CN115162425B - Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level - Google Patents

Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level Download PDF

Info

Publication number
CN115162425B
CN115162425B CN202210764064.3A CN202210764064A CN115162425B CN 115162425 B CN115162425 B CN 115162425B CN 202210764064 A CN202210764064 A CN 202210764064A CN 115162425 B CN115162425 B CN 115162425B
Authority
CN
China
Prior art keywords
pile
force
bearing capacity
rock mass
counter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210764064.3A
Other languages
Chinese (zh)
Other versions
CN115162425A (en
Inventor
李剑
张太科
吴玲正
石海洋
付佰勇
过超
韩冬冬
刘星星
陈占力
师启龙
杨也
崔立川
王昊
王洋浩瀚
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bay Area Traffic Construction Investment Co ltd
CCCC Highway Consultants Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
Guangdong Bay Area Traffic Construction Investment Co ltd
CCCC Highway Consultants Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bay Area Traffic Construction Investment Co ltd, CCCC Highway Consultants Co Ltd, CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd filed Critical Guangdong Bay Area Traffic Construction Investment Co ltd
Priority to CN202210764064.3A priority Critical patent/CN115162425B/en
Publication of CN115162425A publication Critical patent/CN115162425A/en
Application granted granted Critical
Publication of CN115162425B publication Critical patent/CN115162425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/10Miscellaneous comprising sensor means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level, the system comprises a force transmission module used for transmitting force to a rock mass, a loading module used for providing power counter force for the force transmission module, a monitoring module used for monitoring settlement displacement and loading force data, and a fixing module for stabilizing the modules.

Description

Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level
Technical Field
The invention relates to the field of geotechnical engineering test, in particular to a method and a system for testing the bearing capacity of a rock mass under geological conditions of large burial depth and high water level.
Background
The choice of the elevation of the anchorage substrate of the suspension bridge needs to consider both the bearing capacity characteristic of the bearing stratum and the foundation pit excavation economy, and the traditional deep load plate test based on the manual hole digging process is mostly adopted to determine the bearing capacity of the deep rock and soil layer, but the safety risk and the high cost of the deep load plate test method provided by the existing standard are high for the bearing stratum under the geological conditions of large burial depth and high water level, and the difficulty of rock mass bearing capacity test is how to ensure the force transmission stability of the cast-in-place pile and improve the load proportion transferred to the end part.
In order to solve the problems, patent document CN 202020826092-a loading counterforce device for load test-utility model, a first retention plate and a retention counterforce steel beam are arranged on the upper end cover of a counterweight, steel bars are connected with two sides of the retention counterforce steel beam and a lower anchor pile, counterforce of the anchor pile is transferred to the retention counterforce steel beam when load test is carried out, the anchor pile and the counterweight are ensured to bear force simultaneously when the test is carried out, coordination and systematicness of the anchor pile and the counterweight are improved, and meanwhile, the counterweight is fixed by applying pressure through the first retention plate, so that the damage to a construction site or a worker caused by dumping of the counterweight is prevented.
The prior art has several disadvantages: (1) Under the condition of deeper stratum or weak soil environment stability, the loading process of the cast-in-place pile is easy to generate larger side friction with the soil body at the pile side, so that the load actually transferred to the pile end is reduced, and the loading load of the pile end bearing layer is insufficient; (2) For proposing to adopt double-walled bellows to keep apart pile foundation and pore wall to reduce the side friction scheme, the pile side confining pressure tends to be reduced, but because the pile foundation is longer, the pile foundation has self stability problem.
Disclosure of Invention
According to the method, through testing the load and sedimentation values of the bored pile end, the characteristic value of the bearing capacity of the deep rock mass of the pile end bearing layer is analyzed and obtained, when the bored pile is manufactured, an inner layer reinforcement cage is wrapped with a double-wall corrugated pipe to serve as an inner side retaining wall, the pile side friction resistance is reduced, the load proportion transferred to the pile end is improved, a steel retaining cylinder is adopted as the bored retaining wall for the outer layer, filling materials are filled between the inner wall and the outer wall, the stability of the pile foundation and the hole wall is ensured, the problems of high resistance and poor stability of the bearing capacity test side of the deep rock mass of the bored pile are solved, and the problems of poor bearing capacity test stability of the deep rock mass of the bored pile and insufficient load transfer to the end are solved.
In order to achieve the above object, according to one aspect of the present invention, there is provided a method for testing bearing capacity of a rock mass under geological conditions of large burial depth and high water level, comprising:
S100, drilling and clearing holes, namely, driving a steel pile casing in the plane position of a pile foundation, centering, adopting a rotary drilling drill or a percussion drill to finish hole forming operation, and adopting a reverse circulation process to carry out hole clearing work;
S200, binding a reinforcement cage, welding and fixing a reinforcement meter on the reinforcement cage, and embedding a protective sleeve for pile end settlement monitoring and a long reinforcement in the pipe;
S300, lowering the reinforcement cage and the inner protective cylinder, binding the sound measuring tube with the reinforcement cage, sealing the bottom of the sound measuring tube, wrapping the inner sleeve on the outer side of the reinforcement cage, hanging the inner sleeve and the reinforcement cage to a drilling hole for lowering, and filling a filler between the inner sleeve and the outer protective cylinder after lowering in place, wherein the periphery is uniformly filled in the filler filling process, and the perpendicularity of the reinforcement cage is ensured;
s400, pile foundation pouring and integrity detection, wherein before concrete pouring, a gas lift reverse circulation hole cleaning process is adopted to continuously clean holes of drilled holes, then pile body concrete pouring work is completed, and after the pile foundation strength meets the requirement, an ultrasonic non-damage method is used to detect the pile body quality;
S500, arranging a counter-force pile-up system, arranging the counter-force pile-up system after pile body concrete reaches an age, erecting a counter-force beam at the top of the pile body, arranging pile-up blocks at the top of the counter-force beam, respectively contacting the top of the pile body and the bottom of the counter-force beam at two ends of a jack, installing displacement sensors for pile top and pile end settlement monitoring on the counter-force beam, connecting a reinforcing steel bar meter and an acquisition instrument shaft force monitoring device, and completing rock mass bearing capacity test construction.
Further, the S100 includes: after the hole cleaning work is completed, the center deviation of the hole site, the hole diameter, the hole depth, the verticality of the drilled hole and the thickness of sediment at the bottom of the hole are checked.
Further, the S400 includes: and after the pile foundation detection is finished, filling concrete into the sounding pipe.
According to another aspect of the invention there is provided a rock mass bearing capacity testing system under high burial depth and high water level geological conditions, comprising:
The device comprises a force transmission module, a loading module, a sedimentation monitoring module and a fixing module, wherein the force transmission module is used for transmitting force to a rock mass, the loading module is used for providing counter force for the force transmission module, the sedimentation monitoring module is used for monitoring sedimentation displacement and loading force data, and the fixing module is used for stabilizing the modules;
The fixing module comprises a stacking block, a counter-force beam and a buttress, wherein the buttress is fixed on the ground, the counter-force beam is horizontally fixed on the buttress, and the stacking block is fixed on the counter-force beam;
The force transmission module comprises a filling pile, an inner sleeve, an outer protective cylinder and a filler, wherein the inner sleeve is sleeved outside the filling pile and used for reducing side friction force of the filling pile, the outer protective cylinder is arranged in a preset drilling hole, an interlayer is arranged between the inner sleeve and the outer protective cylinder, the filler is filled in the interlayer, the settlement monitoring module is arranged on the force transmission module, and the loading module is connected with the fixing module and the force transmission module.
Further, subside monitoring module includes displacement sensor, bar gauge, long reinforcing bar and outer tube, the bar gauge pre-buried be fixed in the bored concrete pile for detect the bearing capacity value, long reinforcing bar runs through the bottom and the top of bored concrete pile, the outer tube parcel is located on the long reinforcing bar, displacement sensor is fixed in the counter-force roof beam bottom.
Further, the loading module comprises a jack and an oil pump, wherein two ends of the jack are respectively fixed at the top end of the cast-in-place pile and the bottom of the counter-force beam, and the oil pump is communicated with an oil path of the jack.
Further, the pile foundation detection device comprises a sound tube, wherein the sound tube is fixed in the cast-in-place pile, the bottom of the sound tube is sealed, and concrete is filled in the sound tube after pile foundation detection is completed
In general, the above technical solutions conceived by the present invention, compared with the prior art, enable the following beneficial effects to be obtained:
1. The invention provides a rock mass bearing capacity testing system under geological conditions of large burial depth and high water level, which is characterized in that the bearing capacity characteristic value of deep rock mass of a pile end bearing layer is analyzed and obtained by testing the load and settlement values of a bored pile end, an inner layer reinforcement cage is wrapped with a double-wall corrugated pipe to serve as an inner side retaining wall when the bored pile is applied, the friction resistance of the pile side is reduced, the load proportion transferred to the pile end is improved, a steel retaining cylinder is adopted as the bored retaining wall at the outer layer, a filling material is filled between the inner wall and the outer wall, the stability of the pile foundation and the hole wall is ensured, the problems of high side resistance and poor stability of the bearing capacity testing of the deep rock mass bearing capacity of the bored pile under geological conditions of large burial depth and high water level are solved, and the problems of poor bearing capacity testing stability of the deep rock mass of the bored pile and insufficient load proportion transferred to the end are solved.
2. The invention provides a rock mass bearing capacity test method under geological conditions of large burial depth and high water level, which adopts a mode of embedding a protective sleeve in a cast-in-place pile in a monitoring sedimentation system, meanwhile, through-length steel bars are arranged in the pipe, the steel bars are completely separated from the protective sleeve and extend out from the top end of the cast-in-place pile, sedimentation data of the end of the cast-in-place pile can be obtained by monitoring sedimentation of the steel bars by using a displacement sensor, and accuracy of displacement data is ensured.
3. The invention provides a rock mass bearing capacity testing method under geological conditions of large burial depth and high water level, which is characterized in that slag is removed from a preset drilling hole before concrete is poured, so that the slag at the bottom end of a poured pile is ensured to be clean, compression of sediments in the loading process is avoided, and rock mass settlement deformation monitoring data of a pile end bearing layer are influenced.
Drawings
FIG. 1 is a front view of a rock mass bearing capacity testing system under high burial depth and high water level geological conditions in accordance with an embodiment of the present invention;
FIG. 2 is a partial enlarged view A of a rock mass bearing capacity test system under geological conditions of large burial depth and high water level according to an embodiment of the invention;
FIG. 3 is a diagram of a method for testing bearing capacity of a rock mass under geological conditions of large burial depth and high water level according to an embodiment of the invention;
Fig. 4 is a graph of pile stress versus time for a rock mass bearing capacity test of a double-walled cast-in-place pile according to an embodiment of the present invention.
Like reference numerals denote like technical features throughout the drawings, in particular: 1-pile loading block, 2-counterforce beam, 3-buttress, 4-jack, 5-displacement sensor, 6-oil pump, 7-filling pile, 8-inner casing, 9-outer casing, 10-filler and 11-reinforcing steel bar meter.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention. In addition, the technical features of the embodiments of the present invention described below may be combined with each other as long as they do not collide with each other.
The foundation bearing capacity of the anchorage substrate has important significance for reasonably determining the plane scale of the anchorage, the foundation and the reference can be provided for design, the pile loading method deep rock mass bearing capacity test is carried out on the basis of considering test rationality, the reasonable characteristic value of the foundation bearing capacity of the anchorage substrate is determined, the soil shallow layer of the area is provided with sludge with the depth of about forty meters, the water level is relatively deep, and after the construction of the cast-in-place pile is completed, the friction resistance of the sludge and clay to the pile body in the test process is easy to cause inaccurate bearing capacity test result.
As shown in fig. 1 to 3, the invention provides a rock mass bearing capacity test system under geological conditions of large burial depth and high water level, which comprises a force transmission module, a loading module, a settlement monitoring module and a fixing module, wherein the force transmission module is used for transmitting force to a rock mass, the loading module is used for providing counter force for the force transmission module, the settlement monitoring module is used for monitoring settlement displacement and loading force data, the fixing module is used for fixing the modules, the fixing module comprises a pile block 1, a counter force beam 2 and a buttress 3, the force transmission module comprises a filling pile 7, an inner sleeve 8, an outer protective sleeve 9 and a filling material 10, the loading module comprises a jack 4 and an oil pump 6, the jack 4 and the buttress 3 are arranged around the filling pile 7, the buttress is horizontally fixed on the ground, the upper surface is flush, the counter force beam 2 is used for mounting the counter force beam 2, the pile block 1 is fixedly piled on the upper surface of the counter force beam 2, the pile block 1 can be made of concrete, the device is used for compacting the counter-force beam 2 on the buttress 3 and providing counter force for loading the cast-in-place pile 7, further, the inner protective cylinder 8 is sleeved outside the reinforcement cage to serve as an inner protective wall, concrete is cast into the reinforcement cage to form the cast-in-place pile 7, the cast-in-place pile 7 is cast to serve as a force transmission column after reaching an age, the cast-in-place pile 7 is vertically arranged in a preset drilling hole, the drilling hole is positioned at the bottom of the counter-force beam 2, preferably, the inner protective cylinder 8 is made of double-wall corrugated pipe, the double-wall corrugated pipe is made of high-density polyethylene, the device has excellent ageing resistance and environmental stress cracking resistance, the double-wall corrugated pipe with thinner pipe wall is sleeved outside the reinforcement cage, the side body of the cast-in-place pile 7 can be prevented from being rubbed with broken stone directly, and the load proportion transferred to the end part of the cast-in-place pile 7 is improved. Further, an outer casing 9 is arranged on the outer side of the inner casing 8, the sleeve is made of a steel casing, a certain space is formed between the sleeve and the inner casing 8, and a filling material 10 is filled in the space, preferably, the filling material 10 can be made of gravels, and the filling material is supported between the inner casing 8 and the outer casing 9 through uniformly filling the gravels, so that stability of the filling pile 7 and the hole wall when force is transferred under the conditions of soft soil and large burial depth is ensured.
Further, the test system comprises a jack 4 and an oil pump 6, wherein two ends of the jack 4 are respectively fixed at the bottom of the counter-force beam 2 and the top of the filling pile 7, the jack 4 is vertically arranged, the oil pump 6 is externally connected with the jack 4, downward load is applied to the filling pile 7 by increasing oil pressure, and the counter-force beam 2 is pressed on the jack 4 to provide counter force for the filling pile 7.
Further, the test system comprises a displacement sensor 5, a reinforcing steel bar meter 11 and long reinforcing steel bars, wherein the reinforcing steel bar meter 11 is fixed in a bored pile 7 and used for detecting the bearing capacity, the long reinforcing steel bars penetrate through the top and the bottom of the bored pile 7, preferably, an outer sleeve is arranged on the long reinforcing steel bars, the bored pile 7 concrete is isolated from the long reinforcing steel bars, displacement data are obtained by detecting the sedimentation capacity of the long reinforcing steel bars through the displacement sensor 5, the displacement sensor 5 is fixed at the bottom of a counter-force beam 2, the sedimentation capacity of the bored pile 7 is recorded through the displacement sensor 5 and the reinforcing steel bar meter 11 in the pressurizing process of a jack 4, pile end load is obtained through the reinforcing steel bar meter 11, and finally, a pile end load-pile end sedimentation curve graph is obtained through the displacement data and the pile end load data.
1-3, According to another aspect of the present invention, the present invention provides a method for testing bearing capacity of a rock mass under geological conditions of large burial depth and high water level, which specifically includes:
s100, drilling and cleaning holes;
Specifically, determining the plane position of a pile foundation, driving a steel pile casing to a designed depth, then pulling a cross line for centering, adopting a rotary drilling or impact drilling to complete hole forming operation, carrying out hole cleaning work based on a reverse circulation process, and checking the deviation of the center of a hole site, the aperture, the depth of the hole, the verticality of the drilled hole and the thickness of sediment at the bottom of the hole, wherein the requirements of relevant indexes of the technical Specification of highway bridge and culvert construction (JTG/T3650-2020) are met;
s200, binding a reinforcement cage;
Specifically, a reinforcement meter is welded on a designed section position of a reinforcement cage in advance, a protective sleeve and an in-pipe long reinforcement for pile end settlement monitoring are embedded in advance, the in-pipe long reinforcement is completely isolated from a pile body by the protective sleeve, the settlement of the in-pipe long reinforcement at the pile top is monitored to be the pile end settlement value, the sleeve is ensured to be communicated when the reinforcement cage is put down and connected with the cage, the inner diameter of the pipe is preferably larger than the diameter of the long reinforcement, the in-pipe long reinforcement is in a free state, the deviation of the perpendicularity of the protective sleeve is not larger than 1%, and otherwise, the adjustment is required to be reinstalled;
s300, lowering the reinforcement cage and the inner casing;
Specifically, the reinforcement cage is sleeved into the double-wall corrugated pipe and bound with the double-wall corrugated pipe, the double-wall corrugated pipe mainly plays a role in reducing friction force between a pile body and a peripheral soil body, the double-wall corrugated pipe is used as a separating medium, even if crushed, the separating effect is not affected, finally, bearing capacity of a bearing layer is calculated based on the axial force actually monitored by a pile end, enough gaps are reserved between the reinforcement cage and the corrugated pipe to ensure thickness of a concrete protective layer, the reinforcement cage and the acoustic pipe are lowered to the bottom of a hole by a crane, then filling materials 10 are filled between the double-wall corrugated pipe and an outer protective cylinder, and the periphery of the double-wall corrugated pipe is uniformly filled in the process of filling the filling materials 10, so that the influence of bias voltage on the perpendicularity of the double-wall corrugated pipe is avoided;
S400, pile foundation pouring and integrity detection;
specifically, before concrete pouring, continuously clearing holes of a drilled hole by adopting a gas lift reverse circulation hole clearing process, pouring concrete can be started when the thickness of sediment at the pile end is not more than 1cm, pile body concrete pouring work is completed, after the strength of a pile foundation meets the requirement, the quality of the pile body is detected by adopting an ultrasonic non-breakage method, the integrity of the pile body is required to be a type I pile, and after the pile foundation detection is completed, grouting filling treatment is timely carried out on a sound detection pipe;
s500, arranging a counter-force stacking system;
Specifically, after pile body concrete reaches an age, a counter-force pile-up system is arranged, a counter-force beam is erected at the top of the pile body, pile-up blocks are arranged at the top of the counter-force beam, two ends of a jack are respectively contacted with the top of the pile body and the bottom of the counter-force beam, displacement sensors for monitoring pile top and pile end settlement are arranged on a reference beam, a reinforcing steel bar meter and an acquisition instrument shaft force monitoring device are connected, rock mass bearing capacity testing is started, a pile end bearing layer load-settlement relation curve is drawn by monitoring pile end settlement and pile end shaft force, and bearing capacity characteristic values of the bearing layer are analyzed according to the pile end bearing capacity curve;
S501, judging a bearing capacity characteristic value: the relative sedimentation control method is adopted, a load value corresponding to s/d=0.01-0.015 is selected as a bearing stratum characteristic value through a load-sedimentation (p-s) curve, but the value is not larger than 1/2 of the maximum loading capacity, if the range of measured values of three test points of the same stratum is not more than 30% of the average value, the average value is taken as a foundation bearing capacity characteristic value fak (kPa) of the soil layer, foundation bearing capacity correction of foundation burial is not carried out during use according to a foundation bearing capacity characteristic value fak determined by a deep load test, namely, the bearing capacity characteristic value of the bearing stratum obtained according to the method is taken as 0, s is pile end sedimentation, d is pile diameter, and the units are cm.
It will be readily appreciated by those skilled in the art that the foregoing description is merely a preferred embodiment of the invention and is not intended to limit the invention, but any modifications, equivalents, improvements or alternatives falling within the spirit and principles of the invention are intended to be included within the scope of the invention.

Claims (7)

1. The rock mass bearing capacity testing method under the geological condition of large burial depth and high water level is characterized by comprising the following steps:
S100, drilling and clearing holes, namely, driving a steel pile casing in the plane position of a pile foundation, centering, adopting a rotary drilling drill or a percussion drill to finish hole forming operation, and adopting a reverse circulation process to carry out hole clearing work;
S200, binding a reinforcement cage, welding and fixing a reinforcement meter on the reinforcement cage, and embedding a protective sleeve for pile end settlement monitoring and a long reinforcement in the pipe;
S300, lowering the reinforcement cage and the inner protective cylinder, binding the sound measuring tube with the reinforcement cage, sealing the bottom of the sound measuring tube, wrapping the inner sleeve on the outer side of the reinforcement cage, hanging the inner sleeve and the reinforcement cage to a drilling hole for lowering, filling filler between the inner sleeve and the outer protective cylinder after lowering in place, ensuring uniform filling around in the filler filling process, and adjusting the verticality of the reinforcement cage;
s400, pile foundation pouring and integrity detection, wherein before concrete pouring, a gas lift reverse circulation hole cleaning process is adopted to continuously clean holes of drilled holes, then pile body concrete pouring work is completed, and after the pile foundation strength meets the requirement, an ultrasonic non-damage method is used to detect the pile body quality;
S500, arranging a counter-force pile-up system, arranging the counter-force pile-up system after pile body concrete reaches an age, erecting a counter-force beam at the top of the pile body, arranging pile-up blocks at the top of the counter-force beam, respectively contacting the top of the pile body and the bottom of the counter-force beam at two ends of a jack, installing displacement sensors for pile top and pile end settlement monitoring on the counter-force beam, connecting a reinforcing steel bar meter and an acquisition instrument shaft force monitoring device, and completing rock mass bearing capacity test construction.
2. The method for testing the bearing capacity of a rock mass under geological conditions of large burial depth and high water level according to claim 1, wherein said S100 comprises: after the hole cleaning work is completed, the center deviation of the hole site, the hole diameter, the hole depth, the verticality of the drilled hole and the thickness of sediment at the bottom of the hole are checked.
3. The method for testing the bearing capacity of a rock mass under geological conditions of large burial depth and high water level according to claim 1, wherein said S400 comprises: and after the pile foundation detection is finished, filling concrete into the sounding pipe.
4. A system for testing the bearing capacity of a rock mass under geological conditions of large burial depth and high water level, which is used for realizing the method for testing the bearing capacity of the rock mass under geological conditions of large burial depth and high water level according to any one of claims 1 to 3, comprising:
The device comprises a force transmission module, a loading module, a sedimentation monitoring module and a fixing module, wherein the force transmission module is used for transmitting force to a rock mass, the loading module is used for providing counter force for the force transmission module, the sedimentation monitoring module is used for monitoring sedimentation displacement and loading force data, and the fixing module is used for stabilizing the modules;
The fixing module comprises a stacking block (1), a counter-force beam (2) and a buttress (3), wherein the buttress (3) is fixed on the ground, the counter-force beam (2) is horizontally fixed on the buttress (3), and the stacking block (1) is fixed on the counter-force beam (2);
The power transmission module comprises a filling pile (7), an inner sleeve (8), an outer protection cylinder (9) and a filler (10), wherein the inner sleeve (8) is sleeved outside the filling pile (7) and used for reducing side friction force of the filling pile (7), the outer protection cylinder (9) is arranged in a preset drilling hole, an interlayer is arranged between the inner sleeve (8) and the outer protection cylinder (9), the filler (10) is filled in the interlayer, the settlement monitoring module is arranged on the power transmission module, and the loading module is connected with the fixing module and the power transmission module.
5. The rock mass bearing capacity testing system under the geological condition with large burial depth and high water level according to claim 4, wherein the settlement monitoring module comprises a displacement sensor (5), a rebar meter (11), long rebar and an outer sleeve, wherein the rebar meter (11) is pre-buried and fixed in the bored concrete pile (7) and used for detecting bearing capacity values, the long rebar penetrates through the bottom and the top of the bored concrete pile (7), the outer sleeve is wrapped on the long rebar, and the displacement sensor (5) is fixed at the bottom of the counter-force beam (2).
6. The rock mass bearing capacity testing system under the geological condition with large burial depth and high water level according to claim 4, wherein the loading module comprises a jack (4) and an oil pump (6), two ends of the jack (4) are respectively fixed at the top end of the bored concrete pile (7) and the bottom of the counter-force beam (2), and the oil pump (6) is in oil way communication with the jack (4).
7. The rock mass bearing capacity test system under the geological condition of large burial depth and high water level according to claim 4 is characterized by comprising a sound test tube, wherein the sound test tube is fixed in the cast-in-place pile (7), the bottom of the sound test tube is sealed, and concrete is filled in the sound test tube after pile foundation detection is completed.
CN202210764064.3A 2022-06-29 2022-06-29 Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level Active CN115162425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210764064.3A CN115162425B (en) 2022-06-29 2022-06-29 Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210764064.3A CN115162425B (en) 2022-06-29 2022-06-29 Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level

Publications (2)

Publication Number Publication Date
CN115162425A CN115162425A (en) 2022-10-11
CN115162425B true CN115162425B (en) 2024-06-11

Family

ID=83489230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210764064.3A Active CN115162425B (en) 2022-06-29 2022-06-29 Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level

Country Status (1)

Country Link
CN (1) CN115162425B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005256519A (en) * 2004-03-15 2005-09-22 Takenaka Komuten Co Ltd Axial force measurement method of ground improvement pile
CN104499494A (en) * 2014-12-22 2015-04-08 江苏省交通科学研究院股份有限公司 Double-wall corrugated steel cofferdam
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 Underwater drilled pile foundation construction system capable of recycling steel casing and construction method thereof
CN108166546A (en) * 2018-01-24 2018-06-15 中建三局第二建设工程有限责任公司 A kind of device and construction method that pile foundation preloading is carried out using self-balancing static load
CN108532649A (en) * 2018-03-29 2018-09-14 河北建设勘察研究院有限公司 A kind of compressive static load test method of bored concrete pile
CN111042121A (en) * 2019-12-20 2020-04-21 深圳市蛇口招商港湾工程有限公司 Construction method of bored backfill end pile foundation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005256519A (en) * 2004-03-15 2005-09-22 Takenaka Komuten Co Ltd Axial force measurement method of ground improvement pile
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 Underwater drilled pile foundation construction system capable of recycling steel casing and construction method thereof
CN104499494A (en) * 2014-12-22 2015-04-08 江苏省交通科学研究院股份有限公司 Double-wall corrugated steel cofferdam
CN108166546A (en) * 2018-01-24 2018-06-15 中建三局第二建设工程有限责任公司 A kind of device and construction method that pile foundation preloading is carried out using self-balancing static load
CN108532649A (en) * 2018-03-29 2018-09-14 河北建设勘察研究院有限公司 A kind of compressive static load test method of bored concrete pile
CN111042121A (en) * 2019-12-20 2020-04-21 深圳市蛇口招商港湾工程有限公司 Construction method of bored backfill end pile foundation

Also Published As

Publication number Publication date
CN115162425A (en) 2022-10-11

Similar Documents

Publication Publication Date Title
CN102535529A (en) Construction method of self-balancing method pile foundation bearing capacity test device
CN110387879B (en) Concrete cast-in-place pile construction method for hydraulically vibrating and hammering immersed tube
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN111287228A (en) Self-balancing method for detecting vertical compression static load and negative frictional resistance of single pile
Reese et al. Drilled Shaft Design and Construction Guidelines Manual: Reese, LC, and Allen, JD, Structural analysis and design for lateral loading
CN113404040A (en) Construction method of bored pile foundation
CN109537616A (en) A kind of the CFG stake device and its construction method of spiral-digging pore
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
CN113605377A (en) Rock stratum ultra-deep steel pipe column and uplift pile combined construction process
CN112267450B (en) Deep slab load in-situ test method for ultra-thick layer backfill soil
CN116971430B (en) Bridge pile foundation underpinning construction and deformation control method
CN113846618A (en) Dynamic compaction replacement reinforcing method for foundation treatment
CN115162425B (en) Rock mass bearing capacity testing method and system under geological conditions of large burial depth and high water level
CN106948386B (en) Soil filling side frictional resistance model test device and test method thereof
JP3413374B2 (en) In-situ pile tester
CN105780825B (en) A kind of pile foundation construction environmental Kuznets Curves and evaluation method based on autobalanced detection experiment
CN218148483U (en) Tower crane foundation structure
CN113685190B (en) Reinforcing system for shield to penetrate shallow soft clay and construction method
Gandhi Observations on pile design and construction practices in India
Riker et al. A comparison of static and dynamic pile test results
CN113322942A (en) Construction method of soft stratum squeezing and expanding support disc cast-in-place pile
CN112281821A (en) Cast-in-situ bored pile construction process
O’Neill et al. Axial performance of continuous flight auger piles for bearing
CN117905117A (en) Deep load plate test system and test method
Penman et al. FOUNDATIONS FOR STORAGE TANKS ON RECLAIMED LAND AT TEESMOUTH.(INCLUDES APPENDICES).

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant