CN114298660A - Construction power utilization system and use method thereof - Google Patents

Construction power utilization system and use method thereof Download PDF

Info

Publication number
CN114298660A
CN114298660A CN202111485489.2A CN202111485489A CN114298660A CN 114298660 A CN114298660 A CN 114298660A CN 202111485489 A CN202111485489 A CN 202111485489A CN 114298660 A CN114298660 A CN 114298660A
Authority
CN
China
Prior art keywords
sub
authority
construction
module
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111485489.2A
Other languages
Chinese (zh)
Inventor
吉志强
徐恒雷
王雅坤
文旭
辛柏杉
张楠
黄明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Gold Engineering Corp
Original Assignee
China National Gold Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Gold Engineering Corp filed Critical China National Gold Engineering Corp
Priority to CN202111485489.2A priority Critical patent/CN114298660A/en
Publication of CN114298660A publication Critical patent/CN114298660A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction power utilization system and a using method thereof, and the construction power utilization system comprises a construction general table, at least one first sub-table, at least one second sub-table and a power utilization processing module, wherein the power utilization processing module is respectively in signal connection with the construction general table, the first sub-table and the second sub-table, the first sub-table is connected with the at least one second sub-table, the construction general table is connected with the at least one first sub-table, the first sub-table and the second sub-table are provided with authority verification devices, the authority verification device authentication level of the first sub-table is higher than that of the second sub-table, and the power utilization processing module is used for collecting power utilization conditions of each meter head and simultaneously controlling the current power utilization authority of each meter. According to the method, the construction area is divided, and the authority of each area is issued by the user, so that the basic authority division of the electricity utilization is realized, and the real consumption of each using main body is difficult to distinguish when the electricity meter is read due to the mixed use of electricity for large-scale construction, and the subsequent disputes are avoided.

Description

Construction power utilization system and use method thereof
Technical Field
The invention relates to the field of construction site management, in particular to a construction power utilization system and a using method thereof.
Background
In the construction process, construction electricity, various electrical devices and electricity utilization construction machines are increased day by day, construction site constructors are more, personnel mobility is large, cross operation is serious, the types of electricity utilization equipment are more, the working environment is severe, and temporary use is achieved.
Therefore, an electric system for construction is needed to solve the above problems.
Disclosure of Invention
The invention provides a construction power utilization system and an evaluation method thereof, and solves the problems that in the prior art, the temporary power utilization arrangement of a construction site is unscientific, unreasonable in installation and irregular in operation due to the characteristics of more construction personnel, high personnel mobility, serious cross operation, multiple types of power utilization equipment, severe working environment and temporary use in the construction site, and the temporary power utilization management work of the construction site is very difficult.
The invention provides a construction power utilization system which comprises a construction general table, at least one first sub-table, at least one second sub-table and a power utilization processing module, wherein the power utilization processing module is in signal connection with the construction general table, the first sub-table and the second sub-table respectively, the first sub-table is connected with the at least one second sub-table, the construction general table is connected with the at least one first sub-table, the first sub-table and the second sub-table are provided with authority verification devices, the authority verification device authentication level of the first sub-table is higher than that of the second sub-table, and the power utilization processing module is used for collecting power utilization conditions of meter heads and controlling the current power utilization authority of the meters.
The first sub-meter authority lock and the second sub-meter authority lock are set, managers and users are divided, meanwhile, the first authority lock is limited, power utilization authorities among sub-packages are not communicated, the problem of mixed power utilization under the condition that no report or record exists is avoided, and the problem that power utilization records among the sub-packages are disordered and difficult to manage is fundamentally solved. Meanwhile, the problem caused by the person is limited at the tail end to the maximum extent, and the problem caused by cross construction is avoided being difficult to trace back.
According to the construction power utilization system, as an optimal mode, the verification authority of the second sub-meter is a sub-authority of the verification authority of the first sub-meter, and the second sub-meter is hung under the unique first sub-meter power utilization authority.
The invention relates to a construction power utilization system, which is characterized in that as an optimal mode, a power utilization processing module comprises a project creating module, a power utilization recording module, an authority authentication module and a temporary electric quantity allocation module, wherein the project creating module is in data connection with the authority authentication module and the temporary electric quantity allocation module, the authority authentication module is in data connection with the temporary electric quantity allocation module, the power utilization recording module is connected with a construction general table, a first sub-table and a second sub-table, and the authority authentication module is connected with the first sub-table and the second sub-table.
The construction power utilization system is characterized in that a project creation module is used for creating an attribution relation and an authority limit relation of each electric meter in a project, a power utilization recording module is used for recording power utilization conditions under each authority, an authority authentication module is used for issuing use authority to an authority verification device of each first sub-meter and an authority verification device of each second sub-meter according to the attribution relation created by the project creation module, and a temporary power distribution module is used for adjusting the power utilization limit relation between the authorities according to the power utilization conditions under each authority recorded by the power recording module.
After the power utilization authority is divided by the power utilization processing module, the cross construction problem is considered, the cross construction without reporting is limited, and meanwhile, a certain width limit is given for emergency problems.
According to the construction power utilization system, as an optimal mode, the power utilization width limit relation is the range and the electric quantity of power which can be used across the authorities between adjacent construction authorities in the geographic position.
The invention provides a using method of a construction power system, which comprises the following steps:
s1, dividing the construction site into a plurality of construction areas according to the position of the first sub-list in the construction site;
s2, recording the construction area and the predicted power consumption of each sub-packaging unit to a project creation module according to actual conditions, and determining the sub-packaging unit to which the first sub-packaging table and the second sub-packaging table belong in each construction area;
s3, the authority authentication module calls the sub-package units to which the first sub-package and the second sub-package belong in the project creation module to generate the conventional power utilization authority, and the conventional power utilization authority which can be authenticated by the sub-packages is issued to the first sub-packages;
s4, the temporary electricity distribution module calls the positions of adjacent areas belonging to different sub-package units in the project creation module, the authorized temporary electricity utilization authority of the adjacent areas is authorized for each sub-table in the areas, and the temporary electricity utilization authority electric quantity Q2 is the estimated electricity utilization quantity Q1 within the time threshold T of the single construction area of the sub-package unit and is multiplied by 1 and an electricity utilization broad coefficient a;
s5, issuing a second sub-table permission to the user according to the sub-packet unit to which the user belongs, and issuing a first sub-table permission to the manager;
s6, the first sub-table verifies whether the use authority of the first sub-table is the normal power utilization authority or the temporary power utilization authority of the sub-table, and if yes, the step S7 is carried out; otherwise, the construction area receiving the first sub-table use permission grants the temporary electricity utilization permission of which the first sub-table use permission is the period time threshold T;
s7, judging the type of the use authority of the first sub-meter, and if the type of the use authority is the conventional power utilization authority, electrically communicating the power to each second sub-meter connected with the current first sub-meter; if the power utilization authority is the temporary power utilization authority, issuing the use authority with the total amount of the temporary power utilization authority electric quantity Q2 to each second sub-meter connected with the current first sub-meter;
s8, the second sub-table verifies whether the use authority of the second sub-table belongs to the same sub-packaging unit as the use authority issued by the connected first sub-table, and if so, the second sub-table supplies power; otherwise, providing a temporary electric quantity threshold Q3 for the electric appliance providing terminal, and providing the sub-packet unit information of the second sub-packet to the project creation module;
s9, recording the electricity utilization condition within the time threshold T by the electricity utilization recording module, and counting the total electricity utilization amount of each sub-meter under each sub-package unit;
s10, the project creation module detects whether the use times of non-single non-local-area sub-package units in the construction area exceed the temporary use time threshold value X within the time threshold value T, if yes, the sub-package units exceeding the temporary use time threshold value X in the construction area are granted temporary power utilization authority of the period time threshold value T, and step S11 is carried out; otherwise, continuing to step S11;
s11, according to the history records of the actual electricity utilization conditions under the use authority of each first sub-table in each construction area, and the average value of the used amount in the time threshold T, assigning the average value of the used amount to the predicted electricity utilization amount Q1 in the time threshold T;
s12, detecting whether the project creating module receives the project ending signal, if yes, executing step S13; otherwise, performing step S4;
and S13, exporting the total power consumption and recording.
The invention has the following beneficial effects:
(1) by dividing the construction area, the basic authority division of the electricity utilization is realized according to the authority issued by the user to each area, and the real consumption of each using main body is difficult to distinguish when the electricity meters are read due to the mixed use of electricity for large-scale construction, so that the subsequent dispute is avoided;
(2) temporary electricity authorization that each cross region floats is used according to the actual electricity utilization condition, so that the necessary construction problems outside the subareas in the regions are met, and the problem that the preset region range is unreasonable is avoided;
(3) through the non-intercommunication of the use authorities of the first sub-tables, the condition of cross power utilization must be known by at least a user and a regional responsible person, and the problem of being incapable of being checked without data is avoided;
(4) the second sub-table authority is issued through the first sub-table, so that when intersection occurs, if problems such as operation non-standardization and the like occur, the problems are guaranteed to occur under the condition of traceable responsible persons, and the situation that the tail end cannot be traced after the problems caused by intersection construction are avoided;
(5) the electricity utilization condition is limited and recorded by the electricity utilization recording module, the authority authentication module and the temporary electricity distribution module at the same time, so that the electricity utilization condition can be traced vertically.
Drawings
FIG. 1 is a schematic diagram of an electric system for construction;
FIG. 2 is a schematic view of an electricity processing module for a construction electricity system;
fig. 3 is a flow chart of a method for using a construction power system.
Reference numerals:
1. a construction summary table; 2. a first sub-table; 3. a second sub-table; 4. an electricity utilization processing module; 41. a project creation module; 42. a power consumption recording module; 43. an authority authentication module; 44. and a temporary electric quantity distribution module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example 1
As shown in figure 1, the general speed railway turnout state evaluation system comprises a construction general table 1, at least one first sub-table 2, at least one second sub-table 3 and an electricity utilization processing module 4, wherein the electricity utilization processing module 4 is in signal connection with the construction general table 1, the first sub-table 2 and the second sub-table 3 respectively, the first sub-table 2 is connected with the at least one second sub-table 3, the construction general table 1 is connected with the at least one first sub-table 2, the first sub-table 2 and the second sub-table 3 are provided with authority verification devices, the authority verification device authentication level of the first sub-table 2 is higher than that of the second sub-table 3, the electricity utilization processing module 4 is used for collecting electricity utilization conditions of each table head and controlling the current electricity utilization authority of each table simultaneously. The verification authority of the second sub-table 3 is a sub-authority of the verification authority of the first sub-table 2, and the power utilization authority of the second sub-table 3 is hung under the unique power utilization authority of the first sub-table 2.
As shown in fig. 2, the electricity utilization processing module 4 includes an item creating module 41, an electricity utilization recording module 42, an authority authentication module 43 and a temporary electricity amount distribution module 44, the item creating module 41 is in data connection with the authority authentication module 43 and the temporary electricity amount distribution module 44, the authority authentication module 43 is in data connection with the temporary electricity amount distribution module 44, the electricity utilization recording module 42 is connected with the construction general table 1, the first sub-table 2 and the second sub-table 3, and the authority authentication module 43 is connected with the first sub-table 2 and the second sub-table 3.
The project creating module 41 is configured to create an attribution relationship and an authority limit relationship of each electric meter in a project, the electricity consumption recording module 42 is configured to record electricity usage under each authority, the authority authenticating module 43 is configured to issue usage authority to the authority verifying device of each first sub-table 2 and the authority verifying device of the second sub-table 3 according to the attribution relationship created by the project creating module 41, and the temporary electricity distribution module 44 is configured to adjust the electricity consumption limit relationship between each authority according to the electricity usage under each authority recorded by the electricity consumption recording module. The power utilization width limit relationship is the range and the electric quantity of the cross-authority power utilization between adjacent construction authorities in the geographic position.
As shown in fig. 3, the method for using the construction electric system includes the following steps:
s1, dividing the construction site into a plurality of construction areas according to the position of the first sub-table 2 in the construction site;
s2, recording the construction area and the predicted power consumption of each sub-packaging unit to the project creation module 41 according to the actual situation, and determining the sub-packaging unit to which the first sub-packaging table 2 and the second sub-packaging table 3 belong in each construction area;
s3, the authority authentication module 43 calls the sub-package units to which the first sub-package 2 and the second sub-package 3 belong in the item creation module 41 to generate the conventional power utilization authority, and issues the conventional power utilization authority which can be authenticated by the sub-packages to the first sub-packages 2;
s4, the temporary electricity distribution module calls the positions of adjacent areas belonging to different sub-package units in the item creation module 41, the authorized temporary electricity utilization authority of the adjacent areas is authorized for each sub-table in the areas, and the temporary electricity utilization authority electric quantity Q2 is the estimated electricity utilization quantity Q1 within the time threshold T of the single construction area of the sub-package unit and is multiplied by 1 and an electricity utilization broad coefficient a;
s5, issuing the use authority of the second sub-table 3 to the user according to the sub-packet unit to which the user belongs, and issuing the use authority of the first sub-table 2 to the manager;
s6, the first sub-table 2 verifies whether the use authority of the first sub-table 2 is the normal electricity utilization authority or the temporary electricity utilization authority of the sub-table, and if yes, the step S7 is carried out; otherwise, the construction area receiving the use authority of the first sub-table 2 grants the temporary power utilization authority of which the use authority of the first sub-table 2 is the period time threshold T;
s7, judging the type of the use authority of the first sub-table 2, and if the type of the use authority is the conventional use authority, connecting the electricity with each second sub-table 3 connected with the current first sub-table 2; if the power utilization authority is the temporary power utilization authority, issuing the use authority with the total amount of the temporary power utilization authority electric quantity Q2 to each second sub-table 3 connected with the current first sub-table 2;
s8, the second sub-table 3 verifies whether the use authority of the second sub-table 3 and the use authority issued by the connected first sub-table 2 belong to the same sub-packaging unit, and if yes, the second sub-table 3 supplies power; otherwise, providing a temporary electric quantity threshold Q3 for the electric appliance providing terminal, and providing the information of the sub-package unit to which the second sub-package table 3 belongs to the project creating module 41;
s9, the power consumption recording module 42 records the power consumption condition within the time threshold T, and counts the total power consumption of each sub-meter in each sub-package unit;
s10, the project creating module 41 detects whether the use times of non-single non-local-area sub-package units in the construction area exceed the temporary use time threshold value X within the time threshold value T, if yes, the sub-package units exceeding the temporary use time threshold value X in the construction area are granted temporary power utilization authority of the period time threshold value T, and step S11 is carried out; otherwise, continuing to step S11;
s11, according to the history records of the actual electricity utilization conditions under the use authority of each first sub-table 2 in each construction area, and the average value of the used amount in the time threshold T, assigning the average value of the used amount to the predicted electricity consumption Q1 in the time threshold T;
s12, detecting whether the project creating module 41 receives the project ending signal, if yes, executing the step S13; otherwise, performing step S4;
and S13, exporting the total power consumption and recording.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (6)

1. A construction power utilization system is characterized in that: including construction summary table (1), at least one first branch table (2), at least one second branch table (3) and power consumption processing module (4), power consumption processing module (4) respectively with construction summary table (1), first branch table (2) with second branch table (3) signal connection, first branch table (2) connect at least one second branch table (3), construction summary table (1) connects at least one first branch table (2), first branch table (2) with second branch table (3) are provided with the authority verification device, the authority verification device authentication grade of first branch table (2) is higher than the authority verification device authentication grade of second branch table (3), power consumption processing module (4) are used for collecting each gauge outfit power consumption condition, control each table current power consumption authority simultaneously.
2. The construction power system according to claim 1, wherein: the verification authority of the second sub-table (3) is a sub-authority of the verification authority of the first sub-table (2), and the power utilization authority of the second sub-table (3) is hung under the unique power utilization authority of the first sub-table (2).
3. The construction power system according to claim 2, wherein: the electricity utilization processing module (4) comprises an item creating module (41), an electricity utilization recording module (42), an authority authentication module (43) and a temporary electricity quantity distribution module (44), the item creating module (41) is in data connection with the authority authentication module (43) and the temporary electricity quantity distribution module (44), the authority authentication module (43) is in data connection with the temporary electricity quantity distribution module (44), the electricity utilization recording module (42) is connected with the construction general table (1), the first sub-table (2) and the second sub-table (3), and the authority authentication module (43) is connected with the first sub-table (2) and the second sub-table (3).
4. A construction power system according to claim 3, characterized in that: the project creating module (41) is used for creating an attribution relation and an authority limit relation of each electric meter in a project, the electricity utilization recording module (42) is used for recording electricity utilization conditions under each authority, the authority authentication module (43) is used for issuing use authority to the authority verification device of each first sub-table (2) and the authority verification device of each second sub-table (3) according to the attribution relation created by the project creating module (41), and the temporary electricity distribution module (44) is used for adjusting the electricity utilization limit relation between the authorities according to the electricity utilization conditions under each authority recorded by the electricity utilization recording module.
5. The construction power system according to claim 4, wherein: the power utilization width limit relationship is the range and the electric quantity of the cross-authority power utilization between adjacent construction authorities in the geographic position.
6. The method for using a construction electric system according to claim 4, wherein: the method comprises the following steps:
s1, dividing the construction site into a plurality of construction areas according to the position of the first sub-table (2) in the construction site;
s2, recording the construction area and the predicted electricity consumption of each sub-packaging unit to a project creating module (41) according to actual conditions, and determining the sub-packaging unit to which the first sub-table (2) and the second sub-table (3) belong in each construction area;
s3, the authority authentication module (43) calls the sub-package unit to which each first sub-table (2) and each second sub-table (3) belong in the item creation module (41), generates the normal power utilization authority, and issues the normal power utilization authority which can be authenticated by the sub-tables to each first sub-table (2);
s4, the temporary electricity distribution module calls the positions of adjacent areas belonging to different sub-package units in the project creation module (41), the authorized temporary electricity utilization authority of the adjacent areas is authorized for each sub-table in the areas, and the temporary electricity utilization authority electric quantity Q2 is the predicted electricity utilization quantity Q1 within the time threshold T of a single construction area of the sub-package unit and is multiplied by 1 plus an electricity utilization broad coefficient a;
s5, issuing the use authority of the second sub-table (3) to the user according to the sub-packet unit to which the user belongs, and issuing the use authority of the first sub-table (2) to the manager;
s6, the first sub-table (2) verifies whether the use authority of the first sub-table (2) is the normal power utilization authority or the temporary power utilization authority of the sub-table, and if yes, the step S7 is carried out; otherwise, the construction area receiving the use authority of the first sub-table (2) grants the temporary power utilization authority of which the use authority of the first sub-table (2) is the period time threshold T;
s7, judging the type of the use authority of the first sub-table (2), and if the type of the use authority is the normal use authority, connecting the electricity with each second sub-table (3) connected with the current first sub-table (2); if the electricity is the temporary electricity utilization authority, issuing the use authority with the total amount of the temporary electricity utilization authority electric quantity Q2 to each second sub-meter (3) connected with the current first sub-meter (2);
s8, the second sub-table (3) verifies whether the use permission of the second sub-table (3) belongs to the same sub-packaging unit as the use permission issued by the connected first sub-table (2), and if so, the second sub-table (3) supplies power; otherwise, providing a temporary electric quantity threshold Q3 for the electric appliance providing terminal, and providing the sub-packet unit information of the second sub-table (3) to the project creating module (41);
s9, the power utilization recording module (42) records the power utilization condition within the time threshold T, and the total power utilization amount of each sub-meter under each sub-package unit is counted;
s10, the project creating module (41) detects whether the use times of non-single non-local-area sub-package units in a construction area exceed a temporary use time threshold value X within a time threshold value T, if yes, the sub-package units exceeding the temporary use time threshold value X in the construction area are granted temporary power utilization authority of a period time threshold value T, and step S11 is carried out; otherwise, continuing to step S11;
s11, according to the history of the actual electricity utilization condition under the use authority of each first sub-table (2) in each construction area, and the average value of the used amount in the time threshold T, assigning the average value of the used amount to the predicted electricity utilization amount Q1 in the time threshold T;
s12, detecting whether the project creating module (41) receives a project ending signal, if yes, executing the step S13; otherwise, performing step S4;
and S13, exporting the total power consumption and recording.
CN202111485489.2A 2021-12-07 2021-12-07 Construction power utilization system and use method thereof Pending CN114298660A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111485489.2A CN114298660A (en) 2021-12-07 2021-12-07 Construction power utilization system and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111485489.2A CN114298660A (en) 2021-12-07 2021-12-07 Construction power utilization system and use method thereof

Publications (1)

Publication Number Publication Date
CN114298660A true CN114298660A (en) 2022-04-08

Family

ID=80966196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111485489.2A Pending CN114298660A (en) 2021-12-07 2021-12-07 Construction power utilization system and use method thereof

Country Status (1)

Country Link
CN (1) CN114298660A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115080945A (en) * 2022-07-27 2022-09-20 保利长大工程有限公司 Control method and control system of construction device

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009176028A (en) * 2008-01-24 2009-08-06 Fuji Xerox Co Ltd Authority authentication device, authority authentication system, and authority authentication program
CN103929313A (en) * 2014-05-05 2014-07-16 上海千贯节能科技有限公司 Method for channel allocation and bilayer authorization of intelligent electric use networks
CN104485751A (en) * 2015-01-19 2015-04-01 衢州光明电力工程有限公司 Intelligent construction safety power consumption system and method
CN105303309A (en) * 2015-10-20 2016-02-03 国家电网公司 Authority management method and system for energy efficiency management system
KR20180003516A (en) * 2015-06-05 2018-01-09 주식회사 인코어드 테크놀로지스 Server, Communicating Device and System Having a Function of Managing Power Demand and Method of Managing Power Usage Thereof
CN110836990A (en) * 2018-08-16 2020-02-25 云丁智能科技(北京)有限公司 Electric quantity charging system, method and related device
CN110992085A (en) * 2019-11-18 2020-04-10 广东卓维网络有限公司 Mobile terminal system for power utilization inquiry and statistics
CN111062711A (en) * 2019-12-31 2020-04-24 广东伟邦科技股份有限公司 Intelligent management system for shared electricity in area
CN111313399A (en) * 2018-12-12 2020-06-19 武汉国测数据技术有限公司 Method, device and system for confirming topological relation of regional power utilization network
CN111555459A (en) * 2020-05-25 2020-08-18 合肥立达电气有限公司 Building construction site temporary electricity utilization supervision and safety risk management and control system
CN112130109A (en) * 2020-11-06 2020-12-25 中国计量科学研究院 Method for detecting metering performance abnormity of intelligent electric energy meter
CN112215724A (en) * 2020-10-23 2021-01-12 重庆唯此科技有限公司 Terminal safety power consumption wisdom management system
CN112465667A (en) * 2020-11-24 2021-03-09 正太集团有限公司 BIM model-based construction site temporary electricity utilization total load calculation method and electricity utilization arrangement system
CN113408847A (en) * 2021-05-10 2021-09-17 国网浙江省电力有限公司杭州供电公司 Electric quantity distribution method and device combining electric power use condition and user credit

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009176028A (en) * 2008-01-24 2009-08-06 Fuji Xerox Co Ltd Authority authentication device, authority authentication system, and authority authentication program
CN103929313A (en) * 2014-05-05 2014-07-16 上海千贯节能科技有限公司 Method for channel allocation and bilayer authorization of intelligent electric use networks
CN104485751A (en) * 2015-01-19 2015-04-01 衢州光明电力工程有限公司 Intelligent construction safety power consumption system and method
KR20180003516A (en) * 2015-06-05 2018-01-09 주식회사 인코어드 테크놀로지스 Server, Communicating Device and System Having a Function of Managing Power Demand and Method of Managing Power Usage Thereof
CN105303309A (en) * 2015-10-20 2016-02-03 国家电网公司 Authority management method and system for energy efficiency management system
CN110836990A (en) * 2018-08-16 2020-02-25 云丁智能科技(北京)有限公司 Electric quantity charging system, method and related device
CN111313399A (en) * 2018-12-12 2020-06-19 武汉国测数据技术有限公司 Method, device and system for confirming topological relation of regional power utilization network
CN110992085A (en) * 2019-11-18 2020-04-10 广东卓维网络有限公司 Mobile terminal system for power utilization inquiry and statistics
CN111062711A (en) * 2019-12-31 2020-04-24 广东伟邦科技股份有限公司 Intelligent management system for shared electricity in area
CN111555459A (en) * 2020-05-25 2020-08-18 合肥立达电气有限公司 Building construction site temporary electricity utilization supervision and safety risk management and control system
CN112215724A (en) * 2020-10-23 2021-01-12 重庆唯此科技有限公司 Terminal safety power consumption wisdom management system
CN112130109A (en) * 2020-11-06 2020-12-25 中国计量科学研究院 Method for detecting metering performance abnormity of intelligent electric energy meter
CN112465667A (en) * 2020-11-24 2021-03-09 正太集团有限公司 BIM model-based construction site temporary electricity utilization total load calculation method and electricity utilization arrangement system
CN113408847A (en) * 2021-05-10 2021-09-17 国网浙江省电力有限公司杭州供电公司 Electric quantity distribution method and device combining electric power use condition and user credit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏明忠;夏以轩;姜丽萍;: "统一用户认证和授权管理的实现", 计算机与应用化学, no. 08, 28 August 2011 (2011-08-28), pages 129 - 132 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115080945A (en) * 2022-07-27 2022-09-20 保利长大工程有限公司 Control method and control system of construction device
CN115080945B (en) * 2022-07-27 2022-11-08 保利长大工程有限公司 Control method and control system of construction device

Similar Documents

Publication Publication Date Title
CN106873487A (en) With energy equipment energy consumption long distance control system
CN106127885A (en) Intelligent electric controlled lock managing and control system and method
CN101350806A (en) Authorization and management system for laboratory instrument
CN104917291A (en) Low-frequency and low-voltage load reduction system based on distributed hierarchical control framework
CN114298660A (en) Construction power utilization system and use method thereof
CN113919726A (en) Intelligent construction site management and control system based on data analysis
CN104933515B (en) A kind of management system for petrochemical enterprise power grid
CN111815858A (en) Charging network control method, device, equipment and storage medium based on block chain
CN201402280Y (en) Triphase prepayment electric energy meter system based on GPRS
CN211425889U (en) Remote monitoring system of locomotive signal equipment
CN101329788A (en) Authorized power utilization management method and system
CN105932770A (en) Intelligent electric meter box
CN116934259A (en) Work management system applied to intelligent illumination
CN108596782A (en) Large-area power failure data rapid intercommunication method
CN111131464A (en) Distributed terminal management system for laboratory of colleges and universities
CN204681092U (en) A kind of low-frequency and low-voltage load-reducing system
CN106600006A (en) Power failure monitoring system of 10 KV network topology structure and power failure determination method
CN106645938A (en) Electric energy management system and method for urban rail transit
WO2019052296A1 (en) Electric bicycle charging service system
CN112232701A (en) Harbor ship distribution management system based on block chain
WO2018161238A1 (en) Remote monitoring system for energy consumption of energy-using equipment
CN111817437B (en) Intelligent substation intelligent recorder modeling method
CN112270009A (en) Fishing boat fishing supervision system based on block chain
CN202939482U (en) Rail-transit automatic fare collection system station control center system
CN102915475A (en) Method for data modeling of local area network protection and management system and model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination