CN114580939A - Design construction supervision contractor performance evaluation system - Google Patents

Design construction supervision contractor performance evaluation system Download PDF

Info

Publication number
CN114580939A
CN114580939A CN202210238119.7A CN202210238119A CN114580939A CN 114580939 A CN114580939 A CN 114580939A CN 202210238119 A CN202210238119 A CN 202210238119A CN 114580939 A CN114580939 A CN 114580939A
Authority
CN
China
Prior art keywords
contractor
design
construction
unit
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210238119.7A
Other languages
Chinese (zh)
Inventor
尹琛
黄典祖
刘沁
王春丽
陈秉乾
王鹏飞
颜琰
黄靖
高献
陈晓敏
陈熙隆
郭威
林晓宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN202210238119.7A priority Critical patent/CN114580939A/en
Publication of CN114580939A publication Critical patent/CN114580939A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0611Request for offers or quotes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the technical field of electric power infrastructure, in particular to a design construction supervision contractor performance evaluation system which comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance scoring form output unit, wherein the contractor selection unit is used for selecting a design construction supervision contractor performance scoring form; the design construction supervision contractor performance evaluation system provided by the invention is used for respectively grading each project type by combining the vertical performance conditions of the design construction supervision contractor enterprise and correcting by utilizing the Wilson confidence interval, so that dynamic evaluation is realized, manual statistics is not needed, the performance evaluation efficiency and precision are greatly improved, the performance conditions of the contractor enterprise can be stored, valuable reference information is provided for subsequent design and construction, and the benefits of power grid enterprises are ensured.

Description

Design construction supervision contractor performance evaluation system
Technical Field
The invention belongs to the technical field of electric power infrastructure, and particularly relates to a design construction supervision contractor performance evaluation system.
Background
The whole formed by the substation with various voltages and the power transmission and distribution line in the power system is called a power grid, which comprises three units of power transformation, power transmission and power distribution, and the task of the power grid is to transmit and distribute electric energy and change voltage.
The electric power basic construction program is used for planning, coordinating, supervising, controlling and summarizing and evaluating the operation processes of the system such as establishment, feasibility research, evaluation, decision-making, design, equipment purchase, construction, debugging, acceptance inspection, production, capital recovery and the like of a construction project so as to achieve the purposes of ensuring the quality of the investment project, shortening the construction period and improving the investment benefit.
In the process of power grid engineering construction, the selection of power grid construction contractors is crucial, and the power grid construction contractors determine the construction cost and the construction period of the power grid engineering construction to a great extent, so that power grid construction units can search for proper contractors, and the power grid engineering construction quality, the construction cost and the construction period can reach better levels.
In the prior art, a proper power grid engineering construction contractor is usually selected in a contractor bid inviting mode, meanwhile, after bid inviting files are sent out, different enterprises usually select bids according to the needs of the enterprises, after power grid engineering construction units receive the bid files of the contractors, evaluation grading is carried out on the performance capabilities of the contractors, and finally the best contractors are selected for power grid construction work.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides a design construction supervision contractor performance evaluation system which has the characteristics of high evaluation efficiency, high evaluation accuracy and simple and feasible scheme.
In order to achieve the purpose, the invention provides the following technical scheme: a design construction supervision contractor performance evaluation system comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance evaluation form output unit;
the contractor selection unit is used for designing a proper contractor selected by a construction unit according to the bid document and a project type corresponding to the contractor;
the historical database unit stores information of historical performance conditions of different contractors, and is used for designing a construction unit to retrieve the information of the historical performance conditions of the contractors from the historical database unit and to perform preliminary evaluation on the performance capability of the contractors by using the retrieved information of the historical performance conditions of the contractors;
the index system construction comparison unit is used for selecting corresponding performance information according to the project type required by the construction unit from the called contractor historical performance information by the design construction unit, and then comparing the corresponding performance information among different contractors to obtain corresponding index system comparison data;
the design construction supervision contractor performance evaluation unit is used for evaluating the performance of the design construction supervision contractor by a design construction unit according to the generated index system comparison data, grading the performance of the different design construction supervision contractor corresponding to the project types one by one, accumulating the performance scores of the same design construction supervision contractor in different project types, and obtaining a grading result;
and the design construction supervision contractor performance grading form output unit outputs a final evaluation result through the design construction supervision contractor performance grading form output unit after the performance grading results of different design construction supervision contractors are generated.
As a preferred embodiment of the present invention, in the contractor selection unit, the selection of the design construction supervision contractor is specifically performed by:
the method comprises the following steps: designing a construction unit to select a bid inviting mode, editing bid inviting information and a bidding user, and finally releasing the bid inviting information;
step two: designing a construction supervision contractor to participate in bidding;
step three: the design and construction unit examines and selects the enclosed design and construction supervision contractor for bidding according to the project type required by the design and construction unit;
step four: and editing the bidding information by the entered design construction supervision contractor and uploading the bidding information to participate in bidding.
In the first step, the design and construction unit is used for bidding in a public bidding manner.
As a preferred technical solution of the present invention, in the second step, the design and construction supervision contractor selects the tender user through the design and construction unit tender information base and selects the tender enterprise through the search function in the whole station.
As a preferred technical solution of the present invention, in the third step, the design and construction unit selects a bidding enterprise through design of the construction supervision contractor library and selects the bidding enterprise through search function in a total station.
As a preferred technical scheme of the invention, in the process of grading the performance capabilities of project types corresponding to different design construction supervision contractors one by one, initial scores of the contractors are taken as the basis, correction is carried out through a Wilson confidence interval, the lower limit of the Wilson confidence interval of the initial scores is calculated according to the initial scores of the various evaluation contractors and the construction undertaking project sample capacity, the lower limit is taken as the correction score of the construction contractors, and the correction score is calculated according to the formula:
Figure BDA0003543155960000031
in the formula:
Pdownrank the lower Wilson confidence interval limit of the initial score for the contractor; z represents a Z statistical constant corresponding to a confidence level of 1-alpha, the confidence level is usually 95%, and the Z statistical constant is 1.96; n is the total number of projects undertaken by a contractor in the last R years.
As a preferred technical solution of the present invention, the final evaluation result is divided into four levels by percentage, the a-level mapping interval is 90-100, the B-level mapping interval is 80-90, the C-level mapping interval is 70-80, the D-level mapping interval is based on 70, and the linear function mapping interpolation calculation formula is as follows:
Figure BDA0003543155960000041
in the formula:
Rigrading a percentage score for a certain contractor; u shapeminMaking a minimum value between the partitions for the percentage to which the corresponding correction grade belongs; p isdowniA corrected score value corresponding to a certain contractor; p isdown minThe minimum value of the correction score values of all contractors in the corresponding correction grade is obtained; u shapemaxObtaining the maximum value among the partitions for the percentage of the corresponding correction grade; pdown maxThe maximum value of the correction score values for all contractors within the corresponding correction level.
As a preferable embodiment of the present invention, the performance information includes contractor personnel confidence, contractor historical project completion information, contractor historical project completion quality information, and contractor historical project completion satisfaction information.
As a preferable technical solution of the present invention, the design and construction unit uploads the project information of which the design and construction supervision contractor has performed to the history database unit.
As a preferred technical solution of the present invention, the output form of the final evaluation result is a sector graph form, a bar graph form or an Excel table form.
Compared with the prior art, the invention has the beneficial effects that: the design construction supervision contractor performance evaluation system provided by the invention is used for respectively grading each project type by combining the vertical performance conditions of the design construction supervision contractor enterprise and correcting by utilizing the Wilson confidence interval, so that dynamic evaluation is realized, manual statistics is not needed, the performance evaluation efficiency and precision are greatly improved, the performance conditions of the contractor enterprise can be stored, valuable reference information is provided for subsequent design and construction, and the benefits of power grid enterprises are ensured.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic diagram of the system of the present invention;
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1, the present invention provides the following technical solutions: a design construction supervision contractor performance evaluation system comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance evaluation form output unit;
the contractor selection unit is used for designing a proper contractor selected by a construction unit according to the bid document and a project type corresponding to the contractor;
the historical database unit stores information of historical performance conditions of different contractors, and is used for a design construction unit to retrieve the information of the historical performance conditions of the contractors from the historical database unit and to perform preliminary evaluation on the performance capability of the contractors by using the retrieved information of the historical performance conditions of the contractors;
the index system construction comparison unit is used for selecting corresponding performance information according to the project type required by the construction unit from the called contractor historical performance information by the design construction unit, and then comparing the corresponding performance information among different contractors to obtain corresponding index system comparison data;
the design construction supervision contractor performance evaluation unit is used for evaluating the performance of the design construction supervision contractor by a design construction unit according to the generated index system comparison data, grading the performance of the different design construction supervision contractor corresponding to the project types one by one, accumulating the performance scores of the same design construction supervision contractor in different project types, and obtaining a grading result;
and after the performance rating results of different design construction supervision contractors are generated, the final evaluation result is output through the performance rating form output unit of the design construction supervision contractors.
Specifically, according to fig. 1, in the present embodiment, in the contractor selection unit, the selection of the design construction supervision contractor is specifically performed in the following manner:
the method comprises the following steps: designing a construction unit to select a bid inviting mode, editing bid inviting information and a bidding user, and finally releasing the bid inviting information;
step two: designing a construction supervision contractor to participate in bidding;
step three: the design and construction unit examines and selects the enclosed design and construction supervision contractor for bidding according to the project type required by the design and construction unit;
step four: and editing the bidding information by the entered design construction supervision contractor and uploading the bidding information to participate in bidding.
Specifically, as shown in fig. 1, in the first step of the present embodiment, a design construction unit performs bidding in a public bidding manner; in the second step, the design construction supervision contractor selects bid inviting users through a design construction unit bid inviting information base and selects bid inviting enterprises through searching in a total station by a searching function; and in the third step, the design and construction unit selects the bidding enterprises through the design and construction supervision contractor library and selects the bidding enterprises through the search function in the whole station retrieval.
Specifically, as shown in fig. 1, in the present embodiment, in the process of grading performance capabilities of project types corresponding to different design construction supervision contractors one by one, based on initial contractor scores, the initial contractor scores are corrected through a wilson confidence interval, a lower wilson confidence interval limit of the initial scores is calculated according to the initial scores of each involved contractor and the construction undertaking project sample capacity, and the lower limit is used as a corrected score of the construction contractor, where the corrected score is calculated according to the formula:
Figure BDA0003543155960000071
in the formula:
Pdowna Wilson lower confidence interval for the contractor rating the initial score; z represents a Z statistical constant corresponding to a confidence level of 1-alpha, the confidence level is usually 95%, and the Z statistical constant is 1.96; n is the total number of projects undertaken by a contractor in the last R years.
Specifically, as shown in fig. 1, in this embodiment, the final evaluation result is divided into four grades by percentage, the a-grade mapping interval is 90-100 grades, the B-grade mapping interval is 80-90 grades, the C-grade mapping interval is 70-80 grades, the D-grade mapping interval is below 70 grades, and the linear function mapping interpolation calculation formula is as follows:
Figure BDA0003543155960000072
in the formula:
Rigrading a percentage score for a certain contractor; u shapeminMaking a minimum value between the partitions for the percentage to which the corresponding correction grade belongs; pdowniA corrected score value corresponding to a certain contractor; pdownminThe minimum value of the corrected score values of all the contractors in the corresponding correction grade is obtained; u shapemaxObtaining the maximum value among the partitions for the percentage of the corresponding correction grade; pdown maxThe maximum value of the correction score values for all contractors within the corresponding correction level.
Specifically, as shown in fig. 1, in this embodiment, the fulfillment information includes contractor personnel confidence, contractor historical project completion information, contractor historical project completion quality information, and contractor historical project completion satisfaction information; and the design construction unit uploads the information of the engineering project which is already performed by the design construction supervision contractor to the historical database unit.
Specifically, as shown in fig. 1, in the present embodiment, the output form of the final evaluation result is a sector graph form.
Example 2
Referring to fig. 1, the present invention provides the following technical solutions: a design construction supervision contractor performance evaluation system comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance evaluation form output unit;
the contractor selection unit is used for designing a proper contractor selected by a construction unit according to the bid document and a project type corresponding to the contractor;
the historical database unit stores information of historical performance conditions of different contractors, and is used for a design construction unit to retrieve the information of the historical performance conditions of the contractors from the historical database unit and to perform preliminary evaluation on the performance capability of the contractors by using the retrieved information of the historical performance conditions of the contractors;
the index system construction comparison unit is used for selecting corresponding performance information according to the project type required by the construction unit from the called contractor historical performance information by the design construction unit, and then comparing the corresponding performance information among different contractors to obtain corresponding index system comparison data;
the design construction supervision contractor performance evaluation unit is used for evaluating the performance of the design construction supervision contractor by a design construction unit according to the generated index system comparison data, grading the performance of the different design construction supervision contractor corresponding to the project types one by one, accumulating the performance scores of the same design construction supervision contractor in different project types, and obtaining a grading result;
and after the performance rating results of different design construction supervision contractors are generated, the final evaluation result is output through the performance rating form output unit of the design construction supervision contractors.
Specifically, according to fig. 1, in the present embodiment, in the contractor selection unit, the selection of the design construction supervision contractor is specifically performed in the following manner:
the method comprises the following steps: designing a construction unit to select a bid inviting mode, editing bid inviting information and a bidding user, and finally releasing the bid inviting information;
step two: designing a construction supervision contractor to participate in bidding;
step three: the design and construction unit examines and selects the enclosed design and construction supervision contractor for bidding according to the project type required by the design and construction unit;
step four: and editing the bidding information by the entered design construction supervision contractor and uploading the bidding information to participate in bidding.
Specifically, according to the illustration in fig. 1, in the first step of the present embodiment, a design construction unit performs bid inviting in a manner of public bid inviting; in the second step, the design construction supervision contractor selects the bidding users through the bidding information base of the design construction unit and selects the bidding enterprises through the search function; and in the third step, the design and construction unit selects the bidding enterprises through the design and construction supervision contractor library and selects the bidding enterprises through the search function in the whole station retrieval.
Specifically, as shown in fig. 1, in the present embodiment, in the process of scoring the performance capabilities of the project types corresponding to different design construction supervision contractors one by one, based on the initial scores of the contractors, the correction is performed through a wilson confidence interval, a lower limit of the wilson confidence interval of the initial scores is calculated according to the initial scores of the participating contractors and the construction undertaking project sample capacity, and the lower limit is used as the correction score of the construction contractors, and the correction score is calculated according to the following formula:
Figure BDA0003543155960000091
in the formula:
Pdownrank the lower Wilson confidence interval limit of the initial score for the contractor; z represents a Z statistical constant corresponding to a confidence level of 1-alpha, the confidence level is usually 95%, and the Z statistical constant is 1.96; n is the total number of projects undertaken by a contractor in the last R years.
Specifically, as shown in fig. 1, in this embodiment, the final evaluation result is divided into four grades by percentage, the a-grade mapping interval is 90-100 grades, the B-grade mapping interval is 80-90 grades, the C-grade mapping interval is 70-80 grades, the D-grade mapping interval is below 70 grades, and the linear function mapping interpolation calculation formula is as follows:
Figure BDA0003543155960000101
in the formula:
Riscoring a percentage for a certain contractor rating; u shapeminMaking a minimum value between the partitions for the percentage to which the corresponding correction grade belongs; pdowniA corrected score value corresponding to a certain contractor; p isdown minThe minimum value of the corrected score values of all the contractors in the corresponding correction grade is obtained; u shapemaxObtaining the maximum value among the partitions for the percentage of the corresponding correction grade; pdown maxThe maximum value of the revised score values for all contractors within the corresponding revision level.
Specifically, according to fig. 1, in the present embodiment, the performance information includes the contractor staff credit, the contractor historical project completion information, the contractor historical project completion quality information, and the contractor historical project completion satisfaction information; and the design and construction unit uploads the information of the engineering project which is already performed by the design and construction supervision contractor to the historical database unit.
Specifically, as shown in fig. 1, in the present embodiment, the output form of the final evaluation result is in the form of a bar graph.
Example 3
Referring to fig. 1, the present invention provides the following technical solutions: a design construction supervision contractor performance evaluation system comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance evaluation form output unit;
the contractor selection unit is used for designing a proper contractor selected by a construction unit according to the bid document and a project type corresponding to the contractor;
the historical database unit stores information of historical performance conditions of different contractors, and is used for a design construction unit to retrieve the information of the historical performance conditions of the contractors from the historical database unit and to perform preliminary evaluation on the performance capability of the contractors by using the retrieved information of the historical performance conditions of the contractors;
the index system construction comparison unit is used for selecting corresponding performance information according to the project type required by the construction unit from the called contractor historical performance information by the design construction unit, and then comparing the corresponding performance information among different contractors to obtain corresponding index system comparison data;
the design construction supervision contractor performance evaluation unit is used for evaluating the performance of the design construction supervision contractor by a design construction unit according to the generated index system comparison data, grading the performance of the different design construction supervision contractor corresponding to the project types one by one, accumulating the performance scores of the same design construction supervision contractor in different project types, and obtaining a grading result;
and after the performance rating results of different design construction supervision contractors are generated, the final evaluation result is output through the performance rating form output unit of the design construction supervision contractors.
Specifically, according to fig. 1, in the present embodiment, in the contractor selection unit, the selection of the design construction supervision contractor is specifically performed in the following manner:
the method comprises the following steps: designing a construction unit to select a bid inviting mode, editing bid inviting information and a bidding user, and finally releasing the bid inviting information;
step two: designing a construction supervision contractor to participate in bidding;
step three: the design and construction unit examines and selects the enclosed design and construction supervision contractor for bidding according to the project type required by the design and construction unit;
step four: and editing the bid information by the entered design construction supervision contractor and uploading the bid information to participate in bidding.
Specifically, according to the illustration in fig. 1, in the first step of the present embodiment, a design construction unit performs bid inviting in a manner of public bid inviting; in the second step, the design construction supervision contractor selects the bidding users through the bidding information base of the design construction unit and selects the bidding enterprises through the search function; and in the third step, the design and construction unit selects the bidding enterprises through the design and construction supervision contractor library and selects the bidding enterprises through the search function in the whole station retrieval.
Specifically, as shown in fig. 1, in the present embodiment, in the process of scoring the performance capabilities of the project types corresponding to different design construction supervision contractors one by one, based on the initial scores of the contractors, the correction is performed through a wilson confidence interval, a lower limit of the wilson confidence interval of the initial scores is calculated according to the initial scores of the participating contractors and the construction undertaking project sample capacity, and the lower limit is used as the correction score of the construction contractors, and the correction score is calculated according to the following formula:
Figure BDA0003543155960000121
in the formula:
Pdownrank the lower Wilson confidence interval limit of the initial score for the contractor; z represents a Z statistical constant corresponding to a confidence level of 1-alpha, the confidence level is usually 95%, and the Z statistical constant is 1.96; n is the total number of projects undertaken by a contractor in the last R years.
Specifically, as shown in fig. 1, in this embodiment, the final evaluation result is divided into four grades by percentage, the a-grade mapping interval is 90-100 grades, the B-grade mapping interval is 80-90 grades, the C-grade mapping interval is 70-80 grades, the D-grade mapping interval is below 70 grades, and the linear function mapping interpolation calculation formula is as follows:
Figure BDA0003543155960000122
in the formula:
Rigrading a percentage score for a certain contractor;Uminmaking a minimum value between the partitions for the percentage to which the corresponding correction grade belongs; pdowniA corrected score value corresponding to a certain contractor; pdown minThe minimum value of the corrected score values of all the contractors in the corresponding correction grade is obtained; u shapemaxObtaining the maximum value among the partitions for the percentage of the corresponding correction grade; pdown maxThe maximum value of the revised score values for all contractors within the corresponding revision level.
Specifically, according to fig. 1, in the present embodiment, the performance information includes the contractor staff credit, the contractor historical project completion information, the contractor historical project completion quality information, and the contractor historical project completion satisfaction information; and the design construction unit uploads the information of the engineering project which is already performed by the design construction supervision contractor to the historical database unit.
Specifically, as shown in fig. 1, in the present embodiment, the output form of the final evaluation result is an Excel table form.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A design construction supervision contractor performance evaluation system is characterized in that: the system comprises a contractor selection unit, a historical database unit, an index system construction comparison unit, a design construction supervision contractor performance evaluation unit and a design construction supervision contractor performance evaluation form output unit;
the contractor selection unit is used for designing a proper contractor selected by a construction unit according to the bid document and a project type corresponding to the contractor;
the historical database unit stores information of historical performance conditions of different contractors, and is used for designing a construction unit to retrieve the information of the historical performance conditions of the contractors from the historical database unit and to perform preliminary evaluation on the performance capability of the contractors by using the retrieved information of the historical performance conditions of the contractors;
the index system construction comparison unit is used for selecting corresponding performance information according to the project type required by the construction unit from the called contractor historical performance information by the design construction unit, and then comparing the corresponding performance information among different contractors to obtain corresponding index system comparison data;
the design construction supervision contractor performance evaluation unit is used for evaluating the performance of the design construction supervision contractor by a design construction unit according to the generated index system comparison data, grading the performance of the different design construction supervision contractor corresponding to the project types one by one, accumulating the performance scores of the same design construction supervision contractor in different project types, and obtaining a grading result;
and after the performance rating results of different design construction supervision contractors are generated, the final evaluation result is output through the design construction supervision contractor performance rating form output unit.
2. The system of claim 1, wherein the system comprises: in the contractor selection unit, the selection of the design construction supervision contractor is specifically performed by the following method:
the method comprises the following steps: designing a construction unit to select a bid inviting mode, editing bid inviting information and a bidding user, and finally releasing the bid inviting information;
step two: designing a construction supervision contractor to participate in bidding;
step three: the design and construction unit examines and selects the enclosed design and construction supervision contractor for bidding according to the project type required by the design and construction unit;
step four: and editing the bidding information by the entered design construction supervision contractor and uploading the bidding information to participate in bidding.
3. The system of claim 2, wherein the system comprises: in the first step, the design and construction unit carries out bidding in a public bidding mode.
4. The system of claim 2, wherein the system comprises: and in the second step, the design construction supervision contractor selects the bidding users through the design construction unit bidding information base and selects the bidding enterprises through the search function in the whole station retrieval.
5. The system of claim 2, wherein the system comprises: and in the third step, the design and construction unit selects the bidding enterprises through the design and construction supervision contractor library and selects the bidding enterprises through the search function in the whole station retrieval.
6. The system of claim 1, wherein the system comprises: in the process of grading the performance capabilities of project types corresponding to different design construction supervision contractors one by one, correcting the initial scores of the contractors through a Wilson confidence interval on the basis of initial scores of the contractors, calculating the lower limit of the Wilson confidence interval of the initial scores according to the initial scores of the evaluation contractors and the sample capacity of the construction undertaking project, and taking the lower limit as the corrected score of the construction contractors, wherein the corrected score is calculated according to the formula:
Figure FDA0003543155950000021
in the formula:
Pdownrank the lower Wilson confidence interval limit of the initial score for the contractor; z represents the statistical constant of Z corresponding to a confidence level of 1-alpha, typically 95%,the statistical constant Z is 1.96; n is the total number of projects undertaken by a contractor in the last R years.
7. The system of claim 1, wherein the system comprises: the final evaluation result is divided into four grades by adopting a percentage system, the A-grade mapping interval is 90-100 grades, the B-grade mapping interval is 80-90 grades, the C-grade mapping interval is 70-80 grades, the D-grade mapping interval is below 70 grades, and the linear function mapping interpolation calculation formula is as follows:
Figure FDA0003543155950000031
in the formula:
Rigrading a percentage score for a certain contractor; u shapeminMaking a minimum value between the partitions for the percentage to which the corresponding correction grade belongs; pdowniA corrected score value corresponding to a certain contractor; pdownminThe minimum value of the corrected score values of all the contractors in the corresponding correction grade is obtained; u shapemaxObtaining the maximum value among the partitions for the percentage of the corresponding correction grade; pdownmaxThe maximum value of the revised score values for all contractors within the corresponding revision level.
8. The system of claim 1, wherein the system comprises: the performance information comprises the contractor personnel credibility, the contractor historical project completion condition information, the contractor historical project completion quality information and the contractor historical project completion satisfaction information.
9. The system of claim 1, wherein the system comprises: and the design and construction unit uploads the information of the engineering project which is already performed by the design and construction supervision contractor to the historical database unit.
10. The system of claim 1, wherein the system comprises: and the output form of the final evaluation result is in a sector graph form, a bar graph form or an Excel table form.
CN202210238119.7A 2022-03-11 2022-03-11 Design construction supervision contractor performance evaluation system Pending CN114580939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210238119.7A CN114580939A (en) 2022-03-11 2022-03-11 Design construction supervision contractor performance evaluation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210238119.7A CN114580939A (en) 2022-03-11 2022-03-11 Design construction supervision contractor performance evaluation system

Publications (1)

Publication Number Publication Date
CN114580939A true CN114580939A (en) 2022-06-03

Family

ID=81781243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210238119.7A Pending CN114580939A (en) 2022-03-11 2022-03-11 Design construction supervision contractor performance evaluation system

Country Status (1)

Country Link
CN (1) CN114580939A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109582859A (en) * 2018-10-22 2019-04-05 中国平安人寿保险股份有限公司 Insure method for pushing, device, computer equipment and storage medium
CN111242424A (en) * 2019-12-31 2020-06-05 国网北京市电力公司 Quality data processing method and device
CN112381441A (en) * 2020-11-24 2021-02-19 国网北京市电力公司 Method and device for ranking power grid equipment suppliers and computer readable storage medium
CN112561240A (en) * 2020-11-25 2021-03-26 青岛国信建设投资有限公司 Construction project contractor performance credit evaluation method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109582859A (en) * 2018-10-22 2019-04-05 中国平安人寿保险股份有限公司 Insure method for pushing, device, computer equipment and storage medium
CN111242424A (en) * 2019-12-31 2020-06-05 国网北京市电力公司 Quality data processing method and device
CN112381441A (en) * 2020-11-24 2021-02-19 国网北京市电力公司 Method and device for ranking power grid equipment suppliers and computer readable storage medium
CN112561240A (en) * 2020-11-25 2021-03-26 青岛国信建设投资有限公司 Construction project contractor performance credit evaluation method and system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
农峰;: "浅谈电网工程建设承包商考核评价管理", 通讯世界, no. 11, 12 June 2017 (2017-06-12) *
吴炳修: "对施工承包商实施中期评估的监理实践", 广西电业, no. 03, 30 March 2004 (2004-03-30) *
宋超明;张慧宁;: "浅议投标不正当行为和招标人应对措施", 山西建筑, no. 19, 1 July 2009 (2009-07-01) *
张颀;邓曦;: "灰色层次评价法在投标单位资格预审中的应用", 建筑技术开发, no. 04, 20 April 2007 (2007-04-20) *

Similar Documents

Publication Publication Date Title
CN108921376B (en) Optimal selection method and system for electricity reliability improvement object of intelligent power distribution network
Ncube et al. The limitations of current decision-making techniques in the procurement of COTS software components
CN103679544A (en) Comprehensive assessment method for running of intelligent power distribution network
CA2128122A1 (en) Computer-based method and apparatus for interactive computer-assisted negotiations
CN112800212B (en) Power distribution station health assessment method based on knowledge graph and FAHP
CN113139710B (en) Multi-resource parallel task advanced plan scheduling method based on genetic algorithm
CN109858823B (en) Main and distribution network power failure plan selection method and device
CN111027744A (en) Real-time benchmarking optimization method for multi-level power plant
CN113381417A (en) Power distribution network district three-phase load unbalance optimization method, device and terminal
Griffone et al. Applications of clustering techniques to the definition of the bidding zones
CN116663861A (en) Scheduling optimization method combining production robustness of assembly type component and resource balance
CN110516709B (en) Media client value model establishing method based on hierarchical clustering
CN111815016A (en) Power transmission line path optimization method and computer program product
CN113487276B (en) Electric equipment manufacturing production process collaborative management platform
CN113327047B (en) Power marketing service channel decision method and system based on fuzzy comprehensive model
Makui et al. A hybrid intuitionistic fuzzy multi-criteria group decision making approach for supplier selection
Sarfati et al. Increase-decrease game under imperfect competition in two-stage zonal power markets–Part I: Concept analysis
CN114094599A (en) Multi-station fusion participating peak-shaving frequency-modulation voltage-regulation potential evaluation method and device
CN114580939A (en) Design construction supervision contractor performance evaluation system
CN113837912A (en) Method for analyzing influence factors of carbon emission in construction industry
CN109919688B (en) Electronic cigarette product line planning method considering market factors
Ruiz et al. Searching for alternatives to the closest targets: Identifying new directions for improvement while controlling additional efforts
CN117237054A (en) Recommendation method, system and equipment for long-term centralized competitive price transaction strategy in electric power market
Mokhtar et al. Combination of AHP-PROMETHEE and TOPSIS for selecting the best Demand Side Management (DSM) options
CN113033886B (en) Power distribution network planning construction evaluation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination