CN114049427B - VR scene-based intelligent substation secondary circuit information roaming method - Google Patents
VR scene-based intelligent substation secondary circuit information roaming method Download PDFInfo
- Publication number
- CN114049427B CN114049427B CN202111253586.9A CN202111253586A CN114049427B CN 114049427 B CN114049427 B CN 114049427B CN 202111253586 A CN202111253586 A CN 202111253586A CN 114049427 B CN114049427 B CN 114049427B
- Authority
- CN
- China
- Prior art keywords
- secondary circuit
- transformer substation
- scene
- roaming
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 208000033897 Systemic primary carnitine deficiency Diseases 0.000 claims abstract description 9
- 208000016505 systemic primary carnitine deficiency disease Diseases 0.000 claims abstract description 9
- 238000013507 mapping Methods 0.000 claims abstract description 6
- 239000010410 layer Substances 0.000 claims description 11
- 239000000835 fiber Substances 0.000 claims description 8
- 230000003287 optical effect Effects 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 4
- 210000004709 eyebrow Anatomy 0.000 claims description 3
- 230000004927 fusion Effects 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 239000002356 single layer Substances 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 230000006870 function Effects 0.000 abstract description 2
- 238000007689 inspection Methods 0.000 abstract description 2
- 238000012549 training Methods 0.000 abstract description 2
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/003—Navigation within 3D models or images
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111253586.9A CN114049427B (en) | 2021-10-27 | 2021-10-27 | VR scene-based intelligent substation secondary circuit information roaming method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111253586.9A CN114049427B (en) | 2021-10-27 | 2021-10-27 | VR scene-based intelligent substation secondary circuit information roaming method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114049427A CN114049427A (en) | 2022-02-15 |
CN114049427B true CN114049427B (en) | 2024-04-30 |
Family
ID=80206056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111253586.9A Active CN114049427B (en) | 2021-10-27 | 2021-10-27 | VR scene-based intelligent substation secondary circuit information roaming method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114049427B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115953264B (en) * | 2022-10-20 | 2023-09-22 | 中国能源建设集团江苏省电力设计院有限公司 | Screen cabinet model integrated design system and fault judgment method based on three-dimensional modeling |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107346917A (en) * | 2017-08-10 | 2017-11-14 | 嘉兴恒创电力设计研究院有限公司 | Secondary device based on virtual machine integrates joint debugging method |
CN109756030A (en) * | 2019-01-25 | 2019-05-14 | 国网河北省电力有限公司电力科学研究院 | A kind of intelligent substation secondary circuit visualization on-line monitoring and intelligent O&M method |
CN110750910A (en) * | 2019-10-25 | 2020-02-04 | 国网新疆电力有限公司经济技术研究院 | Three-dimensional model file of physical loop model and configuration method |
CN110795609A (en) * | 2019-10-28 | 2020-02-14 | 国网新疆电力有限公司经济技术研究院 | Three-dimensional visualization method for secondary system of transformer substation |
CN112347612A (en) * | 2020-10-19 | 2021-02-09 | 国网江苏省电力有限公司检修分公司 | Direct current converter station secondary system physical loop modeling method and system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106374439B (en) * | 2016-09-29 | 2019-02-12 | 北京东土科技股份有限公司 | Software definition implementation method based on intelligent substation Protection control system |
-
2021
- 2021-10-27 CN CN202111253586.9A patent/CN114049427B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107346917A (en) * | 2017-08-10 | 2017-11-14 | 嘉兴恒创电力设计研究院有限公司 | Secondary device based on virtual machine integrates joint debugging method |
CN109756030A (en) * | 2019-01-25 | 2019-05-14 | 国网河北省电力有限公司电力科学研究院 | A kind of intelligent substation secondary circuit visualization on-line monitoring and intelligent O&M method |
CN110750910A (en) * | 2019-10-25 | 2020-02-04 | 国网新疆电力有限公司经济技术研究院 | Three-dimensional model file of physical loop model and configuration method |
CN110795609A (en) * | 2019-10-28 | 2020-02-14 | 国网新疆电力有限公司经济技术研究院 | Three-dimensional visualization method for secondary system of transformer substation |
CN112347612A (en) * | 2020-10-19 | 2021-02-09 | 国网江苏省电力有限公司检修分公司 | Direct current converter station secondary system physical loop modeling method and system |
Non-Patent Citations (2)
Title |
---|
基于VR的变电站智能巡检场景研究;刚毅凝;王东东;李巍;王鸥;;海峡科技与产业;20171115(11);全文 * |
高旭 ; 于庆广 ; 马迎新 ; 汤小兵 ; .基于图论深度遍历算法的智能变电站光纤虚实回路对应方法研究.电测与仪表.(02),全文. * |
Also Published As
Publication number | Publication date |
---|---|
CN114049427A (en) | 2022-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202230635U (en) | Transformer substation inspection robot simulation system based on virtual reality technology | |
CN111382214B (en) | Comprehensive pipe rack operation and maintenance management system based on 3DGIS BIM | |
CN113011723B (en) | Remote equipment maintenance system based on augmented reality | |
CN111222190B (en) | Ancient building management system | |
CN108984832B (en) | Method and system for loading BIM model by utilizing Unity3D in intelligent building operation and maintenance | |
CN106600688A (en) | Virtual reality system based on three-dimensional modeling technology | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN107391984A (en) | A kind of electric operating processing method and system | |
CN112347639B (en) | Three-dimensional panoramic visualization display method for secondary system of converter station | |
CN112288872A (en) | Remote three-dimensional display method and device for operation data of substation cubicle and storage medium | |
CN114049427B (en) | VR scene-based intelligent substation secondary circuit information roaming method | |
CN102495598B (en) | System and method for monitoring battery charging and replacing station of electric vehicle based on virtual reality technology | |
CN111127974A (en) | Virtual reality and augmented reality three-dimensional application service platform for transformer substation operation | |
CN109147448A (en) | A kind of transmission line high-altitude walking training system and its method | |
CN110909439A (en) | AR-based assembly method and device and terminal | |
CN115953264B (en) | Screen cabinet model integrated design system and fault judgment method based on three-dimensional modeling | |
CN110750910B (en) | Three-dimensional model file and configuration method of physical loop model | |
CN111710032A (en) | Method, device, equipment and medium for constructing three-dimensional model of transformer substation | |
CN110322112A (en) | A kind of electrical network parameter management method and system based on smart grid | |
CN207074418U (en) | A kind of power plant's three-dimension visible sysem | |
CN103412741A (en) | Transformer SVG image splicing method and system of relevant CIM model | |
CN111275788B (en) | Graph synthesis method based on commonality template graph and differential topological graph | |
CN116796391A (en) | Digital modeling and visualization method for secondary circuit of direct current converter station control and protection system | |
CN112184881A (en) | Multi-level overall process monitoring method for power equipment | |
CN106940827A (en) | Modularization power supply plan automatic generation method based on AR technologies and VR technologies |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Yingxin Inventor after: Chen Wei Inventor after: Mu Liang Inventor after: Li Jianping Inventor after: Zhang Chao Inventor after: Gao Xu Inventor after: Ren Jun Inventor after: Fan Dengbo Inventor after: Du Liyan Inventor after: Zhuang Bo Inventor after: Wang Jifei Inventor after: Niu Xuefei Inventor after: Li Maoying Inventor before: Ma Yingxin Inventor before: Chen Wei Inventor before: Mu Liang Inventor before: Li Jianping Inventor before: Zhang Chao Inventor before: Cao Weiguo Inventor before: Yang Xiaoyu Inventor before: Gu Junjie Inventor before: Song Qiang Inventor before: Zhou Junbo Inventor before: Xie Dong Inventor before: Gao Xu Inventor before: Sang Yinxia Inventor before: Guo Rui Inventor before: Cao Xiaofang Inventor before: Liu Hanquan Inventor before: Ren Jun Inventor before: Fan Dengbo Inventor before: Du Liyan Inventor before: Zhuang Bo Inventor before: Wang Jifei Inventor before: Niu Xuefei Inventor before: Li Maoying |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230629 Address after: 075000, No. 131, Wuyi Road, Qiaodong District, Hebei, Zhangjiakou Applicant after: ZHANGJIAKOU POWER SUPPLY COMPANY OF STATE GRID JINBEI ELECTRIC POWER Co.,Ltd. Applicant after: STATE GRID JIBEI ELECTRIC POWER Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Address before: 075000, No. 131, Wuyi Road, Qiaodong District, Hebei, Zhangjiakou Applicant before: ZHANGJIAKOU POWER SUPPLY COMPANY OF STATE GRID JINBEI ELECTRIC POWER Co.,Ltd. Applicant before: STATE GRID JIBEI ELECTRIC POWER Co.,Ltd. Applicant before: STATE GRID CORPORATION OF CHINA Applicant before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |