CN114210758A - Forming process of metal arc-shaped plate - Google Patents

Forming process of metal arc-shaped plate Download PDF

Info

Publication number
CN114210758A
CN114210758A CN202111645984.5A CN202111645984A CN114210758A CN 114210758 A CN114210758 A CN 114210758A CN 202111645984 A CN202111645984 A CN 202111645984A CN 114210758 A CN114210758 A CN 114210758A
Authority
CN
China
Prior art keywords
heating
stamping
equipment
materials
selecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111645984.5A
Other languages
Chinese (zh)
Other versions
CN114210758B (en
Inventor
柳庆
孙原
黄现德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Weilailai Machinery Equipment Co ltd
Original Assignee
Laiwu Weilailai Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Weilailai Machinery Equipment Co ltd filed Critical Laiwu Weilailai Machinery Equipment Co ltd
Priority to CN202111645984.5A priority Critical patent/CN114210758B/en
Publication of CN114210758A publication Critical patent/CN114210758A/en
Application granted granted Critical
Publication of CN114210758B publication Critical patent/CN114210758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/02Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention provides a forming process of a metal arc plate, belonging to the field of forming processes of metal arc plates. The invention provides a reasonable forming process, different processing equipment can be used according to different materials in the process of processing the arc-shaped plate to process the material, the influence of the materials of different materials on the processing efficiency in the processing process is prevented, and different quenching liquids are selected according to the materials of the material to carry out quenching work on the processed product after processing, so that the hardness of the material can be conveniently improved after processing, and the influence of the hardness of the material on the service time of the product after long-time use of the product after processing is prevented.

Description

Forming process of metal arc-shaped plate
Technical Field
The invention belongs to the technical field of arc-shaped plate forming processes, and particularly relates to a forming process of a metal arc-shaped plate.
Background
The arc-shaped plate is a bent plate with a certain radius and arc length, and can be spliced into a cylinder, an elliptic cylinder or other cylinders. To meet the market demand, many devices are now made of special materials. The curved plates in the apparatus are typically cut from a steel plate and then machined to shape.
However, the existing forming process has the problems that the efficiency is low when arc-shaped plates made of different materials are processed in the working process, the hardness of the arc-shaped plates is inconvenient to improve, and the material waste is easily caused in the processing process.
Therefore, it is necessary to invent a forming process of a metal arc plate.
Disclosure of Invention
In order to solve the technical problems, the invention provides a forming process of a metal arc-shaped plate, which aims to solve the problems that the existing forming process is low in efficiency when arc-shaped plates made of different materials are processed in the working process, the hardness of the arc-shaped plate is inconvenient to improve, and the waste of the materials is easily caused in the processing process, and the forming process of the metal arc-shaped plate specifically comprises the following steps:
the method comprises the following steps: selecting materials, selecting proper materials according to working requirements, and cleaning the surfaces of the materials;
step two: cutting the material, measuring the material by using measuring equipment according to requirements, and marking the material;
in the second step, cutting the material, in the first step, selecting a tool, selecting the cutting tool according to the material to be processed, and placing the selected material at a proper position;
secondly, aligning the material, fixing the cutting equipment, and aligning the material to ensure that the cutting position of the material is aligned and corresponds to the cutting part of the cutting tool;
thirdly, cutting, namely, after the materials are aligned, fixing the materials to be cut by using a tool to prevent the materials from moving in the cutting process and influence on the cutting quality, and then controlling the cutting equipment by external control equipment to cut the materials;
fourthly, polishing the material, moving the cut material to a proper position, and polishing the surface of the material by using surface treatment equipment;
step three: fixing the material, aligning the measured material, and then clamping and fixing the material by using a tool;
in the third step, fixing the material, in the first step, selecting a clamp, selecting a proper clamp according to the specification of the cut material, and fixing two ends of the material;
secondly, aligning the materials, namely aligning the materials by using an aligning device in the process of clamping and fixing the materials by using a clamp, and measuring and marking the fixed materials by using a measuring and marking tool;
thirdly, adjusting the angle of the material, fixing two ends of the material, adjusting the angle of the material after the material is fixed and marked, and adjusting according to the bending requirement of the arc-shaped plate;
step four: heating the material, selecting proper heating equipment, and then heating the material heating part;
heating the material, selecting a heating tool in the first step, and selecting proper heating equipment according to the material of the material and the stamping requirement;
secondly, planning a heating position, and moving the heating equipment to a proper position for fixing work according to the heating position marked on the surface of the material;
thirdly, heating, namely switching on an external power supply by using an external lead, then switching on a heating device, and starting the device to work to heat the material;
fourthly, detecting the temperature, selecting a proper temperature measuring tool after heating for a period of time, and carrying out temperature detection on the material being heated by using the temperature measuring tool;
step five: stamping the material, selecting proper stamping equipment according to the material of the material, and stamping the material by the stamping equipment;
in the fifth step, fixing equipment, selecting proper stamping equipment, fixing the stamping equipment at a proper position, and stamping the position of the stamping equipment corresponding to the material to be stamped;
secondly, detecting the temperature, and performing secondary temperature measurement on different positions of the material by using a temperature measuring tool before starting stamping to prevent the stamping quality from being influenced by too low or too high temperature;
thirdly, stamping, namely starting stamping equipment to work when the temperature of the material reaches, and then stamping the material;
step six: and cooling the product, namely disassembling the heated and stamped material, putting the material into quenching liquid to cool the product, and performing surface treatment on the cooled product by using surface treatment equipment.
Preferably, in the third step, the material is fixed, in the first step, a clamp is selected, and in the process of selecting the clamp, the clamp capable of rotating according to the processing requirement is selected, so that the two ends of the material can rotate conveniently in the forming process.
Preferably, in step four, the material is heated, and in the first step, the heating tool is selected, and the material specification is selected, and the selected heating tool can perform moving heating work during the use process.
Preferably, in the sixth step, the quenching liquid is made to permeate through the product during the cooling process of the product, so as to prevent the hardness of the product from being inconsistent during the cooling process.
Compared with the prior art, the invention has the following beneficial effects: the forming process of the metal arc plate is widely applied to the field of forming processes of metal arc plates. The invention provides a reasonable forming process, different processing equipment can be used according to different materials in the process of processing an arc-shaped plate, the materials are processed, the influence on the processing efficiency due to the materials of different materials in the processing process is prevented, simultaneously, different quenching liquids are selected to carry out quenching work on a processed product according to the materials of the materials after processing, the hardness of the materials after processing is conveniently improved, the influence on the service time of the product due to the hardness of the materials after the product is processed due to long-time use is prevented, the secondary temperature measurement work is carried out on the heated materials before stamping, meanwhile, the detection work is carried out on different positions of the materials in the temperature measurement process, the influence on the stamping quality due to the inconsistent temperature of the materials in the processing process is prevented, and the waste caused by unqualified products during processing is prevented.
Drawings
Fig. 1 is a flow chart of a forming process of a metal arc plate.
Fig. 2 is a flow chart for cutting a material.
Fig. 3 is a flow chart of a fixation material.
Fig. 4 is a heating material flow chart.
Fig. 5 is a stamping material flow diagram.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
in the figure:
as shown in figures 1 to 5
The forming process of the metal arc plate specifically comprises the following steps:
s101: selecting materials, selecting proper materials according to working requirements, and cleaning the surfaces of the materials;
s102: cutting the material, measuring the material by using measuring equipment according to requirements, and marking the material;
in S102, the material is cut;
s201, selecting a tool, selecting a cutting tool according to a material to be processed, and placing the selected material at a proper position;
s202, aligning the material, after fixing the cutting equipment, aligning the material to enable the cutting position of the material to be aligned, and enabling the cutting position to correspond to the cutting part of the cutting tool;
s203, cutting, after aligning the materials, fixing the materials to be cut by using a tool to prevent the materials from moving in the cutting process and influencing the cutting quality, and then controlling the cutting equipment by external control equipment to cut the materials;
s204, polishing the material, moving the cut material to a proper position, and polishing the surface of the material by using surface treatment equipment;
s103: fixing the material, aligning the measured material, and then clamping and fixing the material by using a tool;
in S103, the material is fixed;
s301, selecting a clamp, selecting a proper clamp according to the specification of the cut material, and fixing two ends of the material;
s302, aligning the materials by using an aligning device in the process of clamping and fixing the materials by using a clamp, and measuring and marking the fixed materials by using a measuring and marking tool;
s303, adjusting the angle of the material, fixing two ends of the material, adjusting the angle of the material after the material is fixed and marked, and adjusting according to the bending requirement of the arc-shaped plate;
s104: heating the material, selecting proper heating equipment, and then heating the material heating part;
in S104, the material is heated;
s401, selecting a heating tool, and selecting appropriate heating equipment according to the material and stamping requirements of the material;
s402, planning a heating position, and moving the heating equipment to a proper position to perform fixing work according to the heating position marked on the surface of the material;
s403, heating, connecting an external power supply by using an external lead, then connecting a heating device with the power supply, starting the device to work, and heating the material;
s404, detecting the temperature, heating for a period of time, selecting a proper temperature measuring tool, and carrying out temperature detection on the heated material by using the temperature measuring tool;
s105: stamping the material, selecting proper stamping equipment according to the material of the material, and stamping the material by the stamping equipment;
in S105, punching the material;
s501, fixing equipment, selecting proper stamping equipment, fixing the stamping equipment at a proper position, and stamping the material corresponding to the stamping equipment at the position needing stamping;
s502, detecting the temperature, and performing secondary temperature measurement on different positions of the material by using a temperature measurement tool before starting stamping to prevent the stamping quality from being influenced by too low or too high temperature;
s503, stamping, starting the stamping equipment to work when the temperature of the material reaches, and then stamping the material;
s106: and cooling the product, namely disassembling the heated and stamped material, putting the material into quenching liquid to cool the product, and performing surface treatment on the cooled product by using surface treatment equipment.
In the process, specifically, in the third step, the material is fixed, in the first step, the clamp is selected, and in the process of selecting the clamp, the clamp capable of rotating according to the processing requirement is selected, so that the two ends of the material can rotate conveniently in the forming process.
In the process, specifically, in the fourth step, the material is heated, and in the first step, a heating tool is selected, the material specification is provided, and the heating tool is selected, and meanwhile, the selected heating tool can be moved and heated in the using process.
In the process, specifically, in the sixth step, the quenching liquid is enabled to permeate through the product in the product cooling process, so that the hardness inconsistency of the product in the cooling process is prevented.
Detailed description of the preferred embodiment
Example (b): in the process of processing the arc-shaped plate, selecting a proper material according to the requirements of a product, processing the surface of the material after selecting the material, selecting a proper cutting work according to the material of the material, aligning the material, placing the aligned material at the cutting position of a cutting tool, cutting, cleaning the surface of the material after cutting, selecting a proper clamp, clamping and fixing the two ends of the cut material by using the selected clamp, aligning the material in the process of fixing the material, adjusting the angle of the material according to the processing requirements, measuring the surface of the material by using a measuring tool, marking the surface of the material while measuring, selecting a heating device after marking the material, and fixing the heating device at a proper position, and correspondingly works with the position of the material to be heated, then heats the material, selects a proper tool to measure the temperature of the material in the heating process, selecting proper stamping equipment in the instant heating process, enabling the stamping equipment to correspond to the stamping position of the material, then using a temperature measuring tool to carry out the temperature measurement of the material, during the temperature measurement, different positions of the material are detected, and if necessary, the heating equipment is moved, heating different positions of the material to prevent the processing quality from being influenced by inconsistent material temperature, then the stamping equipment is used for stamping to make the material form an arc-shaped plate, then the processed product is put into a proper quenching liquid, the quenching work is carried out, the hardness of the product is ensured, and the phenomenon that the service life is influenced due to too low hardness after the quenching die is used for a long time is prevented, so that the arc-shaped plate forming work is completed.
The technical solutions of the present invention or similar technical solutions designed by those skilled in the art based on the teachings of the technical solutions of the present invention are all within the scope of the present invention.

Claims (4)

1. The forming process of the metal arc plate is characterized by comprising the following steps:
the method comprises the following steps: selecting materials, selecting proper materials according to working requirements, and cleaning the surfaces of the materials;
step two: cutting the material, measuring the material by using measuring equipment according to requirements, and marking the material;
in the second step, cutting the material, in the first step, selecting a tool, selecting the cutting tool according to the material to be processed, and placing the selected material at a proper position;
secondly, aligning the material, fixing the cutting equipment, and aligning the material to ensure that the cutting position of the material is aligned and corresponds to the cutting part of the cutting tool;
thirdly, cutting, namely, after the materials are aligned, fixing the materials to be cut by using a tool to prevent the materials from moving in the cutting process and influence on the cutting quality, and then controlling the cutting equipment by external control equipment to cut the materials;
fourthly, polishing the material, moving the cut material to a proper position, and polishing the surface of the material by using surface treatment equipment;
step three: fixing the material, aligning the measured material, and then clamping and fixing the material by using a tool;
in the third step, fixing the material, in the first step, selecting a clamp, selecting a proper clamp according to the specification of the cut material, and fixing two ends of the material;
secondly, aligning the materials, namely aligning the materials by using an aligning device in the process of clamping and fixing the materials by using a clamp, and measuring and marking the fixed materials by using a measuring and marking tool;
thirdly, adjusting the angle of the material, fixing two ends of the material, adjusting the angle of the material after the material is fixed and marked, and adjusting according to the bending requirement of the arc-shaped plate;
step four: heating the material, selecting proper heating equipment, and then heating the material heating part;
heating the material, selecting a heating tool in the first step, and selecting proper heating equipment according to the material of the material and the stamping requirement;
secondly, planning a heating position, and moving the heating equipment to a proper position for fixing work according to the heating position marked on the surface of the material;
thirdly, heating, namely switching on an external power supply by using an external lead, then switching on a heating device, and starting the device to work to heat the material;
fourthly, detecting the temperature, selecting a proper temperature measuring tool after heating for a period of time, and carrying out temperature detection on the material being heated by using the temperature measuring tool;
step five: stamping the material, selecting proper stamping equipment according to the material of the material, and stamping the material by the stamping equipment;
in the fifth step, fixing equipment, selecting proper stamping equipment, fixing the stamping equipment at a proper position, and stamping the position of the stamping equipment corresponding to the material to be stamped;
secondly, detecting the temperature, and performing secondary temperature measurement on different positions of the material by using a temperature measuring tool before starting stamping to prevent the stamping quality from being influenced by too low or too high temperature;
thirdly, stamping, namely starting stamping equipment to work when the temperature of the material reaches, and then stamping the material;
step six: and cooling the product, namely disassembling the heated and stamped material, putting the material into quenching liquid to cool the product, and performing surface treatment on the cooled product by using surface treatment equipment.
2. The process for forming a metal arc plate according to claim 1, wherein the material is fixed in step three, and in the first step, the jig is selected, and in the process of selecting the jig, the jig which can be rotated according to the processing requirements is selected, so that the rotation of both ends of the material is facilitated in the forming process.
3. The process for forming a metal arc according to claim 1, wherein in step four, the material is heated, and in the first step, a heating tool is selected, further comprising a material specification, and the heating tool is selected, and the selected heating tool is moved to perform a heating operation during the use.
4. The process for forming a metal arc plate according to claim 1, wherein in the sixth step, the quenching liquid is allowed to flow over the product during cooling of the product, thereby preventing inconsistency in hardness of the product during cooling.
CN202111645984.5A 2021-12-30 2021-12-30 Forming process of metal arc plate Active CN114210758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111645984.5A CN114210758B (en) 2021-12-30 2021-12-30 Forming process of metal arc plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111645984.5A CN114210758B (en) 2021-12-30 2021-12-30 Forming process of metal arc plate

Publications (2)

Publication Number Publication Date
CN114210758A true CN114210758A (en) 2022-03-22
CN114210758B CN114210758B (en) 2023-08-01

Family

ID=80706891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111645984.5A Active CN114210758B (en) 2021-12-30 2021-12-30 Forming process of metal arc plate

Country Status (1)

Country Link
CN (1) CN114210758B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170125248A (en) * 2016-05-04 2017-11-14 주식회사 새한산업 Equipment for multistep continuous forming material
CN112058984A (en) * 2020-07-28 2020-12-11 深圳新顿科技有限公司 Light alloy plate punch forming process and punching device
CN112613145A (en) * 2020-12-28 2021-04-06 武汉理工大学 Servo hot stamping process design method
CN112756450A (en) * 2020-12-18 2021-05-07 安徽瑞卓汽车部件有限公司 Rapid stamping and shaping process for automobile door frame
CN113399941A (en) * 2021-06-03 2021-09-17 无锡胜鼎智能科技有限公司 Machining method of gearbox shell

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170125248A (en) * 2016-05-04 2017-11-14 주식회사 새한산업 Equipment for multistep continuous forming material
CN112058984A (en) * 2020-07-28 2020-12-11 深圳新顿科技有限公司 Light alloy plate punch forming process and punching device
CN112756450A (en) * 2020-12-18 2021-05-07 安徽瑞卓汽车部件有限公司 Rapid stamping and shaping process for automobile door frame
CN112613145A (en) * 2020-12-28 2021-04-06 武汉理工大学 Servo hot stamping process design method
CN113399941A (en) * 2021-06-03 2021-09-17 无锡胜鼎智能科技有限公司 Machining method of gearbox shell

Also Published As

Publication number Publication date
CN114210758B (en) 2023-08-01

Similar Documents

Publication Publication Date Title
CN101898205A (en) Method for levelling metal plate with stress deformation by utilizing vacuum annealing
CN110396590B (en) Local heat treatment method for large pressure container
CN103639640B (en) A kind of automobile pipeline welding positioning tool
CN104597137A (en) Ultrasonic testing block group for residual stress of aluminum alloy prestretching plate and application method thereof
CN108875113A (en) Fusion penetration prediction and control method and the system of the cross sectional plates that thicken laser welding
CN114210758A (en) Forming process of metal arc-shaped plate
CN206343803U (en) A kind of robot automatic soldering device
CN107254579A (en) A kind of high-temperature alloy steel self-plugging rivet nail set differential annealing method and annealing device
LU102140B1 (en) System and method for testing uniaxial tensile high-temperature mechanical properties of plate
CN106624528B (en) A kind of use for laboratory thermocouple welding platform and welding method
CN204183153U (en) For the tool part of antenna array inner wire welding
CN213080195U (en) Crimping formula motor casing butt joint face milling process anchor clamps
CN210596190U (en) High-frequency induction heating device for thin-wall copper pipe
CN203993816U (en) Handle of a knife
CN112176175A (en) TP347 thick-wall pipeline stabilizing heat treatment method
CN110284136B (en) Laser remanufacturing processing method for automobile stamping die
CN109708937B (en) Inlaying method suitable for products with diameter or thickness smaller than 2mm
CN107617930A (en) A kind of grinding and strengthening layer uniformity improves processing method
CN217832112U (en) Cutting machine of neodymium iron boron product module
CN204817553U (en) Anchor clamps are rectified in cutting board welding
CN218555767U (en) Die steel processing and cutting equipment
CN117139988A (en) Honeycomb sealing vacuum brazing process method for aero-modified gas turbine
CN221304712U (en) Repair device
CN117773298A (en) Spot welding simulation method
CN218262652U (en) Metal plate heat treatment clamping fixture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant