CN114016439B - 一种高墩墩中转体桥梁上墩身及0号块支架施工方法 - Google Patents
一种高墩墩中转体桥梁上墩身及0号块支架施工方法 Download PDFInfo
- Publication number
- CN114016439B CN114016439B CN202111339462.2A CN202111339462A CN114016439B CN 114016439 B CN114016439 B CN 114016439B CN 202111339462 A CN202111339462 A CN 202111339462A CN 114016439 B CN114016439 B CN 114016439B
- Authority
- CN
- China
- Prior art keywords
- pier body
- pier
- steel upright
- bracket
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 65
- 239000010959 steel Substances 0.000 claims abstract description 65
- 244000035744 Hura crepitans Species 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 6
- 230000007306 turnover Effects 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/08—Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111339462.2A CN114016439B (zh) | 2021-11-12 | 2021-11-12 | 一种高墩墩中转体桥梁上墩身及0号块支架施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111339462.2A CN114016439B (zh) | 2021-11-12 | 2021-11-12 | 一种高墩墩中转体桥梁上墩身及0号块支架施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114016439A CN114016439A (zh) | 2022-02-08 |
CN114016439B true CN114016439B (zh) | 2024-06-04 |
Family
ID=80063882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111339462.2A Active CN114016439B (zh) | 2021-11-12 | 2021-11-12 | 一种高墩墩中转体桥梁上墩身及0号块支架施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114016439B (zh) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR950014438U (ko) * | 1993-11-09 | 1995-06-16 | 이효수 | 지 승 |
JPH08296210A (ja) * | 1995-03-02 | 1996-11-12 | Tomoe Corp | 橋脚の構築工法ならびに橋脚の解体工法およびリフトアップ・回転装置 |
JP2000008329A (ja) * | 1998-06-26 | 2000-01-11 | Nishimatsu Constr Co Ltd | 橋梁の建設方法 |
KR20020060351A (ko) * | 2001-01-10 | 2002-07-18 | 이효계 | 교각회전장치 및 이를 이용한 티형 교각 가설공법 |
JP2004218316A (ja) * | 2003-01-16 | 2004-08-05 | Ps Mitsubishi Construction Co Ltd | 柱頭部の構築方法及び架設作業車 |
CN204919367U (zh) * | 2015-08-18 | 2015-12-30 | 中铁工程设计咨询集团有限公司 | 墩体顶部转体结构 |
CN106049283A (zh) * | 2016-06-05 | 2016-10-26 | 中交路桥建设有限公司 | 一种桥梁矩形墩挂模施工方法 |
CN107119579A (zh) * | 2017-06-13 | 2017-09-01 | 中铁武汉勘察设计研究院有限公司 | 一种兼顾地面交通的框架墩转体桥及其设计和施工方法 |
JP2018035549A (ja) * | 2016-08-31 | 2018-03-08 | 東急建設株式会社 | 橋脚の構築方法 |
CN207904783U (zh) * | 2018-02-06 | 2018-09-25 | 中铁二院昆明勘察设计研究院有限责任公司 | 高空墩身中部转体装置 |
CN108660943A (zh) * | 2018-07-06 | 2018-10-16 | 重庆三峡学院 | 一种桥梁转体施工体系 |
CN209584871U (zh) * | 2019-01-08 | 2019-11-05 | 中交路桥建设有限公司 | 一种高墩独柱大悬臂盖梁施工托架 |
CN210658028U (zh) * | 2019-07-08 | 2020-06-02 | 中交二公局东萌工程有限公司 | 一种带装饰板连续刚构桥0#块支架 |
CN112538822A (zh) * | 2020-11-30 | 2021-03-23 | 中建五局第三建设有限公司 | 一种桥梁矩形高墩独墩盖梁三角托架体系及施工方法 |
CN112962427A (zh) * | 2021-04-20 | 2021-06-15 | 中铁三局集团有限公司 | 一种跨沟谷非标跨度现浇梁支架及施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208219432U (zh) * | 2018-05-21 | 2018-12-11 | 中国十九冶集团有限公司 | 连续刚构桥箱梁0#块现浇支架装置 |
CN111455859A (zh) * | 2020-04-29 | 2020-07-28 | 中铁十五局集团有限公司 | 一种高墩连续钢构桥0、1号块托架施工方法 |
-
2021
- 2021-11-12 CN CN202111339462.2A patent/CN114016439B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR950014438U (ko) * | 1993-11-09 | 1995-06-16 | 이효수 | 지 승 |
JPH08296210A (ja) * | 1995-03-02 | 1996-11-12 | Tomoe Corp | 橋脚の構築工法ならびに橋脚の解体工法およびリフトアップ・回転装置 |
JP2000008329A (ja) * | 1998-06-26 | 2000-01-11 | Nishimatsu Constr Co Ltd | 橋梁の建設方法 |
KR20020060351A (ko) * | 2001-01-10 | 2002-07-18 | 이효계 | 교각회전장치 및 이를 이용한 티형 교각 가설공법 |
JP2004218316A (ja) * | 2003-01-16 | 2004-08-05 | Ps Mitsubishi Construction Co Ltd | 柱頭部の構築方法及び架設作業車 |
CN204919367U (zh) * | 2015-08-18 | 2015-12-30 | 中铁工程设计咨询集团有限公司 | 墩体顶部转体结构 |
CN106049283A (zh) * | 2016-06-05 | 2016-10-26 | 中交路桥建设有限公司 | 一种桥梁矩形墩挂模施工方法 |
JP2018035549A (ja) * | 2016-08-31 | 2018-03-08 | 東急建設株式会社 | 橋脚の構築方法 |
CN107119579A (zh) * | 2017-06-13 | 2017-09-01 | 中铁武汉勘察设计研究院有限公司 | 一种兼顾地面交通的框架墩转体桥及其设计和施工方法 |
CN207904783U (zh) * | 2018-02-06 | 2018-09-25 | 中铁二院昆明勘察设计研究院有限责任公司 | 高空墩身中部转体装置 |
CN108660943A (zh) * | 2018-07-06 | 2018-10-16 | 重庆三峡学院 | 一种桥梁转体施工体系 |
CN209584871U (zh) * | 2019-01-08 | 2019-11-05 | 中交路桥建设有限公司 | 一种高墩独柱大悬臂盖梁施工托架 |
CN210658028U (zh) * | 2019-07-08 | 2020-06-02 | 中交二公局东萌工程有限公司 | 一种带装饰板连续刚构桥0#块支架 |
CN112538822A (zh) * | 2020-11-30 | 2021-03-23 | 中建五局第三建设有限公司 | 一种桥梁矩形高墩独墩盖梁三角托架体系及施工方法 |
CN112962427A (zh) * | 2021-04-20 | 2021-06-15 | 中铁三局集团有限公司 | 一种跨沟谷非标跨度现浇梁支架及施工方法 |
Non-Patent Citations (4)
Title |
---|
Michel Bruneau ; Michael Engelhardt ; Andre Filiatrault ; S C Goel ; Ahmad Itani ; Jerome Hajjar ; Roberto Leon ; James Ricles ; Bozidar Stojadinovic ; Chia-Ming Uang.Review of selected recent research on US seismic design and retrofit strategies for steel structures.Progress in Structural Engineering and Materials.2005,7(3),全文. * |
何义斌等.《桥梁转体施工关键技术与应用》.中国铁道出版社有限公司,2021,(第1版),全文. * |
刚构桥边跨现浇段与引桥架设同步施工技术研究;傅重阳;山西交通科技;20161231(001);全文 * |
首座连续梁桥高墩墩中转体施工技术研究;方兵;《铁道建筑技术》;20200731;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN114016439A (zh) | 2022-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203904851U (zh) | 一种连续梁边跨直线段吊架*** | |
CN107386327A (zh) | U型槽侧墙与挡墙一体化无拉杆模板及由该模板组成的组合墙 | |
CN107435335A (zh) | 基坑围护顶圈梁上砖砌挡土墙钢筋桁架加固***及方法 | |
CN103306206A (zh) | 一种薄壁空心高墩钢筋支模架及施工方法 | |
CN107190647A (zh) | 一种适用于钢结构异形塔的线形控制装置和方法 | |
CN215947902U (zh) | 一种可调节公路圆柱墩中系梁模板支架*** | |
CN112323646B (zh) | 刚构桥水平转体***的施工方法及其应用 | |
CN114016439B (zh) | 一种高墩墩中转体桥梁上墩身及0号块支架施工方法 | |
CN113265950A (zh) | 一种用于大悬臂盖梁施工的支架及其施工方法 | |
CN207392053U (zh) | 一种适用于钢结构异形塔的线形控制装置 | |
CN106958233B (zh) | 用于浇筑拱坝混凝土的液压自升式悬臂模板施工方法 | |
CN203113226U (zh) | 高耸悬挑不对称混凝土结构模板支架体系 | |
CN202787097U (zh) | 一种可变化角度的挂篮纵梁旋转装置 | |
CN113882277B (zh) | 一种高墩墩中转体桥梁施工结构 | |
CN211775752U (zh) | 外斜柱模板钢管脚手架支撑体系 | |
CN210002829U (zh) | 一种剪力墙绑扎安装操作平台 | |
CN207714150U (zh) | 附着式高空装配支架 | |
CN206319260U (zh) | 一种可变弧桥梁落地支架装置 | |
CN111501531A (zh) | 一种v型薄壁墩及0#块主梁支撑体系施工方法 | |
CN221371866U (zh) | 一种桥梁施工用支撑底座 | |
CN214883708U (zh) | 便于拆装的基坑支护装置 | |
CN110656581A (zh) | 一种便桥施工工艺 | |
CN219010989U (zh) | 一种0#块辅助支架 | |
CN217517360U (zh) | 一种新型桥塔处主梁支撑结构 | |
CN219080110U (zh) | 钢管柱支架施工安全平台装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: No.269, Yingze street, Yingze District, Taiyuan City, Shanxi Province Applicant after: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd. Applicant after: China Railway No.3 Engineering Group No.5 Engineering Co.,Ltd. Address before: 030600 No.1, Shuncheng East Street, Yuci District, Jinzhong City, Shanxi Province Applicant before: China Railway No.3 Engineering Group No.5 Engineering Co.,Ltd. Country or region before: China Applicant before: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd. |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Fu Zhongyang Inventor after: Feng Li Inventor after: Zhang Liqiang Inventor after: Zhang Zefeng Inventor after: Huang Hui Inventor after: Ma Hongjie Inventor after: Gao Qing Inventor after: Liu Yan Inventor after: Duan Jiubo Inventor after: Wang Wenming Inventor after: Wang Jingwei Inventor after: Wei Qiang Inventor after: Zhang Jiangang Inventor before: Ma Hongjie Inventor before: Feng Li Inventor before: Zhang Liqiang Inventor before: Zhang Zefeng Inventor before: Huang Hui Inventor before: Liu Yan Inventor before: Duan Jiubo Inventor before: Gao Qing Inventor before: Wang Wenming Inventor before: Fu Zhongyang Inventor before: Wang Jingwei Inventor before: Wei Qiang Inventor before: Zhang Jiangang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |