CN114856249B CN202210710050.3A CN202210710050A CN114856249B CN 114856249 B CN114856249 B CN 114856249B CN 202210710050 A CN202210710050 A CN 202210710050A CN 114856249 B CN114856249 B CN 114856249B
Authority
CN
China
Prior art keywords
sliding
upright
control rod
sliding block
rod member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210710050.3A
Other languages
Chinese (zh)
Other versions
CN114856249A (en
Inventor
占宏坤
孙孝辉
常亮
焦国华
许鹏举
银小豪
吴劲松
陈礼松
张孟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN202210710050.3A priority Critical patent/CN114856249B/en
Publication of CN114856249A publication Critical patent/CN114856249A/en
Application granted granted Critical
Publication of CN114856249B publication Critical patent/CN114856249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention belongs to the technical field of fabricated building, and particularly discloses a fabricated building movable plank house and a construction method thereof, wherein the fabricated building movable plank house comprises a plurality of upright posts and a plurality of wallboards, the wallboards are embedded between every two upright posts, and the two upright posts are connected through steel ropes in a hanging manner; the wall board is characterized in that at least two wall boards are embedded between every two upright posts, and a cavity structure is formed between the two wall boards. The assembled movable plank house can be quickly disassembled and fastened, and has good sound insulation effect and high connection strength.

Description

Prefabricated building movable plank house and construction method thereof
Technical Field
The invention relates to the technical field of prefabricated houses, in particular to an prefabricated building movable plank house and a construction method thereof.
Background
Most of the components can be connected in an assembled mode to achieve the purpose of rapid assembly and disassembly, and the assembled type plate house is suitable for short-time living of field constructors, but the existing plate house structure comprises a wallboard and other structures, a steel skeleton is required to be built in advance, and then the assembly of the wallboard and other components is completed in a rivet riveting mode, so that the assembled type plate house is very convenient to install, and finally the assembled type plate house is very troublesome to disassemble.
In the prior art, an assembled structure exists, the fastening connection between the upright posts is realized by stretching steel ropes between the upright posts, then the wallboard is embedded between the upright posts, but in the connection mode, although the connection strength of the wallboard can be improved by stretching the steel ropes, and meanwhile, certain claw assembly convenience is ensured, on one hand, the steel rope part is arranged on the inner side or the outer side of the wallboard, the aesthetic property is poor, and if certain aesthetic property is ensured, a decoration panel is additionally required to be installed; on the other hand, the tensioning of the steel cord is also a relatively laborious operation, with a considerable reduction in the assemblability.
Disclosure of Invention
The invention aims to provide an assembled building movable plank house and a construction method thereof, wherein the steel rope is more convenient to stretch, and meanwhile, double-layer wallboard fixing can be realized, so that on one hand, the assembly convenience of the wallboard is effectively improved, on the other hand, the double-layer wallboard is arranged, a hollow structure is formed in the middle, and the sound insulation performance of the plank house can be effectively improved.
The invention is realized by the following technical scheme:
The prefabricated movable house for the building comprises a plurality of upright posts and a plurality of wallboards, wherein the wallboards are embedded between every two upright posts and are connected with each other through steel ropes in a hanging manner; at least two wallboards are embedded between every two upright posts, and a cavity structure is formed between the two wallboards.
Optionally, in the cavity structure, a fixed block for connecting the steel rope is arranged on the upright column on one side, and a sliding block for connecting the steel rope is arranged on the upright column on the other side, wherein the sliding block is connected with the upright column by adopting a sliding structure sliding along the height direction of the upright column, and the sliding block is also connected with a fastening mechanism.
Optionally, the fastening mechanism includes screw rod component, gear drive pair and control lever component, the screw rod component is followed the stand is arranged, and the sliding block cover is located the screw rod component and with its screw thread cooperation, the screw rod component with the control lever component passes through the gear drive pair is connected, the tip of control lever component is provided with locking component, can block in the stand that is located the tip in order to lock the control lever component.
Optionally, the screw member comprises at least two thread segments, and the threads of the two thread segments are oppositely handed.
Optionally, the gear transmission pair adopts a bevel gear transmission pair.
Optionally, the bottom of stand is provided with hollow structure, is provided with the slide rail in the hollow structure, be provided with the slide that is used for supporting the control lever component on the slide rail, slide and slide rail sliding fit are provided with the rotor plate on the slide, the control lever component is fixed on the rotor plate, the rotor plate can rotate around a gyration axle center to rotate the bevel gear on the control lever component to the state with the bevel gear intermeshing on the screw rod component.
Optionally, a pin member for locking the rotating plate is provided on the slider at the end.
The construction method of the prefabricated building prefabricated house, which comprises the following steps:
The method comprises the steps of vertically positioning a stand column positioned at the end part, clamping one side of one wallboard into the stand column, respectively suspending and pulling steel ropes between a fixed block and a sliding block of the other stand column, pre-rotating a screw rod component and the sliding block on one side of the stand column, clamping the other wallboard into the stand column positioned at the end part after the suspension and the pulling of the steel ropes are completed, and clamping the stand column where the sliding block is positioned into two wallboards, so that a basic wall structure is formed;
The control rod member is sent to a position where the bevel gear transmission pair can be meshed with each other in a mode that the sliding seat moves along the sliding rail, the rotating plate is rotated, the bevel gear on the control rod member is meshed with the bevel gear on the screw rod member, then the pin rod member is inserted, locking is achieved, finally the locking member at the end part of the control rod member is rotated, the sliding block can slide on the screw rod member, so that the steel rope is tightened, and then the locking member is clamped into the upright post, so that the assembly of the wallboard is completed.
The technical scheme of the invention has at least the following beneficial effects:
according to the prefabricated building movable plank house and the construction method thereof, the wallboard is installed by adopting the two structures, the hollow cavity structure is formed in the middle to accommodate the hanging steel rope, so that the reinforcing effect of the steel rope is utilized, the safety problem and the attractive problem caused by the external steel rope are avoided, and the hollow cavity formed by the double-layer wallboard structure can improve the wallboard sound insulation effect of the plank house and solve the problem of poor sound insulation effect of the traditional plank house.
Drawings
FIG. 1 is a schematic cross-sectional view of an prefabricated building prefabricated house according to the present invention;
FIG. 2 is a schematic longitudinal section of the prefabricated building prefabricated house of the present invention;
FIG. 3 is a side view of a carriage portion of the present invention;
FIG. 4 is a schematic view of the slide of the present invention after the rotation of the rotating plate;
icon: 1-upright post, 2-wallboard, 3-steel rope, 4-fixed block, 5-sliding block, 61-screw component, 62-gear transmission pair, 63-control rod component, 630-locking component, 7-sliding component, 71-slide, 72-rotating plate, 73-pin rod component.
Detailed Description
Referring to fig. 1 and 2, the prefabricated building prefabricated house of the invention comprises a plurality of upright posts 1 and a plurality of wallboards 2, wherein the wallboards 2 are embedded between every two upright posts 1, and the two upright posts 1 are connected in a hanging manner through steel ropes 3; at least two wallboards 2 are embedded between every two upright posts 1, and a cavity structure is formed between the two wallboards 2. According to the invention, by installing two wallboards 2 between the two upright posts 1, a hollow cavity structure formed in the middle can be used for hanging the steel rope 3 on one hand, so that a space for hanging the steel rope 3 is provided, and on the other hand, a hollow wallboard 2 structural component can be formed, so that the sound insulation effect of the wallboard 2 can be improved. The main body frame of the movable house can be formed by encircling through the connection of the upright posts 1 and the wallboards 2, and then the integrated house structure can be formed through the covering floor board or the top board.
In the cavity structure, a fixed block 4 for connecting the steel rope 3 is arranged on the upright 1 on one side, a sliding block 5 for connecting the steel rope 3 is arranged on the upright 1 on the other side, the sliding block 5 is connected with the upright 1 by adopting a sliding structure sliding along the height direction of the upright 1, and the sliding block 5 is also connected with a fastening mechanism. The fixed block 4 can be integrally formed with the upright 1, after the fixed block is independently manufactured, the fixed connection can be realized through fastening connection modes such as screw connection, and the sliding block 5 is in sliding connection with the upright 1, wherein the sliding connection can be a mode that a sliding groove is arranged on the upright 1 in advance, the sliding block 5 is embedded in the sliding groove, for example, a conventional T-shaped groove matching structure is adopted, a T-shaped protrusion is arranged on the sliding block 5, and the T-shaped protrusion is inserted into a T-shaped groove formed in the upright 1. Between the two uprights 1, the steel rope 3 is connected at one end to the fixed block 4 and at the other end to the sliding block 5, the suspension tension of the steel rope 3 can be changed as long as the movement of the sliding block 5 is controlled, and the movement of the control block is finished by means of a fastening mechanism.
In this embodiment, the fastening mechanism includes a screw member 61, a gear pair 62 and a control lever member 63, the screw member 61 is disposed along the upright 1, the sliding block 5 is sleeved on the screw member 61 and is in threaded engagement with the screw member 61, the screw member 61 and the control lever member 63 are connected through the gear pair 62, and a locking member 630 is disposed at an end of the control lever member 63 and can be snapped into the upright 1 at the end to lock the control lever member 63. The screw member 61 is installed in a vertical state with the side surface of the upright 1, and the movable block is in threaded fit with the threaded member, so that the sliding block 5 can be controlled to linearly move along the side surface of the upright 1 only by controlling the rotation of the screw member 61, and the tensioning of the steel rope 3 is conveniently completed. Further, the screw member 61 includes at least two thread segments, and the thread directions of the two thread segments are opposite, so that the steel rope 3 arranged in an X-shape can be connected through the matching mode of the two sliding blocks 5 and the two fixing blocks 4, when the screw member 61 is controlled to rotate in one direction, the two sliding blocks 5 on the screw member 61 can be separated from each other or are close to each other, and when the two sliding blocks are separated from each other, tensioning is completed, and when the two sliding blocks are close to each other, loosening is completed, so that tensioning of the steel rope 3 becomes more convenient.
The gear transmission pair 62 adopts a bevel gear transmission pair 62, so that the transmission connection of the control rod member 63 and the screw rod member 61 is realized, meanwhile, the control habit is met, the vertically arranged screw rod member 61 is converted into the horizontally arranged control rod member 63, and the rotation control of the screw rod member 61 can be completed by rotating the control rod member 63.
Referring to fig. 3 and 4, the bottom of the column 1 is provided with a hollow structure in which a sliding assembly 7 is provided, enabling sliding of the control rod member 63. The sliding assembly 7 includes a slide rail, on which a slide carriage 71 for supporting the control lever member 63 is provided, the slide carriage 71 is slidably fitted with the slide rail, a rotation plate 72 is provided on the slide carriage 71, the control lever member 63 is fixed on the rotation plate 72, and the rotation plate 72 can rotate around a rotation axis, thereby rotating the bevel gear on the control lever member 63 to a state of being engaged with the bevel gear on the screw member 61. The sliding rail can be pre-installed at a designated position, or can be pushed in at a later stage. By mounting the control lever member 63 on the slide carriage 71, the control lever member 63 and its bevel gear can be conveniently fed into the wallboard 2 assembly, avoiding the problem of complicated installation of the main structure (the upright 1 and the wallboard 2) caused by excessive pre-arrangement of the scattered components in the prior art, and simultaneously, since the upright 1 and the upright 1 are connected by the steel rope 3 in a hanging manner, the position of the upright 1 at the beginning is not fixed, so that the problem of assembly interference and the problem of incomplete assembly of the assembly structure are easily caused by pre-mounting the control lever member 63 and other components.
Therefore, in the present embodiment, the pin member 73 for locking the rotating plate 72 is provided on the sliding seat 71 at the end, and the control lever is finally fed to the designated position by using the sliding seat 71, so that the control work is completed, and the rotating plate 72 is provided in a rotating structure, so that the problem of mutual interference between bevel gears during the feeding process is avoided, and as shown in fig. 2, interference occurs during the moving process when a plurality of bevel gears are provided on the control lever member 63. The rotary plate 72 is preferably kept away from the interference position, the feeding process is rotated again, and then the locking is realized through the pin member 73, so that the gear engagement work is conveniently completed.
The construction method of the prefabricated building prefabricated house of the embodiment comprises the following steps:
The upright 1 at the end is positioned vertically, which may be a conventional, for example, frame structure, such as a floor mounted frame, and then the upright 1 is bolted to the frame structure, etc. Then one side of one wallboard 2 is clamped into the upright 1, then the steel rope 3 is respectively hung between the fixed block 4 and the sliding block 5 of the other upright 1, the screw rod component 61 and the sliding block 5 are pre-assembled on one side of the upright 1, after the steel rope 3 is hung, the other wallboard 2 is clamped into the upright 1 positioned at the end part, then the upright 1 where the sliding block 5 is positioned is clamped into the two wallboards 2, thus a basic wall structure is formed, and the steel rope 3 can be assembled simply without reaching a pre-tightening state in the assembling sequence.
The control rod member 63 is sent to a position where the bevel gear transmission pair 62 can be meshed with each other in a sliding way through the sliding seat 71, the rotating plate 72 is rotated, the bevel gear on the control rod member 63 is meshed with the bevel gear on the screw rod member 61, then the pin rod member 73 is inserted to realize locking, and finally the locking member 630 at the end part of the control rod member 63 is rotated, so that the sliding block 5 can slide on the screw rod member 61, thereby tightening the steel rope 3, and then the locking member 630 is clamped into the upright 1, thus the assembly of the wallboard 2 is completed.

Claims (2)

1. The prefabricated movable house for the building comprises a plurality of upright posts and a plurality of wallboards, wherein the wallboards are embedded between every two upright posts and are connected with each other through steel ropes in a hanging manner; the wall board is characterized in that at least two wall boards are embedded between every two upright posts, and a cavity structure is formed between the two wall boards;
In the cavity structure, a fixed block for connecting a steel rope is arranged on the upright column on one side, a sliding block for connecting the steel rope is arranged on the upright column on the other side, the sliding block is connected with the upright column by adopting a sliding structure sliding along the height direction of the upright column, and the sliding block is also connected with a fastening mechanism;
the fastening mechanism comprises a screw member, a gear transmission pair and a control rod member, wherein the screw member is arranged along the upright post, a sliding block is sleeved on the screw member and is in threaded fit with the screw member, the screw member is connected with the control rod member through the gear transmission pair, and a locking member is arranged at the end part of the control rod member and can be clamped into the upright post at the end part to lock the control rod member;
the screw member comprises at least two thread segments, and the threads of the two thread segments are opposite in rotation direction;
the gear transmission pair adopts a bevel gear transmission pair;
The bottom of the upright post is provided with a hollow structure, a sliding rail is arranged in the hollow structure, a sliding seat for supporting a control rod component is arranged on the sliding rail and is in sliding fit with the sliding rail, a rotating plate is arranged on the sliding seat, the control rod component is fixed on the rotating plate, and the rotating plate can rotate around a rotation axis, so that a bevel gear on the control rod component is rotated to a state of being meshed with a bevel gear on a screw rod component;
A pin member for locking the rotary plate is provided on the slider at the end.
2. A method of constructing a prefabricated building activity panel according to claim 1, comprising the steps of:
The method comprises the steps of vertically positioning a stand column positioned at the end part, clamping one side of one wallboard into the stand column, respectively suspending and pulling steel ropes between a fixed block and a sliding block of the other stand column, pre-rotating a screw rod component and the sliding block on one side of the stand column, clamping the other wallboard into the stand column positioned at the end part after the suspension and the pulling of the steel ropes are completed, and clamping the stand column where the sliding block is positioned into two wallboards, so that a basic wall structure is formed;
The control rod member is sent to a position where the bevel gear transmission pair can be meshed with each other in a mode that the sliding seat moves along the sliding rail, the rotating plate is rotated, the bevel gear on the control rod member is meshed with the bevel gear on the screw rod member, then the pin rod member is inserted, locking is achieved, finally the locking member at the end part of the control rod member is rotated, the sliding block can slide on the screw rod member, so that the steel rope is tightened, and then the locking member is clamped into the upright post, so that the assembly of the wallboard is completed.
CN202210710050.3A 2022-06-22 2022-06-22 Prefabricated building movable plank house and construction method thereof Active CN114856249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210710050.3A CN114856249B (en) 2022-06-22 2022-06-22 Prefabricated building movable plank house and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210710050.3A CN114856249B (en) 2022-06-22 2022-06-22 Prefabricated building movable plank house and construction method thereof

Publications (2)

Publication Number Publication Date
CN114856249A CN114856249A (en) 2022-08-05
CN114856249B true CN114856249B (en) 2024-06-18

Family

ID=82626644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210710050.3A Active CN114856249B (en) 2022-06-22 2022-06-22 Prefabricated building movable plank house and construction method thereof

Country Status (1)

Country Link
CN (1) CN114856249B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212641721U (en) * 2020-04-06 2021-03-02 刘华 Reinforcement type prefabricated building
CN113309364A (en) * 2021-04-14 2021-08-27 黄康 Assembled wallboard reinforcing bar is to hole device with correct function
CN216516156U (en) * 2021-12-28 2022-05-13 河南永泽建筑科技有限公司 Board room mounting structure
CN217601769U (en) * 2022-06-06 2022-10-18 中铁十局集团有限公司 Mounting structure of building assembled wall body

Family Cites Families (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPR422901A0 (en) * 2001-04-05 2001-05-17 Bergqvist, Tonny Modular building structure
JP2003096909A (en) * 2001-09-21 2003-04-03 Kenjiro Ogata Multi-layer bonded lap wall
KR20060008802A (en) * 2004-07-24 2006-01-27 이종현 Tension controller of wire for reinforcing a frame assembly of three dimentional structure
CN101906831A (en) * 2010-07-23 2010-12-08 何永强 Novel fireproof wall and board room consisting of same
US20120090259A1 (en) * 2010-10-15 2012-04-19 Constructive, L.L.C. Prefabricated compound masonry units
KR20130015697A (en) * 2011-08-04 2013-02-14 탁승호 Fast and easy assembly pre-fabrication house
CN102852270A (en) * 2012-08-10 2013-01-02 上海理想家园工程营造有限公司 Diversified metal skin bounding box type package level-A fireproof die wallboard and construction method thereof
CA2868656C (en) * 2013-10-22 2016-04-12 Folding Holdings Llc Improved folding building system
CN104164941B (en) * 2014-07-23 2016-06-08 华北水利水电大学 Steel frame prestressing force junked tire dwelling house system
ITUB20151946A1 (en) * 2015-07-03 2017-01-03 Wood System Int Srl Connection joint for wooden panels of walls and floors of buildings, building structure incorporating the joint and construction method of the structure
CN204781334U (en) * 2015-07-18 2015-11-18 浙江依家幕墙科技有限公司 Relief of disaster room
CN105735478B (en) * 2016-03-25 2018-08-31 柳州市雅泰活动板房厂 Whole plate Foldable prefabricated house
JP6444444B2 (en) * 2017-03-30 2018-12-26 恒彦 浮橋 Building block, building block composite and building frame
CN207306253U (en) * 2017-10-19 2018-05-04 潍坊歌尔电子有限公司 A kind of telescopic device and wearable device
CN107975147A (en) * 2017-12-10 2018-05-01 柳州市雅泰活动板房厂 Whole plate foldable mobile board room
CN109183978B (en) * 2018-09-15 2020-07-24 安徽中工建总建设集团股份有限公司 Module assembling energy-saving environment-friendly building
CN208981550U (en) * 2018-10-19 2019-06-14 济南大学 A kind of assembled architecture shock absorption wall
CN109162378A (en) * 2018-10-24 2019-01-08 仙居县中正智能科技有限公司 A kind of steel construction assembling type outer wall system and its application method
CN109972891B (en) * 2019-03-08 2021-05-25 福建鑫晟钢业有限公司 Prefabricated steel structure-based fabricated steel plate net concrete-encased shear wall structure
CN110565827B (en) * 2019-08-22 2024-05-17 广东中集建筑制造有限公司 Anti-seismic assembly and modularized building
CN110805210B (en) * 2019-11-11 2021-09-21 南京六合科技创业投资发展有限公司 Polycarbonate hollow plate assembly convenient to connect and mount
CN211447262U (en) * 2019-12-17 2020-09-08 大连阔森特新型建材有限公司 Folding house installation protector
CN212642137U (en) * 2020-06-22 2021-03-02 杨宏伟 Quick assembly disassembly template of construction main part construction
CN111677105B (en) * 2020-07-09 2021-02-02 南京工业大学 Wooden house convenient to dismouting
CN213774231U (en) * 2020-07-21 2021-07-23 浙江汪洋建设有限公司 Decorative board for decoration
CN111734193A (en) * 2020-07-22 2020-10-02 张延年 Assembled simple and easy room with consolidate anti-seismic structure
CN212317231U (en) * 2020-08-14 2021-01-08 南京林业大学 Assembled steel-bamboo combined shear wall with damper
CN111980222A (en) * 2020-09-15 2020-11-24 金螳螂精装科技(苏州)有限公司 Steel construction assembled wallboard is built in room
CN212896972U (en) * 2020-09-15 2021-04-06 金螳螂精装科技(苏州)有限公司 Steel construction assembled wallboard is built in room
CN213806147U (en) * 2020-09-23 2021-07-27 赵庆宝 Civil engineering construction is with high strength combination wallboard
CN112282499A (en) * 2020-11-16 2021-01-29 淳安县九景新型建材厂 Intelligent cement wood-imitating railing
CN215107575U (en) * 2020-12-07 2021-12-10 合肥易成机械制造有限公司 Reinforced structure of double-layer movable container board room
CN112478704A (en) * 2020-12-14 2021-03-12 益阳市明正宏电子有限公司 Plate turnover is used in circuit board production
CN214705727U (en) * 2021-02-05 2021-11-12 佛山市南海琦博精密五金制品有限公司 Capacitor heat dissipation aluminum plate suitable for different specifications
CN215483764U (en) * 2021-05-19 2022-01-11 灌南县华为建材有限公司 Low-energy-consumption high-strength efficient heat-insulation composite ceramsite wallboard
CN113404210B (en) * 2021-07-06 2022-07-15 中建二局第一建筑工程有限公司 Assembled heat-preservation and decoration integrated wall and manufacturing and mounting process thereof
CN214989845U (en) * 2021-07-27 2021-12-03 山东滕建建设集团有限公司 Assembled building wallboard hoist device
CN215564652U (en) * 2021-08-05 2022-01-18 李可心 Building engineering construction protector
CN216476036U (en) * 2021-10-19 2022-05-10 日照市翰鼎钢结构科技有限公司 External hanging type steel skeleton wallboard for building
CN216341162U (en) * 2021-11-23 2022-04-19 郑州建安科技开发有限公司 Building wall prevents fracture reinforced structure
CN216665245U (en) * 2021-12-02 2022-06-03 安徽省寿县楚阳建筑安装工程有限公司 Noise reduction equipment for construction site construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212641721U (en) * 2020-04-06 2021-03-02 刘华 Reinforcement type prefabricated building
CN113309364A (en) * 2021-04-14 2021-08-27 黄康 Assembled wallboard reinforcing bar is to hole device with correct function
CN216516156U (en) * 2021-12-28 2022-05-13 河南永泽建筑科技有限公司 Board room mounting structure
CN217601769U (en) * 2022-06-06 2022-10-18 中铁十局集团有限公司 Mounting structure of building assembled wall body

Also Published As

Publication number Publication date
CN114856249A (en) 2022-08-05

Similar Documents

Publication Publication Date Title
CN101449019A (en) Gate support device
CN112982660B (en) Assembly type steel structure building assembly and assembly method
CN114856249B (en) Prefabricated building movable plank house and construction method thereof
CN216380090U (en) Assembly type component for assembly type building wall
CN112627385B (en) Energy-saving environment-friendly green building
CN110409958A (en) A kind of assembled integrated building door and window installation structure
CN215777167U (en) Pulley structure for curtain and curtain applying pulley structure
CN211850200U (en) Corrosion-resistant prefabricated reinforced concrete shear wall
CN111962891A (en) Auxiliary fixing mechanism for building assembly type building
CN111255114A (en) Heat preservation outer wall modularization continuous installation device for construction
CN221052986U (en) Novel light wall board
CN220565445U (en) Beam-column connection assembly structure
CN112575902B (en) Green building
CN218580924U (en) Installation component for assembly type building
CN217998590U (en) Ceiling connecting piece
CN114809419B (en) Detachable building decoration ceiling system
CN221119220U (en) Building templates with connecting piece structure
CN220591985U (en) Steel structure welding equipment
CN216766236U (en) Assembled arch steel construction
CN216552538U (en) Wallboard connection structure for assembly type building
CN113931431B (en) Construction hanging basket for outdoor operation
CN202390059U (en) Dismountable sightseeing lift glass frame upright column
CN215212533U (en) Door aperture hole strutting arrangement
CN219365266U (en) PCF board bolted connection structure
CN219345170U (en) Combined middle wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant