top of the T-shaped frame are respectively connected with the guide steel wire rope and the working steel wire rope; one end of the temporary hook is fixedly installed on the hanging basket hanging platform, and the other end of the temporary hook is connected with the guide steel wire rope.
Preferably, the T-shaped frame is provided with a working steel wire rope pulley, a guide steel wire rope pulley and a fixing bolt; the working steel wire rope pulley and the guide steel wire rope pulley are respectively arranged at two ends of the top of the T-shaped frame, the working steel wire rope pulley is connected with the working steel wire rope, and the guide steel wire rope pulley is connected with the guide steel wire rope; the T-shaped frame is fixedly arranged on the hanging basket hanging platform through a fixing bolt.
Preferably, the first support frame is provided with a first guide steel wire rope hole and a first floor layer fixing piece; the guide steel wire rope is fixedly connected with the first support frame through a first guide steel wire rope hole; the working steel wire rope passes through the first support frame through the working steel wire rope hole; first support frame passes through first floor layer mounting fixed mounting on first floor layer.
Preferably, the second support frame is provided with a second guide steel wire rope hole and a second floor layer fixing piece; the guide steel wire rope passes through the second support frame through the second guide steel wire rope hole; the second support frame passes through second floor layer mounting fixed mounting on the second floor layer.
Preferably, the top of the ground fixing plate is connected with the guide steel wire rope through a turn buckle, and the top of the ground fixing plate is fixedly installed on the ground through a ground fixing piece.
Preferably, the first floor layer is a top floor layer, and the second floor layer to the secondary top floor layer are the second floor layers.
Based on the same thought, the invention also provides a construction method of the hanging basket track restraining device of the building outer vertical surface with complex modeling, which comprises the following steps: s1: fixedly installing a hanging basket suspension mechanism on the top of the first floor layer, and debugging the hanging basket suspension mechanism; s2: fixedly mounting a first support frame on a first floor layer, fixedly mounting a second support frame on a second floor layer, and fixedly mounting a ground fixing plate on the ground; s3: installing a guide steel wire rope and a working steel wire rope; s4: assembling and installing a hanging basket suspension platform; s5: and starting a hoist in the hanging basket hanging mechanism, so that the hoist pulls the hanging basket hanging platform through a working steel wire rope to complete the lifting operation.
Preferably, S3: installing a guide steel wire rope and a working steel wire rope, comprising the following steps of: s31: one end of a guide steel wire rope is fixedly arranged on the first support frame, and the other end of the guide steel wire rope passes through the second support frame to be fixedly connected with the ground fixing plate; s32: one end of the working steel wire rope is connected with the hanging basket hanging mechanism, and the other end of the working steel wire rope penetrates through the first supporting frame.
Preferably, the ratio of S4: assembling and installing a hanging basket suspension platform comprises the following steps: s41: fixedly installing a T-shaped frame on the hanging basket hanging platform through a fixing bolt, and installing a temporary hook on the hanging basket hanging platform; s42: respectively installing a working steel wire rope pulley and a guide steel wire rope pulley at two ends of the top of the T-shaped frame; s43: hanging the temporary hook on the guide steel wire rope; s44: the end part of the working steel wire rope penetrates through the working steel wire rope pulley to be fixedly connected with the hanging basket suspension platform; connecting a guide steel wire rope pulley with a guide steel wire rope; s45: and taking down the temporary hook on the guide steel wire rope.
Compared with the closest prior art, the invention has the beneficial effects that:
the first support frame and the second support frame can enable the hanging basket hanging platform to move obliquely up and down along the direction of the guide steel wire rope no matter how complex the outer vertical surface of the building is, and keep a constant distance with the operation surface, so that the dilemma that the conventional hanging basket can only be vertically lifted is effectively improved.
Drawings
Fig. 1 is a schematic structural view of a basket rail restraining device for a building facade with a complex shape.
Fig. 2 is a schematic structural diagram of the first support frame of the present invention.
Fig. 3 is a schematic structural view of a second supporting frame of the present invention.
Fig. 4 is a schematic structural view of the ground fixing plate according to the present invention.
Figure 5 is a schematic structural view of the hanging basket suspension platform of the present invention.
FIG. 6 is a schematic structural view of a T-shaped frame according to the present invention.
Reference numerals are as follows:
1-basket hanging mechanism, 2-first support frame, 21-first guide steel wire rope hole, 22-working steel wire rope hole, 23-first floor layer fixing piece, 3-second support frame, 31-second guide steel wire rope hole, 32-second floor layer fixing piece, 4-ground fixing plate, 41-turn buckle, 42-ground fixing piece, 5-basket hanging platform, 51-T type frame, 52-temporary hook, 53-working steel wire rope pulley, 54-guide steel wire rope pulley, 55-fixing bolt, 6-guide steel wire rope, 7-working steel wire rope, 8-first floor layer, 9-second floor layer.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Example 1
As shown in fig. 1 to 6, the present invention provides a basket rail restraining device for building facades with complex shapes, which comprises: the hanging basket hanging device comprises a hanging basket hanging mechanism 1, a first support frame 2, a second support frame 3, a ground fixing plate 4, a hanging basket hanging platform 5, a guide steel wire rope 6 and a working steel wire rope 7; the hanging basket hanging mechanism 1 is arranged at the top of a first floor layer 8, the ground fixing plate 4 is fixedly arranged on the ground, the first support frame 2 is fixedly arranged on the first floor layer 8, and the second support frame 3 is fixedly arranged on a second floor layer 9; one end of a guide steel wire rope 6 is fixedly arranged on the first support frame 2, and the other end of the guide steel wire rope 6 passes through the second support frame 3 and is fixedly connected with the ground fixing plate 4; one end of the working steel wire rope 7 is connected with the hanging basket suspension mechanism 1, the other end of the working steel wire rope 7 penetrates through the first support frame 2 to be connected with the hanging basket suspension platform 5, and the hanging basket suspension platform 5 is connected with the guide steel wire rope 6. Preferably, the first floor layer 8 is a top floor layer, and the second floor layer to the second floor layer are the second floor layers 9. And a second support frame 3 is installed on each second floor layer 9. The length of the second support frame 3 is constant, so that the distance between the hanging platform 5 of the hanging basket and the building body is constant.
In a preferred embodiment, a T-shaped frame 51 and a temporary hook 52 are arranged on the hanging basket platform 5; the bottom of the T-shaped frame 51 is fixedly connected with the hanging basket suspension platform 5, and two ends of the top of the T-shaped frame 51 are respectively connected with the guide steel wire rope 6 and the working steel wire rope 7; one end of the temporary hook 52 is fixedly arranged on the hanging basket hanging platform 5, and the other end of the temporary hook 52 is connected with the guide steel wire rope 6.
In a preferred embodiment, the T-shaped frame 51 is provided with a working wire rope pulley 53, a guide wire rope pulley 54 and a fixing bolt 55; wherein, the working wire rope pulley 53 and the guiding wire rope pulley 54 are respectively arranged at two ends of the top of the T-shaped frame 51, the working wire rope pulley 53 is connected with the working wire rope 7, and the guiding wire rope pulley 54 is connected with the guiding wire rope 6; the T-shaped frame 51 is fixedly arranged on the hanging basket suspension platform 5 through a fixing bolt 55.
In a preferred embodiment, the first support frame 2 is provided with a first guiding wire rope hole 21 and a first floor fixing piece 23; wherein, the guide steel wire rope 6 is fixedly connected with the first support frame 2 through a first guide steel wire rope hole 21; the working steel wire rope 7 passes through the first support frame 2 through the working steel wire rope hole 22; the first support frame 2 is fixedly mounted on the first floor layer 8 by means of a first floor layer fixing element 23.
In a preferred embodiment, the second support frame 3 is provided with a second guide wire rope hole 31 and a second floor fixing element 32; wherein, the guide steel wire rope 6 passes through the second support frame 3 through the second guide steel wire rope hole 31; the second support frame 3 is fixedly mounted on the second floor layer 9 by means of second floor layer fixing elements 32.
In a preferred embodiment, the top of the ground fixing plate 4 is connected to the guide wire rope 6 by a turn buckle 41, and the top of the ground fixing plate 4 is fixedly installed on the ground by a ground fixing member 42.
Example 2
The invention also provides a construction method of the hanging basket rail restraining device for the building outer vertical surface with complex modeling, which comprises the following steps:
step 1: fixedly installing the hanging basket suspension mechanism 1 on the top of the first floor layer 8, and debugging the hanging basket suspension mechanism 1;
step 2: fixedly mounting the first support frame 2 on a first floor layer 8, fixedly mounting the second support frame 3 on a second floor layer 9, and fixedly mounting the ground fixing plate 4 on the ground;
and step 3: one end of a guide steel wire rope 6 is fixedly arranged on the first support frame 2, and the other end of the guide steel wire rope 6 passes through the second support frame 3 to be fixedly connected with the ground fixing plate 4; one end of the working steel wire rope 7 is connected with the hanging basket suspension mechanism 1, and the other end of the working steel wire rope 7 penetrates through the first support frame 2.
And 4, step 4: fixedly mounting the T-shaped frame 51 on the hanging basket suspension platform 5 through a fixing bolt 55, and mounting the temporary hook 52 on the hanging basket suspension platform 5; respectively installing a working steel wire rope pulley 53 and a guide steel wire rope pulley 54 at two ends of the top of the T-shaped frame 51; hanging the temporary hook 52 on the guide steel wire rope 6; the end part of the working steel wire rope 7 passes through the working steel wire rope pulley 53 to be fixedly connected with the hanging basket suspension platform 5; connecting the guide wire rope pulley 54 with the guide wire rope 6; the temporary hook 52 is taken off from the guide wire rope 6
And 5: and starting a hoist in the hanging basket suspension mechanism 1, so that the hoist pulls the hanging basket suspension platform 5 through the working steel wire rope 7 to complete the lifting operation.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, improvement or the like made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention as filed.

Claims (10)

1. A hanging flower basket track restraint device of building facade of complicated molding which characterized in that includes: the hanging basket hanging device comprises a hanging basket hanging mechanism (1), a first support frame (2), a second support frame (3), a ground fixing plate (4), a hanging basket hanging platform (5), a guide steel wire rope (6) and a working steel wire rope (7);
the hanging basket hanging mechanism (1) is arranged at the top of a first floor layer (8), the ground fixing plate (4) is fixedly arranged on the ground, the first support frame (2) is fixedly arranged on the first floor layer (8), and the second support frame (3) is fixedly arranged on a second floor layer (9);
one end of the guide steel wire rope (6) is fixedly arranged on the first support frame (2), and the other end of the guide steel wire rope (6) penetrates through the second support frame (3) to be fixedly connected with the ground fixing plate (4);
one end of the working steel wire rope (7) is connected with the hanging basket suspension mechanism (1), the other end of the working steel wire rope (7) penetrates through the first support frame (2) and the hanging basket suspension platform (5) to be connected, and the hanging basket suspension platform (5) is connected with the guide steel wire rope (6).
2. A basket rail restraining device for building facades of complex shapes as set forth in claim 1, characterized in that the basket suspension platform (5) is provided with T-shaped racks (51) and temporary hooks (52);
the bottom of the T-shaped frame (51) is fixedly connected with the hanging basket suspension platform (5), and two ends of the top of the T-shaped frame (51) are respectively connected with the guide steel wire rope (6) and the working steel wire rope (7);
one end of the temporary hook (52) is fixedly arranged on the hanging basket hanging platform (5), and the other end of the temporary hook (52) is connected with the guide steel wire rope (6).
3. A complex building facade basket rail restraint as claimed in claim 2 wherein the T-shaped frame (51) is provided with a work wire rope pulley (53), a guide wire rope pulley (54) and a fixing bolt (55);
the working steel wire rope pulley (53) and the guide steel wire rope pulley (54) are respectively arranged at two ends of the top of the T-shaped frame (51), the working steel wire rope pulley (53) is connected with the working steel wire rope (7), and the guide steel wire rope pulley (54) is connected with the guide steel wire rope (6);
the T-shaped frame (51) is fixedly arranged on the hanging basket suspension platform (5) through the fixing bolt (55).
4. A complex building facade basket rail restraint as claimed in claim 1 wherein the first support frame (2) is provided with a first guide wire rope hole (21) and a first floor layer fixture (23);
the guide steel wire rope (6) is fixedly connected with the first support frame (2) through the first guide steel wire rope hole (21);
the working steel wire rope (7) penetrates through the first support frame (2) through the working steel wire rope hole (22);
the first support frame (2) is fixedly installed on the first floor layer (8) through the first floor layer fixing piece (23).
5. A complex building facade basket rail restraint as claimed in claim 1 wherein the second support frame (3) is provided with a second guide wire rope hole (31) and a second floor layer fixture (32);
wherein the guide steel wire rope (6) passes through the second support frame (3) through the second guide steel wire rope hole (31);
the second support frame (3) is fixedly arranged on a second floor layer (9) through the second floor layer fixing piece (32).
6. A complex building facade basket rail restraint as claimed in claim 1 wherein the top of the ground fixing plate (4) is connected to the guide wire rope (6) by a basket bolt (41) and the top of the ground fixing plate (4) is fixedly mounted on the ground by a ground fixing member (42).
7. A basket rail restraint for intricately shaped building facades as claimed in any of claims 1-6, characterized in that the first floor level (8) is the top floor level and the second floor level to the next top floor level are the second floor level (9).
8. A method of constructing a complex building facade basket track restraint as defined in any one of claims 1 to 7 comprising the steps of:
s1: fixedly installing the hanging basket suspension mechanism (1) on the top of the first floor layer (8), and debugging the hanging basket suspension mechanism (1);
s2: fixedly mounting a first support frame (2) on the first floor layer (8), fixedly mounting a second support frame (3) on a second floor layer (9), and fixedly mounting a ground fixing plate (4) on the ground;
s3: installing a guide steel wire rope (6) and a working steel wire rope (7);
s4: assembling and installing a hanging basket suspension platform (5);
s5: and starting a hoister in the hanging basket hanging mechanism (1), and enabling the hoister to pull the hanging basket hanging platform (5) through a working steel wire rope (7) to finish lifting operation.
9. The construction method according to claim 8, wherein S3: installing a guide steel wire rope (6) and a working steel wire rope (7), comprising the following steps:
s31: one end of a guide steel wire rope (6) is fixedly arranged on the first support frame (2), and the other end of the guide steel wire rope (6) penetrates through the second support frame (3) to be fixedly connected with the ground fixing plate (4);
s32: one end of a working steel wire rope (7) is connected with the hanging basket hanging mechanism (1), and the other end of the working steel wire rope (7) penetrates through the first support frame (2).
10. The construction method according to claim 8, wherein S4: assembling and installing a hanging basket suspension platform (5) comprises the following steps:
s41: fixedly mounting a T-shaped frame (51) on the hanging basket suspension platform (5) through a fixing bolt (55), and mounting a temporary hook (52) on the hanging basket suspension platform (5);
s42: respectively installing a working steel wire rope pulley (53) and a guide steel wire rope pulley (54) at two ends of the top of the T-shaped frame (51);
s43: hanging the temporary hook (52) on the guide steel wire rope (6);
s44: the end part of the working steel wire rope (7) penetrates through the working steel wire rope pulley (53) to be fixedly connected with the hanging basket suspension platform (5); connecting a guide steel wire rope pulley (54) with a guide steel wire rope (6);
s45: and taking down the temporary hook (52) on the guide steel wire rope (6).
CN202210981350.5A 2022-08-16 2022-08-16 Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof Pending CN115217314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210981350.5A CN115217314A (en) 2022-08-16 2022-08-16 Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210981350.5A CN115217314A (en) 2022-08-16 2022-08-16 Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof

Publications (1)

Publication Number Publication Date
CN115217314A true CN115217314A (en) 2022-10-21

Family

ID=83615628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210981350.5A Pending CN115217314A (en) 2022-08-16 2022-08-16 Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof

Country Status (1)

Country Link
CN (1) CN115217314A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2400313A1 (en) * 1974-01-04 1975-08-21 Krupp Gmbh AUXILIARY DEVICE FOR A CABLE NET COOLING TOWER
CN214220561U (en) * 2020-08-28 2021-09-17 杭州悦为科技有限公司 Building slope facade diversion rail formula hanging flower basket construction platform
CN114033155A (en) * 2021-11-30 2022-02-11 中铁十局集团城建工程有限公司 Inclined plane curtain wall rail mounted hanging flower basket construction system
CN216340805U (en) * 2021-11-15 2022-04-19 中建海峡建设发展有限公司 Multi-section outward-inclined mechanical hanging basket
CN114482576A (en) * 2022-02-28 2022-05-13 中建海峡(厦门)建设发展有限公司 Building external inclined curved surface curtain wall installation construction device and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2400313A1 (en) * 1974-01-04 1975-08-21 Krupp Gmbh AUXILIARY DEVICE FOR A CABLE NET COOLING TOWER
CN214220561U (en) * 2020-08-28 2021-09-17 杭州悦为科技有限公司 Building slope facade diversion rail formula hanging flower basket construction platform
CN216340805U (en) * 2021-11-15 2022-04-19 中建海峡建设发展有限公司 Multi-section outward-inclined mechanical hanging basket
CN114033155A (en) * 2021-11-30 2022-02-11 中铁十局集团城建工程有限公司 Inclined plane curtain wall rail mounted hanging flower basket construction system
CN114482576A (en) * 2022-02-28 2022-05-13 中建海峡(厦门)建设发展有限公司 Building external inclined curved surface curtain wall installation construction device and construction method thereof

Similar Documents

Publication Publication Date Title
CN104379488B (en) Method and installation system for assembling elevator parts
JP2018070362A (en) Elevator installation method
KR20070005533A (en) Gang form
JP2002003124A (en) Elevator installing device, and installing method thereof
CN115217314A (en) Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof
CN217871735U (en) Hanging basket for building facade with complex shape
CN101768925B (en) Mounting equipment of beam falling prevention stopping block and construction method thereof
CN216196742U (en) A wallboard installation device for position is striden to height
KR20090084163A (en) Gang form climbing guide and system using the same
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN210134364U (en) Bridge construction device
JP2000169059A (en) Installation method of elevator
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
JP2000086113A (en) Elevator, and installation method thereof
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
JP4841171B2 (en) Rise-up elevator installation method
CN221140974U (en) Device for hoisting box girder anchorage device
JP2507636B2 (en) Mechanical platform support device for temporary elevator
CN110453836A (en) Oblique glass curtain wall installation system and installation method
CN218538894U (en) Self-lifting unloading platform
CN217461450U (en) Electric formwork climbing frame
CN220485065U (en) Prefabricated T roof beam side form hoist device
CN214462409U (en) Climbing frame attachment structure suitable for decorative constructional column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20221021