CN114396280B - Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence - Google Patents

Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence Download PDF

Info

Publication number
CN114396280B
CN114396280B CN202210099815.4A CN202210099815A CN114396280B CN 114396280 B CN114396280 B CN 114396280B CN 202210099815 A CN202210099815 A CN 202210099815A CN 114396280 B CN114396280 B CN 114396280B
Authority
CN
China
Prior art keywords
chamber
ore
ore body
stope
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210099815.4A
Other languages
Chinese (zh)
Other versions
CN114396280A (en
Inventor
李晓刚
赵运涛
喻六平
郝学冉
魏兵兵
许翠云
唐志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd, Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Priority to CN202210099815.4A priority Critical patent/CN114396280B/en
Publication of CN114396280A publication Critical patent/CN114396280A/en
Application granted granted Critical
Publication of CN114396280B publication Critical patent/CN114396280B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses an underground structure arrangement mode for mining by successively adopting a sectional open stope method and a stage open stope method, wherein a wall-hanging vein-following roadway (10) is constructed on an upper wall of an ore body, a wall-hanging vein-following roadway (1) is constructed on a lower wall of the ore body, a wall-hanging vein-passing roadway (11) is constructed on the upper wall of the ore body, a vein-following roadway (2) is constructed on the lower wall of the ore body, a ventilating pedestrian raise and a sectional rock drilling roadway (13) are constructed in the upper wall of the ore body, a medium-length hole is constructed in the upper wall of the ore body, and the blasted ore is transported out of a stope through a ore removal route of a sectional open stope method chamber; and when the stoping of the sublevel open stoping method chamber is finished, the sublevel open stoping method chamber positioned on the lower disk ore body is mined, and the blasted ore is transported out of the stope through a sublevel open stoping method chamber ore removal inlet (5). The method has the advantages of good safety, easy construction, high resource recovery rate and the like, can effectively reduce the mixing rate of the waste rocks and the dilution rate of the ores, and is particularly suitable for popularization and application in thick and large steeply inclined ore body underground mines with extremely broken surrounding rocks.

Description

Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence
Technical Field
The invention belongs to the technical field of underground mining, and particularly relates to a mining method for underground mines by combining a segmented open stope method and a staged open stope method, which is particularly suitable for thick and large steeply inclined ore body underground mines with extremely broken surrounding rocks.
Background
The open stope mining method is widely used in underground mining, and is a method for dividing ore blocks into chambers and pillars for mining, and includes a comprehensive mining method, a chamber pillar mining method, a shrinkage mining method, a segmental open stope method (a segmental chamber method), a stage open stope method (a stage chamber method) and the like. The method comprises the steps of dividing an ore block into sections along the inclined direction, dividing the ore block into an ore room and an ore pillar in each section, arranging a section transportation drift to form a section rock drilling ore breaking and an independent stoping unit for section ore removal, stoping the ore room first and then the ore pillar, and processing a goaf simultaneously; the stage open stope method is suitable for extremely inclined thick and extremely thick ore bodies, the ore rooms are divided along the extreme full height, ore removal is only carried out on the lower part of the stage by a bottom structure, and the method is divided into a sectional rock drilling stage open stope method and a stage rock drilling stage open stope method according to different rock drilling modes.
In the design of the underground mine mining method, the vertical deep hole stage open stoping subsequent filling method mining is usually adopted for thick and large steeply inclined ore bodies, the vertical direction arrangement of the ore room ore bodies is carried out in a mode of separating three mining and one mining, and the purposes of mining and cutting work Cheng Shao, safe operation, high resource recovery rate and the like are achieved. For example, the south of the Zhou oil mill iron ore belonging to Cheng-Ore Limited liability company of Jinri Ri, anhui has a large ore body thickness and an average thickness of about 50m; the inclination angle of the ore body is 60-80 degrees. The design adopts a vertical deep hole rock drilling stage open stope subsequent filling mining method, and a chamber is arranged in a vertical ore body trend at three-mining-one interval.
Practice proves that when surrounding rocks are broken completely, the open-stope subsequent filling mining method cannot serve production well in the vertical deep hole rock drilling stage. Because the ore body has a certain inclination angle and the stoping sequence between stages is from bottom to top, the broken hanging wall surrounding rocks are difficult to keep stable after stoping of a stope is finished. At this time, mine enterprises usually adopt measures such as increasing ore pillars, reducing stope span, and strengthening hanging wall surrounding rock support to ensure safety. Because the standard chamber size of the stage empty field method is larger, the length of the chamber is the same as the thickness of the ore body, namely about 60m, the width is 15-20 m, and the height is the same as the height of the stage, namely 50-60 m generally. On the premise of such huge size, the effects of the various optimization measures are not obvious, and the mineral resources are seriously wasted.
In view of the above problems, there is an urgent need to develop and design a novel underground mining method and a stope arrangement structure with good safety, easy construction and high resource recovery rate.
Disclosure of Invention
The invention aims to solve the outstanding problems of poor mining safety and serious mineral resource waste under the condition of a thick and large steeply inclined ore body with broken surrounding rocks in the prior art, and provides an underground structural arrangement mode which is safe and reliable, simple in construction and high in resource recovery rate and adopts a sublevel open-field method and a staged open-field method for mining successively, so that the current mining situation of the existing thick and large steeply inclined ore body underground mine with quite broken surrounding rocks can be obviously improved.
In order to achieve the purpose, the invention adopts an underground structure arrangement mode of mining by a sectional open stope method and a stage open stope method, an ore chute is positioned in the ore body footwall surrounding rock, a stope slope way is also positioned in the ore body footwall surrounding rock, and the following technical scheme is adopted for carrying out structure arrangement and construction:
1) The segmented open stope method chamber is positioned on the upper wall ore body and arranged in parallel with the trend of the ore body; the stage empty-field method chamber is positioned on the footwall ore body and arranged along the direction vertical to the ore body; the method comprises the following steps that a sectional-empty-field-method chamber and a stage-empty-field-method chamber are connected through a drift, wherein the drift on the upper plate of the sectional-empty-field-method chamber is an upper-plate drift, the drift on the lower plate of the stage-empty-field-method chamber is a lower-plate drift, and the upper-plate drift and the lower-plate drift are two parts of the same drift; the stope slope ramp is respectively communicated with the footwall pulse-through roadway and a drilling chamber communication roadway positioned in the footwall ore body;
2) Firstly, constructing a sublevel open stope method to mine an underground structure: constructing an upper-disk vein-following roadway on the upper disk of the ore body, and constructing a lower-disk vein-following roadway on the lower disk of the ore body; constructing an upper-plate vein-penetrating roadway on an upper plate of an ore body, and constructing a vein-penetrating roadway on a lower plate of the ore body; constructing a ventilation pedestrian raise and a sectional rock drilling roadway in the upper tray ore body, wherein the ventilation pedestrian raise is communicated with the sectional rock drilling roadway; a stud is reserved in the upper-tray mine body, a top pillar is reserved at the upper part of the sectioned empty-field method mine room, a medium-length hole is constructed in the upper-tray mine body under the protection of the stud and the top pillar, and the blasted ore is transported out of a stope through a sublevel empty-field method mine room ore removal access of the sublevel empty-field method mine room);
3) After the sublevel open-yard method chamber is completely mined and filled, constructing the underground structure of the open-yard method in the stage: in the lateral construction stage of the footwall vein-passing roadway, ore removal and access of an empty yard method chamber and a stage empty yard method chamber bottom structure are carried out; constructing a drilling chamber connecting roadway and a drilling chamber in the lower tray ore body; and (4) constructing downward deep holes downwards in the drilling chamber, and transporting the blasted ores out of a stope through a step-by-step open stope method chamber ore removal route.
Furthermore, the height of the sectional open stope method chamber is the same as the stage height H, and is 52-63 m, the width B1 of the sectional open stope method chamber is not more than 10m, and the length L1 is 55-62 m; the height of the stage empty-field method chamber is the same as the height H of the stage, and the height H of the chamber is 52-63 m, the width B2 of the stage empty-field method chamber is 15-22 m, and the length L2 of the chamber is the same as the thickness of the residual ore body.
Studies have shown that it is preferable for the length L1 of the sectional open space method room to be equal to four times the width B2 of the sectional open space method room.
The method firstly adopts the sectional empty stope method chamber, the stope is finished and filled, and after the strength of the filling body reaches the standard, the sectional empty stope method chamber is stoped by adopting a mode of three mining and one mining.
After the technical scheme is adopted in the underground structure arrangement mode for mining by adopting the sectional open stope method and the stage open stope method in sequence, the underground structure arrangement mode has the following positive effects:
(1) The hanging wall ore body is preferably mined and cemented and filled by adopting a segmental open stope method, so that a stable artificial hanging wall rock is formed, and a safety prerequisite condition is created for the step open stope method chamber with high yield and low energy consumption adopted by the lower wall ore body;
(2) The sectional empty-lot method chamber is communicated with the stage empty-lot method chamber through a vein-through tunnel, so that a safety outlet is added for the stage empty-lot method chamber; on the premise of ensuring that the mining preparation project is not changed, the ore removal efficiency is improved by more than 20%;
(3) Under the protection of stable and manual hanging wall rock, the method greatly reduces the amount of crushed wall rock entering a stage open stope method chamber, can effectively reduce the mixing rate of waste rock, ore dilution rate and other parameters, wherein the mixing rate of waste rock is reduced by more than 60%, and brings huge economic benefit to mine enterprises; on the other hand, the stable filling body can ensure that the ground surface does not collapse, thereby achieving the purpose of environmental protection.
Drawings
FIG. 1 is a schematic perspective view of a chamber arrangement of an underground structure arrangement mode of mining by a segmental open stope method and a stage open stope method in sequence according to the present invention;
FIG. 2 is a cross-sectional view taken along the Y-axis of FIG. 1;
FIG. 3 is an X-axis directional diagram of the sectioned open field method room of FIG. 1;
FIG. 4 is a Z-axis directional diagram of the segmented open stope method chamber floor structure of FIG. 1;
FIG. 5 is an X-axis directional diagram of the phase-empty-field method room of FIG. 1;
FIG. 6 is a Z-axis directional diagram of the stage-empty-field method room floor structure of FIG. 1.
The reference signs are: a-a sectioned empty-field method chamber; c-stage empty-field method ore; l1-length of a sublevel open stope method chamber; b1, the width of a chamber by a sectional open stope method; l2-length of the empty-field method chamber; b2-the width of the chamber by the stage empty field method; h-stage height; 1-a footwall vein laneway; 2-a lower-disk vein-crossing roadway; 3-a rock drilling chamber communication roadway; 4-a rock drilling chamber; 5-stage ore room ore removal route by an empty yard method; 6-downward deep hole; 7-stage empty-field method chamber bottom structure; 8-ore pass; 9-stope ramp; 10-upper plate vein-following roadway; 11-hanging a plate and penetrating a vein tunnel; 12-ventilated pedestrian patio; 13-sectional rock drilling roadway; 14-studs; 15-a top post; 16-ore removal and access of a sublevel open stope method chamber; 17-a medium-length hole; 18-subsection empty-field method chamber bottom structure.
Detailed Description
In order to better describe the invention, the following describes in detail the underground structure arrangement mode of the invention by adopting the sublevel open stope method and the stage open stope method successively with reference to the attached drawings. The invention divides the chamber into two parts in the length direction of the standard chamber of the stage empty field. The ore body close to the upper plate is mined by a sectional empty field method, ore blocks are arranged along the trend of the ore body, and high-concentration tailings are cemented and filled after mining. And the residual ore body is recovered under the protection of the formed upper-disc solid filling body.
In the embodiment, the chamber A of the sectional open stope method is positioned on the upper wall ore body and arranged in parallel to the trend of the ore body. The height of the chamber is the same as the stage height H, and is 60m, the width B1 is 10m, and the length L1 is 60m; the stage empty-field method chamber C is positioned on the footwall ore body and is arranged perpendicular to the trend of the ore body, the height of the chamber is the same as the height H of the stage, the width B2 is 60m, the length L2 is the same as the thickness of the rest ore body; the length L1 of the sectional open-field method room a is equal to four times the width B2 of the sectional open-field method room C, i.e.: l1=4 × B2, the two rooms being in a vertically disposed relationship. And (3) mining the sublevel empty stope method chamber A, finishing the stoping and filling, and stoping the sublevel empty stope method chamber C in a 'three-mining-one' mode after the strength of a filling body reaches the standard.
As shown in fig. 2, which is a cross-sectional view in the Y-axis direction of fig. 1, in conjunction with fig. 3, 4 and 1, the underground structure of the mining sublevel open stope room (a) is arranged as follows: constructing an upper tray vein-following roadway 10 on the upper tray of the ore body, and constructing a lower tray vein-following roadway 1 on the lower tray of the ore body; constructing an upper-plate vein-penetrating roadway 11 on an upper plate of an ore body and constructing a vein-penetrating roadway 2 on a lower plate of the ore body; a ventilating pedestrian raise 12 and a segmented rock drilling roadway 13 are constructed in the upper-tray mine, a stud 14 is reserved in the upper-tray mine, a top column 15 is reserved at the upper part of the segmented open-field method mine room A, a medium-length hole 17 is constructed in the upper-tray mine under the protection of the stud 14 and the top column 15, and the blasted ore is transported out of a stope through a segmented open-field method mine room ore removal access 16 of the segmented open-field method mine room A.
As shown in the cross-sectional view in the Y-axis direction of fig. 1 shown in fig. 2 and in combination with fig. 1, the sectional empty-stope-method room a and the sectional empty-stope-method room C are connected by a drift, wherein the drift on the upper tray of the sectional empty-stope-method room a is an upper tray drift 11, the drift on the lower tray of the sectional empty-stope-method room C is a lower tray drift 2, and the upper tray drift 11 and the lower tray drift 2 are two parts of the same drift; the ore pass shaft 8 is positioned in the ore body footwall surrounding rock, the stope slope 9 is also positioned in the ore body footwall surrounding rock, and the stope slope 9 is respectively communicated with the footwall vein-penetrating roadway 2 and the rock drilling chamber connecting roadway 3;
as shown in fig. 2, which is a cross-sectional view in the Y-axis direction of fig. 1, in conjunction with fig. 5, 6, and 1, the downhole structure of the mining-stage open-seam method room (C) is arranged as follows: in the lateral construction of the footwall vein-passing roadway 2, an empty-field-method chamber ore removal access 5 and a stage empty-field-method chamber bottom structure 7 are adopted; constructing a drilling chamber connecting roadway 3 and a drilling chamber 4 in the lower tray ore body; and (3) constructing a downward deep hole 6 downwards in the rock drilling chamber 4, and transporting the blasted ore out of a stope through a step-open stope method chamber ore removal access 5.
As can be seen from the sectional open stope method room X-axis directional diagram of fig. 1 shown in fig. 3, the ventilated pedestrian patio 12 communicates with the sectional rock drilling roadway 13.
The invention has been carried on the industrial test application in some underground mine of 300 ten thousand tons of annual mining volume, the application result shows, the invention adopts the underground structure arrangement way of the method mining of the segmental open stope, stage open stope successively and has advantages such as the security is good, easy to construct, the recovery rate of resources is high, etc., the ore recovery rate has improved 2 percentage points after applying, create the comprehensive economic benefits and reach more than 3000 ten thousand yuan annually, have made unexpected economy, technological effect.

Claims (3)

1. The utility model provides an successively adopt underground structure arrangement mode of segmentation open stope method, stage open stope method mining, ore pass (8) are arranged in ore body footwall surrounding rock, and stope ramp (9) also are arranged in ore body footwall surrounding rock, its characterized in that:
1) The sublevel open stope method chamber (A) is positioned on the hanging wall ore body and arranged in parallel to the trend of the ore body; the stage empty-field method chamber (C) is positioned on the ore body of the lower tray and arranged along the direction vertical to the ore body; the sectional empty-field method chamber (A) and the sectional empty-field method chamber (C) are connected through a vein-penetrating tunnel, wherein the vein-penetrating tunnel positioned on the upper plate of the sectional empty-field method chamber (A) is an upper-plate vein-penetrating tunnel (11), the vein-penetrating tunnel positioned on the lower plate of the sectional empty-field method chamber (C) is a lower-plate vein-penetrating tunnel (2), and the upper-plate vein-penetrating tunnel (11) and the lower-plate vein-penetrating tunnel (2) are two parts of the same vein-penetrating tunnel; the stope slope ramp (9) is respectively communicated with the footwall pulse-through roadway (2) and a drilling chamber connecting roadway (3) positioned in the footwall ore body;
2) Firstly, constructing a sublevel open stope method to mine an underground structure: constructing an upper-disk vein-following roadway (10) on the upper disk of the ore body and a lower-disk vein-following roadway (1) on the lower disk of the ore body; constructing an upper-tray vein-penetrating roadway (11) on the upper tray of the ore body and a lower-tray vein-penetrating roadway (2) on the lower tray of the ore body; constructing a ventilating pedestrian courtyard (12) and a sectional rock drilling roadway (13) in the upper tray ore body, wherein the ventilating pedestrian courtyard (12) is communicated with the sectional rock drilling roadway (13); a stud (14) is reserved in the upper-tray ore body, a top pillar (15) is reserved on the upper portion of the sectioned open-field method chamber (A), a medium-length hole (17) is constructed in the upper-tray ore body under the protection of the stud (14) and the top pillar (15), and the blasted ore is transported out of a stope through a sectioned open-field method chamber ore removal access (16) of the sectioned open-field method chamber (A);
3) After the sublevel open stoping method chamber (A) is completely stoped and filled, constructing the open stoping method underground structure in the stage: during the lateral construction of the footwall vein-through roadway (2), an empty-field-method chamber ore removal access (5) and a stage empty-field-method chamber bottom structure (7) are adopted; constructing a drilling chamber connection roadway (3) and a drilling chamber (4) in the lower plate ore body; downward deep holes (6) are constructed downwards in the rock drilling chamber (4), and the blasted ore is transported out of a stope through a stope ore removal access (5) by a stage open stope method.
2. The underground structure arrangement mode of mining by adopting a segmental open stope method and a stage open stope method in sequence according to claim 1, which is characterized in that: the height of the sectional empty-field method chamber (A) is the same as the stage height H, and is 52-63 m, the width B1 of the sectional empty-field method chamber (A) is not more than 10m, and the length L1 is 55-62 m; the height of the stage empty-field method chamber (C) is the same as the height H of the stage, and the height is 52-63 m, the width B2 of the stage empty-field method chamber (C) is 15-22 m, and the length L2 is the same as the thickness of the residual ore body.
3. The underground structure arrangement mode of mining by adopting a segmental open stope method and a stage open stope method in sequence according to claim 2, which is characterized in that: the length L1 of the sectional open-field method chamber (A) is equal to 4 times of the width B2 of the sectional open-field method chamber (C).
CN202210099815.4A 2022-01-27 2022-01-27 Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence Active CN114396280B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210099815.4A CN114396280B (en) 2022-01-27 2022-01-27 Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210099815.4A CN114396280B (en) 2022-01-27 2022-01-27 Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence

Publications (2)

Publication Number Publication Date
CN114396280A CN114396280A (en) 2022-04-26
CN114396280B true CN114396280B (en) 2022-10-28

Family

ID=81232448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210099815.4A Active CN114396280B (en) 2022-01-27 2022-01-27 Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence

Country Status (1)

Country Link
CN (1) CN114396280B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396281B (en) * 2022-01-27 2022-10-28 中钢集团马鞍山矿山研究总院股份有限公司 Underground mine combined mining method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3712677A (en) * 1971-03-10 1973-01-23 Atlantic Richfield Co Mining method
CA1144103A (en) * 1979-05-16 1983-04-05 Ivan P. Gubin Method and apparatus for underground working of ore deposits
CN103032070A (en) * 2011-10-09 2013-04-10 彭康 Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method
CN106121648A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
CN107939402A (en) * 2017-12-28 2018-04-20 昆明冶金高等专科学校 The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium
CN107989614A (en) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
WO2019051569A1 (en) * 2017-09-12 2019-03-21 VALKANOV, Nikolay Georgiev Method for underground mining of minerals
CN111852478A (en) * 2020-08-20 2020-10-30 安徽铜冠(庐江)矿业有限公司 Thick, large and stable ore body filling mining method with H-shaped stud structure
CN111927452A (en) * 2020-09-25 2020-11-13 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method
WO2021236000A1 (en) * 2020-05-20 2021-11-25 Luossavaara Kiirunavaara Ab Raise caving method for mining an ore from an ore body, and a mining infrastructure, monitoring system, machinery, control system and data medium therefor

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3712677A (en) * 1971-03-10 1973-01-23 Atlantic Richfield Co Mining method
CA1144103A (en) * 1979-05-16 1983-04-05 Ivan P. Gubin Method and apparatus for underground working of ore deposits
CN103032070A (en) * 2011-10-09 2013-04-10 彭康 Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method
CN106121648A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
WO2019051569A1 (en) * 2017-09-12 2019-03-21 VALKANOV, Nikolay Georgiev Method for underground mining of minerals
CN107989614A (en) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
CN107939402A (en) * 2017-12-28 2018-04-20 昆明冶金高等专科学校 The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium
WO2021236000A1 (en) * 2020-05-20 2021-11-25 Luossavaara Kiirunavaara Ab Raise caving method for mining an ore from an ore body, and a mining infrastructure, monitoring system, machinery, control system and data medium therefor
CN111852478A (en) * 2020-08-20 2020-10-30 安徽铜冠(庐江)矿业有限公司 Thick, large and stable ore body filling mining method with H-shaped stud structure
CN111927452A (en) * 2020-09-25 2020-11-13 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
全段高组合凿岩***技术在会宝岭铁矿的应用;刘允秋;《有色金属工程》;20150531;第5卷(第S1期);第120-122页 *
分段空场嗣后充填采矿法在龙江亭铜矿的应用;黄明发;《采矿技术》;20150731;第15卷(第04期);第5-6、12页 *
房柱式盘区阶段空场联合崩落采矿法在红岭矿业公司的应用;张建伟等;《黄金》;20160930;第37卷(第09期);第39-42页 *
阶段空场与上向分层联合采矿法应用实践;于常先等;《黄金科学技术》;20150831;第23卷(第04期);第35-38页 *

Also Published As

Publication number Publication date
CN114396280A (en) 2022-04-26

Similar Documents

Publication Publication Date Title
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN102086765B (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN104763434B (en) A kind of without coal column double lanes driving method
CN104481543B (en) Stage shrink caved stopes
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN111706328B (en) Mining method for treating goaf left pillars by filling method
CN103089266A (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN110295909A (en) Only stay mining methods under the obturation of tooth form ore pillar
CN110984989B (en) Mining method of steeply inclined medium-thickness ore body
CN111852478B (en) Thick, large and stable ore body filling mining method with H-shaped stud structure
CN109751050B (en) Downward concave-convex rib-free inlaid continuous layered filling mining method
CN105804748A (en) Method for mining hanging wall ore by subareas under open-air transportation system
CN103953345A (en) Exploitation method of gob-side entry retaining with small section
CN114396280B (en) Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence
CN114592909A (en) Downward layered access filling mining method for extremely-broken thick and large ore body
CN114396281B (en) Underground mine combined mining method
CN113356851B (en) Continuous downward medium-length hole segmented open stoping subsequent filling mining method for medium-thickness ore body
CN103982185B (en) Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
CN207080226U (en) A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein
CN102926754A (en) Two-tunneling bidirectional stripping two-step pre-support mining method
CN104989402A (en) Medium-deep hole room pillar mining method for limestone underground mine mining
CN113187481B (en) Filling mining method for centralized grouting caving stoping of overburden rock
CN114087016B (en) Caving-to-filling mining isolation top column pre-control supporting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant