CN114934671B - Fixing wallboard device for building construction pouring and mounting method thereof - Google Patents
Fixing wallboard device for building construction pouring and mounting method thereof Download PDFInfo
- Publication number
- CN114934671B CN114934671B CN202210652087.5A CN202210652087A CN114934671B CN 114934671 B CN114934671 B CN 114934671B CN 202210652087 A CN202210652087 A CN 202210652087A CN 114934671 B CN114934671 B CN 114934671B
- Authority
- CN
- China
- Prior art keywords
- fixing
- base
- splice
- picture peg
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G19/00—Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/16—Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N29/00—Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
- G01N29/04—Analysing solids
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a fixed wallboard device for building construction and pouring and an installation method thereof, relates to the technical field of building construction, and aims to solve the problems that the existing fixed wallboard device for building construction and pouring is time-consuming and labor-consuming in disassembly work after pouring is completed due to inconvenient positioning, installation and disassembly. Including unable adjustment base, unable adjustment base's upper end is provided with the connecting rod, unable adjustment base's upper end is provided with the bracing piece, the upper end of bracing piece is provided with the backup pad, the inboard of backup pad is provided with anti-skidding contact pad, and picture peg fixed end face, it sets up unable adjustment base's up end, one side of picture peg fixed end face is provided with the slot, unable adjustment base's inside is provided with the bolt mounting groove, and the sealed end, it sets up unable adjustment base's inboard, unable adjustment base's front and back both sides are provided with splice plate, splice picture peg respectively, the inside of splice plate is provided with the splice groove.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a fixed wallboard device for building construction pouring and an installation method thereof.
Background
In a traditional cast wallboard device, such as application number: 202110659073.1; the name is: steel template hoist device of wallboard is pour at present to assembled building. The device comprises: the device comprises a wire rope, a base, universal wheels, supporting rods, a hooking plate, an electric driving module A, a movable pulley A, a winding wheel, an electric driving module B and the like, wherein the base provided with the four universal wheels is hinged with the supporting rods, and the hooking plate supported by a reinforcement frame in a cast-in-situ wall body is in sliding fit with the supporting rods along the length direction of the supporting rods; in the process of erecting and installing the steel templates, the invention fully utilizes the existing steel bar frame as a support to erect and install the steel templates, does not need to add other equipment, and reduces equipment cost. Meanwhile, the tower crane can withdraw the steel template only by lifting and placing the steel template on a construction floor through the tower crane, and the whole erection and installation process of the steel template does not need the participation of the tower crane.
However, the fixed wallboard device for building construction pouring is inconvenient to position, assemble and disassemble, so that the problem that the disassembling work is time-consuming and labor-consuming after the pouring is completed is caused; therefore, the existing requirements are not met, and a fixed wallboard device for building construction pouring and an installation method thereof are provided.
Disclosure of Invention
The invention aims to provide a fixed wallboard device for building construction pouring and an installation method thereof, which are used for solving the problems that the existing fixed wallboard device for building construction pouring is inconvenient to position, install and disassemble, and time and labor are wasted in disassembly work after pouring is completed.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a house construction is pour and is used fixed wallboard device, includes unable adjustment base, unable adjustment base's upper end is provided with the connecting rod, the upper end of connecting rod is provided with the bracing piece, the upper end of bracing piece is provided with the backup pad, and backup pad and bracing piece integrated into one piece set up, the inboard of backup pad is provided with anti-skidding contact pad, and anti-skidding contact pad and backup pad bolt fixed connection;
further comprises:
the inserting plate fixing end face is arranged on the upper end face of the fixing base, the inserting plate fixing end face and the fixing base are integrally formed, one side of the inserting plate fixing end face is provided with a slot, the slot and the fixing base are integrally formed, a bolt mounting groove is formed in the fixing base, and the bolt mounting groove and the fixing base are integrally formed;
the sealing end is arranged on the inner side of the fixed base, and the sealing end is in adhesive connection with the fixed base.
Preferably, splice plates and splice plugboards are respectively arranged on the front side and the rear side of the fixed base, the splice plates, the splice plugboards and the fixed base are integrally formed, splice grooves are formed in the splice plates, the splice grooves and the splice plates are integrally formed, and the splice plugboards are fixedly connected with the splice grooves.
Preferably, the lower extreme of bracing piece is provided with the cross connector, and cross connector and bracing piece integrated into one piece set up to cross connector and connecting rod draw-in groove fixed connection.
Preferably, an ultrasonic flaw detector is arranged in the supporting plate.
Preferably, the lower extreme of connecting rod is provided with the picture peg and connects the base, and picture peg connection base and connecting rod integrated into one piece set up to the lower terminal surface and chute draw-in groove fixed connection of base are connected to the picture peg, one side that the base was connected to the picture peg is provided with the picture peg, and picture peg connection base integrated into one piece set up, and picture peg and slot draw-in groove fixed connection.
Preferably, a porous rubber membrane is arranged on one side of the sealing end, an elastic vent pipe is arranged in the sealing end, a porous rubber layer is arranged on one side of the elastic vent pipe, and a buffer pad is arranged on one side of the porous rubber layer.
Preferably, the upper end face of the fixed end face of the plugboard is provided with a chute, and the chute and the fixed base are integrally formed.
Preferably, a fixing bolt is arranged in the bolt mounting groove, and the fixing bolt is fixedly connected with the inner wall of the fixing base through threads.
Preferably, a method for using a fixed wallboard device for building construction and pouring comprises the following steps:
step one: firstly, determining the installation position of the device, tightly attaching a fixing base to a fixing wallboard, screwing a fixing bolt, fixing the fixing base on the outer side of the fixing wallboard, then inserting an inserting plate of a connecting rod into the inside of an inserting groove for fixing, improving the connection stability of the inserting groove before the inserting plate is connected with the base by the inserting groove, and then fixedly connecting a cross connector at the lower end of a supporting rod with a connecting rod clamping groove, so that the device is integrally installed, the supporting plate is used for supporting the fixing wallboard, and an ultrasonic flaw detector detects concrete on the inner side of the fixing wallboard in an ultrasonic mode, thereby greatly improving the practicability and convenient detection performance of the fastening of the device;
step two: the two fixing bases are installed side by side, and the splicing insertion plates are inserted into the splicing grooves in the splicing plates so as to be convenient for side by side fixed installation, so that the supporting force of the device on the fixed wallboard is improved, and the problems that the existing fixed wallboard device for building construction pouring is time-consuming and labor-consuming in disassembly work after pouring is completed due to inconvenient positioning, installation and disassembly of the device are solved;
step three: when the fixed base clings to the fixed wallboard, the porous rubber layer and the buffer pad discharge air inside the fixed base from the porous rubber film along the elastic vent pipe, so that the installation tightness between the fixed base and the fixed wallboard is greatly improved.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, through the arrangement of the fixing base, the connecting rod, the supporting plate, the anti-skid contact pad, the bolt mounting groove, the fixing bolt, the inserting plate fixing end surface, the inclined groove, the inserting groove and the cross connector, the installation position of the device is determined firstly, the fixing base is tightly clung to the fixing wallboard to screw the fixing bolt, the fixing base is fixed on the outer side of the fixing wallboard, then the inserting plate of the connecting rod is inserted into the inserting groove to be fixed, the connecting stability before the connecting rod is connected with the inserting plate is improved by the inclined groove, the cross connector at the lower end of the supporting rod is fixedly connected with the connecting rod clamping groove, the device is integrally installed, the supporting plate is used for supporting the fixing wallboard, the ultrasonic flaw detector detects concrete on the inner side of the fixing wallboard in an ultrasonic mode, and the practicability and convenient detection performance of the fastening of the device are greatly improved.
2. Through splice plate, splice groove, splice picture peg's setting, install two unable adjustment base side by side, splice picture peg inserts splice plate inside splice groove and is convenient for side by side fixed mounting to improved the device and pour with fixed wallboard device to fixed wallboard's support dynamics, solved current house construction, because it is inconvenient to fix a position, install, disassemble, cause the dismantlement work after pouring to accomplish time and energy's problem.
3. Through the setting of sealed end, when unable adjustment base hugs closely fixed wallboard, porous rubber layer and cushion are with its inside air along the elastic breather pipe follow porous rubber membrane discharge, have greatly improved the installation inseparable degree between unable adjustment base and the fixed wallboard.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present invention;
FIG. 2 is an enlarged schematic view of the fixing base structure of the present invention;
FIG. 3 is a schematic side view of the support plate of the present invention;
FIG. 4 is a schematic side view of the stationary base of the present invention;
FIG. 5 is an enlarged schematic view of the structure of the portion A of the present invention;
FIG. 6 is a schematic view of the internal structure of the seal end of the present invention;
in the figure: 1. a fixed base; 2. a connecting rod; 3. a support rod; 4. a support plate; 5. an anti-slip contact pad; 6. a bolt mounting groove; 7. a fixing bolt; 8. the plugboard is fixed on the end face; 9. a chute; 10. a slot; 11. sealing the end; 12. splice plates; 13. a splice groove; 14. splicing plugboards; 15. the plugboard is connected with the base; 16. inserting plate; 17. a cross connector; 18. an ultrasonic flaw detector; 19. a porous rubber membrane; 20. an elastic vent pipe; 21. a porous rubber layer; 22. and a cushion pad.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Further FIGS. 1-6, one embodiment provided by the present invention: the utility model provides a house construction is pour and is used fixed wallboard device, includes unable adjustment base 1, and unable adjustment base 1's upper end is provided with connecting rod 2, and connecting rod 2's upper end is provided with bracing piece 3, and bracing piece 3's upper end is provided with backup pad 4, and backup pad 4 and bracing piece 3 integrated into one piece set up, and backup pad 4's inboard is provided with anti-skidding contact pad 5, and anti-skidding contact pad 5 and backup pad 4 bolt fixed connection;
further comprises:
the inserting plate fixing end face 8 is arranged on the upper end face of the fixing base 1, the inserting plate fixing end face 8 and the fixing base 1 are integrally formed, one side of the inserting plate fixing end face 8 is provided with the inserting groove 10, the inserting groove 10 and the fixing base 1 are integrally formed, the bolt mounting groove 6 is formed in the fixing base 1, and the bolt mounting groove 6 and the fixing base 1 are integrally formed;
the sealing end 11 is arranged on the inner side of the fixed base 1, and the sealing end 11 is in adhesive connection with the fixed base 1.
Further, splice plates 12 and splice plugplates 14 are respectively arranged on the front side and the rear side of the fixed base 1, the splice plates 12, the splice plugplates 14 and the fixed base 1 are integrally formed, splice grooves 13 are formed in the splice plates 12, the splice grooves 13 and the splice plates 12 are integrally formed, and the splice plugplates 14 are fixedly connected with the splice grooves 13 in a clamping mode.
Further, the lower extreme of bracing piece 3 is provided with cross connector 17, and cross connector 17 and bracing piece 3 integrated into one piece set up to cross connector 17 and connecting rod 2 draw-in groove fixed connection.
Further, an ultrasonic flaw detector 18 is provided inside the support plate 4.
Further, the lower extreme of connecting rod 2 is provided with picture peg connection base 15, and picture peg connection base 15 and connecting rod 2 integrated into one piece set up to the lower terminal surface and chute 9 draw-in groove fixed connection of base 15 are connected to the picture peg, and one side of base 15 is connected to the picture peg is provided with picture peg 16, and picture peg 16 and picture peg connection base 15 integrated into one piece set up, and picture peg 16 and slot 10 draw-in groove fixed connection.
Further, a porous rubber membrane 19 is provided on one side of the sealing end 11, an elastic vent pipe 20 is provided inside the sealing end 11, a porous rubber layer 21 is provided on one side of the elastic vent pipe 20, and a cushion pad 22 is provided on one side of the porous rubber layer 21.
Further, the upper end face of the plugboard fixing end face 8 is provided with a chute 9, and the chute 9 and the fixing base 1 are integrally formed.
Further, the inside of the bolt installation groove 6 is provided with a fixing bolt 7, and the fixing bolt 7 is fixedly connected with the inner wall threads of the fixing base 1.
Further, a method for using the fixed wallboard device for building construction pouring comprises the following steps:
step one: firstly, determining the installation position of the device, tightly attaching a fixed base 1 to a fixed wallboard, screwing a fixed bolt 7, fixing the fixed base 1 on the outer side of the fixed wallboard, then inserting a plugboard 16 of a connecting rod 2 into the inside of a slot 10 for fixing, improving the connection stability before the plugboard is connected with a base 15 by a chute 9, and then fixedly connecting a cross connector 17 at the lower end of a supporting rod 3 with a clamping slot of the connecting rod 2, so that the device is integrally installed, wherein a supporting plate 4 is used for supporting the fixed wallboard, and an ultrasonic flaw detector 18 detects concrete on the inner side of the fixed wallboard in an ultrasonic manner, thereby greatly improving the practicability and convenient detection performance of the fastening of the device;
step two: the two fixing bases 1 are installed side by side, and the splicing plugboards 14 are inserted into the splicing grooves 13 in the splicing plates 12 to facilitate side by side fixing installation, so that the supporting force of the device on the fixed wallboard is improved, and the problems that the existing fixed wallboard device for building construction pouring is time-consuming and labor-consuming in disassembly work after pouring is completed due to inconvenient positioning, installation and disassembly are solved;
step three: when the fixed base 1 is tightly attached to the fixed wallboard, the porous rubber layer 21 and the buffer cushion 22 discharge the air in the fixed base from the porous rubber film 19 along the elastic vent pipe 20, so that the installation tightness between the fixed base 1 and the fixed wallboard is greatly improved.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (7)
1. The utility model provides a house construction is pour and is used fixed wallboard device, includes unable adjustment base (1), unable adjustment base (1) upper end is provided with connecting rod (2), the upper end of connecting rod (2) is provided with bracing piece (3), the upper end of bracing piece (3) is provided with backup pad (4), and backup pad (4) and bracing piece (3) integrated into one piece set up, the inboard of backup pad (4) is provided with anti-skidding contact pad (5), and anti-skidding contact pad (5) and backup pad (4) bolt fixed connection;
the method is characterized in that: further comprises:
the inserting plate fixing end face (8) is arranged on the upper end face of the fixing base (1), the inserting plate fixing end face (8) and the fixing base (1) are integrally formed, one side of the inserting plate fixing end face (8) is provided with a slot (10), the slot (10) and the fixing base (1) are integrally formed, a bolt mounting groove (6) is formed in the fixing base (1), and the bolt mounting groove (6) and the fixing base (1) are integrally formed;
sealing end (11), it sets up the inboard of unable adjustment base (1), and sealing end (11) are connected with unable adjustment base (1) gluing, both sides are provided with splice plate (12), splice picture peg (14) respectively around unable adjustment base (1), and splice plate (12), splice picture peg (14) and unable adjustment base (1) integrated into one piece set up, splice plate (12) inside is provided with splice groove (13), and splice groove (13) and splice plate (12) integrated into one piece set up to splice picture peg (14) and splice groove (13) draw-in groove fixed connection, the lower extreme of bracing piece (3) is provided with cross connector (17), and cross connector (17) and bracing piece (3) integrated into one piece set up to cross connector (17) and connecting rod (2) draw-in groove fixed connection.
2. A fixed wallboard device for building construction pouring according to claim 1, wherein: an ultrasonic flaw detector (18) is arranged in the supporting plate (4).
3. A fixed wallboard device for building construction pouring according to claim 1, wherein: the lower extreme of connecting rod (2) is provided with picture peg connection base (15), and picture peg connection base (15) and connecting rod (2) integrated into one piece set up to the lower terminal surface and chute (9) draw-in groove fixed connection of picture peg connection base (15), one side of picture peg connection base (15) is provided with picture peg (16), and picture peg (16) and picture peg connection base (15) integrated into one piece set up to picture peg (16) and slot (10) draw-in groove fixed connection.
4. A fixed wallboard device for building construction pouring according to claim 1, wherein: one side of the sealing end (11) is provided with a porous rubber membrane (19), the inside of the sealing end (11) is provided with an elastic vent pipe (20), one side of the elastic vent pipe (20) is provided with a porous rubber layer (21), and one side of the porous rubber layer (21) is provided with a cushion pad (22).
5. A fixed wallboard device for building construction pouring according to claim 1, wherein: the upper end face of the plugboard fixing end face (8) is provided with a chute (9), and the chute (9) and the fixing base (1) are integrally formed.
6. A fixed wallboard device for building construction pouring according to claim 1, wherein: the inside of bolt mounting groove (6) is provided with fixing bolt (7), and fixing bolt (7) and the inner wall screw thread fixed connection of unable adjustment base (1).
7. A method of using a fixed wall panel apparatus for building construction casting, based on the fixed wall panel apparatus for building construction casting of any one of claims 1 to 6, characterized by comprising the steps of:
step one: firstly, determining the installation position of the device, tightly attaching a fixing base (1) to a fixing wallboard, screwing a fixing bolt (7), fixing the fixing base (1) on the outer side of the fixing wallboard, then inserting a plugboard (16) of a connecting rod (2) into the inside of a slot (10) for fixing, improving the connection stability before the plugboard is connected with a base (15) by a chute (9), and then fixedly connecting a cross connector (17) at the lower end of a supporting rod (3) with a clamping groove of the connecting rod (2), so that the device can be integrally installed, supporting the fixing wallboard by the supporting plate (4), and detecting the concrete on the inner side of the fixing wallboard by an ultrasonic flaw detector (18);
step two: two fixing bases (1) are arranged side by side, and a splicing inserting plate (14) is inserted into a splicing groove (13) in the splicing plate (12) so as to be convenient for side by side fixing and installation;
step three: when the fixing base (1) is tightly attached to the fixing wallboard, the porous rubber layer (21) and the buffer pad (22) discharge air in the fixing base from the porous rubber film (19) along the elastic vent pipe (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210652087.5A CN114934671B (en) | 2022-06-09 | 2022-06-09 | Fixing wallboard device for building construction pouring and mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210652087.5A CN114934671B (en) | 2022-06-09 | 2022-06-09 | Fixing wallboard device for building construction pouring and mounting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114934671A CN114934671A (en) | 2022-08-23 |
CN114934671B true CN114934671B (en) | 2023-09-12 |
Family
ID=82866152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210652087.5A Active CN114934671B (en) | 2022-06-09 | 2022-06-09 | Fixing wallboard device for building construction pouring and mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114934671B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06200622A (en) * | 1993-01-07 | 1994-07-19 | Junichi Sugisaka | Concrete form device |
WO2016115937A1 (en) * | 2015-01-19 | 2016-07-28 | 刘思斌 | Spliced multifunctional plastic pallet |
KR200484857Y1 (en) * | 2016-05-10 | 2017-11-03 | 강문형 | Container house horizontality device |
JP2018091018A (en) * | 2016-12-01 | 2018-06-14 | 清水建設株式会社 | Concrete form fixture, concrete form fixing device, concrete form, concrete form fixing method and construction method of joint |
CN210976626U (en) * | 2019-09-23 | 2020-07-10 | 富利建设集团有限公司 | Basement outer wall unilateral formwork reinforcing apparatus |
CN211899817U (en) * | 2020-03-14 | 2020-11-10 | 王彦明 | Novel building engineering formwork supports device |
CN112031418A (en) * | 2020-08-17 | 2020-12-04 | 浙江舜杰建筑集团股份有限公司 | Temporary supporting device of aluminum formwork for building construction |
CN212743439U (en) * | 2020-06-29 | 2021-03-19 | 甘肃万得绿色建筑有限责任公司 | Wall body panel fixes auxiliary device for light steel house |
CN213173754U (en) * | 2020-09-08 | 2021-05-11 | 马沛沛 | House building's foundation ditch retaining structure |
CN113353832A (en) * | 2021-06-15 | 2021-09-07 | 杭州谦泰五金机械制造有限公司 | Steel template hoist device of wallboard is pour to prefabricated construction now |
CN214696888U (en) * | 2020-12-17 | 2021-11-12 | 中煤建工集团有限公司 | Wall pouring formwork supporting device |
-
2022
- 2022-06-09 CN CN202210652087.5A patent/CN114934671B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06200622A (en) * | 1993-01-07 | 1994-07-19 | Junichi Sugisaka | Concrete form device |
WO2016115937A1 (en) * | 2015-01-19 | 2016-07-28 | 刘思斌 | Spliced multifunctional plastic pallet |
KR200484857Y1 (en) * | 2016-05-10 | 2017-11-03 | 강문형 | Container house horizontality device |
JP2018091018A (en) * | 2016-12-01 | 2018-06-14 | 清水建設株式会社 | Concrete form fixture, concrete form fixing device, concrete form, concrete form fixing method and construction method of joint |
CN210976626U (en) * | 2019-09-23 | 2020-07-10 | 富利建设集团有限公司 | Basement outer wall unilateral formwork reinforcing apparatus |
CN211899817U (en) * | 2020-03-14 | 2020-11-10 | 王彦明 | Novel building engineering formwork supports device |
CN212743439U (en) * | 2020-06-29 | 2021-03-19 | 甘肃万得绿色建筑有限责任公司 | Wall body panel fixes auxiliary device for light steel house |
CN112031418A (en) * | 2020-08-17 | 2020-12-04 | 浙江舜杰建筑集团股份有限公司 | Temporary supporting device of aluminum formwork for building construction |
CN213173754U (en) * | 2020-09-08 | 2021-05-11 | 马沛沛 | House building's foundation ditch retaining structure |
CN214696888U (en) * | 2020-12-17 | 2021-11-12 | 中煤建工集团有限公司 | Wall pouring formwork supporting device |
CN113353832A (en) * | 2021-06-15 | 2021-09-07 | 杭州谦泰五金机械制造有限公司 | Steel template hoist device of wallboard is pour to prefabricated construction now |
Also Published As
Publication number | Publication date |
---|---|
CN114934671A (en) | 2022-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210767797U (en) | Connecting structure of prefabricated outer wall and external scaffold | |
CN114934671B (en) | Fixing wallboard device for building construction pouring and mounting method thereof | |
CN215168080U (en) | Accept template reinforcing apparatus | |
CN209890036U (en) | Derrick structure for villa elevator | |
CN205017257U (en) | Photovoltaic assembling mounting system | |
CN111254975A (en) | Construction method and fixing device for pre-buried U-shaped groove of comprehensive pipe gallery | |
CN220645355U (en) | Civil engineering wall body bearing structure | |
CN219985189U (en) | Coating roller convenient to dismantle and change | |
CN112796513A (en) | Formwork supporting structure for post-cast strip and construction method | |
CN218619761U (en) | Wall-attached embedded part of construction elevator | |
CN201971520U (en) | Connection structure of a small-well elevator car wall | |
CN212248351U (en) | Utility tunnel pre-buried U type groove fixing device | |
CN211447767U (en) | Floor post-cast strip supporting back-jacking structure and template structure thereof | |
CN219011621U (en) | Tower glass curtain wall and assembly node thereof | |
CN220811662U (en) | Tower crane wall attaching device for bridge construction | |
CN221168574U (en) | Combined frame column operation platform | |
CN214405148U (en) | Rubber disc pipeline plugging device | |
CN218623328U (en) | Building aluminium mould rupture membrane device | |
CN221168372U (en) | Building spandrel girder structure is built in room | |
CN215717117U (en) | Novel detachable external scaffolding is wall spare even | |
CN218091935U (en) | Novel combined type aluminum alloy climbing frame | |
CN218646509U (en) | Air tightness test fixture | |
CN218449361U (en) | A pre-buried structure for installation of cable mounting bracket | |
CN212685876U (en) | Manufacturing jig frame for single angle steel guide rail of container ship | |
CN219530010U (en) | Utility tunnel bracket including bracket built-in fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |