CN114763732A - Pressure control casing drilling method for underground injection pressure containing stratum - Google Patents

Pressure control casing drilling method for underground injection pressure containing stratum Download PDF

Info

Publication number
CN114763732A
CN114763732A CN202210022276.4A CN202210022276A CN114763732A CN 114763732 A CN114763732 A CN 114763732A CN 202210022276 A CN202210022276 A CN 202210022276A CN 114763732 A CN114763732 A CN 114763732A
Authority
CN
China
Prior art keywords
drilling
well
pressure
casing
cementing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210022276.4A
Other languages
Chinese (zh)
Inventor
刘玉民
王洪星
杨智光
王洪卫
季海军
齐悦
张振华
贾维君
杨决算
何俊才
朱焱
李吉军
孙中昌
王立哲
马晓伟
王连生
杨秀天
陈绍云
杨瑞明
王永福
豁达
董岩
耿建卫
姜玉芳
董明
田玉栋
那自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Petroleum Administration Bureau
China National Petroleum Corp
Original Assignee
Daqing Petroleum Administration Bureau
China National Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Petroleum Administration Bureau, China National Petroleum Corp filed Critical Daqing Petroleum Administration Bureau
Publication of CN114763732A publication Critical patent/CN114763732A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A method of drilling a well with a controlled pressure casing for use downhole with injection pressure of a subterranean formation. The method mainly solves the problems that the yield is influenced when the existing three-mining casing damage well is drilled and shut down to renew the well, the three-mining development effect is influenced, and the drilling safety is influenced when the well is not drilled and shut down. The method is characterized in that: firstly, drilling a well, secondly, cementing the well, installing pressure control drilling equipment and testing the pressure; secondly, drilling a well in a non-oil layer section, testing by using a hydraulic pressurization anti-inclination tool, and recording the pressure of a neutral pipe and the displacement of a pump in the process; drilling a well in a second casing drilling section, and cementing a well; and (6) logging. By adopting the pressure-controlled casing drilling method for underground injection pressure containing stratum, a well can be drilled and updated under the condition of not stopping the well, the injection-production relation of a casing damage well group can be completed in time, the injection of a drilling area is not influenced, and the normal block development effect is ensured.

Description

Pressure control casing drilling method for underground injection pressure containing stratum
Technical Field
The invention relates to the field of oil fields, in particular to a pressure control casing drilling method for underground injection pressure containing stratum.
Background
After years of oilfield development, the number of casing damage problem wells of a three-mining block is increasing. And according to the capacity construction requirement of the three mining blocks, more and more wells need to be drilled. However, conventional drilling of a renewal well has the following problems:
(1) the drill bit has great influence on the yield: because the distribution of the renewal wells is scattered, pressure reduction (so-called 'drilling shut-in') is needed in the conventional drilling, for some areas with high well pattern density, 40 water injection (entering) wells are shut-in averagely in the drilling shut-in range of 450 meters of one scattered renewal well, the influence time reaches about 35 days, the influence of the conventional drilling of one renewal well on oil mass is large, and the pressure change of a local well area is large, so that the casing protection is not facilitated.
(2) The effect of tertiary oil recovery development is influenced by updating the well drilling shut-in: according to the requirement of an oil displacement scheme, continuous injection is required in an injection period in order to ensure the development effect of a three-mining positive injection block, so that casing damage wells in the three-mining block cannot be updated in time, and the injection and the mining of a local well pattern are incomplete; if the updating well is a three-recovery well pattern well, and the updating is carried out after one period is finished, the reserve of the updating well area is not effectively used in the tertiary oil recovery process, and the tertiary oil recovery can not be carried out any more; if drilling shut and pressure reduction are adopted, the gathered section is jammed and relaxed, and the development effect and benefit of the third mining are influenced.
(3) The drilling safety and the cementing quality under the conventional drilling conditions are greatly influenced by the non-drilling condition: the local extra-high pressure of the static pressure of the stratum can be difficult to determine, and the superposition risk of shallow gas and the like can exist in partial blocks.
At present, aiming at the geological conditions, in order to ensure the drilling safety and the cementing quality, the conventional well updating is completed under the condition of drilling shutdown, and the well updating is difficult to drill under the condition of not drilling shutdown.
Disclosure of Invention
The invention provides a pressure-controlled casing drilling method for underground injection pressure containing stratum, which can drill and renew wells under the condition of not stopping the wells, not only can timely perfect the casing damage well group injection and production relationship, but also can not influence the injection of a drilling area, and ensure the normal block development effect.
The technical scheme of the invention is as follows: a method of drilling a well with a controlled pressure casing downhole containing formation injection pressure, comprising the steps of: firstly, drilling a well, secondly, cementing the well, installing pressure control drilling equipment and testing the pressure; drilling a well in a non-oil layer section, testing a hydraulic pressurization anti-deviation tool, and recording the pressure of a neutral pipe and the pump displacement in the process; drilling a well in a second casing drilling section, and cementing a well; and (6) logging.
Further, after the well is first opened, the roller bit drills the plug, the drill continues to drill for 5-10 m, and then pressure control drilling equipment is installed.
Further, when drilling in the second-casing drilling section, firstly, the pipe column is put at the bottom of the well, rotary drilling is carried out, the circulation and the connection of the stand column are carried out to control the pressure to drill the well, partial casings are removed after drilling, and the removed casings are connected after reaming and drifting;
further, before secondary well cementation, the length of a short section of the casing pipe is adjusted to ensure that the coupling just exposes out of the casing head after a sufficient pocket is reserved; connecting the top connection section, wherein the upper buckling torque is the lowest upper buckling torque; connecting a drilling pump and circulating; and (4) performing a formation leakage test.
Further, when secondary well cementation is carried out, a rotary well cementation cement head is connected, isolation liquid is injected, cement is injected, a rubber plug is pressed, the displacement is carried out, and a casing pipe pressure test is carried out; and closing the well sealer after well cementation, and adding back pressure to the annulus for curing.
Further, after the second-opening well cementation, the connecting top joint is disassembled, and the ring iron is installed.
The invention has the following beneficial effects: the pressure control sleeve drilling method for drilling under pressure uses a special sleeve to drill, applies pressure control equipment and a pressure control method to accurately control annular pressure in a borehole, directly cementing the borehole after drilling, and has the advantages of shortening the drilling period, simplifying the drilling process, reducing the drilling accidents of blowout, leakage and the like. The method has the advantages that the well drilling process is the casing running process and the well cementation can be realized after the well drilling process is finished, so that the accident that the bottom hole pressure is out of control during the process of' electrical logging and casing running after the well drilling process in the conventional well drilling process is reduced.
Detailed Description
The invention is further illustrated below:
a method of drilling a well with a controlled pressure casing downhole containing formation injection pressure, comprising the steps of:
and (I) drilling, well opening and well cementing, after well opening and well cementing, plugging by using a roller bit, continuously drilling for a certain depth of 5-10 m, then installing pressure control drilling equipment, debugging and pressure testing the pressure control drilling equipment, performing combined debugging, and starting construction after normal test operation.
And (II) drilling a well in a non-oil interval with two openings, selecting a hydraulic pressurization anti-deviation tool, opening the hydraulic pressurization anti-deviation tool to be closed through top drive, testing and recording the pressure of a neutral pipe and the displacement of a pump in the process so as to judge whether the tool is normal or not, determine whether the tool is unblocked or not and determine whether the pressure of fluid passing through the tool is normal or not.
(III) drilling in a second casing pipe drilling section, and cementing in a second casing pipe:
a. the two sleeves are connected to form an upright column, the upper end of each upright column is connected with a driving rod protection joint, and the lower end of each upright column is provided with a male protection wire and vertically arranged on a drill floor;
b. lowering the pipe column to the bottom of the well, rotary drilling, recycling, connecting the upright column to the casing pipe, controlling pressure and drilling, removing part of the casing pipe after drilling, reaming and dredging the well, and then connecting the removed casing pipes;
c. connecting a well cementation pipe column, adjusting the length of a short section of the casing pipe, and ensuring that a coupling just exposes out of a casing head after a sufficient pocket is left; the connection top section is connected, and the screwing-on torque is the lowest screwing-on torque, so that connection and sealing are ensured, and the screw is conveniently unscrewed after well cementation; connecting a drilling pump, circulating and performing a stratum leakage test;
d. connecting a rotary cementing head, drilling a spacer fluid, cementing (lifting and lowering a cementing pipe column, and also rotating the cementing pipe column), and if the circulating pump is high in pressure, the cement slurry does not flow through a drill bit and a screw drill, then throwing the ball and suppressing the pressure to open a bypass valve; pressing a rubber plug, and replacing (lifting and lowering the well cementation pipe column, or rotating the well cementation pipe column without performing simultaneously) the rubber plug; testing the pressure of the sleeve, after the pressure testing is finished, opening the sleeve for waiting for condensation, closing the sleeve for waiting for condensation, and increasing the pressure of the closed sleeve to 1-2 MPa greater than the annulus balance pressure; closing the well sealer after cementing, and adding back pressure to the annulus for waiting for setting; if the check valve is out of order, the pressure difference between the inside and the outside of the pipe is calculated, and the pressure is held and the waiting solidification is carried out.
e. Removing the top joint and mounting a ring iron;
f. logging: and measuring geological parameters and engineering parameters.
Aiming at the problem that scattered updating well drilling closure affects yield, the well drilling method adopts a mode of applying back pressure to the annulus of the well head, provides a scheme for drilling and completing scattered updating well pressure control casing pipes, achieves the purpose of perfecting a well pattern, and reduces the influence on the yield. When drilling, circulating and connecting a single joint, applying back pressure to a wellhead by adjusting an automatic throttling manifold; the well is completed by one-time drilling, and the well is directly fixed, so that the pressure is controlled in the whole process, and the control risk in the process of tripping and casing running is reduced; meanwhile, taking the peripheral well into account, and logging after casing; and (4) applying annular back pressure to the wellhead by adjusting the automatic throttling manifold in well cementation displacement and waiting coagulation. Aiming at the problem that the stratum fracture pressure of a layer in a shaft is higher than the pore pressure of the stratum, in order to reduce the problem that drilling fluid leaks the stratum, the density of the drilling fluid is reduced, pressure control equipment and a pressure control method are applied to accurately control the annular pressure in the shaft, and safe drilling without collapse, leakage and blowout is ensured. By using the hydraulic pressurization anti-deviation tool, the casing can be prevented from being bent by axial compression under the condition of not using a drill collar, well deviation is prevented, drilling pressure is flexibly applied to the drill bit, and vibration damage of rock breaking of the drill bit to the casing is isolated.

Claims (6)

1. A method of drilling a well with a controlled pressure casing downhole containing formation injection pressure, comprising the steps of: firstly, drilling a well, secondly, cementing the well, installing pressure control drilling equipment and testing the pressure; drilling a well in a non-oil layer section, testing a hydraulic pressurization anti-deviation tool, and recording the pressure of a neutral pipe and the pump displacement in the process; drilling a well in a second casing drilling section, and cementing a well; and (6) logging.
2. The method of claim 1 for drilling a controlled pressure casing downhole containing formation injection pressure, wherein: after the well is first opened, the roller bit drills the plug, the drill continues to drill for 5-10 m, and then pressure control drilling equipment is installed.
3. The method of claim 2 for drilling a controlled pressure casing downhole containing formation injection pressure, wherein: when drilling in the two-casing drilling section, the pipe column is firstly put to the bottom of the well, rotary drilling is carried out, recirculation and connection of the stand column are carried out to control pressure drilling, partial casings are removed after drilling, and the removed casings are connected after reaming and drifting.
4. The method of claim 3 for drilling a controlled pressure casing downhole containing formation injection pressure, wherein: before second-opening well cementation, the length of a short section of the casing pipe is adjusted to ensure that the casing head just exposes out of the coupling after a sufficient pocket is reserved; connecting the top connection section, wherein the upper buckling torque is the lowest upper buckling torque; connecting a drilling pump and circulating; and (4) performing a formation leakage test.
5. The method of claim 4 for drilling a controlled pressure casing downhole containing formation injection pressure, wherein: when the well is opened, connecting a rotary well cementing head, injecting isolation liquid, injecting cement, pressing a rubber plug, replacing, and testing the pressure of the casing; and (5) closing the well sealer after well cementation, and adding back pressure to the annulus for waiting for setting.
6. The method of claim 5 for drilling a controlled pressure casing downhole containing formation injection pressure, wherein: and after second-opening well cementation, detaching the connecting top joint and installing ring iron.
CN202210022276.4A 2021-01-12 2022-01-10 Pressure control casing drilling method for underground injection pressure containing stratum Pending CN114763732A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2021100356622 2021-01-12
CN202110035662.2A CN112780176A (en) 2021-01-12 2021-01-12 Pressure control casing drilling method for underground injection pressure containing stratum

Publications (1)

Publication Number Publication Date
CN114763732A true CN114763732A (en) 2022-07-19

Family

ID=75757064

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202110035662.2A Pending CN112780176A (en) 2021-01-12 2021-01-12 Pressure control casing drilling method for underground injection pressure containing stratum
CN202210022276.4A Pending CN114763732A (en) 2021-01-12 2022-01-10 Pressure control casing drilling method for underground injection pressure containing stratum

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202110035662.2A Pending CN112780176A (en) 2021-01-12 2021-01-12 Pressure control casing drilling method for underground injection pressure containing stratum

Country Status (1)

Country Link
CN (2) CN112780176A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114183070A (en) * 2021-12-07 2022-03-15 托普威尔石油技术股份公司 Drilling method without drilling and closing under pressure

Also Published As

Publication number Publication date
CN112780176A (en) 2021-05-11

Similar Documents

Publication Publication Date Title
CN110118069B (en) Ultra-deep well drilling pressure control equipment and operation method
CN101586462B (en) Method of suspending, completing and working over a well
CN103244071B (en) Old well plugging method for underground gas storage
WO2003100209A1 (en) Dynamic mudcap drilling and well control system
CN112012667B (en) Oil testing and well completion integrated pipe string combined with fine pressure control technology
CN109736737B (en) Method for snubbing tripping of reservoir gas drilling well
CN109915039B (en) Oil and gas well reservoir protection completion pipe string, installation method and upper pipe string replacement method
CN111622728B (en) Horizontal well perforation process for connecting perforation of cable tractor with hydraulic conveying perforation
CN108361001A (en) A kind of deep trona drilling well exploitation cementing stage technique
CN101532375B (en) Method for recycling for failure of stage cementing unit and sealed circulation device
CN115110893A (en) Complex oil reservoir stratum double-gradient drilling and completion integrated operation system and method
RU2320849C2 (en) Well construction and operation method
CN114763732A (en) Pressure control casing drilling method for underground injection pressure containing stratum
CN205605156U (en) Workover device is pressed in oil gas field area
CN108625841A (en) Horizontal well annulus sealing and ball-throwing sliding sleeve combined repeated fracturing method
CN114396243B (en) Gas drilling high-pressure gas well completion method
CN207813564U (en) A kind of cyclic permutation grouting device of drilling pipe-fixing
CN112081535A (en) Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
Marca 13 Remedial Cementing
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN104963656A (en) Well structure for petroleum and natural gas exploitation and installation method thereof
CN112065296B (en) Well completion operation method combining fine pressure control technology
CN201381824Y (en) Sealed circulation device for stage-cementing device invalidation
CN204571946U (en) A kind of casing programme for natural petroleum gas field
CN217270111U (en) Blowout prevention diversion casing head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination