CN114116918B - Digital management method, system, equipment and storage medium for power generation group technical standard - Google Patents

Digital management method, system, equipment and storage medium for power generation group technical standard Download PDF

Info

Publication number
CN114116918B
CN114116918B CN202111397793.1A CN202111397793A CN114116918B CN 114116918 B CN114116918 B CN 114116918B CN 202111397793 A CN202111397793 A CN 202111397793A CN 114116918 B CN114116918 B CN 114116918B
Authority
CN
China
Prior art keywords
technical standard
group technical
equipment
power plant
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111397793.1A
Other languages
Chinese (zh)
Other versions
CN114116918A (en
Inventor
孙玺
杜金刚
单正涛
赵轩
高旭
徐红伟
李崇晟
杜军
赵先进
吴智群
何新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Xian TPRI Power Station Information Technology Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Xian TPRI Power Station Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd, Xian TPRI Power Station Information Technology Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202111397793.1A priority Critical patent/CN114116918B/en
Publication of CN114116918A publication Critical patent/CN114116918A/en
Application granted granted Critical
Publication of CN114116918B publication Critical patent/CN114116918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/28Databases characterised by their database models, e.g. relational or object models
    • G06F16/284Relational databases
    • G06F16/285Clustering or classification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2228Indexing structures
    • G06F16/2246Trees, e.g. B+trees
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the field of data processing, and discloses a method, a system, equipment and a storage medium for managing technical standards of a power generation group, which comprise the steps of acquiring and selecting group technical standard items to be published from a preset group technical standard item library according to the publishing requirement; acquiring a release state of a group technical standard project to be released, acquiring equipment classification and application conditions of the group technical standard project to be released and power plant equipment basic information of each power plant of a power generation group when the release state is not released, and determining a target power plant in each power plant; issuing all target power plants by the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state. The method effectively reduces the carding work of power generation enterprise technicians on a large number of technical standards, facilitates the standard management of the power plants according to the group technical standard project of each target power plant, and avoids the condition of equipment damage caused by nonstandard management.

Description

Digital management method, system, equipment and storage medium for power generation group technical standard
Technical Field
The invention belongs to the field of data processing, and relates to a method, a system, equipment and a storage medium for digitally managing technical standards of a power generation group.
Background
The technical management of the power generation group enterprises is the basis for ensuring the safe operation of equipment, and is an important way for ensuring the implementation of national and industry related technical regulations. Along with the continuous development of the standardized requirements of power generation group enterprise management and the informatization technology, the basic information data of the power plant equipment are more perfect, the business process of the power plant equipment management basically realizes informatization, but the informatization data is not standardized and digitized, the business association is insufficient, the intellectualization is still to be enhanced, and the pushing effect of the informatization technology on the power generation enterprise technology management is not fully exerted.
For example, based on the complexity of a thermal power generation system, the technical standard specifications related to equipment management are thousands, the treaty is more numerous, often one clause corresponds to multiple types of equipment, and even the equipment of the same type is different in standard content in different models, so that the working project establishment and result evaluation difference of the equipment management of a power plant are larger due to the fact that field personnel understand the technical standard specifications differently, and the implementation effect of the technical standard specifications in power generation group enterprises is affected.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a power generation group technical standard management method, a system, equipment and a storage medium.
In order to achieve the purpose, the invention is realized by adopting the following technical scheme:
in a first aspect of the present invention, a method for digitally managing a power generation group technical standard includes the steps of:
s1: acquiring and selecting a group technical standard item to be published from a preset group technical standard item library according to the publishing requirement;
s2: acquiring a release state of a group technical standard project to be released, and performing S3 when the release state is not released; ending when the release state is released;
s3: acquiring equipment classification and applicable conditions of a group technical standard project to be issued and power plant equipment basic information of each power plant of a power generation group;
s4: traversing the basic information of power plant equipment of each power plant according to the equipment classification of the group technical standard project to be released, and acquiring the basic information of equipment classification which is the same as the equipment classification in the group technical standard project to be released in each power plant, thereby acquiring a plurality of target equipment basic information;
s5: sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be released, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be released, taking the power plant to which the basic information of the current target device belongs as a target power plant;
s6: issuing all target power plants by the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
Optionally, the group technical standard items comprise equipment classification, item names, item contents, applicable conditions, item periods, reference standards, associated test report templates and associated equipment state indexes.
Optionally, the device classification adopts a tree structure to classify, and the tree structure comprises four layers of classification information, wherein the first layer is professional information, the second layer is device main classification information, the third layer is device sub-classification information, and the fourth layer is device type information.
Optionally, the power plant equipment basic information comprises equipment basic information of each equipment in the power plant; the device base information includes management information and a technical parameter template for each parameter of the device.
Optionally, the management information includes a power plant, a unit name, a department name, a professional name, an equipment owner, equipment classification, a manufacturer, a specification model, a delivery date and a commissioning date; the technical parameter template comprises a parameter name, a unit parameter value list, a unit and an input type.
Optionally, the applicable conditions of the group technical standard project to be published include: the device classification of the group technical standard project to be issued corresponds to parameter name definition and/or parameter value range definition of the technical parameter template of the device.
Optionally, the preset group technical standard project library comprises a regular operation project library, a regular maintenance project library, a inspection project library, a spot inspection project library and an operation parameter and index monitoring project library.
The invention relates to a power generation group technical standard management system, which comprises a first acquisition module, a state determination module, a second acquisition module, a third acquisition module, a checking module and a release module:
the first acquisition module is used for acquiring and selecting group technical standard items to be published from a preset group technical standard item library according to the publishing requirements;
the state determining module is used for acquiring the release state of the group technical standard project to be released, and triggering the second acquiring module when the release state is not released; ending when the release state is released;
the second acquisition module is used for acquiring equipment classification and applicable conditions of the technical standard project of the group to be issued and power plant equipment basic information of each power plant of the power generation group;
the third acquisition module is used for traversing the basic information of the power plant equipment of each power plant according to the equipment classification of the group technical standard item to be released, acquiring the basic information of the equipment classification which is the same as the equipment classification in the group technical standard item to be released in each power plant, and acquiring a plurality of target equipment basic information;
the checking module is used for sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be issued, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be issued, the power plant to which the basic information of the current target device belongs is the target power plant;
the issuing module is used for issuing all target power plants with the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
In a third aspect of the present invention, a computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the power generation group technical standard management method described above when the computer program is executed.
In a fourth aspect of the present invention, a computer readable storage medium stores a computer program which, when executed by a processor, implements the steps of the power generation group technical standard management method as described above.
Compared with the prior art, the invention has the following beneficial effects:
according to the power generation group technical standard management method, management of all group technical standard items is achieved based on a preset group technical standard item library, further, the group technical standard items to be released are obtained according to release requirements, whether release is carried out or not is determined based on release states of the group technical standard items to be released, when release is needed, a power plant to be released is determined according to equipment classification and applicable conditions of the group technical standard items to be released and power plant equipment basic information of all power plants of the power generation group, and all group technical standard items to be released are issued to serve as technical standard items of all target power plants, so that standard management of the power plants is carried out according to the group technical standard items of all target power plants, and equipment damage caused by non-standard management is avoided. The method effectively reduces the carding work of technicians of power generation enterprises on a large number of technical standards, avoids the gap between standard floor execution content and effect caused by the difference of the technicians, can complement technical short plates, realizes standardization, standardization and intellectualization of technical management work of power plants under power generation groups, and integrally improves the technical management level of basic-level enterprises of the power generation groups.
Drawings
FIG. 1 is a flow chart of a power generation group technical standard management method of the present invention;
FIG. 2 is a schematic diagram of the content of a group technology standard project according to the present invention;
FIG. 3 is a schematic diagram of classification of a group technical standard project library according to the present invention;
FIG. 4 is a flow chart of an application process of the present invention;
FIG. 5 is a schematic diagram of the association relationship among the group technical standard project library, the equipment state indexes and the test report templates;
FIG. 6 is a flow chart of the issuing of the group technical standard item of the present invention;
FIG. 7 is a schematic illustration of technical standard project content of a power plant of the present invention.
Detailed Description
In order that those skilled in the art will better understand the present invention, a technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in which it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present invention without making any inventive effort, shall fall within the scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and the claims of the present invention and in the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate such that the embodiments of the invention described herein may be implemented in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The invention is described in further detail below with reference to the attached drawing figures:
referring to fig. 1, in an embodiment of the present invention, a method for managing technical standards of a power generation group is provided, by using expert knowledge to decompose and reconstruct relevant technical standards and specifications of power generation from the view point of operation, overhaul and maintenance field service of power plant equipment, with equipment as a center, to form an equipment management service rule that can be directly executed by power plant personnel, so as to facilitate power plant execution, and meanwhile, by combining with an informatization means, pushing of technical standard items of the group is realized, and standardization, standardization and intellectualization of technical management work of the power plant equipment are realized.
Specifically, the technical standard management method of the power generation group comprises the following steps:
s1: and acquiring and selecting the group technical standard items to be published from a preset group technical standard item library according to the publishing requirements.
S2: acquiring a release state of a group technical standard project to be released, and performing S3 when the release state is not released; when the release status is released, the method is finished.
S3: and acquiring equipment classification and applicable conditions of the technical standard project of the group to be issued and power plant equipment basic information of each power plant of the power generation group.
S4: according to the equipment classification of the group technical standard project to be released, traversing the power plant equipment basic information of each power plant, and acquiring the equipment basic information of the equipment classification which is the same as the equipment classification in the group technical standard project to be released in each power plant, thereby acquiring a plurality of target equipment basic information.
S5: and sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be released, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be released, taking the power plant to which the basic information of the current target device belongs as the target power plant.
S6: issuing all target power plants by the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
Optionally, referring to fig. 2, the group technology standard items include a device classification, a project name, a project content, a applicable condition, a project period, a reference standard, an associated test report template, and an associated device status index.
The equipment classification adopts a tree structure to classify, specifically, equipment of each power plant is classified according to professional attributes, technical characteristics, parameter characteristics and the like of the power plant, the equipment classification comprises four layers of classification information, wherein the first layer is professional information, the second layer is equipment main classification information, the third layer is equipment sub-classification information, and the fourth layer is equipment type information.
The reference standard may be in the form of a technical parameter template, specifically, for each specific device under each device classification, define its technical specification in terms of overall life cycle management, list "parameter name", "unit parameter value list", "unit" and "input type" to form the technical parameter template, where the input type is classified into "input type", "option type", and if the parameter is "option type", the parameter selection value needs to be maintained. The reference standard can be obtained by inputting the reference data into the technical parameter template.
Wherein, the related test report template and the related equipment state index refer to the test report template and the equipment state index contained in the group technical standard project. Specifically, the important indexes in the group technical standard items are digitized into equipment state indexes to form a group equipment state index library, wherein the equipment state indexes mainly comprise index codes, index descriptions, index units, index values, index alarm values and index metadata information, and specific equipment state indexes in the group equipment state index library are associated according to the equipment state indexes contained in the group technical standard items during association. Meanwhile, in order to standardize and report the test report, the equipment state indexes contained in the group technical standard project are organized into a standard format to form a standardized test report template, so that basic staff can fill in conveniently, and meanwhile, data extraction is facilitated; the test report template is internally provided with an algorithm formula, so that the equipment state index can be calculated, the equipment state index threshold value is set, and alarm reminding can be carried out.
Optionally, the power plant equipment basic information comprises equipment basic information of each equipment in the power plant; the device base information includes management information and a technical parameter template for each parameter of the device. The management information comprises a power plant, a unit name, a department name, a professional name, an equipment owner, equipment classification, a manufacturer, a specification model, a delivery date and a commissioning date; the technical parameter template comprises a parameter name, a unit parameter value list, a unit and an input type.
Specifically, equipment basic information of each power plant is created according to equipment classification and a technical parameter template by collecting equipment basic information data of each power plant subordinate to the group. Generally, the device basic information includes management information and technical parameter information. The management information includes the power plant, the unit name, the department name, the professional name, the equipment owner, the equipment classification, the manufacturer, the specification model, the delivery date and the commissioning date. After the equipment classification is selected, each technical parameter template corresponding to the equipment classification is determined, and the parameter value and unit of the corresponding parameter name in the technical parameter template are filled in.
Optionally, the applicable conditions of the group technical standard project to be published include: the device classification of the group technical standard project to be issued corresponds to parameter name definition and/or parameter value range definition of the technical parameter template of the device. Specifically, the applicable conditions of each group technical standard project include the parameter names and the parameter value ranges in the technical parameter templates corresponding to the equipment classification of the group technical standard project, and may be a combination of a plurality of parameter limiting conditions.
Optionally, referring to fig. 3, the preset group technology standard project library includes a running periodic work project library, a periodic maintenance work project library, a maintenance project library, a inspection project library, and a running parameter and index monitoring project library.
Specifically, technical experts are used for carrying out structuring and digital processing on technical standards, a group technical standard project library is established, and the group technical standard project library is divided into five types according to the business property of power plant work, so that the management of each group technical standard project, the creation of new group technical standard project and the inquiry of specific group technical standard project are facilitated.
In summary, the method for managing the technical standards of the power generation group of the invention realizes the management of each group technical standard item based on the preset group technical standard item library, further obtains the group technical standard item to be released according to the release requirement, determines whether to release or not based on the release state of the group technical standard item to be released, and when release is required, determines the power plant to be released and issues each target power plant as the technical standard item of each target power plant according to the equipment classification and the applicable condition of the group technical standard item to be released and the basic information of the power plant equipment of each power plant of the power generation group, so that the power plant specification management of each target power plant according to the group technical standard item is convenient, and the condition that the equipment is damaged due to the management non-specification is avoided. The method effectively reduces the carding work of technicians of power generation enterprises on a large number of technical standards, avoids the gap between standard floor execution content and effect caused by the difference of the technicians, can complement technical short plates, realizes standardization, standardization and intellectualization of technical management work of power plants under power generation groups, and integrally improves the technical management level of basic-level enterprises of the power generation groups.
Referring to fig. 4, the power generation group technical standard management method of the present invention will be described with reference to a specific application process.
1. And establishing a device classification system.
A scientific and reasonable equipment classification system is established in the power generation group, and classification is carried out by adopting a tree structure according to professional attributes, technical characteristics, parameter characteristics and the like of the thermal power plant as shown in table 1, and the classification is divided into four layers: the first layer is professional and totally comprises 8 types of professional and 1 type general equipment; the 8 classes of professions are electric primary, electric secondary, steam turbine, boiler, thermal control, environmental protection, fuel and water conversion. The second layer is the equipment main classification, such as a steam turbine system, a boiler system, a generator system, a booster station system, a relay protection, measurement and control device, a control system and the like. The third layer is a device sub-classification, which is the next layer of refined classification of the device main classification, for example, the device sub-classification is divided into the following sub-classifications under the classification of a generator system: generator equipment, generator accessories, and the like. The fourth layer is a specific device category under the above classification, such as the generator device is subdivided into: synchronous generators, diesel generators, and the like.
Table 1 device class example table
2. And (6) establishing a technical parameter template system.
Technical parameter templates for device classification are established in the group scope, for example: the technical parameter templates of the generator are shown in table 2.
Table 2 synchronous generator technical parameter template
Name of the name Belonging to electric power plant Machine set name Department name Professional name Device owner Device classification Manufacturing factories
Name of the name Specification and model Delivery date Operation date
Name of the name Number of phases Efficiency of Rated capacity Rated power Rated frequency Rated voltage Rated current
Unit (B) MVA MW Hz kV A
Name of the name Rated rotational speed Power factor Rated exciting voltage Rated exciting current Cooling mode Nominal hydrogen pressure Rated water pressure
Unit (B) r/min V A MPa MPa
The type of entry of the cooling mode in the technical parameters in table 2 is an option type, the contents of the options are full hydrogen cooling, water hydrogen, air cooling and double water internal cooling, and the other technical parameters are entry type.
3. And establishing basic information of power plant equipment.
Basic information of each power plant equipment is collected according to equipment technical parameter templates, such as the collected technical parameters of the A power plant #1 generator shown in table 3.
Table 3A technical parameter table for Power plant #1 Generator
4. And establishing a group technical standard project library.
The group technical standard project library is divided into five types, namely an operation periodic work project library, a periodic maintenance work project library, a maintenance project library, a inspection project library, an operation parameter and index monitoring project library. The following describes a technique standard digitization technique by taking a hydrogen leakage test of a generator operating periodically.
1. And establishing main information of the group technical standard project.
Through the digestion understanding of technical standards, laws and regulations by power generation technical experts, the technical standards are structured and digitized with equipment as a center from the perspective of power plant equipment management service personnel, and the main information of the synchronous generator hydrogen leakage test is shown in table 4.
TABLE 4 Main information Table of group technical Standard project
2. Device status index definition and device status index threshold settings.
And further refining the required equipment state index and the equipment state index threshold according to the content of main information of the synchronous generator hydrogen leakage test. The device status index definition mainly includes "index code", "index name", "index unit". The device state index threshold is classified into "high-limit primary", "high-limit secondary", "high-limit tertiary", "low-limit primary", "low-limit secondary", "low-limit tertiary", as shown in table 5.
TABLE 5 State index information table of generator hydrogen leakage test equipment
Further defining the threshold value of the state index of the equipment, the higher the alarm level is, the more serious. When the rated hydrogen pressure of the water hydrogen generator is less than or equal to 0.3 and less than 0.4, the alarm value is shown in Table 6.
TABLE 6 Hydrogen leakage alarm value setting TABLE 1
Index name Unit (B) High limit primary High limit secondary stage High-limit three-stage Low limit first level Low limit secondary stage Low-limit three-stage
Hydrogen leakage amount m 3 14.5
When the rated hydrogen pressure of the water hydrogen generator is less than or equal to 0.4 and less than 0.5, the alarm value is shown in table 7.
TABLE 7 Hydrogen leakage alarm value setting TABLE 2
Index name Unit (B) High limit primary High limit secondary stage High-limit three-stage Low limit first level Low limit secondary stage Low-limit three-stage
Hydrogen leakage amount m 3 16
3. Creating a test report template.
In order to standardize and report the test report, the equipment state indexes are organized into a standard format to form a standardized group test report template, so that basic staff can fill in conveniently, and meanwhile, data extraction is facilitated; and an algorithm formula is built in the test report, a test result is automatically calculated, and alarm reminding is carried out according to an index threshold value. For example, the report templates of the hydrogen leakage test of the group generator are shown in Table 8.
Table 8 report template table for hydrogen leakage test of group generator
4. And establishing a group technical standard project library, equipment state indexes and test report template association relation.
Referring to fig. 5, an association relationship among a group technical standard project library, an equipment state index and a test report template is established, the group technical standard project is associated with the equipment state index and the test report template, and the equipment state index is associated with the test report template.
5. The issuing of the group technical standard items in the group technical standard item library, see fig. 6, comprises the following specific processes:
1) A data list of the group technical standard project library is obtained, a group technical standard project of the project library is read, for example, data of a group technical standard project library number W001YX00001 is obtained, see table 4.
2) Judging whether the state of the group technical standard project library is 'unpublished', if so, carrying out 3), otherwise, returning to 1). For example, the acquisition group technology standard project library number "W001YX00001" data state is not "unpublished".
3) The equipment classification corresponding to the group technical standard item in the group technical standard item library is obtained, for example, the equipment classification corresponding to the group technical standard item library 'W001 YX 00001' is a 'synchronous generator'. Acquiring a power plant list in a group, selecting a device list and device technical parameters of a first household electrical appliance plant such as a device classified into a synchronous generator under the power plant A, and inquiring the technical parameter cooling mode of the power plant A #1 generator: hydrohydrogen "," nominal hydrogen pressure: 0.31MPa ", as shown in Table 3.
4) And (3) comparing whether the technical parameters of the equipment meet the requirement of the "applicable conditions" in the project library W001YX00001 of the group technical standard, for example, if the generator of the power plant #1 meets the requirement of the "applicable conditions" of the project library W001YX00001, carrying out 5), otherwise, returning to 3) acquiring the next data of the generator of the power plant #2 of the equipment list under the condition that the equipment of the power plant A is classified as the synchronous generator, and comparing the applicable conditions of the project library W001YX 00001.
5) And (3) creating a power plant group technical standard project by using equipment suitable for condition screening of the group project library, and associating the power plant group technical standard project with the group technical standard project library. For example, "A plant #1 generator" automatically creates plant project library data, numbered "W105YX00001", by screening the group technical standard project library "W001YX00001" for "applicable conditions", as shown in Table 9.
6) Whether all the basic information of the equipment of all the power plants under the corresponding equipment classification of the group project library is traversed or whether the currently acquired basic information of the power plant equipment is the last equipment of the last power plant, if yes, 7) is carried out, if no, 1) is returned, and the next household appliance equipment data is acquired. In the example, the method returns to 1) and reads the data of the synchronous generator of the next B power plant to carry out the comparison of the applicable conditions.
7) Whether the clique technical standard project library data has been traversed, if yes, go to 8), if no return to 1).
8) Whether the acquired current group technical standard project is the last piece of data in the group technical standard project which is not issued in the project, if yes, the issuing is finished, and if no, the method returns to 1).
6. A pool of power plant group technical standard projects is created.
After the distribution flow of the group technical standard project library, a power plant group technical standard project library is created, and referring to fig. 7, the main content of the power plant group technical standard project library is shown. The technical standard project library of the generator group A power plant #1 in this example is shown in Table 9.
Table 9A Power plant #1 Generator group technical Standard project library Table
Meanwhile, the equipment state index threshold and the test report template which are related to the group technical standard project of the power generation group are also suitable for the technical standard project of the power plant, and the equipment state index and the test report template of the power plant A are generated and are related to the group technical standard project of the power plant #1 generator A.
The following are device embodiments of the present invention that may be used to perform method embodiments of the present invention. For details not disclosed in the apparatus embodiments, please refer to the method embodiments of the present invention.
In still another embodiment of the present invention, a power generation group technical standard management system is provided, which can be used to implement the above-mentioned power generation group technical standard management method, and specifically, the power generation group technical standard management system includes a first acquisition module, a state determination module, a second acquisition module, a third acquisition module, a verification module, and a release module.
The first acquisition module is used for acquiring and selecting a group technical standard item to be published from a preset group technical standard item library according to the publishing requirement; the state determining module is used for acquiring the release state of the group technical standard project to be released, and triggering the second acquiring module when the release state is not released; ending when the release state is released; the second acquisition module is used for acquiring equipment classification and applicable conditions of the technical standard project of the group to be issued and power plant equipment basic information of each power plant of the power generation group; the third acquisition module is used for traversing the basic information of the power plant equipment of each power plant according to the equipment classification of the group technical standard item to be released, acquiring the basic information of the equipment classification which is the same as the equipment classification in the group technical standard item to be released in each power plant, and acquiring a plurality of target equipment basic information; the checking module is used for sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be issued, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be issued, the power plant to which the basic information of the current target device belongs is the target power plant; the issuing module is used for issuing all target power plants with the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
All relevant contents of each step related to the foregoing embodiment of the power generation group technical standard management method may be cited to the functional description of the functional module corresponding to the power generation group technical standard management system in the embodiment of the present invention, which is not described herein.
The division of the modules in the embodiments of the present invention is schematically only one logic function division, and there may be another division manner in actual implementation, and in addition, each functional module in each embodiment of the present invention may be integrated in one processor, or may exist separately and physically, or two or more modules may be integrated in one module. The integrated modules may be implemented in hardware or in software functional modules.
In yet another embodiment of the present invention, a computer device is provided that includes a processor and a memory for storing a computer program including program instructions, the processor for executing the program instructions stored by the computer storage medium. The processor may be a central processing unit (Central Processing Unit, CPU), but may also be other general purpose processors, digital signal processors (Digital Signal Processor, DSP), application specific integrated circuits (Application Specific Integrated Circuit, ASIC), off-the-shelf Programmable gate arrays (FPGAs) or other Programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc., which are the computational core and control core of the terminal adapted to implement one or more instructions, in particular adapted to load and execute one or more instructions within a computer storage medium to implement the corresponding method flow or corresponding functions; the processor provided by the embodiment of the invention can be used for the operation of the standard management method of the power generation group technology.
In yet another embodiment of the present invention, a storage medium, specifically a computer readable storage medium (Memory), is a Memory device in a computer device, for storing a program and data. It is understood that the computer readable storage medium herein may include both built-in storage media in a computer device and extended storage media supported by the computer device. The computer-readable storage medium provides a storage space storing an operating system of the terminal. Also stored in the memory space are one or more instructions, which may be one or more computer programs (including program code), adapted to be loaded and executed by the processor. The computer readable storage medium herein may be a high-speed RAM memory or a non-volatile memory (non-volatile memory), such as at least one magnetic disk memory. One or more instructions stored in a computer-readable storage medium may be loaded and executed by a processor to implement the corresponding steps of the power generation group technology standard management method in the above embodiments.
It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical aspects of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the above embodiments, it should be understood by those of ordinary skill in the art that: modifications and equivalents may be made to the specific embodiments of the invention without departing from the spirit and scope of the invention, which is intended to be covered by the claims.

Claims (10)

1. The digital management method for the technical standard of the power generation group is characterized by comprising the following steps of:
s1: acquiring and selecting a group technical standard item to be published from a preset group technical standard item library according to the publishing requirement;
s2: acquiring a release state of a group technical standard project to be released, and performing S3 when the release state is not released; ending when the release state is released;
s3: acquiring equipment classification and applicable conditions of a group technical standard project to be issued and power plant equipment basic information of each power plant of a power generation group;
s4: traversing the basic information of power plant equipment of each power plant according to the equipment classification of the group technical standard project to be released, and acquiring the basic information of equipment classification which is the same as the equipment classification in the group technical standard project to be released in each power plant, thereby acquiring a plurality of target equipment basic information;
s5: sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be released, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be released, taking the power plant to which the basic information of the current target device belongs as a target power plant;
s6: issuing all target power plants by the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
2. The power generation group technical standard management method according to claim 1, wherein the group technical standard items include equipment classification, item names, item contents, applicable conditions, item periods, reference standards, association test report templates, and associated equipment status indexes.
3. The power generation group technical standard management method according to claim 2, wherein the device classification adopts a tree structure to perform classification form, and comprises four layers of classification information, wherein the first layer is professional information, the second layer is device main classification information, the third layer is device sub-classification information, and the fourth layer is device type information.
4. The power generation group technical standard management method according to claim 1, wherein the power plant equipment basic information comprises equipment basic information of each equipment in a power plant; the device base information includes management information and a technical parameter template for each parameter of the device.
5. The power generation group technical standard management method according to claim 4, wherein the management information includes a power plant to which the management information belongs, a unit name, a department name, a professional name, an equipment owner, an equipment classification, a manufacturer, a specification model, a delivery date, and a commissioning date; the technical parameter template comprises a parameter name, a unit parameter value list, a unit and an input type.
6. The power generation group technical standard management method according to claim 1, wherein the applicable conditions of the group technical standard project to be issued include: the device classification of the group technical standard project to be issued corresponds to parameter name definition and/or parameter value range definition of the technical parameter template of the device.
7. The method of claim 1, wherein the predetermined group technical standard project library comprises a periodic operation project library, a periodic maintenance project library, a inspection project library, and an operation parameter and index monitoring project library.
8. The power generation group technical standard management system is characterized by comprising a first acquisition module, a state determination module, a second acquisition module, a third acquisition module, a checking module and a release module:
the first acquisition module is used for acquiring and selecting group technical standard items to be published from a preset group technical standard item library according to the publishing requirements;
the state determining module is used for acquiring the release state of the group technical standard project to be released, and triggering the second acquiring module when the release state is not released; ending when the release state is released;
the second acquisition module is used for acquiring equipment classification and applicable conditions of the technical standard project of the group to be issued and power plant equipment basic information of each power plant of the power generation group;
the third acquisition module is used for traversing the basic information of the power plant equipment of each power plant according to the equipment classification of the group technical standard item to be released, acquiring the basic information of the equipment classification which is the same as the equipment classification in the group technical standard item to be released in each power plant, and acquiring a plurality of target equipment basic information;
the checking module is used for sequentially checking whether the basic information of each target device accords with the applicable conditions of the group technical standard project to be issued, and when the basic information of the current target device accords with the applicable conditions of the group technical standard project to be issued, the power plant to which the basic information of the current target device belongs is the target power plant;
the issuing module is used for issuing all target power plants with the group technical standard items to be issued as the technical standard items of all the target power plants, and changing the issuing state of the group technical standard items to be issued into issued state.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that the processor implements the steps of the power generation group technical standard management method of any one of claims 1 to 7 when the computer program is executed.
10. A computer-readable storage medium storing a computer program, wherein the computer program when executed by a processor implements the steps of the power generation group technical standard management method according to any one of claims 1 to 7.
CN202111397793.1A 2021-11-23 2021-11-23 Digital management method, system, equipment and storage medium for power generation group technical standard Active CN114116918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111397793.1A CN114116918B (en) 2021-11-23 2021-11-23 Digital management method, system, equipment and storage medium for power generation group technical standard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111397793.1A CN114116918B (en) 2021-11-23 2021-11-23 Digital management method, system, equipment and storage medium for power generation group technical standard

Publications (2)

Publication Number Publication Date
CN114116918A CN114116918A (en) 2022-03-01
CN114116918B true CN114116918B (en) 2024-03-01

Family

ID=80440201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111397793.1A Active CN114116918B (en) 2021-11-23 2021-11-23 Digital management method, system, equipment and storage medium for power generation group technical standard

Country Status (1)

Country Link
CN (1) CN114116918B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7089203B1 (en) * 1999-06-04 2006-08-08 Crookshanks Rex J Building construction bid and contract management system, internet-based method and computer program therefor
KR20140124475A (en) * 2013-04-17 2014-10-27 노영희 An automatic project selection, distribution and management system in on-line enviroment and the method using the system.
CN107766457A (en) * 2017-09-27 2018-03-06 华能国际电力股份有限公司上海石洞口第二电厂 A kind of thermal power plant's operation management system and its task executing method
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM
CN109978513A (en) * 2019-04-17 2019-07-05 新地能源工程技术有限公司 Obtain method and apparatus, project task management equipment and the medium of technical standard
WO2019184120A1 (en) * 2018-03-29 2019-10-03 平安科技(深圳)有限公司 Account management method and apparatus, terminal device, and storage medium
CN112529131A (en) * 2021-02-18 2021-03-19 国能信控互联技术有限公司 Equipment full production cycle management system based on three-dimensional visualization for power plant
CN113469496A (en) * 2021-05-31 2021-10-01 北京中挥科技有限公司 Petrochemical engineering digital delivery process control method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020143782A1 (en) * 2001-03-30 2002-10-03 Intertainer, Inc. Content management system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7089203B1 (en) * 1999-06-04 2006-08-08 Crookshanks Rex J Building construction bid and contract management system, internet-based method and computer program therefor
KR20140124475A (en) * 2013-04-17 2014-10-27 노영희 An automatic project selection, distribution and management system in on-line enviroment and the method using the system.
CN107766457A (en) * 2017-09-27 2018-03-06 华能国际电力股份有限公司上海石洞口第二电厂 A kind of thermal power plant's operation management system and its task executing method
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM
WO2019184120A1 (en) * 2018-03-29 2019-10-03 平安科技(深圳)有限公司 Account management method and apparatus, terminal device, and storage medium
CN109978513A (en) * 2019-04-17 2019-07-05 新地能源工程技术有限公司 Obtain method and apparatus, project task management equipment and the medium of technical standard
CN112529131A (en) * 2021-02-18 2021-03-19 国能信控互联技术有限公司 Equipment full production cycle management system based on three-dimensional visualization for power plant
CN113469496A (en) * 2021-05-31 2021-10-01 北京中挥科技有限公司 Petrochemical engineering digital delivery process control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
发电集团公司技术监督信息管控平台的开发及应用;李彭;;内蒙古电力技术;20121228(06);全文 *
建筑集团工程项目管控信息化实现;巢良存;姜慧;;电脑知识与技术;20180705(19);全文 *

Also Published As

Publication number Publication date
CN114116918A (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN107402976B (en) Power grid multi-source data fusion method and system based on multi-element heterogeneous model
CN103337012B (en) Towards the multi-threaded intelligent comprehensive alert analysis method of grid equipment monitoring
CN102799789B (en) The main equipment model foundation of a kind of hydraulic power plant, storage and synchronous method
CN109885019B (en) Automatic fan state judgment method
CN111507001A (en) Method and system for calculating construction cost of power transformation project, readable storage medium and computer
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN116303391A (en) Processing method for remote transmission of electric energy time sequence data by intelligent ammeter
CN110535131B (en) Hierarchical consumption early warning method based on scene analysis and safety constraint economic dispatching
CN109740223B (en) Auxiliary drawing method for direct-current power supply system of transformer substation
CN114116918B (en) Digital management method, system, equipment and storage medium for power generation group technical standard
CN111894798B (en) Method and system for determining running state of fan
CN111078731A (en) Hbase-based power grid operation data collaborative query method and device and storage medium
CN114049082A (en) Power grid technical improvement overhaul cost data structuring method
CN110287279B (en) Method for converting unstructured log report into structured system report
CN113937774A (en) Power supply grid-related protection checking method and system
CN112783862A (en) Data modeling method, system, equipment and storage medium for regulating and controlling cloud application
CN102902891B (en) A kind of intellectualized algorithm library model for protective relaying device
CN112532432A (en) Automatic mapping method and system based on LTU terminal
CN113094516A (en) Multi-source data fusion-based power grid monitoring field knowledge graph construction method
CN110660002B (en) Method and device for determining failure rate curve of component of wind generating set
CN113541600B (en) Method, system, equipment and storage medium for judging branch fault of photovoltaic power station
CN114421469B (en) Method for identifying and counting peak regulation frequency of steam turbine generator under deep peak regulation working condition
CN117435779A (en) Grammar rule-based power grid monitoring object calculation method and device and electronic equipment
CN111310855B (en) Multi-data source planning state data fusion method based on MapReduce
CN115796489A (en) Security-constrained economic scheduling optimization engine method, system, device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant