CN115110706B - Prefabricated combined stair and construction method thereof - Google Patents

Prefabricated combined stair and construction method thereof Download PDF

Info

Publication number
CN115110706B
CN115110706B CN202210807834.8A CN202210807834A CN115110706B CN 115110706 B CN115110706 B CN 115110706B CN 202210807834 A CN202210807834 A CN 202210807834A CN 115110706 B CN115110706 B CN 115110706B
Authority
CN
China
Prior art keywords
die
groove
supporting die
stair
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210807834.8A
Other languages
Chinese (zh)
Other versions
CN115110706A (en
Inventor
李天真
张喜红
张一品
卢光智
冯奇
孟庆峰
杜洪利
王亚坤
罗礼军
汪叶苗
祖炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202210807834.8A priority Critical patent/CN115110706B/en
Publication of CN115110706A publication Critical patent/CN115110706A/en
Application granted granted Critical
Publication of CN115110706B publication Critical patent/CN115110706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • B28B7/225Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units for making stairs or stair units comprising more than one step
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The application relates to the technical field of prefabricated building processing, in particular to a prefabricated combined stair and a construction method thereof, wherein the prefabricated combined stair comprises a supporting die, two platform hanging plates, a circulating steel die and a shielding assembly, the supporting die is a pattern steel plate, the supporting die is arranged in a stair-shaped inclined structure, the platform hanging plates are respectively vertically and oppositely welded on two sides of the supporting die, the supporting die and a steel ladder frame are combined permanently, and then are matched with the circulating steel plate which can be recycled, the prefabricated stair is prefabricated in a steel structure, meanwhile, under the matching action of a connecting assembly, the assembly is simple and convenient, the use is convenient, the use of a traditional cast-in-place template is reduced, the resources are saved, the environment is protected, in addition, the prefabricated stair step is a folded shape, compared with the traditional prefabricated stair with a plane bottom, the advantages of light weight are achieved, the advantages of saving materials, the field hoisting efficiency and the like are achieved, the integral supporting die and the circulating steel die enable the apparent quality of the stair to be high, and the secondary leveling and the process of the traditional cast-in-place stair is avoided.

Description

Prefabricated combined stair and construction method thereof
Technical Field
The application relates to the technical field of prefabricated building processing, in particular to a prefabricated combined stair and a construction method thereof.
Background
The stairway is a member for vertical traffic between floors in a building and is used for traffic connection between floors and in the case of large height difference, the types of the stairway are designed according to actual conditions according to different requirements of the building, and the steel structure building stairway is a common concrete casting stairway;
when the construction operation is carried out on the steel structure public building stairs in the prior art, a construction mode of casting concrete layers on pattern steel plates in situ is often adopted;
however, the template of the concrete layer is in a step shape, so that the template quantity is large, and the pouring quality of the thinner concrete layer is difficult to control.
Disclosure of Invention
The application aims to provide a prefabricated combined stair and a construction method thereof, which are used for solving the problems in the background technology.
In order to achieve the above purpose, the present application provides the following technical solutions: a prefabricated combination stairway, the prefabricated combination stairway comprising:
the support die is a patterned steel plate and is arranged in a stair-shaped inclined structure;
the two platform hanging plates are respectively welded on two sides of the supporting die vertically and oppositely;
the circulating steel die is horizontally arranged at the upper end of the supporting die through the connecting component, and a concrete layer is arranged between the circulating steel die and the supporting die;
the shielding assembly is obliquely welded on two sides of the supporting die and comprises two steel ladder frames.
Preferably, the circulating steel die and the supporting die are correspondingly arranged in a stair-shaped inclined structure, the reinforcing steel mesh is paved at the upper end of the supporting die, and the reinforcing steel mesh is arranged in the concrete layer.
Preferably, the heights of the two steel ladder frames are larger than the combined height of the circulating steel die and the supporting die, and two sides of the two steel ladder frames are respectively welded and connected with two sides of the two platform hanging plates.
Preferably, the connecting assembly comprises a plurality of connecting rods, the connecting rods are respectively and vertically symmetrically arranged at the lower end of one side of the circulating steel die close to the supporting die, and the lower ends of the connecting rods respectively penetrate through the concrete layer and the supporting die.
Preferably, the connecting rod penetrates through one side of the concrete layer and is movably sleeved with an embedded pipe, the embedded pipe is in an I-shaped structure, the upper end and the lower end of the embedded pipe are respectively in contact with the lower end and the upper end of the circulating steel die and the supporting die, the connecting rod penetrates through the lower end of the embedded pipe, the center of the lower end in the supporting die is provided with an assembly groove, and the assembly groove is vertically inserted with an assembly block.
Preferably, the assembly groove is internally provided with four symmetrical strip grooves in a penetrating way respectively, the assembly block is provided with strip blocks in the splicing assembly groove in a symmetrical way respectively, the four strip blocks are respectively provided with four strip grooves in a splicing way, the upper ends of one side of the four strip blocks are provided with spring grooves, the centers of the four strip blocks are horizontally provided with spring rods, one side of each spring rod is movably sleeved with a limiting block, one side of each limiting block penetrates through the spring grooves, one side of each spring rod is sleeved with a first spring, the lower end face of one side of each limiting block penetrates through the spring grooves is provided with an inclined face, and the upper ends of one side of each limiting block penetrating through the spring grooves are respectively contacted with the lower ends of embedded pipes.
Preferably, the assembly block center runs through and has seted up first screw thread groove, and the second screw thread groove has been seted up at assembly inslot upper end center, is equipped with the assembly screw rod through the vertical grafting of screw thread in the first screw thread groove, and the assembly screw rod upper end runs through first screw thread groove grafting second screw thread groove setting, and assembly screw rod lower extreme level is equipped with the mount pad, and the vertical check valve that is equipped with in mount pad lower extreme center.
Preferably, the center link up the check valve in the mount pad and has seted up the splitter box, and three storage tank has all been symmetrically seted up to one side that is close to the splitter box in the mount pad, and storage tank in one side all levels are equipped with the piston tube, and piston tube one side link up with the splitter box and link to each other, and storage tank in one side level peg graft and are equipped with the telescopic link, and piston tank has been seted up to telescopic link one side, and piston tube one side has cup jointed sealed piston, and the piston tank setting of the telescopic link of pegging graft of sealed piston one side of piston tube.
Preferably, the support mould lower extreme is located the connecting rod and runs through one side all is equipped with the mounting disc, the conical groove has all been seted up at mounting disc lower extreme center, the mount pad runs through the grafting and arranges in the conical groove setting, it has offered the business turn over hole to run through the mount pad respectively to accomodate inslot one side, telescopic link one side level runs through the grafting business turn over hole setting, the wheel groove has been seted up on one side of business turn over hole to the telescopic link, all be equipped with the installation wheel through the shaft activity in the wheel groove, installation wheel one side contacts with one side in the conical groove and sets up, the telescopic link is arranged in and is accomodate groove one side and vertically be equipped with the deflector, it is equipped with four guide bars to be close to business turn over hole one side horizontal symmetry in accomodate the inslot, four guide bars run through the deflector setting respectively the level, and the telescopic link is located deflector and business turn over hole one side all cup joints and is equipped with the second spring.
The construction method of the prefabricated combined stairway is applied to the prefabricated combined stairway and comprises the following steps of:
step one: when in use, the steel ladder frame and the platform hanging plate are welded with the support die, so as to achieve permanent combination;
step two: then coating a release agent on the side, which is contacted with the concrete, of the circulating steel die, paving the reinforcing steel mesh on the supporting die, and enabling a plurality of connecting rods to respectively penetrate through the reinforcing steel mesh and plug in the supporting die;
step three: positioning and supporting the position between the circulating steel die and the supporting die by the embedded pipe, and improving the dimensional consistency of concrete layer casting;
step four: then the pressurizing pipe of the air compression equipment is taken out, the one-way valve is sleeved, high-pressure gas is injected into the diversion trench, the telescopic rod extends out of the inlet and outlet holes along the piston pipe and the guide rod under the sealing action of the sealing piston and is contacted with the inside of the conical trench of the mounting plate, the circulating steel die is more firmly connected with the supporting die under the conical surface action of the conical trench as the telescopic rod is further pressurized, and loosening does not occur under the action of the one-way valve, so that the operation is simple and convenient;
step five: when the embedded pipe is required to be disassembled, the limiting block is contacted with the supporting die under the action of the inclined surface and compressed into the spring groove, and when the connecting rod is separated from the supporting die, the connecting rod can enter the pipe groove of the embedded pipe, and the embedded pipe can not directly extend out to be hooked, so that the embedded pipe is convenient to disassemble, and when the embedded pipe is installed in the same way, the embedded pipe is directly sleeved on one side of the limiting block and kept at a preset position under the action of the limiting block to wait for use;
step six: after the die is removed, the circulating steel die waits for the next use, the formed concrete layer has an excellent stair structure, the surface is smooth, the lower end is folded, the weight is low, and the finished product is transported to a construction position by matching with the holes of the embedded pipe for normal assembly and use.
Compared with the prior art, the application has the beneficial effects that:
the prefabricated stair is characterized in that the prefabricated stair is prefabricated by combining the support die with the permanent face of the steel stair frame and then matching with the circulating steel plate capable of being recycled, meanwhile, under the matching action of the connecting component, the assembly is simple and convenient, the use is convenient, the use of traditional cast-in-situ templates is reduced, resources are saved, the environment is protected, in addition, the prefabricated stair steps are folded, compared with traditional prefabricated stair with planar bottom, the prefabricated stair has the advantage of light weight, the integrated support die and the circulating steel die have the advantages of saving materials, on-site hoisting efficiency and the like, the appearance quality of the stair is high, and the secondary leveling and plastering procedures of the traditional cast-in-situ stair are avoided.
Drawings
FIG. 1 is a schematic diagram of the structure of the present application;
FIG. 2 is a schematic perspective view of the present application;
FIG. 3 is a schematic side sectional view of the present application;
FIG. 4 is a schematic view of the bottom structure of the present application;
FIG. 5 is a schematic view of the concrete layer structure of the present application;
FIG. 6 is a schematic view of a connection assembly according to the present application;
FIG. 7 is a schematic view of a connecting rod according to the present application;
FIG. 8 is a schematic view of a telescopic link connection structure according to the present application;
FIG. 9 is a schematic view of the portion A of FIG. 1 according to the present application;
fig. 10 is a schematic view of the portion B of fig. 9 according to the present application.
In the figure: the concrete pile-up device comprises a supporting die 1, a platform hanging plate 2, a circulating steel die 3, a concrete layer 4, a steel ladder frame 5, a steel bar net sheet 6, a connecting rod 7, an embedded pipe 8, an assembly groove 9, an assembly block 10, a bar groove 11, a bar block 12, a spring groove 13, a spring rod 14, a limiting block 15, a first spring 16, an assembly screw 17, a mounting seat 18, a one-way valve 19, a shunt groove 20, a piston pipe 21, a telescopic rod 22, a sealing piston 23, a mounting disc 24, a mounting wheel 25, a guide plate 26, a guide rod 27 and a second spring 28.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Referring to fig. 1-10, the present application provides the following five preferred embodiments.
Example 1
A prefabricated combination stair, characterized in that: the prefabricated combination stairway comprises:
the support die 1 is a patterned steel plate, and the support die 1 is arranged in a stair-shaped inclined structure;
the two platform hanging plates 2 are respectively welded on two sides of the supporting die 1 vertically and oppositely;
the circulating steel mould 3 is horizontally arranged at the upper end of the supporting mould 1 through a connecting component, a concrete layer 4 is arranged between the circulating steel mould 3 and the supporting mould 1, the circulating steel mould 3 and the supporting mould 1 are correspondingly arranged in a stair-shaped inclined structure, a reinforcing steel mesh 6 is paved at the upper end of the supporting mould 1, the reinforcing steel mesh 6 is arranged in the concrete layer 4, the heights of two steel ladder frames 5 are larger than the combined height of the circulating steel mould 3 and the supporting mould 1, two sides of the two steel ladder frames 5 are respectively welded and connected with two sides of the two platform hanging plates 2, the connecting component comprises a plurality of connecting rods 7, the connecting rods 7 are respectively and vertically symmetrically arranged at one side lower end of the circulating steel mould 3 close to the supporting mould 1, the lower ends of the connecting rods 7 respectively penetrate through the concrete layer 4 and the supporting mould 1, the pre-buried pipe 8 is movably sleeved at one side of the connecting rods 7, the pre-buried pipe 8 is arranged in an I-shaped structure, the upper end and the lower end of the pre-buried pipe 8 are respectively connected with the lower end and the upper end of the circulating steel mould 3 and the upper end of the supporting mould 1, the connecting rods 7 penetrate through the lower end of the pre-buried pipe 8 and are respectively provided with an assembling groove 9, the lower end of the supporting mould 1 is respectively provided with a first threaded socket 9, the first threaded socket is arranged at the lower end of the first threaded socket 17, the first threaded socket is arranged at the lower end of the first threaded socket 17, the first threaded socket is provided with a first threaded assembly seat 17, and the first threaded assembly seat is arranged at the lower threaded center 17, and the first threaded assembly center 17, the threaded assembly seat is provided with a threaded screw 17, the first threaded assembly center 17, and the threaded assembly threaded screw 17 is provided at the first threaded assembly center, and the threaded screw 17, the threaded assembly seat 17, the threaded assembly threaded screw 17, the threaded assembly 17, the threaded screw 17, the threaded assembly respectively;
the shielding component is obliquely welded on two sides of the supporting die 1 and comprises two steel ladder frames 5.
The construction method of the prefabricated combined stairway is applied to the prefabricated combined stairway and comprises the following steps of:
step one: when in use, the steel ladder frame 5 and the platform hanging plate 2 are welded with the supporting die 1 to achieve permanent combination;
step two: then, coating a release agent on the side, which is contacted with the concrete, of the circulating steel die 3, paving the reinforcing steel mesh 6 on the supporting die 1, and enabling a plurality of connecting rods 7 to respectively penetrate through the reinforcing steel mesh 6 and be inserted into the supporting die 1;
step three: the embedded pipe 8 is positioned and supported at the position between the circulating steel die 3 and the supporting die 1, so that the casting size consistency of the concrete layer 4 is improved;
step four: then the pressurizing pipe of the air compression equipment is taken out, the one-way valve is sleeved, high-pressure gas is injected into the diversion trench 20, under the sealing action of the sealing piston 23, the telescopic rod 22 extends out of the access hole along the piston pipe 21 and the guide rod 27 and contacts with the inside of the conical trench of the mounting plate 24, and as the telescopic rod 22 is further pressurized, the more firmly the circulating steel die 3 is connected with the supporting die 1 under the conical surface action of the conical trench, the looseness can not occur under the action of the one-way valve 19, and the operation is simple and convenient;
step five: when the embedded pipe 8 is required to be disassembled, the limiting block 15 is contacted with the supporting die 1 under the action of the inclined plane and is compressed into the spring groove 13, when the connecting rod 7 is separated from the supporting die 1, the connecting rod enters the pipe groove of the embedded pipe 8, the embedded pipe 8 is not directly stretched out to be hooked, the disassembly is convenient, and when the embedded pipe 8 is installed in the same way, the embedded pipe is directly sleeved on one side of the limiting block 15 and keeps a preset position under the action of the limiting block 15 to wait for use;
step six: after the die is removed, the circulating steel die 3 waits for the next use, the formed concrete layer 4 has an excellent stair structure, the surface is smooth, the lower end is folded, the weight is low, and the finished product is transported to a construction position by matching with the holes of the embedded pipe 8 for normal assembly and use.
Example two
On the basis of the first embodiment, the four sides in the assembly groove 9 are symmetrically penetrated and provided with the strip-shaped grooves 11 respectively, the four sides in the assembly groove 9 are symmetrically provided with the strip-shaped blocks 12 respectively, the four strip-shaped blocks 12 are respectively inserted and connected with the four strip-shaped grooves 11, the upper ends of one sides of the four strip-shaped blocks 12 are provided with the spring grooves 13, the centers in the spring grooves 13 are horizontally provided with the spring rods 14, one sides of the spring rods 14 are movably sleeved with the limiting blocks 15, one sides of the limiting blocks 15 penetrate through the spring grooves 13, one sides of the spring rods 14 are sleeved with the first springs 16, the lower end faces of one sides of the limiting blocks 15 penetrate through the spring grooves 13 are inclined surfaces, and the upper ends of one sides of the limiting blocks 15 penetrate through the spring grooves 13 and are respectively contacted with the lower ends of the embedded pipes 8, so that the embedded pipes 8 are installed and limited.
Example III
On the basis of the second embodiment, the center in the mounting seat 18 is communicated with the check valve 19 and is provided with the splitter box 20, one side, close to the splitter box 20, in the mounting seat 18 is symmetrically provided with three storage grooves, one side in the storage grooves is horizontally provided with the piston tube 21, one side of the piston tube 21 is communicated with the splitter box 20 and is horizontally inserted with the telescopic rod 22, one side of the telescopic rod 22 is provided with the piston groove, one side of the piston tube 21 is sleeved with the sealing piston 23, one side of the sealing piston 23 of the piston tube 21 is inserted with the piston groove of the telescopic rod 22, mechanical control is performed on assembly, and assembly efficiency is improved.
Example IV
On the basis of embodiment III, the support mould 1 lower extreme is located connecting rod 7 and runs through one side all is equipped with mounting disc 24, conical groove has all been seted up at mounting disc 24 lower extreme center, mounting seat 18 runs through the grafting and arranges in conical groove in, the business turn over hole has been seted up to mounting seat 18 is run through respectively to one side of accomodating the inslot, telescopic link 22 one side level runs through the grafting business turn over hole setting, the wheel groove has been seted up on one side of the business turn over hole is run through to telescopic link 22, all be equipped with installation wheel 25 through the shaft activity in the wheel groove, installation wheel 25 one side contacts with conical inslot one side and sets up, telescopic link 22 is arranged in and is accomodate the vertical deflector 26 that is equipped with in groove one side, stability and the installation convenience of installation are improved.
Example five
On the basis of the fourth embodiment, four guide rods 27 are horizontally and symmetrically arranged on one side, close to the access hole, of the storage groove, the four guide rods 27 are respectively and horizontally arranged through the guide plate 26, the telescopic rods 22 are positioned on one side of the guide plate 26 and one side, close to the access hole, of the telescopic rods 22, and second springs 28 are sleeved on one side, close to the access hole, of the telescopic rods 22, so that stable guiding is performed.
When in use, the steel ladder frame 5 and the platform hanging plate 2 are welded with the supporting die 1 to achieve permanent combination, then the demoulding agent is smeared on one side of the circulating steel die 3, which is contacted with concrete, the steel bar net 6 is paved on the supporting die 1, a plurality of connecting rods 7 respectively penetrate through the steel bar net 6 and are inserted into the supporting die 1, the embedded pipe 8 is used for positioning and supporting the position between the circulating steel die 3 and the supporting die 1, the casting size consistency of the concrete layer 4 is improved, the pressurizing pipe of the air compression device is taken out after that, the one-way valve is sleeved, the high-pressure gas is injected into the diversion trench 20, the telescopic rod 22 stretches out of the inlet and outlet holes along the piston pipe 21 and the guide rod 27 under the sealing action of the sealing piston 23 and contacts with the conical trench of the mounting disc 24, the telescopic rod 22 is pressurized with the further action of the conical surface of the conical trench, the circulating steel die 3 is more firmly connected with the supporting die 1, looseness cannot occur under the action of the one-way valve 19, the operation is simple and convenient, when disassembly is needed, the limiting block 15 is in contact with the supporting die 1 under the action of the inclined surface, is compressed into the spring groove 13, and enters the pipe groove of the embedded pipe 8 when the connecting rod 7 is separated from the supporting die 1, does not directly stretch out to hook the embedded pipe 8, is convenient to disassemble, and is directly sleeved on one side of the limiting block 15 when the embedded pipe 8 is installed, and keeps a preset position under the action of the limiting block 15, and waits for use, after the disassembly is finished, the circulating steel die 3 waits for next use, the formed concrete layer 4 has an excellent stair structure, the surface is smooth, the lower end is folded, the weight is lower, and is matched with the holes of the embedded pipe 8, and the finished product is transported to a construction position for normal assembly and use.
Although embodiments of the present application have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the application, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A prefabricated combination stair, characterized in that: the prefabricated combination stairway comprises:
the support die (1) is a patterned steel plate, and the support die (1) is arranged in a stair-shaped inclined structure;
the two platform hanging plates (2) are respectively welded on two sides of the supporting die (1) vertically and oppositely;
the circulating steel die (3) is horizontally arranged at the upper end of the supporting die (1) through a connecting component, and a concrete layer (4) is arranged between the circulating steel die (3) and the supporting die (1);
the shielding components are obliquely welded on two sides of the supporting die (1), and the shielding components comprise two steel ladder frames (5);
the connecting assembly comprises a plurality of connecting rods (7), the connecting rods (7) are respectively and vertically symmetrically arranged at the lower end of one side of the circulating steel die (3) close to the supporting die (1), and the lower ends of the connecting rods (7) respectively penetrate through the concrete layer (4) and the supporting die (1);
the connecting rod (7) penetrates through one side of the concrete layer (4) and is movably sleeved with an embedded pipe (8), the embedded pipe (8) is in an I-shaped structure, the upper end and the lower end of the embedded pipe (8) are respectively in contact with the lower end and the upper end of the circulating steel die (3) and the lower end of the supporting die (1), the connecting rod (7) penetrates through the center of the lower end in the lower end of the embedded pipe (8) and is inserted into the supporting die (1), an assembly groove (9) is formed in the center of the lower end in the supporting die (1), and an assembly block (10) is vertically inserted into the assembly groove (9);
the utility model discloses a spring groove (9), including equipment groove (9), spring groove (13), stopper (15), spring bar (14), stopper (15) one side run through spring groove (13) setting, spring bar (14) one side activity has cup jointed stopper (15), spring bar (14) one side has all cup jointed first spring (16), stopper (15) run through spring groove (13) one side lower terminal surface and are the inclined plane setting, and stopper (15) run through spring groove (13) one side upper end respectively with pre-buried pipe (8) lower extreme contact.
2. A prefabricated composite stairway according to claim 1, characterised in that: the circulating steel die (3) and the supporting die (1) are correspondingly arranged in a stair-shaped inclined structure, the reinforcing steel mesh (6) is paved at the upper end of the supporting die (1), and the reinforcing steel mesh (6) is arranged in the concrete layer (4).
3. A prefabricated composite stairway according to claim 2, characterised in that: the heights of the two steel ladder frames (5) are larger than the combined height of the circulating steel die (3) and the supporting die (1), and two sides of the two steel ladder frames (5) are respectively welded and connected with two sides of the two platform hanging plates (2).
4. A prefabricated composite stairway according to claim 3, characterised in that: the assembly block (10) center runs through and has seted up first screw thread groove, and the second screw thread groove has been seted up at upper end center in equipment groove (9), is equipped with assembly screw rod (17) through the vertical grafting of screw thread in the first screw thread groove, and assembly screw rod (17) upper end runs through first screw thread groove grafting second screw thread groove setting, and assembly screw rod (17) lower extreme level is equipped with mount pad (18), and the vertical check valve (19) that are equipped with in mount pad (18) lower extreme center.
5. A prefabricated composite stairway according to claim 4, characterised in that: the center link up check valve (19) in mount pad (18) has seted up splitter box (20), three storage tank has all been symmetrically seted up near splitter box (20) one side in mount pad (18), storage tank in one side all the level be equipped with piston tube (21), piston tube (21) one side link up with splitter box (20), storage tank in one side level peg graft and are equipped with telescopic link (22), piston tank has been seted up on telescopic link (22) one side, piston tube (21) one side has cup jointed sealed piston (23), and piston tube (21) sealed piston (23) one side peg graft the piston tank setting of telescopic link (22).
6. A prefabricated composite stairway according to claim 5, characterised in that: the utility model provides a support mould (1) lower extreme is located connecting rod (7) and runs through one side and all is equipped with mounting disc (24), conical groove has all been seted up at mounting disc (24) lower extreme center, mount pad (18) run through the grafting and arrange in conical groove in setting, the business turn over hole has been seted up respectively to mount pad (18) are run through to storage tank one side, telescopic link (22) one side level runs through the grafting business turn over hole setting, the wheel groove has been seted up to telescopic link (22) one side of running through business turn over hole, all be equipped with installation wheel (25) through the shaft activity in the wheel groove, installation wheel (25) one side contacts with conical groove one side and sets up, telescopic link (22) are arranged in and are accomodate groove one side and are vertically be equipped with deflector (26), be close to business turn over hole one side horizontal symmetry in accomodating the groove and be equipped with four guide bars (27), four guide bars (27) run through deflector level respectively and set up, and telescopic link (22) are located deflector (26) and business turn over hole one side all cup joints second spring (28).
7. A prefabricated combined stair construction method is characterized in that: the prefabricated combined stair construction method is applied to the prefabricated combined stair according to any one of the claims 1-6, and comprises the following steps:
step one: when in use, the steel ladder frame (5) and the platform hanging plate (2) are welded with the supporting die (1) to achieve permanent combination;
step two: then, smearing a release agent on the side, which is contacted with the concrete, of the circulating steel die (3), paving the reinforcing steel mesh (6) on the supporting die (1), and enabling a plurality of connecting rods (7) to respectively penetrate through the reinforcing steel mesh (6) and be connected with the supporting die (1);
step three: the pre-buried pipe (8) is used for carrying out positioning and supporting on the position between the circulating steel die (3) and the supporting die (1), so that the casting size consistency of the concrete layer (4) is improved;
step four: then taking out a pressurizing pipe of the air compression equipment, sleeving a one-way valve, injecting high-pressure gas into the diversion trench (20), extending a telescopic rod (22) out of the inlet and outlet holes along a piston pipe (21) and a guide rod (27) under the sealing action of a sealing piston (23), contacting with the inside of a conical trench of a mounting disc (24), and further pressurizing the telescopic rod (22), wherein the more firmly the circulating steel die (3) is connected with the supporting die (1) under the conical surface action of the conical trench, the less loosening can be caused under the action of the one-way valve (19), and the operation is simple and convenient;
step five: when the embedded pipe (8) is required to be disassembled, the limiting block (15) is contacted with the supporting die (1) under the action of the inclined plane and compressed into the spring groove (13), when the connecting rod (7) is separated from the supporting die (1), the connecting rod can enter the pipe groove of the embedded pipe (8) along with the connecting rod, the embedded pipe (8) is not directly stretched out and hooked, the disassembly is convenient, and when the embedded pipe (8) is installed in the same way, one side of the limiting block (15) is directly sleeved, and the preset position is kept under the action of the limiting block (15) to wait for use;
step six: after the die is removed, the circulating steel die (3) waits for the next use, the formed concrete layer (4) has an excellent stair structure, the surface is smooth, the lower end is folded, the weight is low, and the finished product is transported to a construction position by matching with the holes of the embedded pipe (8) for normal assembly and use.
CN202210807834.8A 2022-07-11 2022-07-11 Prefabricated combined stair and construction method thereof Active CN115110706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210807834.8A CN115110706B (en) 2022-07-11 2022-07-11 Prefabricated combined stair and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210807834.8A CN115110706B (en) 2022-07-11 2022-07-11 Prefabricated combined stair and construction method thereof

Publications (2)

Publication Number Publication Date
CN115110706A CN115110706A (en) 2022-09-27
CN115110706B true CN115110706B (en) 2023-09-29

Family

ID=83331923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210807834.8A Active CN115110706B (en) 2022-07-11 2022-07-11 Prefabricated combined stair and construction method thereof

Country Status (1)

Country Link
CN (1) CN115110706B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101728294B1 (en) * 2017-01-26 2017-04-18 파슨스 브링커호프 아시아 리미티드 Blocking Sound Bridge Equipment For Stairway
CN206123903U (en) * 2016-11-08 2017-04-26 安徽宇辉建筑产业现代化设计研究院有限公司 Prefabricated assembled concrete stairway mould
WO2017084636A1 (en) * 2015-11-20 2017-05-26 中铁第四勘察设计院集团有限公司 Concrete-filled steel tube sleeper suitable for ballastless track
CN106965302A (en) * 2017-05-24 2017-07-21 青岛越群建筑工程咨询有限公司 A kind of prefabricated stringer type stairway and its particular manufacturing craft and construction method
KR101961110B1 (en) * 2017-11-28 2019-03-22 대양전기공업 주식회사 A signal transfer assembly for sensor
CN109853881A (en) * 2019-02-02 2019-06-07 河南绿建建筑科技有限公司 Steel concrete combines the light-duty assembled stair of curved plate
CN110344553A (en) * 2019-07-08 2019-10-18 中机工程有限公司 A kind of formwork erecting structure and formwork support process of stair lifting construction piece post-cast strip
CN209682501U (en) * 2018-08-23 2019-11-26 铭际建筑科技(上海)有限公司 A kind of stair are prefabricated to pour mold
CN110510496A (en) * 2019-08-20 2019-11-29 山东广发建材制品有限公司 A kind of pre-buried lifting part of precast stair
CN210414929U (en) * 2019-04-30 2020-04-28 重庆川船大业钢结构有限公司 Assembled stair mould
CN212507406U (en) * 2020-05-27 2021-02-09 中国建筑第二工程局有限公司 Direct-burried pipe fitting positioning tool
CN112895088A (en) * 2021-01-19 2021-06-04 陕西中天建筑工业有限公司 Prefabricated staircase mold and processing technology of prefabricated staircase

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10500760B2 (en) * 2016-02-19 2019-12-10 II Richard J. Eggleston Method and apparatus for production of precision precast concrete flights of stairs

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017084636A1 (en) * 2015-11-20 2017-05-26 中铁第四勘察设计院集团有限公司 Concrete-filled steel tube sleeper suitable for ballastless track
CN206123903U (en) * 2016-11-08 2017-04-26 安徽宇辉建筑产业现代化设计研究院有限公司 Prefabricated assembled concrete stairway mould
KR101728294B1 (en) * 2017-01-26 2017-04-18 파슨스 브링커호프 아시아 리미티드 Blocking Sound Bridge Equipment For Stairway
CN106965302A (en) * 2017-05-24 2017-07-21 青岛越群建筑工程咨询有限公司 A kind of prefabricated stringer type stairway and its particular manufacturing craft and construction method
KR101961110B1 (en) * 2017-11-28 2019-03-22 대양전기공업 주식회사 A signal transfer assembly for sensor
CN209682501U (en) * 2018-08-23 2019-11-26 铭际建筑科技(上海)有限公司 A kind of stair are prefabricated to pour mold
CN109853881A (en) * 2019-02-02 2019-06-07 河南绿建建筑科技有限公司 Steel concrete combines the light-duty assembled stair of curved plate
CN210414929U (en) * 2019-04-30 2020-04-28 重庆川船大业钢结构有限公司 Assembled stair mould
CN110344553A (en) * 2019-07-08 2019-10-18 中机工程有限公司 A kind of formwork erecting structure and formwork support process of stair lifting construction piece post-cast strip
CN110510496A (en) * 2019-08-20 2019-11-29 山东广发建材制品有限公司 A kind of pre-buried lifting part of precast stair
CN212507406U (en) * 2020-05-27 2021-02-09 中国建筑第二工程局有限公司 Direct-burried pipe fitting positioning tool
CN112895088A (en) * 2021-01-19 2021-06-04 陕西中天建筑工业有限公司 Prefabricated staircase mold and processing technology of prefabricated staircase

Also Published As

Publication number Publication date
CN115110706A (en) 2022-09-27

Similar Documents

Publication Publication Date Title
CN113338451A (en) Assembly type structure adaptive to deformed steel pipe column and construction method thereof
CN211172777U (en) Assembled combination stair
CN115110706B (en) Prefabricated combined stair and construction method thereof
CN210086281U (en) Prefabricated assembled constructs support basis
CN209760787U (en) post-cast strip supporting structure capable of being used in turnover mode
CN109252448B (en) Prepressing construction method of bridge tower column cross beam support
CN111411746A (en) Unbonded prefabricated staircase and construction method thereof
CN214461139U (en) Assembled building frame construction
CN111485887B (en) Construction method of novel working well
CN210289135U (en) Large-section frame column plastic-coated template
CN211523938U (en) Floor pipeline and preparation device thereof
CN211447710U (en) Elevator shaft operating platform
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN216196140U (en) Prefabricated thin wall steel pipe concrete light assembled stair of sectional installation
CN221001398U (en) Building assembled beam column steel structure
TWI632273B (en) Concave shape building construction methods
CN205476155U (en) Prefabricated assembly beam type stair
CN208396103U (en) A kind of beam and floor assembled composite structure
CN219659390U (en) Lightning protection device of sliding mode lifting system
CN114892528B (en) Construction method of double-layer template of uniform-section thin-wall hollow pier
CN219196541U (en) End hoisting plug-in type scissors stair
CN220267177U (en) Elevator well operation platform
CN217480889U (en) House reinforcing structure
CN213710373U (en) Fixing mechanism for vertical plate of stair mold
CN214885642U (en) Cross joist installed by steel structure net rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant