CN115142383A - Rapid ecological restoration landscape lifting method for original river channel gabion revetment - Google Patents

Rapid ecological restoration landscape lifting method for original river channel gabion revetment Download PDF

Info

Publication number
CN115142383A
CN115142383A CN202210764754.9A CN202210764754A CN115142383A CN 115142383 A CN115142383 A CN 115142383A CN 202210764754 A CN202210764754 A CN 202210764754A CN 115142383 A CN115142383 A CN 115142383A
Authority
CN
China
Prior art keywords
gabion
composite
original
layer
composite mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210764754.9A
Other languages
Chinese (zh)
Inventor
于欢
张津鑫
相汉雨
于立洪
张泽喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Construction Co ltd Of Sixth Hydropower Bureau
Sinohydro Bureau 6 Co Ltd
Original Assignee
East China Construction Co ltd Of Sixth Hydropower Bureau
Sinohydro Bureau 6 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Construction Co ltd Of Sixth Hydropower Bureau, Sinohydro Bureau 6 Co Ltd filed Critical East China Construction Co ltd Of Sixth Hydropower Bureau
Priority to CN202210764754.9A priority Critical patent/CN115142383A/en
Publication of CN115142383A publication Critical patent/CN115142383A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • A01G22/60Flowers; Ornamental plants
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/402River restoration

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Botany (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides a rapid ecological restoration landscape lifting method for an original river gabion revetment, belonging to the field of ecological restoration landscape lifting of a river channel, and comprising the following steps of: cage cleaning and weed removing are carried out on the original riverway gabion revetment, sundries on the original riverway gabion revetment are cleaned, and weeds are removed; grouting the composite slurry into rubble gaps by using hydraulic pressure of spray-seeding equipment to form gabion composite slurry crack-grouting layers; and after the gabion composite mud crack injection layer is constructed, spraying composite mud to the gabion composite mud crack injection layer in a layered mode by adopting spraying equipment to form a composite mud base layer. The slurry is used for thickening the characteristic, the hydraulic pressure of the spray-seeding machine is used for grouting into the gap of the gabion until the gabion is filled, and the check net on the original gabion slope protection is directly used for forming a frame to replace an anchor rod hanging net of the traditional foreign soil spray-seeding technology.

Description

Rapid ecological restoration landscape lifting method for original river channel gabion revetment
Technical Field
The invention relates to the field of landscape lifting for ecological restoration, in particular to a rapid ecological restoration landscape lifting method for stone cage protection slope of an original river channel.
Background
With the increasing importance of the country on the ecological environment management, the requirements of people on the quality of life are also higher and higher. In the traditional river channel gabion stone cage revetment, although flood discharge safety and side slope stability of the river channel revetment are ensured, certain visual pollution is caused. The traditional gabion slope protection greening scheme is broadcast seeding slope protection greening, and the main planting mode is grass seeding and ground cover seed seeding. The construction process needs to perform manual full-joint soil filling and tamping on the stone cage before sowing (sieving humus soil, peat soil and slow-release nutrient fertilizer are mixed uniformly, filling the humus soil, peat soil and slow-release nutrient fertilizer into gaps of the stone cage slope protection for multiple times, watering until the soil is filled into the gaps of the stone cage slope protection), covering 10mm of the whole stone cage slope protection after the gap filling, covering 1mm of thin soil for the second time after the sowing is finished, watering and soaking, moisturizing and preserving the heat for at least one month by adopting a geotextile after the sowing and soaking is finished, and preferably sowing in spring. The construction process has low efficiency of manual full-joint soil filling and tamping in the construction process and has poor effect of tamping not easy to be full; the slope surface of the slope protection is longer, earthwork can be only unloaded to the top of the slope surface by a loader and then covered with soil by a large amount of manpower by using tools such as rakes and shovels, the manpower efficiency is low, uneven soil covering is easily caused, and the slope protection of the river-facing gabion is operated by a large amount of manpower, so that potential safety hazards are easily formed; the moisture preservation and heat preservation in the later period are troublesome, and the construction is carried out in the best season of broadcast planting in summer and not in spring at that time.
Therefore, how to improve the construction efficiency and the landscape effect and ensure long-term greening needs to adopt a more advanced, rapid, stable and beautiful river slope protection method for improving the ecological restoration landscape.
Disclosure of Invention
The invention provides a rapid ecological restoration landscape lifting method for protecting slope of original river channel gabions, aiming at solving the problems that the construction efficiency can be improved, the landscape effect can be improved, and long-term greening is guaranteed.
In order to achieve the purpose, the invention adopts the following technical scheme: a quick ecological restoration landscape lifting method for an original river channel gabion revetment comprises the following steps:
cage cleaning and weed removal are carried out on the original river channel gabion revetment, sundries on the original river channel gabion revetment are cleaned up, and weeds are removed;
grouting the composite slurry into rubble gaps by using hydraulic pressure of spray-seeding equipment to form gabion composite slurry grouting layers;
after the construction of the gabion composite mud crack injection layer is completed, spraying and sowing composite mud to the gabion composite mud crack injection layer by adopting spraying and sowing equipment to form a composite mud base layer;
and after the construction of the composite mud base layer is finished, spraying the composite mud containing the seeds onto the composite mud base layer by adopting spraying equipment to form a composite mud planting surface layer.
As a further description of the above technical solution:
the composite slurry base course is formed by dividing 4 layers of composite slurry with proper proportion into 7-8 cm thick layers by using a check net on the original riverway gabion revetment.
As a further description of the above technical solution:
the composite mud planting surface layer is formed by utilizing spray seeding equipment to divide into 2 layers and spray seeding with the thickness of 2-3 cm.
As a further description of the above technical solution:
further comprising: planting surface in the compound slurryAfter the layer construction is finished, the covering specification is 15g/m 2 The non-woven fabric maintenance net of (1).
As a further description of the above technical solution:
the composite mud is formed by fully stirring sieved humus soil, grass fiber, peat soil, a slow-release nutrient fertilizer, an adhesive, a water-retaining agent and water.
The invention has the beneficial effects that: the method adopts a spray-seeding slope protection greening technology, mixed materials such as screened humus soil, grass fiber, peat soil, slow-release nutrient fertilizer, adhesive, water-retaining agent, water and the like are fully stirred by a spray-seeding machine, then the materials and seeds are delivered to the slope surface through the spray-seeding machine, gap filling in the middle of the gabion is firstly carried out, and then the original gabion mesh is directly sprayed on the gabion slope protection (the traditional soil dressing technology needs to construct anchor rods and hanging meshes on the side slope), so that a porous stable soil structure which has certain thickness and is similar to or better than natural surface soil is created, and the porous stable soil structure is firm and breathable. Utilize thick liquid characteristic of mud to utilize spray-seeding machine fluid pressure slip casting to go into gabion space department until filling to directly utilize check guest net on the former gabion bank protection, check guest net forms the frame, with the stock string net that replaces traditional foreign soil spray-seeding technique, can directly carry out the spray-seeding operation on it, this simple process, convenient construction, accelerate site operation progress and process, safe and reliable, both reducible manual work and change into mechanical operation, reduce the potential safety hazard, can guarantee the construction effect again, raise the efficiency. And (4) carrying out long-term re-greening (shrubs and ginseng are added into the mixture ratio, the flowers grow for about 3 years, then the flowers are irrigated with whole grass, and after 3 years, the flowers are irrigated with whole grass and are integrated with surrounding vegetation, so that the re-greening time is longer and beautified, and the surrounding natural beautiful scenery is integrated, so that a good construction effect of ecological restoration of blossoming and re-greening is achieved.
Drawings
In order to more clearly show a fast ecological restoration landscape lifting method used on the original river channel gabion revetment, the following drawings are shown;
FIG. 1 is a schematic structural diagram of the present invention.
Wherein the reference numbers in the figures;
1. planting a surface layer by using the composite slurry; 2. a composite slurry base layer; 3. and (4) preparing a gabion composite slurry crack injection layer.
Detailed Description
Referring to the attached figure 1, a fast ecological restoration landscape lifting method directly used on the original river course gabion revetment comprises the following steps:
(1) Firstly, cage cleaning and weed removing are carried out on the original riverway gabion revetment, sundries on the original riverway gabion revetment are cleaned up, and weeds are removed up.
(3) The structure section of this application includes that compound mud plants surface course 1, compound mud basic unit 2, the compound mud of gabion slip casting layer 3. The structure section is sequentially provided with the gabion composite slurry crack injection layer 3, the composite slurry base layer 2 and the composite slurry planting surface layer 1 from bottom to top respectively.
(4) The gabion composite slurry crack injection layer 3 is used for injecting rubble cracks in the original gabion protection slope in a proper proportion by 2 layers by using spray-seeding equipment, and fully injecting; after the construction of the gabion composite mud crack injection layer 3 is completed, the composite mud base layer 2 is sprayed and sowed on the gabion composite mud crack injection layer 3 in a layered mode by adopting an alien soil spraying and sowing technology; the composite slurry base layer 2 can directly utilize the gabion mesh in the original gabion protection slope and directly spray-sow the composite slurry with a proper proportion by 4 layers by using spray-sowing equipment, the thickness is 7-8 cm, the spraying is full, and the layer thickness is uniform and meets the requirement; after the construction of the composite mud base layer 2 is finished, the composite mud planting surface layer 1 is sprayed and sowed on the composite mud base layer 2 layer by adopting an alien soil spraying and sowing technology; the composite mud planting surface layer 1 is arranged on the uppermost layer, the composite mud planting surface layer 1 can be directly arranged on the composite mud base layer 2, composite mud with proper material proportion such as grass, flowers and irrigation is directly distributed in 2 layers with the thickness of 2-3 cm by using spray-seeding equipment, the spray-seeding equipment is full of spray-seeding, and the layer thickness is uniform and meets the requirement. The composite slurry planting surface layer 1, the composite slurry base layer 2 and the gabion composite slurry crack injection layer 3 are synthesized to form the 1-type ecological restoration landscape structure layer of the ecological spray-seeding system.
(5) Finally, after the construction of the composite mud planting surface layer 1 is finished, the covering specification is 15g/m 2 The non-woven fabric maintenance net: after spray seeding, the slope surface is paved withoutSpinning the cloth curing net and fixing with thick nylon rope and anchor nail. The non-woven fabric has the following four functions: firstly, prevent that the grass seeds from being eaten by the bird and being blown out by wind, secondly prevent that the plant seeds from washing away and causing the grass seeds uneven when watering, thirdly can cushion the washing away of rainwater to the side slope, fourthly prevent that moisture evaporation is too fast.
(6) And performing management and maintenance in time.
(7) After about 45 days, the effect of blooming and greening is achieved. The spraying seeding technology for the foreign soil adopts a spraying seeding slope protection greening technology, mixed materials of screened humus soil, grass fiber, peat soil, slow-release nutrient fertilizer, adhesive, water-retaining agent, water and the like are fully stirred by a spraying seeding machine, and then the materials and seeds are delivered to a slope surface by the spraying seeding machine, so that a porous stable soil structure which has certain thickness, is resistant to rain and wind erosion, firm and breathable and is similar to or better than natural surface soil is manufactured, long-term re-greening is carried out, shrubs are added into the porous stable soil structure, and after flowers grow for about 3 years, the porous stable soil structure is used for full-irrigation and is integrated with surrounding vegetation after full-grass irrigation, so that the re-greening time is longer and the greening is more beautiful.
Other embodiments of the invention will be apparent to those skilled in the art from consideration of the specification and practice of the disclosure herein. This application is intended to cover any variations, uses, or adaptations of the invention following, in general, the principles of the invention and including such departures from the present disclosure as come within known or customary practice within the art to which the invention pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.
It is to be understood that relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. The invention is not limited to the precise arrangements described above and shown in the drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the invention is limited only by the appended claims.

Claims (5)

1. A rapid ecological restoration landscape lifting method for original river gabion revetment is characterized by comprising the following steps:
cage cleaning and weed removing are carried out on the original riverway gabion revetment, sundries on the original riverway gabion revetment are cleaned, and weeds are removed;
grouting the composite slurry into rubble gaps by using hydraulic pressure of spray-seeding equipment to form a gabion composite slurry crack-grouting layer (3);
after the gabion composite mud crack-pouring layer (3) is constructed, spraying composite mud on the gabion composite mud crack-pouring layer (3) layer by adopting spraying equipment to form a composite mud base layer (2);
after the construction of the composite mud base layer (2) is finished, the composite mud containing the seeds is sprayed on the composite mud base layer (2) layer by adopting spraying equipment to form a composite mud planting surface layer (1).
2. The method for rapidly and ecologically restoring the landscape on the original riverway gabion revetment according to claim 1, which is characterized in that: the composite slurry base layer (2) is formed by dividing 4 layers of composite slurry with proper proportion into 7-8 cm thick layers by using a check net on the original riverway gabion revetment.
3. The method for rapidly and ecologically restoring the landscape on the original riverway gabion revetment according to claim 1, which is characterized in that: the composite mud planting surface layer (1) is formed by utilizing spray-seeding equipment to divide into 2 layers and spray-seeding the layers with the thickness of 2-3 cm.
4. The fast ecological restoration landscape lifting method for the original river gabion revetment according to claim 1, it is characterized by also comprising: after the construction of the composite mud planting surface layer (1) is finished, the covering specification is 15g/m 2 Non-woven fabric of a maintenance net.
5. The method for rapidly and ecologically restoring the landscape on the original riverway gabion revetment according to claim 1, which is characterized in that: the composite mud is formed by fully stirring sieved humus soil, grass fiber, peat soil, a slow-release nutrient fertilizer, an adhesive, a water-retaining agent and water.
CN202210764754.9A 2022-06-29 2022-06-29 Rapid ecological restoration landscape lifting method for original river channel gabion revetment Pending CN115142383A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210764754.9A CN115142383A (en) 2022-06-29 2022-06-29 Rapid ecological restoration landscape lifting method for original river channel gabion revetment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210764754.9A CN115142383A (en) 2022-06-29 2022-06-29 Rapid ecological restoration landscape lifting method for original river channel gabion revetment

Publications (1)

Publication Number Publication Date
CN115142383A true CN115142383A (en) 2022-10-04

Family

ID=83410722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210764754.9A Pending CN115142383A (en) 2022-06-29 2022-06-29 Rapid ecological restoration landscape lifting method for original river channel gabion revetment

Country Status (1)

Country Link
CN (1) CN115142383A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007043760A1 (en) * 2005-10-14 2007-04-19 Wan-Jin Jun Method of constructing levee with ecological environment
CN102359113A (en) * 2011-07-20 2012-02-22 上海嘉洁环保工程有限公司 Integrally-cast cement pervious concrete ecological protection slope and construction method thereof
CN103866776A (en) * 2014-04-09 2014-06-18 湖北工业大学 Gabion wall ecology slope protection method of construction waste
CN103898870A (en) * 2014-03-18 2014-07-02 北京工业大学 Gabion box ecological gabion river channel slope protection construction method
CN105297745A (en) * 2014-07-18 2016-02-03 青岛润国生态科技发展有限公司 Protection method for high and steep side slope ecological restoration technology
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics
CN109258323A (en) * 2018-09-20 2019-01-25 鞍钢集团矿业有限公司 A kind of greening for the exposed barren rock side slope in FIX CHARGE RATE ABOUT THE WASTE ROCK field is sowed grass seeds by duster method
CN110832965A (en) * 2019-11-12 2020-02-25 中徽生态环境有限公司 Ecological restoration construction method for damaged mountain

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007043760A1 (en) * 2005-10-14 2007-04-19 Wan-Jin Jun Method of constructing levee with ecological environment
CN102359113A (en) * 2011-07-20 2012-02-22 上海嘉洁环保工程有限公司 Integrally-cast cement pervious concrete ecological protection slope and construction method thereof
CN103898870A (en) * 2014-03-18 2014-07-02 北京工业大学 Gabion box ecological gabion river channel slope protection construction method
CN103866776A (en) * 2014-04-09 2014-06-18 湖北工业大学 Gabion wall ecology slope protection method of construction waste
CN105297745A (en) * 2014-07-18 2016-02-03 青岛润国生态科技发展有限公司 Protection method for high and steep side slope ecological restoration technology
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics
CN109258323A (en) * 2018-09-20 2019-01-25 鞍钢集团矿业有限公司 A kind of greening for the exposed barren rock side slope in FIX CHARGE RATE ABOUT THE WASTE ROCK field is sowed grass seeds by duster method
CN110832965A (en) * 2019-11-12 2020-02-25 中徽生态环境有限公司 Ecological restoration construction method for damaged mountain

Similar Documents

Publication Publication Date Title
CN104255280B (en) A kind of high precipitous rock slope vegetation implantation methods
CN110565660B (en) Spray seeding construction method for slope greening
CN105926533B (en) A kind of embedded type ecology consolidates beach method
CN102379201B (en) Method of quick restoration of vegetation in reservoir hydro-fluctuation belt
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN108093729A (en) Side-slope greening and protection method
CN109832074B (en) Method for recovering vegetation in karst region lead-zinc ore polluted rocky desertification area
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN109392582A (en) A kind of massif slope surface implantation methods
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN109328808A (en) A kind of the Northwest's ecological treatment of slope method
CN112211203A (en) High-strength structure organic fiber composite repair method for high and steep slope
CN101518186A (en) Method of recovering and reconstructing vegetation of mining land
CN108739118A (en) A kind of method of fast quick-recovery side slope vegetation
CN111802183A (en) Ecological slope protection and vertical greening process
CN109328805A (en) A kind of Rocky Desertification Region ecological treatment of slope method
CN110447481B (en) Granule spray-seeding construction method
CN210946834U (en) Immersed net type ecological slope protection structure for mine restoration
CN108967063A (en) A kind of high steep limestone slope replies immediately green method fastly
DE102023130746A1 (en) A method for restoring vegetation in a high-altitude region for hydropower development
CN111636444A (en) Water and soil conservation method for side slope in high-altitude area
CN110024627A (en) A kind of ecological restoration of grassland method
CN101268740B (en) Ecological protection method of shale side slope
CN111236271A (en) Slope ecological restoration system and method
CN104737738B (en) Method of greening bare slope by utilizing local herbaceous plants

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20221004