CN114328787A - Information processing method, device and system for construction site, terminal and storage medium - Google Patents

Information processing method, device and system for construction site, terminal and storage medium Download PDF

Info

Publication number
CN114328787A
CN114328787A CN202111628363.6A CN202111628363A CN114328787A CN 114328787 A CN114328787 A CN 114328787A CN 202111628363 A CN202111628363 A CN 202111628363A CN 114328787 A CN114328787 A CN 114328787A
Authority
CN
China
Prior art keywords
information
construction site
event
stage
alarm information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202111628363.6A
Other languages
Chinese (zh)
Inventor
蔡伟强
任晓园
谭巧巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sensetime Technology Co Ltd
Original Assignee
Shenzhen Sensetime Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sensetime Technology Co Ltd filed Critical Shenzhen Sensetime Technology Co Ltd
Priority to CN202111628363.6A priority Critical patent/CN114328787A/en
Publication of CN114328787A publication Critical patent/CN114328787A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides an information processing method, an information processing device, an information processing system, a terminal and a storage medium for a construction site, wherein the information processing method for the construction site comprises the following steps: acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage. According to the construction site management and control method and system, after the event alarm information of the construction site is obtained, the event alarm information is processed at each preset event processing stage, intelligent management of the construction site is achieved, management and control efficiency is improved, and therefore the construction site is comprehensively and effectively managed and controlled in real time.

Description

Information processing method, device and system for construction site, terminal and storage medium
Technical Field
The present application relates to the field of construction site management technologies, and in particular, to a method, an apparatus, a system, a terminal, and a storage medium for processing information at a construction site.
Background
With the rapid development of urban construction in recent years, the number of urban construction sites is increasing as tall buildings, rail transit and the like are paved like bamboo shoots in spring after rain. Traditional building site lacks information-based means, and the managerial efficiency is low, and the ubiquitous feedback is untimely in personnel management, safety control, and each data stream of unable real-time analysis forms timely feedback, causes that there are management confusion, supervision difficulty, incident frequently, building site pollution scheduling difficult problem such as serious on the building site management, and then influences the problem of safety in production and engineering quality control.
Disclosure of Invention
The technical problem mainly solved by the application is to provide an information processing method, device, system, terminal and storage medium for a construction site, and solve the problem that comprehensive real-time site management and control cannot be realized in the prior art.
In order to solve the above technical problem, the first technical solution adopted by the present application is: provided is a construction site information processing method including: acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage.
Wherein the monitoring information comprises environment perception information; acquiring event alarm information of a construction site, comprising: receiving environment perception information of a construction site; and under the condition that the received environment perception information is determined not to accord with the preset rule, generating first event warning information of the construction site.
Wherein the monitoring information comprises video monitoring information; acquiring event alarm information of a construction site, comprising: receiving second event alarm information of the construction site; and the second event alarm information is obtained by inputting the video monitoring information of the construction site into the event detection model.
Wherein, after obtaining the event alarm information of construction site, include: and performing secondary verification on the event alarm information to determine that the event alarm information is accurate event alarm information.
Wherein the second event alert information includes: the construction site has event alarm information of personnel not wearing the protection equipment; the event detection model comprises a first event detection model, and the first event detection model is used for outputting event warning information of personnel not wearing the protection equipment on a construction site under the condition that the personnel not wearing the protection equipment is detected in the video monitoring information.
Wherein the second event alert information includes: event alarm information of a bare soil area exists in a construction site; the event detection model comprises a second event detection model, and the second event detection model is used for outputting event alarm information of the bare soil area existing in the construction site under the condition that the bare soil area existing in the video monitoring information is detected.
Wherein the environmental perception information comprises dust concentration data; under the condition that the received environment perception information is determined not to accord with the preset rule, first event warning information of the construction site is generated, and the method comprises the following steps: and generating raise dust alarm information of the construction site under the condition that the raise dust concentration data is determined to be larger than a preset first threshold value.
Wherein the environmental awareness information comprises a PM2.5 value; under the condition that the received environment perception information is determined not to accord with the preset rule, first event warning information of the construction site is generated, and the method comprises the following steps: and generating PM2.5 alarm information of the construction site under the condition that the PM2.5 value is determined to be larger than a preset second threshold value.
Wherein the environmental awareness information includes noise detection data; under the condition that the received environment perception information is determined not to accord with the preset rule, first event warning information of the construction site is generated, and the method comprises the following steps: and generating noise alarm information of the construction site under the condition that the received noise detection data is determined to be larger than a preset third threshold value.
Wherein each preset event processing stage comprises: at least one of an acceptance phase, a dispatch phase, a disposition phase, a verification phase, and an archiving phase.
Wherein, the event alarm information is processed in the accepting stage, which comprises the following steps: in the acceptance stage, the acceptance of the event alarm information is automatically completed; or, in the accepting stage, generating an event accepting stage interactive interface, wherein the event accepting stage interactive interface comprises event alarm information; under the condition that a user confirms an acceptance operation on an interactive interface in an acceptance stage, completing acceptance of event alarm information; and under the condition that the user applies for the invalidation operation on the interactive interface in the acceptance stage, the invalidation processing is carried out on the event alarm information.
Wherein, processing the event alarm information in the dispatching stage comprises the following steps: in the dispatching stage, processing personnel or vehicles of the event warning information are automatically selected and dispatching instructions are sent; or, in the dispatching stage, determining a party corresponding to the event warning information according to a pre-configured monitoring information base of the construction site, and sending an instruction for processing the event warning information to the party; or, in the dispatching stage, generating a dispatching stage interactive interface, wherein the dispatching stage interactive interface comprises information of dispatchable personnel or vehicles; and responding to the dispatching operation of the user on the interactive interface in the dispatching stage, and sending a dispatching instruction to a person or a vehicle corresponding to the dispatching operation.
The dispatching stage interactive interface also comprises an electronic map, wherein the electronic map marks the occurrence place of the event and marks the positioning information of the dispatchable personnel or vehicles.
Wherein, processing the event alarm information in the handling stage comprises: and in the handling stage, handling information of the event alarm information reported by dispatching personnel is received.
Wherein, the event alarm information is processed in the checking stage, which comprises the following steps: in the checking stage, under the condition that the event warning information is not obtained again within the preset time period, the checking stage is automatically completed; or, skipping the checking stage; or in the checking stage, generating a checking stage interactive interface, wherein the checking stage interactive interface comprises a picture of the treated construction site uploaded by a dispatching person; finishing the checking stage under the condition that the user passes the checking operation on the interactive interface in the checking stage; and entering a disposal phase under the condition that the user performs a rejection operation on the interactive interface in the checking phase.
Wherein, confirming that the event alarm information is not acquired again within the preset time period comprises: acquiring disposal information reported by dispatched personnel for event alarm information, wherein the disposal information comprises a rectification time limit; and under the condition that the rectification time limit is determined to reach, judging whether the event alarm information is acquired again or not, and confirming that the event alarm information is not acquired.
Wherein, processing the event alarm information in the filing stage comprises: in the filing stage, automatically inputting the processing information of the event alarm information into a database to finish the filing stage; or, in the filing stage, generating an interactive interface of the filing stage; under the condition that a user carries out filing operation on an interactive interface in a filing stage, the associated information of the event alarm information is recorded into a database to complete the filing stage; and entering a disposal phase under the condition that the user performs a return operation on the interactive interface in the filing phase.
In order to solve the above technical problem, the second technical solution adopted by the present application is: provided is an information processing device for a construction site, the device including: the information acquisition module is used for acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and the processing module is used for processing the event alarm information at each preset event processing stage.
In order to solve the above technical problem, the third technical solution adopted by the present application is: there is provided a terminal including: the system comprises a memory and a processor, wherein the memory is used for storing computer readable instructions, and the processor is used for calling the computer instructions to realize the information processing method of the construction site.
In order to solve the above technical problem, a fourth technical solution adopted by the present application is: there is provided a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the above-described information processing method for a construction site.
In order to solve the above technical problem, a fifth technical solution adopted by the present application is: there is provided an information processing system of a construction site, the information processing system of the construction site including: the monitoring terminals are distributed on the construction site and used for acquiring monitoring information of the construction site; the management platform is used for acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage.
The monitoring terminal comprises one or more of image acquisition equipment, PM2.5 acquisition equipment, dust emission acquisition equipment and noise acquisition equipment; the image acquisition equipment is used for acquiring images of constructors and/or construction sites of a construction site; the PM2.5 acquisition equipment is used for detecting a PM2.5 value of the construction site environment; the raise dust collecting equipment is used for detecting raise dust concentration data of a construction site environment; noise collection equipment is used for gathering the noise detection data of building site environment.
The beneficial effect of this application is: provided are a construction site information processing method, apparatus, system, terminal, and storage medium, distinguished from the state of the art, the construction site information processing method including: acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage. According to the construction site management and control method and system, after the event alarm information of the construction site is obtained, the event alarm information is processed at each preset event processing stage, intelligent management of the construction site is achieved, management and control efficiency is improved, and therefore the construction site is comprehensively and effectively managed and controlled in real time.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a block diagram of a construction site information processing system provided herein;
FIG. 2 is a schematic flow diagram of a construction site information processing method provided herein;
FIG. 3 is a schematic flow chart diagram illustrating a method for processing construction site information according to one embodiment of the present disclosure;
FIG. 4 is a flowchart illustrating one embodiment of step S2 of the construction site information processing method provided in FIG. 2;
FIG. 5 is a block diagram of a construction site information processing apparatus provided in the present application;
FIG. 6 is a schematic block diagram of one embodiment of a terminal provided by the present invention;
FIG. 7 is a schematic block diagram of one embodiment of a computer-readable storage medium provided by the present invention.
Detailed Description
The following describes in detail the embodiments of the present application with reference to the drawings attached hereto.
In the following description, for purposes of explanation and not limitation, specific details are set forth such as particular system structures, interfaces, techniques, etc. in order to provide a thorough understanding of the present application.
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The terms "first", "second" and "third" in this application are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any indication of the number of technical features indicated. Thus, a feature defined as "first," "second," or "third" may explicitly or implicitly include at least one of the feature. In the description of the present application, "plurality" means at least two, e.g., two, three, etc., unless explicitly specifically limited otherwise. All directional indications (such as up, down, left, right, front, and rear … …) in the embodiments of the present application are only used to explain the relative positional relationship between the components, the movement, and the like in a specific posture (as shown in the drawings), and if the specific posture is changed, the directional indication is changed accordingly. Furthermore, the terms "include" and "have," as well as any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements listed, but may alternatively include other steps or elements not listed, or inherent to such process, method, article, or apparatus.
Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the application. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
Referring to fig. 1, fig. 1 is a block diagram illustrating a construction of a worksite management system according to the present application. The present embodiment provides an information processing system 10 for a construction site, and the information processing system 10 for a construction site includes a monitoring terminal 1, a server 2, and a management platform 3. The management platform 3 serves as an information processing device at a construction site. The server 2 is in communication connection with the monitoring terminal 1 and the management platform 3.
The monitoring terminals 1 are distributed on the construction site according to actual conditions, and the monitoring terminals 1 are mainly used for collecting monitoring information of the construction site. In an alternative embodiment, the monitoring terminal 1 includes one or more of an image collecting device, a Particulate Matter (PM) 2.5 collecting device, a dust collecting device, and a noise collecting device. The image acquisition equipment is used for shooting images of constructors and/or construction sites of the construction site. For example, the image capturing device may capture an image of a construction site including a constructor, and may also capture an image of a construction site including a construction site. The PM2.5 collection device is used to detect PM2.5 values for the worksite environment. Raise dust collection equipment is used for detecting the raise dust concentration of building site environment. Noise collection equipment is used for detecting the noise information of building site environment. The method comprises the steps of associating a monitoring end 1 with a construction site needing to be monitored, and presetting the equipment type, the area where the monitoring end 1 is located, the alarm time period, the alarm type and the corresponding alarm threshold value of the monitoring end 1.
The server 2 is mainly used for receiving the monitoring information of the construction site collected by the monitoring terminal 1, detecting whether the monitoring information of the construction site conforms to a corresponding preset rule or not, obtaining a judgment result of the monitoring information, and sending the judgment result to the management platform 3. In an embodiment, in order to reduce the workload, the server 2 transmits only the construction data that does not meet the corresponding work site specification and the determination result for the construction data to the management platform 3, and the construction data that meets the work site specification and the determination result are stored in the server 2.
In an embodiment, the server 2 receives an image which is acquired by the image acquisition device and contains a constructor, the server 2 identifies whether the constructor wears the protection device in the image, if the server 2 detects that the constructor does not wear the protection device, it is determined that the constructor does not meet the construction site specification, and the image and the determination result are sent to the management platform 3. In another embodiment, the server 2 identifies whether the construction site in the image has an open soil area, and obtains a corresponding judgment result after identifying the image. If the bare soil area is detected to exist in the image, the construction site is judged not to be in accordance with the construction site standard, and the server 2 sends the acquired image and the judgment result not in accordance with the construction site standard to the management platform 3. The behaviors which are illegal in the image comprise dangerous area station people, building garbage accumulation, detention of workers in a construction site, no mask, no gloves, no work clothes, no reflective clothes and the like, and the illegal behaviors can also comprise other behaviors which do not accord with safety regulations.
In another optional embodiment, the server 2 receives the PM2.5 value in the air of the work site environment collected by the PM2.5 collecting device, analyzes and judges whether the detected PM2.5 value exceeds the PM2.5 alarm threshold, determines that the air quality of the work site environment does not reach the standard if the analyzed and detected PM2.5 value exceeds the PM2.5 alarm threshold, and the server 2 sends the detected PM2.5 value and the non-standard determination result to the management platform 3. In another embodiment, the management platform 3 receives the PM2.5 value in the air of the work site environment collected by the PM2.5 collecting device, analyzes and judges whether the detected PM2.5 value exceeds the PM2.5 alarm threshold, and determines that the air quality of the work site environment does not reach the standard if the analyzed and detected PM2.5 value exceeds the PM2.5 alarm threshold.
In another optional embodiment, the server 2 receives the raise dust concentration in the ambient air of the construction site collected by the raise dust collecting device, analyzes and judges whether the detected raise dust concentration exceeds a raise dust alarm threshold, determines that the quality of the ambient air of the construction site does not reach the standard if the analyzed and detected raise dust concentration exceeds the raise dust alarm threshold, and the server 2 sends the detected raise dust concentration and the non-standard judgment result to the management platform 3. In another embodiment, the management platform 3 receives the raise dust concentration in the building site ambient air collected by the raise dust collecting device, analyzes and judges whether the detected raise dust concentration exceeds the raise dust alarm threshold, and determines that the quality of the building site ambient air does not reach the standard if the analyzed and detected raise dust concentration exceeds the raise dust alarm threshold.
In another optional embodiment, the server 2 receives noise information of the environment of the construction site collected by the noise collection device, analyzes and judges whether the detected noise information exceeds a noise alarm threshold set in a corresponding time period, determines that noise pollution exists in the environment of the construction site if the analyzed and detected noise information exceeds the noise alarm threshold set in the corresponding time period, and sends the detected noise information and the judgment result of the existence of the noise pollution to the management platform 3. In another embodiment, the management platform 3 receives noise information of the environment of the construction site collected by the noise collecting device, analyzes and judges whether the detected noise information exceeds a noise alarm threshold set in a corresponding time period, and determines that noise pollution exists in the environment of the construction site if the detected noise information exceeds the noise alarm threshold set in the corresponding time period.
Specifically, the Internet of Things (IOT) platform can be docked to play a role of a pipeline so as to transmit construction data of the construction site collected by the monitoring end 1 to the server 2.
The management platform 3 is mainly used for receiving the event alarm information generated by the server 2. In another embodiment, the management platform 3 may also be configured to directly generate event warning information according to the monitoring information of the construction site collected by the monitoring terminal 1.
In order to avoid false detection, the management platform 3 is further configured to perform secondary verification on the event alarm information to determine that the event alarm information is accurate event alarm information.
The management platform 3 is further configured to accept the event alarm information in an acceptance phase to generate an event acceptance phase interactive interface, where the event acceptance phase interactive interface includes the event alarm information; or under the condition that the user confirms the acceptance operation on the interactive interface in the acceptance stage, completing the acceptance of the event alarm information; and under the condition that the user applies for the invalidation operation on the interactive interface in the acceptance stage, the invalidation processing is carried out on the event alarm information.
The management platform 3 is also used for selecting processing personnel or vehicles of the event alarm information in a dispatching stage and sending dispatching instructions; or determining a party corresponding to the event warning information according to a pre-configured monitoring information base of the construction site, and sending an instruction for processing the event warning information to the party; or generating a dispatching stage interactive interface, wherein the dispatching stage interactive interface comprises information of dispatchable personnel or vehicles; and responding to the dispatching operation of the user on the interactive interface in the dispatching stage, and sending a dispatching instruction to a person or a vehicle corresponding to the dispatching operation. The dispatching stage interactive interface also comprises an electronic map, wherein the electronic map marks the occurrence place of the event and marks the positioning information of the dispatchable personnel or vehicles.
The management platform 3 is further configured to receive, in the handling phase, handling information on the event alarm information reported by the dispatch personnel.
The management platform 3 is further configured to, in the verification stage, automatically complete the verification stage when it is determined that the event warning information is not obtained again within the preset time period; or skipping the checking stage; or in the checking stage, generating a checking stage interactive interface, wherein the checking stage interactive interface comprises the pictures of the treated construction site uploaded by dispatching personnel; finishing the checking stage under the condition that the user passes the checking operation on the interactive interface in the checking stage; and entering a disposal phase under the condition that the user performs a rejection operation on the interactive interface in the checking phase.
In an embodiment, the management platform 3 is configured to accept the event alarm information in an acceptance phase, and the management platform 3 dispatches a corresponding manager to handle the event that does not meet the corresponding site specification. In one embodiment, the management platform 3 searches for law enforcement officers within a preset range from the location of the event that does not meet the corresponding site specification, and the management platform 3 sends the event alert message to the law enforcement officer closest to the location of the event that does not meet the corresponding site specification. After receiving the event alarm information sent by the management platform 3, the law enforcement officer can drive to the place where the event which does not accord with the corresponding construction site standard occurs, and handle the event according to the site situation. In other optional embodiments, when the management platform 3 prestores the contact way of the construction data corresponding to the job site responsible person, the job site responsible person is notified by a remote way such as a short message to perform self-disposal on the event which does not conform to the corresponding job site specification.
The law enforcement officer informs the construction site responsible person to correct the behaviors which do not accord with the corresponding construction site standard in the disposal process, can inform the construction site responsible person to correct the behaviors which do not accord with the corresponding construction site standard immediately, and can also inform the construction site responsible person to correct and correct the behaviors for a limited period so as to finish the disposal of the event; the disposal information is uploaded to the management platform 3 by law enforcement personnel through a terminal.
If the current event meets the standard of the case, law enforcement officers can take the received construction data as evidence to carry out case setting processing on the event; and the plan processing information is uploaded to the management platform 3 by law enforcement officers through terminals.
After the construction site responsible person and/or law enforcement personnel finish the processing of the incident, send the instruction of accomplishing the rectification to management platform 3 after, management platform 3 sends and checks the instruction to continue to gather the monitoring information of construction site and check the rectification result through control end 1, and then realize tracking the construction data who is not conform to the standard operation in the building site, improve management and control efficiency.
In another optional embodiment, the monitoring terminal 1 is configured to collect environment sensing information and/or video monitoring information of a construction site, and the monitoring terminal may judge the environment sensing information and the video monitoring information, determine whether the collected environment sensing information/video monitoring information meets a preset rule, and send the collected environment sensing information/video monitoring information and a corresponding judgment result to the server when it is determined that the collected environment sensing information/video monitoring information does not meet the preset rule. And the server generates event alarm information of the construction site according to the environment perception information/video monitoring information and the corresponding judgment result. The server transmits the generated event alert information of the construction site to the management platform 3. And the management platform is used for accepting the received event alarm information, dispatching a responsible person to handle the event, and after the event is handled, checking the event again until the collected monitoring information of the construction site conforms to the corresponding site specification. When the detected monitoring information of the construction site accords with the corresponding site standard, the monitoring end sends the monitoring information of the construction site which accords with the corresponding site standard and the corresponding judgment result to the server, the server sends the monitoring information of the construction site and the corresponding judgment result to the management platform 3, and the management platform 3 is used for making an instruction for passing the check according to the received monitoring information of the construction site and the corresponding judgment result.
In another alternative embodiment, the server 2 and the management platform 3 may be integrated. In another alternative embodiment, the information processing system 10 of the construction site may not include the server 2, so that the monitoring terminal 1 is directly connected to the management platform 3.
The information processing system for the construction site comprises monitoring ends, a server and a management platform, wherein the monitoring ends are distributed on the construction site and used for collecting monitoring information of the construction site; the management platform is connected with the server and used for receiving the monitoring information of the construction site and obtaining event warning information of the construction site based on the monitoring information of the construction site; and further processing the event alarm information at each preset event processing stage. According to the construction site monitoring system and method, monitoring information of a construction site can be collected and reported in real time through a monitoring end, real-time monitoring of the construction site is further achieved, received monitoring information of the construction site is processed through an event warning information generated by a management platform, integrated management of the monitoring information of the construction site is achieved, and time and labor are saved; event alarm information is processed at each preset event processing stage through the management platform, so that detection information which is not in accordance with preset rules in a construction site is tracked, management and control efficiency is improved, and comprehensive and effective real-time management and control of the construction site are achieved.
Referring to fig. 2 and 3, fig. 2 is a schematic flow chart of the construction site information processing method provided by the present application; FIG. 3 is a flowchart illustrating a method for processing construction site information according to an embodiment of the present disclosure.
The present embodiment provides a method for processing information on a construction site, which is implemented by a site management system, and the specific steps of the method for processing information on a specific construction site are as follows.
S1: and acquiring event alarm information of the construction site.
Specifically, the event warning information of the construction site is generated according to the monitoring information of the construction site.
In an embodiment, the monitoring information comprises environmental awareness information, wherein the environmental awareness information comprises fugitive dust concentration data, PM2.5 values and noise detection data.
The management platform receives environment perception information of a construction site; and under the condition that the received environment perception information is determined not to accord with the preset rule, generating first event warning information of the construction site. In a specific embodiment, the environmental awareness information includes fugitive dust concentration data. And generating raise dust alarm information of the construction site under the condition that the raise dust concentration data is determined to be larger than a preset first threshold value. In another particular embodiment, the context awareness information includes a PM2.5 value. And generating PM2.5 alarm information of the construction site under the condition that the PM2.5 value is determined to be larger than a preset second threshold value. In another embodiment, the environmental awareness information includes noise detection data. And generating noise alarm information of the construction site under the condition that the received noise detection data is determined to be larger than a preset third threshold value. In a specific embodiment, the preset third thresholds of the preset time periods are different. For example, the preset third threshold value at night is smaller than the preset third threshold value at day time.
In one embodiment, the monitoring information includes video monitoring information, wherein the video monitoring information includes video data including constructors and/or construction sites, the video data being composed of a plurality of consecutive video frames. Receiving second event alarm information of the construction site; and the second event alarm information is obtained by inputting the video monitoring information of the construction site into the event detection model. In a specific embodiment, the second event warning information comprises event warning information of personnel not wearing the protection equipment on the construction site; the event detection model comprises a first event detection model, the first event detection model is used for detecting whether protection equipment personnel are not worn according to video monitoring information of the construction site, and event warning information of the protection equipment personnel are not worn on the construction site is output according to detected detection information of the protection equipment personnel. In another embodiment, the second event alert information includes event alert information for the existence of an open soil area at the construction site; the event detection model comprises a second event detection model, the second event detection model is used for detecting whether the bare soil area exists according to the video monitoring information of the construction site, and the event warning information of the bare soil area existing in the construction site is output according to the detected detection information of the bare soil area.
In an optional embodiment, the event alarm information is checked for the second time, and the event alarm information is determined to be accurate event alarm information.
Specifically, in order to avoid the situation of false alarm and misinformation of the event alarm information, after determining that the received environment sensing information or video monitoring information does not conform to the corresponding preset rule, the user is required to confirm on the interactive interface at the secondary verification stage, so that the user judges the received monitoring information, confirms whether the judgment on the detection information is accurate, and further confirms whether the event alarm information is accurate. And responding to the condition that the received monitoring information does not accord with the corresponding preset rule on the interactive interface of the secondary verification stage by the user, and determining the event alarm information as accurate event alarm information. And in response to the fact that the user confirms that the received monitoring information accords with the corresponding preset rule on the interactive interface in the secondary verification stage, confirming that the event alarm information is false alarm, and finishing the processing of the event alarm information after the secondary verification stage is finished. And when the second judgment result of the monitoring information in the secondary verification stage is inconsistent with the first judgment result of the monitoring information for the first time, taking the second judgment result as the final judgment result of the monitoring information, and further determining whether the event alarm information is accurate event alarm information. The event alarm information comprises monitoring information and a final judgment result made for the monitoring information.
S2: and processing the event alarm information at each preset event processing stage.
Specifically, each preset event processing stage includes: an acceptance stage, a dispatch stage, a disposal stage, a check stage and an archiving stage; the reception stage, the dispatch stage, the disposal stage, the verification stage, and the filing stage are sequentially performed.
Referring to fig. 4, fig. 4 is a flowchart illustrating an embodiment of step S2 in the construction site information processing method provided in fig. 2.
S21: and completing the acceptance of the event alarm information in an acceptance phase.
In one embodiment, the acceptance of the event alarm information may be automatically completed in the acceptance phase. In another embodiment, an event acceptance phase interactive interface is generated in an acceptance phase, and the acceptance phase interactive interface comprises event alarm information; under the condition that a user confirms an acceptance operation on an interactive interface in an acceptance stage, completing acceptance of event alarm information; and under the condition that the user applies for the invalidation operation on the interactive interface in the acceptance stage, the invalidation processing is carried out on the event alarm information.
S22: and issuing a dispatching instruction based on the event alarm information in the dispatching stage.
In one embodiment, the management platform may automatically select a handler or vehicle for event alert information and issue a dispatch instruction during the dispatch phase. In another embodiment, the sending stage may automatically determine the party corresponding to the event warning information according to a pre-configured database of the construction site, and issue an instruction to the party to process the event warning information. In another embodiment, a dispatch stage interactive interface is generated in the dispatch stage, and the dispatch stage interactive interface comprises information of dispatchable personnel or vehicles; and responding to the dispatching operation of the user on the interactive interface in the dispatching stage, and sending a dispatching instruction to a person or a vehicle corresponding to the dispatching operation. The dispatching stage interactive interface also comprises an electronic map, wherein the electronic map marks the occurrence place of the event and marks the positioning information of the dispatchable personnel or vehicles.
In one embodiment, the dispatchable personnel may be a city management. In the dispatching stage, the management platform can automatically send dispatching instructions to urban management personnel and vehicles within a preset distance range around, and respond to the confirmation and the receiving of the dispatching instructions by the urban management personnel on the interactive interface.
In another embodiment, the dispatchable personnel include a job site leader and/or a constructor, and at the dispatch stage, the job site leader and/or the constructor is dispatched to process the event warning information in a remote manner such as by sending a short message by querying a pre-established job site database for the contact of the job site leader and/or the contact of the constructor associated with the event warning information. The construction site database comprises a monitoring end, a construction site responsible person and a corresponding incidence relation between constructors and construction site information.
S23: handling information for the event alert information is received at a handling stage.
In one embodiment, handling information reported by dispatch personnel for event alarm information is received in a handling stage.
Specifically, the city management reaches the construction site after receiving the dispatching instruction, and the city management processes the event warning information. Specifically, the city management judges whether the event alarm information belongs to the standard of the scheme according to the laws and regulations. If the event alarm information violates laws and regulations and conforms to the standard of the scheme, the urban management performs the scheme setting according to the event alarm information and uploads the scheme setting result to an interactive interface in a disposal stage. In other embodiments, the city management can also make corresponding administrative penalties for the construction site responsible person who has the event warning information according to the law and regulations. If the event alarm information does not accord with the set standard, the urban management uploads the treatment result of the event alarm information on the interactive interface in the treatment stage so as to inform a construction site responsible person of carrying out scheduled correction or immediate correction on the event alarm information and inform the construction site responsible person of uploading the correction result of the event alarm information on the interactive interface in the treatment stage.
S24: and finishing the check of the handling condition of the event alarm information in the check stage.
In an embodiment, in the checking stage, the checking stage is automatically completed when it is determined that the event warning information is not obtained again within a preset time period. Specifically, processing information reported by dispatching personnel for event alarm information is obtained, wherein the processing information comprises a rectification time limit; and under the condition that the rectification time limit is determined to reach, judging whether the event alarm information is acquired again or not, and confirming that the event alarm information is not acquired. In other alternative embodiments, the verification phase may be skipped. In another optional embodiment, during the checking stage, generating a checking stage interactive interface, wherein the checking stage interactive interface comprises a photo of the treated construction site uploaded by the dispatching personnel; finishing the checking stage under the condition that the user passes the checking operation on the interactive interface in the checking stage; and entering a disposal phase under the condition that the user performs a rejection operation on the interactive interface in the checking phase.
S25: and finishing the archiving of the processing information of the event alarm information in the archiving stage.
In one embodiment, the processing information of the event alarm information can be automatically recorded into the database in the archiving stage, and the archiving stage is completed. In another optional embodiment, in the archiving phase, an archiving phase interactive interface is generated; under the condition that a user carries out filing operation on an interactive interface in a filing stage, the associated information of the event alarm information is recorded into a database to complete the filing stage; and entering a disposal phase under the condition that the user performs a return operation on the interactive interface in the filing phase.
The embodiment provides an information processing method for a construction site, which comprises the following steps: acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage in sequence. According to the construction site management and control method and system, after the event alarm information of the construction site is obtained, the event alarm information is processed at each preset event processing stage, intelligent management of the construction site is achieved, management and control efficiency is improved, and therefore the construction site is comprehensively and effectively managed and controlled in real time.
Referring to fig. 5, fig. 5 is a block diagram of a construction site information processing device according to the present application. The present embodiment provides an information processing apparatus 60 for a construction site, and the information processing apparatus 60 for a construction site includes an information acquisition module 61 and a processing module 62.
The information acquisition module 61 is used for acquiring event alarm information of a construction site; and generating the event alarm information of the construction site according to the monitoring information of the construction site.
The processing module 62 is configured to process the event alarm information at each preset event processing stage. Wherein each preset event processing stage comprises: at least one of an acceptance phase, a dispatch phase, a disposition phase, a verification phase, and an archiving phase.
In an embodiment, the monitoring information comprises context awareness information. The information acquisition module 61 is used for receiving environment perception information of a construction site; and under the condition that the received environment perception information is determined not to accord with the preset rule, generating first event warning information of the construction site.
In a specific embodiment, the environmental awareness information includes fugitive dust concentration data. The information obtaining module 61 is configured to generate raise dust alarm information of the construction site when it is determined that the raise dust concentration data is greater than a preset first threshold.
In a particular embodiment, the context awareness information includes a PM2.5 value. The information acquisition module 61 is configured to generate PM2.5 warning information of the construction site when it is determined that the PM2.5 value is greater than the preset second threshold value.
In one embodiment, the environmental awareness information includes noise detection data. The information obtaining module 61 is configured to generate noise alarm information of the construction site when it is determined that the received noise detection data is greater than a preset third threshold.
In a particular embodiment, the monitoring information includes video monitoring information. The information acquisition module 61 is used for receiving second event alarm information of the construction site; and the second event alarm information is obtained by inputting the video monitoring information of the construction site into the event detection model. The second event alert information includes: the construction site has event alarm information of personnel not wearing the protection equipment; the event detection model comprises a first event detection model, and the first event detection model is used for outputting event warning information of personnel not wearing the protection equipment on a construction site under the condition that the personnel not wearing the protection equipment is detected in the video monitoring information. The second event alert information includes: event alarm information of a bare soil area exists in a construction site; the event detection model comprises a second event detection model, and the second event detection model is used for outputting event alarm information of the bare soil area existing in the construction site under the condition that the bare soil area existing in the video monitoring information is detected.
In one embodiment, the processing module 62 is configured to perform a second check on the event alert information to determine that the event alert information is accurate event alert information.
In one embodiment, the processing module 62 is configured to automatically complete the acceptance of the event alarm information in the acceptance phase; or generating an event acceptance phase interactive interface in an acceptance phase, wherein the acceptance phase interactive interface comprises event alarm information; under the condition that a user confirms an acceptance operation on an interactive interface in an acceptance stage, completing acceptance of event alarm information; and under the condition that the user applies for the invalidation operation on the interactive interface in the acceptance stage, the invalidation processing is carried out on the event alarm information.
In one embodiment, the processing module 62 is configured to automatically select a processing person or vehicle for the event alert information and issue a dispatch command during the dispatch phase; or, according to a monitoring information base of a construction site configured in advance, determining a party corresponding to the event warning information, and sending an instruction for processing the event warning information to the party; or generating a dispatching stage interactive interface, wherein the dispatching stage interactive interface comprises information of dispatchable personnel or vehicles; and responding to the dispatching operation of the user on the interactive interface in the dispatching stage, and sending a dispatching instruction to a person or a vehicle corresponding to the dispatching operation. The dispatching stage interactive interface also comprises an electronic map, wherein the electronic map marks the occurrence place of the event and marks the positioning information of the dispatchable personnel or vehicles.
In one embodiment, the processing module 62 is configured to receive handling information reported by dispatch personnel for the event alert information during a handling phase.
In a specific embodiment, the processing module 62 is configured to, in the checking phase, automatically complete the checking phase when it is determined that the event warning information is not obtained again within the preset time period; or, skipping the checking stage; or in the checking stage, generating a checking stage interactive interface, wherein the checking stage interactive interface comprises a picture of the treated construction site uploaded by a dispatching person; finishing the checking stage under the condition that the user passes the checking operation on the interactive interface in the checking stage; and entering a disposal phase under the condition that the user performs a rejection operation on the interactive interface in the checking phase. Specifically, the processing module 62 is configured to obtain disposal information about the event warning information reported by the dispatch personnel, where the disposal information includes a rectification time limit; in the event that it is determined that the rectification time limit has arrived, the processing module 62 is further configured to determine whether the event alert information is acquired again, and confirm that the event alert information is not acquired.
In one embodiment, the processing module 62 is configured to automatically enter the processing information of the event alert information into the database during the archiving phase, and complete the archiving phase; or, in the filing stage, generating an interactive interface of the filing stage; under the condition that a user carries out filing operation on an interactive interface in a filing stage, the associated information of the event alarm information is recorded into a database to complete the filing stage; and entering a disposal phase under the condition that the user performs a return operation on the interactive interface in the filing phase.
In the embodiment, after the event alarm information of the construction site is acquired, the event alarm information is processed at each preset event processing stage, so that intelligent management of the construction site is realized, the management and control efficiency is improved, and the construction site is comprehensively and effectively managed and controlled in real time.
Referring to fig. 6, fig. 6 is a schematic block diagram of an embodiment of a terminal provided in the present invention. The terminal 70 in this embodiment includes: the processor 71, the memory 72, and a computer program stored in the memory 72 and capable of running on the processor 71, wherein the computer program, when executed by the processor 71, implements the above-mentioned information processing method for a construction site, and for avoiding repetition, it is not described herein repeatedly.
Referring to fig. 7, fig. 7 is a schematic block diagram of an embodiment of a computer-readable storage medium provided by the present invention. The embodiment of the present application further provides a computer-readable storage medium 90, the computer-readable storage medium 90 stores a computer program 901, the computer program 901 includes program instructions, and a processor executes the program instructions to implement the information processing method for a construction site provided in the embodiment of the present application.
The computer-readable storage medium 90 may be an internal storage unit of the computer device of the foregoing embodiment, such as a hard disk or a memory of the computer device. The computer-readable storage medium 90 may also be an external storage device of the computer device, such as a plug-in hard disk provided on the computer device, a Smart Media Card (SMC), a Secure Digital (SD) Card, a Flash memory Card (Flash Card), and the like.
The above embodiments are merely examples and are not intended to limit the scope of the present disclosure, and all modifications, equivalents, and flow charts using the contents of the specification and drawings are included in the scope of the present disclosure.

Claims (22)

1. A method of processing information at a construction site, the method comprising:
acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site;
and processing the event alarm information at each preset event processing stage.
2. The information processing method of a construction site according to claim 1, wherein the monitoring information includes environment perception information;
the event warning information of the construction site is obtained, and the method comprises the following steps:
receiving environment perception information of the construction site;
and under the condition that the received environment perception information is determined not to accord with a preset rule, generating first event warning information of the construction site.
3. The information processing method of a construction site according to claim 1, wherein the monitoring information includes video monitoring information;
the event warning information of the construction site is obtained, and the method comprises the following steps:
receiving second event warning information of the construction site; wherein the second event warning information is obtained by inputting the video monitoring information of the construction site into an event detection model.
4. The information processing method of a construction site according to any one of claims 1 to 3, after the acquiring of the event alert information of the construction site, comprising:
and performing secondary verification on the event alarm information to determine that the event alarm information is accurate event alarm information.
5. The information processing method of a construction site according to claim 3, wherein the second event warning information includes: the construction site has event alarm information of personnel not wearing protective equipment; the event detection model comprises a first event detection model, and the first event detection model is used for outputting event warning information of personnel not wearing protective equipment on the construction site under the condition that the personnel not wearing protective equipment is detected in the video monitoring information.
6. The information processing method of a construction site according to claim 3, wherein the second event warning information includes: event alarm information of an area with bare soil exists in the construction site; the event detection model comprises a second event detection model, and the second event detection model is used for outputting event warning information of the bare soil area existing on the construction site under the condition that the bare soil area existing in the video monitoring information is detected.
7. The information processing method of a construction site according to claim 2, wherein the environment sensing information includes dust concentration data;
the generating of the first event warning information of the construction site under the condition that it is determined that the received environment perception information does not conform to the preset rule includes:
and generating raise dust alarm information of the construction site under the condition that the raise dust concentration data is determined to be larger than a preset first threshold value.
8. The information processing method of a construction site according to claim 2, wherein the environment awareness information includes a PM2.5 value;
the generating of the first event warning information of the construction site under the condition that it is determined that the received environment perception information does not conform to the preset rule includes:
and generating PM2.5 alarm information of the construction site under the condition that the PM2.5 value is determined to be larger than a preset second threshold value.
9. The information processing method of a construction site according to claim 2, wherein the environment perception information includes noise detection data;
the generating of the first event warning information of the construction site under the condition that it is determined that the received environment perception information does not conform to the preset rule includes:
and generating noise alarm information of the construction site under the condition that the received noise detection data is determined to be larger than a preset third threshold value.
10. The information processing method of a construction site according to claim 1, wherein each of the preset event processing stages includes:
at least one of an acceptance phase, a dispatch phase, a disposition phase, a verification phase, and an archiving phase.
11. The information processing method of a construction site according to claim 10,
and processing the event alarm information in an acceptance phase, wherein the processing comprises the following steps:
in the accepting stage, automatically finishing the acceptance of the event alarm information;
alternatively, the first and second electrodes may be,
generating an event handling stage interactive interface in a handling stage, wherein the handling stage interactive interface comprises the event warning information;
completing the acceptance of the event alarm information under the condition that a user confirms acceptance operation on the interactive interface in the acceptance stage;
and under the condition that the user applies for cancellation operation on the interactive interface in the acceptance phase, the event alarm information is subjected to cancellation processing.
12. The information processing method of a construction site according to claim 11,
and processing the event alarm information in a dispatching stage, wherein the dispatching stage comprises the following steps:
in the dispatching stage, processing personnel or vehicles of the event warning information are automatically selected and dispatching instructions are sent;
alternatively, the first and second electrodes may be,
in the dispatching stage, determining a party corresponding to the event alarm information according to a monitoring information base of a pre-configured construction site, and sending an instruction for processing the event alarm information to the party;
alternatively, the first and second electrodes may be,
in a dispatching stage, generating a dispatching stage interactive interface, wherein the dispatching stage interactive interface comprises information of dispatchable personnel or vehicles;
and responding to the dispatching operation of the user on the interactive interface in the dispatching stage, and sending a dispatching instruction to a person or a vehicle corresponding to the dispatching operation.
13. The information processing method of a construction site according to claim 12, wherein the dispatch stage interactive interface further includes an electronic map marking a place where an event occurs and marking location information of the dispatchable person or vehicle.
14. The information processing method of a construction site according to claim 10,
processing the event alarm information in a handling phase, including:
and in the handling stage, receiving handling information of the event alarm information reported by dispatching personnel.
15. The information processing method of a construction site according to claim 10,
and processing the event alarm information in an inspection stage, wherein the processing comprises the following steps:
in the checking stage, under the condition that the event warning information is not obtained again within a preset time period, the checking stage is automatically completed;
alternatively, the first and second electrodes may be,
skipping the verification phase;
alternatively, the first and second electrodes may be,
in the checking stage, generating a checking stage interactive interface, wherein the checking stage interactive interface comprises a picture of the construction site after the construction site is processed and uploaded by dispatching personnel;
under the condition that the user passes the checking operation on the interactive interface in the checking stage, finishing the checking stage;
and entering a disposal phase under the condition that the user performs a rejection operation on the check phase interactive interface.
16. The information processing method of a construction site according to claim 15,
the confirming that the event alarm information is not obtained again within a preset time period includes:
acquiring disposal information reported by dispatched personnel for the event alarm information, wherein the disposal information comprises a rectification time limit;
and under the condition that the rectification time limit is determined to be reached, judging whether the event alarm information is acquired again or not, and confirming that the event alarm information is not acquired.
17. The information processing method of a construction site according to claim 10,
and processing the event alarm information in an archiving stage, wherein the processing comprises the following steps:
in the filing stage, automatically inputting the processing information of the event alarm information into a database to finish the filing stage;
alternatively, the first and second electrodes may be,
in the filing stage, generating an interactive interface of the filing stage;
under the condition that a user carries out archiving operation on the interaction interface of the archiving stage, the associated information of the event alarm information is recorded into a database to complete the archiving stage;
and entering a disposal phase under the condition that the user performs a return operation on the archiving phase interactive interface.
18. An information processing apparatus at a construction site, characterized in that the apparatus comprises:
the information acquisition module is used for acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site;
and the processing module is used for processing the event alarm information at each preset event processing stage.
19. A terminal, comprising: a memory for storing computer readable instructions, a processor for invoking the computer instructions to implement the method of any of claims 1-17.
20. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the method of any one of claims 1 to 17.
21. An information processing system for a construction site, the information processing system for a construction site comprising:
the monitoring terminals are distributed on a construction site and used for acquiring monitoring information of the construction site;
the management platform is used for acquiring event alarm information of a construction site; the event warning information of the construction site is generated according to the monitoring information of the construction site; and processing the event alarm information at each preset event processing stage.
22. The information processing system of a construction site according to claim 21, wherein the monitoring terminal includes one or more of an image acquisition device, a PM2.5 acquisition device, a dust emission acquisition device, and a noise acquisition device;
wherein the image acquisition equipment is used for acquiring an image containing constructors and/or a construction site of the construction site; the PM2.5 acquisition equipment is used for detecting a PM2.5 value of a construction site environment; the dust collection equipment is used for detecting dust concentration data of the construction site environment; the noise collection device is used for collecting noise detection data of the construction site environment.
CN202111628363.6A 2021-12-28 2021-12-28 Information processing method, device and system for construction site, terminal and storage medium Withdrawn CN114328787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111628363.6A CN114328787A (en) 2021-12-28 2021-12-28 Information processing method, device and system for construction site, terminal and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111628363.6A CN114328787A (en) 2021-12-28 2021-12-28 Information processing method, device and system for construction site, terminal and storage medium

Publications (1)

Publication Number Publication Date
CN114328787A true CN114328787A (en) 2022-04-12

Family

ID=81014247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111628363.6A Withdrawn CN114328787A (en) 2021-12-28 2021-12-28 Information processing method, device and system for construction site, terminal and storage medium

Country Status (1)

Country Link
CN (1) CN114328787A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115249392A (en) * 2022-04-29 2022-10-28 中铁建(无锡)工程科技发展有限公司 Intelligent visitor system of wisdom building site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115249392A (en) * 2022-04-29 2022-10-28 中铁建(无锡)工程科技发展有限公司 Intelligent visitor system of wisdom building site

Similar Documents

Publication Publication Date Title
CN110889339B (en) Head and shoulder detection-based dangerous area grading early warning method and system
CN111310947A (en) Building facility operation and maintenance method, equipment, storage medium and system based on 5G
KR101386591B1 (en) CCTV integrated management system
CN113011833A (en) Safety management method and device for construction site, computer equipment and storage medium
CN111932709A (en) Method for realizing violation safety supervision of inspection operation of gas station based on AI identification
CN116863708B (en) Smart city scheduling distribution system
CN110807460A (en) Transformer substation intelligent patrol system based on image recognition and application method thereof
CN110543866A (en) Safety management system and method for capital construction engineering constructors
CN210222962U (en) Intelligent electronic fence system
CN114022810A (en) Method, system, medium and terminal for detecting working state of climbing frame protective net in construction site
CN114328787A (en) Information processing method, device and system for construction site, terminal and storage medium
CN109345787A (en) A kind of anti-outer damage monitoring and alarming system of the transmission line of electricity based on intelligent image identification technology
CN114463873A (en) Patrol system for community
CN112163497A (en) Construction site accident prediction method and device based on image recognition
CN108776453B (en) Building safety monitoring system based on computer
CN113888024A (en) Operation monitoring method and device, electronic equipment and storage medium
CN112666911A (en) Cooperative control system
CN111582676A (en) Engineering supervision and supervision system
CN116824725A (en) Forest resource intelligent management and protection method and system
CN116206246A (en) Method and system for identifying safety violation target of infrastructure engineering
CN114004720A (en) Checking method, device, server, system and storage medium
CN112560562B (en) Method, apparatus and storage medium for identifying violations
CN112927383A (en) Cross-regional labor worker face recognition system and method based on building industry
CN112785745A (en) Night patrol management method and system
JP2018041295A (en) System and method for evaluating quality of administrative tasks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20220412

WW01 Invention patent application withdrawn after publication