CN113931402A - Assembly type building structure - Google Patents

Assembly type building structure Download PDF

Info

Publication number
CN113931402A
CN113931402A CN202111236781.0A CN202111236781A CN113931402A CN 113931402 A CN113931402 A CN 113931402A CN 202111236781 A CN202111236781 A CN 202111236781A CN 113931402 A CN113931402 A CN 113931402A
Authority
CN
China
Prior art keywords
locking
rack
groove
fossil fragments
sealing strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111236781.0A
Other languages
Chinese (zh)
Other versions
CN113931402B (en
Inventor
樊洪坤
徐超
李梦金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yaohua Planning And Architectural Design Co ltd
Original Assignee
Zhejiang Yaohua Planning And Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yaohua Planning And Architectural Design Co ltd filed Critical Zhejiang Yaohua Planning And Architectural Design Co ltd
Priority to CN202111236781.0A priority Critical patent/CN113931402B/en
Publication of CN113931402A publication Critical patent/CN113931402A/en
Application granted granted Critical
Publication of CN113931402B publication Critical patent/CN113931402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The application discloses assembled building structure, it includes a plurality of ceramic tile bodies, is used for connecting fossil fragments and the coupling mechanism of multiunit setting on fossil fragments on the face of rising outward, be connected with the inner panel on the ceramic tile body, be provided with a plurality ofly on the fossil fragments and be used for supplying the inner panel to insert the connecting hole of establishing, coupling mechanism sets up the locking rack on fossil fragments including rotating the locking gear of connection on fossil fragments and sliding, the extending direction of the slip direction perpendicular to connecting hole of locking rack, locking rack and locking gear meshing, offer on the lateral wall of inner panel and be used for supplying the locking rack tip to insert the locking groove of establishing. This application has the effect of convenient to detach ceramic tile.

Description

Assembly type building structure
Technical Field
The application relates to the technical field of constructional engineering, in particular to an assembly type building structure.
Background
The fabricated building is a building which is fabricated by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and accessories on the site in a reliable connection mode.
In the related art, in order to beautify the outer vertical surface of a building, an assembled ceramic tile wall surface is often installed on the outer vertical surface. When the ceramic tile is installed, cement needs to be coated on the outer vertical surface of the building, and then the ceramic tile is attached to the outer vertical surface of the building.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: when one of the ceramic tiles is damaged and needs to be replaced and maintained, the ceramic tile is difficult to take down and needs to be improved.
Disclosure of Invention
In order to facilitate the dismantlement ceramic tile, this application provides an assembly type building structure.
The application provides an assembled building structure adopts following technical scheme:
the utility model provides an assembly type building structure, includes a plurality of ceramic tile bodies, is used for connecting fossil fragments and the coupling mechanism of multiunit setting on fossil fragments on outer facade, be connected with the inner panel on the ceramic tile body, be provided with a plurality of connecting holes that are used for supplying the inner panel to insert and establish on the fossil fragments, coupling mechanism sets up the locking rack on fossil fragments including rotating the locking gear of connection on fossil fragments and sliding, the extending direction of the slip direction perpendicular to connecting hole of locking rack, locking rack and locking gear meshing, offer on the lateral wall of inner panel and be used for supplying locking rack tip to insert the locking groove of establishing.
Through adopting above-mentioned technical scheme, when installing the ceramic tile body, fix fossil fragments on the facade outside earlier, insert the connecting hole with the inner panel again, then rotate the locking gear and slide to the direction that is close to the inner panel with the drive locking rack, insert the locking groove until the tip of locking rack to the restriction inner panel shifts out the connecting hole, and then makes the ceramic tile body fixed on the facade outside.
When the ceramic tile body damages and needs to be changed, the locking gear is rotated to shift out the locking groove with the driving rack, the ceramic tile body can be taken down from the keel, and the new ceramic tile body and the inner plate can be replaced.
Through adopting above-mentioned structure for damaged ceramic tile body can be changed alone, and only need rotate when dismantling locking gear can, easy and simple to handle, the staff of being convenient for dismantles the ceramic tile.
Optionally, still including setting up the heat preservation pad in the connecting hole, coupling mechanism still includes the spacing rack of slip setting on fossil fragments, the extending direction of the slip direction perpendicular to connecting hole of spacing rack, spacing rack and locking gear keep away from the meshing of one side of locking rack, offer on the terminal surface that the ceramic tile body was kept away from to the inner panel and be used for supplying spacing rack to insert the groove of stepping down of establishing, the groove of stepping down is linked together with the lateral wall of inner panel.
By adopting the technical scheme, the heat insulation pad arranged in the connecting hole plays a role in keeping warm for the whole building. Because the limiting rack is meshed with one side, far away from the locking rack, of the locking gear, when the locking gear rotates towards one direction, the limiting rack moves towards the connecting hole, and when the locking gear rotates towards the other direction, the locking rack moves towards the connecting hole.
When the tile body is disassembled, the locking gear is firstly rotated to drive the locking rack to move out of the locking groove and the limiting rack to stretch into the abdicating groove. Because the groove of stepping down sets up on the terminal surface that the ceramic tile body was kept away from to the inner panel, and the lateral wall of groove and inner panel of stepping down to being linked together for the ceramic tile body of treating to change can be taken off. At this moment, spacing rack has played the effect that blocks, has restricted that the heat preservation pad is deviate from the connecting hole for the staff need not to support the heat preservation pad, helps the staff to carry new ceramic tile body. After the inner plate on the new ceramic tile body is installed into the connecting hole, the locking gear is reversely rotated, the locking rack is inserted into the locking groove to connect the inner plate and the keel, and the inner plate plays a role in blocking so as to limit the heat preservation cushion to be separated from the connecting hole.
Through the structure, the working personnel do not need to support the heat-insulating pad, and the simplicity of the ceramic tile body during installation or disassembly is improved.
Optionally, the locking gear is divided into a toothed portion and a non-toothed portion along the circumferential direction, gear teeth are arranged on the circumferential side wall of the toothed portion, the circumferential side wall of the non-toothed portion is smooth, and the toothed portion is used for being meshed with the locking rack or the limiting rack.
By adopting the technical scheme, when the tile body is installed on the keel, the locking gear is rotated to enable the toothed part to be meshed with the locking rack, so that the locking rack is driven to be inserted into the locking groove; when the tile body is replaced, the locking gear is rotated to enable the toothed part to be meshed with the locking rack firstly and then meshed with the limiting rack, so that the locking rack is driven to be drawn out of the locking groove, and the limiting rack is driven to be inserted into the abdicating groove; when the heat preservation pad is installed, the locking gear is rotated to enable the locking rack and the limiting rack to move out of the connecting hole, and at the moment, the tooth part rotates to a position between the limiting rack and the locking rack. Through the locking gear of this application, can only drive locking rack or spacing rack and remove to make locking rack and spacing rack all can not play the interference to the installation that keeps warm and fill up, help the staff to install the pad that keeps warm.
Optionally, the last eccentric feedback piece that is provided with of locking gear, be provided with the touch piece on the fossil fragments, the tip of touch piece is located the rotation route of feedback portion, when the touch piece is contradicted with one of them side wall of feedback piece, the locking rack stretches into in the locking groove, when the touch piece is contradicted with the opposite side lateral wall of feedback piece, spacing rack stretches into in the groove of stepping down.
Through adopting above-mentioned technical scheme, because the inner panel inserts in the connecting hole when installing the ceramic tile body for whether staff is difficult to observe the locking piece and inserts the locking groove completely, or whether spacing rack inserts the groove of stepping down completely. Through feedback piece and touch piece for during staff rotating gear, rotate to feedback piece and touch piece conflict, insert the locking groove for the locking rack, or spacing rack inserts the groove of stepping down, help the staff to judge whether the installation of ceramic tile body finishes, improved the stability after the ceramic tile body is installed to fossil fragments.
Optionally, a plurality of sealing strips are arranged on the keel, and the sealing strips are located between the two adjacent tile bodies.
Through adopting above-mentioned technical scheme, the sealing strip has played the effect that blocks water, has restricted during the rainwater gets into the clearance between two ceramic tile bodies, has further improved the water blocking performance of this application assembly type structure, has improved the protection effect that blocks water of external facade.
Optionally, the sealing strip is provided with a hexagonal block, the keel is rotatably connected with a rotating shaft, the locking gear is fixed on the rotating shaft, and the rotating shaft is provided with a hexagonal groove for the hexagonal block to be inserted.
Through adopting above-mentioned technical scheme, when installing or dismantling the ceramic tile body, insert hexagonal groove with the hexagonal spanner, help the staff to rotate locking gear through the rotation axis. After the ceramic tile body is installed to the fossil fragments, shield the clearance between two ceramic tile bodies through the sealing strip to insert the hexagonal piece into the hexagonal groove, thereby through rotation axis restriction locking gear rotation, further improved the stability after the ceramic tile body is installed to the fossil fragments.
Optionally, the hexagonal block has elasticity, and a sectional area of the hexagonal block is slightly larger than a sectional area of the hexagonal groove.
Through adopting above-mentioned technical scheme, during the installation sealing strip, rotate the rotation axis earlier so that locking tooth strip inserts locking groove, touching piece and feedback piece conflict, then insert the hexagonal piece hexagonal groove again, the hexagonal piece takes place to deform and supports the cell wall in tight hexagonal groove in-process that inserts the hexagonal groove to the effect of connecting sealing strip and rotation axis has been played. Through the structural installation sealing strip, the structure is simple and convenient, and the simplicity of the worker for dismounting the tile body is further improved.
Optionally, a water blocking groove is formed in the sealing strip, a water blocking block is arranged on the sealing strip, the water blocking block and the water blocking groove are respectively located at two ends of the sealing strip, and when the sealing strip is installed on the keel, one of the water blocking blocks on the sealing strip is inserted into the water blocking groove of the adjacent sealing strip.
Through adopting above-mentioned technical scheme, when installing the sealing strip to the fossil fragments, the piece that blocks water on one of them sealing strip is inserted and is established in the water blocking groove on another block water piece. The water blocking block and the water blocking groove enable rainwater not to easily enter a gap between the two sealing strips, and the waterproof protection effect on the external surface is further improved.
Optionally, an extension strip is arranged on the side wall of the sealing strip close to the tile body.
By adopting the technical scheme, after the sealing strip is installed, the gap between the sealing strip and the tile body is shielded by the extension strip, and the waterproof protection effect on the external vertical surface is further improved.
In summary, the present application includes at least one of the following beneficial technical effects:
when the ceramic tile body is installed, the keel is fixed on the outer vertical surface, the inner plate is inserted into the connecting hole, and then the locking gear is rotated to drive the locking rack to be inserted into the locking groove, so that the ceramic tile body is fixed on the outer vertical surface; when the tile body is damaged and needs to be replaced, the locking gear is rotated to drive the rack to move out of the locking groove, and the tile body can be taken down from the keel; through adopting above-mentioned structure, dismouting ceramic tile body only need rotate the locking gear can, the staff of being convenient for dismantles the ceramic tile.
When the tile body is disassembled, the locking gear is firstly rotated to drive the locking rack to move out of the locking groove and the limiting rack to extend into the abdicating groove, so that even if the tile body is disassembled, the limiting rack also plays a role of blocking, the heat-insulating pad is limited from being separated from the connecting hole, a worker does not need to support the heat-insulating pad, the worker is facilitated to carry a new tile body, and the simplicity of disassembling and assembling the tile by the worker is further improved;
the hexagonal block not only plays a role in connecting the sealing strip with the rotating shaft, but also limits the rotation of the rotating shaft, so that the stability of the tile body after being installed on the keel is improved.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present application.
Fig. 2 is a schematic diagram of an explosive structure according to an embodiment of the present application.
FIG. 3 is a schematic view showing a partial structure of a salient gear groove in the embodiment of the present application.
Fig. 4 is an enlarged schematic view at a in fig. 3.
FIG. 5 is a partial schematic view showing a locking groove and a relieving groove.
Fig. 6 is an enlarged schematic view at B in fig. 2.
Description of reference numerals:
1. a keel; 11. a cross beam; 12. a stringer; 121. a first sliding groove; 122. a second sliding groove; 123. a rotating tank; 124. a first rack slot; 125. a second rack groove; 13. connecting holes; 14. a heat-insulating pad; 2. a tile body; 21. an inner plate; 211. a locking groove; 212. a yielding groove; 3. a connecting mechanism; 31. a rotating shaft; 311. a hexagonal groove; 32. a locking gear; 321. a toothed portion; 322. no tooth part; 333. a feedback block; 334. a touch block; 33. locking the rack; 34. a limit rack; 35. a locking block; 36. a limiting block; 4. a sealing strip; 41. a strip extending; 42. a water blocking tank; 43. a water blocking block; 44. a hexagonal block.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses an assembly type building structure. Referring to fig. 1 and 2, the prefabricated building structure includes a keel 1 for being fixed on an external vertical surface, a plurality of tile bodies 2, a plurality of sets of connecting mechanisms 3 provided on the keel 1, and a plurality of sealing strips 4 provided on the keel 1.
Referring to fig. 2 and 3, the keel 1 comprises a plurality of cross beams 11 and a plurality of longitudinal beams 12, the cross beams 11 and the longitudinal beams 12 are arranged in a shape like a Chinese character 'jing' to form a plurality of connecting holes 13, and the cross beams 11 and the longitudinal beams 12 are welded and fixed. Each cross beam 11 extends in the horizontal direction and each longitudinal beam 12 extends in the vertical direction. The connecting hole 13 is internally provided with a heat insulation pad 14, and the heat insulation pad 14 is a rock wool heat insulation board so as to play a heat insulation role for the building.
Referring to fig. 3 and 4, the connecting mechanism 3 is disposed on the side member 12, and the connecting mechanism 3 includes a rotating shaft 31, a locking gear 32, a locking rack 33, a stopper rack 34, a locking block 35, and a stopper 36. The end surface of the longitudinal beam 12 close to the connecting hole 13 is provided with a first sliding groove 121 and a second sliding groove 122, and the extending directions of the first sliding groove 121 and the second sliding groove 122 are both perpendicular to the extending direction of the connecting hole 13. The end surface of the longitudinal beam 12 away from the outer vertical surface is provided with a rotating groove 123, and the first sliding groove 121 and the second sliding groove 122 are respectively located on the upper side and the lower side of the rotating groove 123 in the vertical direction. A first rack groove 124 communicated with the rotation groove 123 is formed on a groove wall of the first sliding groove 121 close to the rotation groove 123, and a second rack groove 125 communicated with the rotation groove 123 is formed on a groove wall of the second sliding groove 122 close to the rotation groove 123.
Referring to fig. 4, the rotation shaft 31 and the locking gear 32 are both disposed in the rotation groove 123, the rotation shaft 31 is rotatably coupled to a groove wall of the rotation groove 123, and the locking gear 32 is fixed to the rotation shaft 31. The locking gear 32 is divided into a toothed portion 321 and a non-toothed portion 322 along the circumferential direction, gear teeth are uniformly distributed on the circumferential side wall of the toothed portion 321, and the circumferential side wall of the non-toothed portion 322 is smooth.
Referring to fig. 4, the first rack slot 124 has a slot width smaller than that of the first sliding slot 121, and the second rack slot 125 has a slot width smaller than that of the second sliding slot 122. The locking rack 33 is slidably disposed in the first rack slot 124, and the locking rack 33 is configured to engage with the toothed portion 321. The locking block 35 is slidably disposed in the first sliding groove 121, and the locking block 35 is fixedly connected to the locking rack 33. The limit rack 34 is slidably disposed in the second rack groove 125, and the limit rack 34 is configured to engage with the toothed portion 321. The limiting block 36 is slidably disposed in the second sliding groove 122, and the limiting block 36 is fixedly connected with the limiting rack 34. When the toothed portion 321 is engaged with the locking rack 33, the stopper rack 34 is offset from the toothed portion 321.
Referring to fig. 4 and 5, an inner plate 21 is fixedly connected to a side wall of the tile body 2, a sectional area of the tile body 2 is larger than that of the inner plate 21, and the connecting hole 13 is used for inserting the inner plate 21. The two opposite side walls of the inner plate 21 are both provided with locking grooves 211. One of the locking grooves 211 is located at the top end of the side wall of the inner panel 21, and the other locking groove 211 is located at the bottom end of the side wall of the inner panel 21. The locking groove 211 is for inserting the end of the locking block 35 and the locking rack 33.
Referring to fig. 4 and 5, two yielding grooves 212 are formed in the side wall of the inner plate 21 away from the tile body 2, one of the yielding grooves 212 is communicated with one side wall of the inner plate 21 having the locking groove 211, and the other yielding groove 212 is communicated with the other side wall of the inner plate 21 having the locking groove 211. The avoiding groove 212 is used for inserting the end parts of the limiting rack 34 and the limiting block 36.
Referring to fig. 3 and 5, the locking groove 211 and the receding groove 212 each extend in a direction perpendicular to the direction in which the connection hole 13 extends.
Referring to fig. 4 and 5, the toothed portion 321 is eccentrically provided with a feedback block 333, and the feedback block 333 is fixedly connected to the toothed portion 321. A touch pad 334 is fixed to a wall of the rotation groove 123, and an end of the touch pad 334 is located on a rotation path of the feedback pad 333. When the touch block 334 is abutted against one side wall of the feedback block 333, the locking block 35 and the locking rack 33 are inserted into the locking groove 211; when the touch block 334 is abutted against the other side wall of the feedback block 333, the limit block 36 and the limit rack 34 extend into the receding groove 212.
Referring to fig. 1 and 6, each sealing strip 4 is arranged on the longitudinal beam 12, the sealing strips 4 are rubber strips with elasticity, the sealing strips 4 are located between two adjacent tile bodies 2 in the horizontal direction, and the sealing strips 4 are used for being embedded between two adjacent tiles. The sealing strip 4 has the extension strip 41 towards the homogeneous shaping on the lateral wall of two adjacent ceramic tile bodies 2 on the horizontal direction, has seted up on the roof of sealing strip 4 and has blocked water groove 42, and integrated into one piece has the piece 43 that blocks water on the diapire of sealing strip 4. When the seal strips 4 are mounted to the stringers 12, the water blocking block 43 on one of the seal strips 4 is inserted in the water blocking groove 42 of the adjacent seal strip 4.
Referring to fig. 3 and 6, two hexagonal blocks 44 are integrally formed on the side wall of the sealing strip 4 close to the longitudinal beam 12, a hexagonal groove 311 for embedding the hexagonal block 44 is formed on the side wall of the rotating shaft 31 far from the outer vertical surface, and the sectional area of the hexagonal block 44 is slightly larger than that of the hexagonal groove 311.
The implementation principle of an assembly type building structure of the embodiment of the application is as follows: replacing a damaged tile body 2 comprises the following steps:
the first step is as follows: two sealing strips 4 adjacent to the damaged tile body 2 are removed.
The second step is that: the rotating shaft 31 is rotated by a hexagon wrench, the rotating shaft 31 drives the locking gear 32 to rotate, the toothed portion 321 is firstly meshed with the locking rack 33 and then meshed with the limiting rack 34, so that the locking rack 33 and the locking block 35 are driven to move out of the locking groove 211, the limiting rack 34 and the limiting block 36 to be inserted into the abdicating groove 212 until the feedback block 333 is abutted against the touch block 334 to limit the rotation of the locking gear 32.
The third step: the damaged tile body 2 is taken down and a new tile body 2 is taken out first, the inner plate 21 of the new tile body 2 is inserted into the connecting hole 13, then the rotating shaft 31 is rotated reversely by the hexagonal wrench to drive the locking gear 32 to rotate, so that the limiting rack 34 and the limiting block 36 are moved out of the abdicating groove 212, the locking rack 33 and the locking block 35 to be inserted into the locking groove 211, and the feedback block 333 is abutted against the touch block 334 to limit the rotation of the locking gear 32.
The fourth step: the sealing strip 4 is inserted into the gap between two adjacent tile bodies 2, and the hexagonal block 44 is embedded into the hexagonal groove 311 until the extension strip 41 is abutted against the tile bodies 2.
When the heat insulation pad 14 is installed, the rotating shaft 31 can be rotated by a hexagonal wrench, so as to drive the locking gear 32 to rotate, so that the locking block 35 moves into the first sliding groove 121, the locking rack 33 moves into the first rack groove 124, the limiting block 36 moves into the second limiting groove, and the limiting rack 34 moves into the second rack groove 125, which is helpful for workers to install the heat insulation pad 14.
Through the structure, only need take off sealing strip 4 and rotate rotation axis 31 during dismouting ceramic tile body 2 can, easy and simple to handle, the staff of being convenient for dismantles the ceramic tile.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. A fabricated building structure, characterized by: including a plurality of ceramic tile bodies (2), be used for connecting fossil fragments (1) and the coupling mechanism (3) of multiunit setting on fossil fragments (1) on outer facade, be connected with inner panel (21) on ceramic tile body (2), be provided with a plurality of connecting holes (13) that are used for supplying inner panel (21) to insert and establish on fossil fragments (1), coupling mechanism (3) are including rotating locking gear (32) of connection on fossil fragments (1) and sliding locking rack (33) that set up on fossil fragments (1), the extending direction of the slip direction perpendicular to connecting hole (13) of locking rack (33), locking rack (33) and locking gear (32) meshing, set up locking groove (211) that are used for supplying locking rack (33) tip to insert and establish on the lateral wall of inner panel (21).
2. A fabricated building structure according to claim 1, wherein: still including setting up heat preservation pad (14) in connecting hole (13), coupling mechanism (3) are still including sliding spacing rack (34) of setting on fossil fragments (1), the extending direction of the slip direction perpendicular to connecting hole (13) of spacing rack (34), one side meshing of locking rack (33) is kept away from with locking gear (32) in spacing rack (34), offer on the terminal surface that ceramic tile body (2) was kept away from in inner panel (21) and be used for supplying spacing rack (34) to insert groove (212) of stepping down of establishing, groove (212) of stepping down is linked together with the lateral wall of inner panel (21).
3. A fabricated building structure according to claim 2, wherein: the locking gear (32) is divided into a toothed part (321) and a non-toothed part (322) along the circumferential direction, gear teeth are arranged on the circumferential side wall of the toothed part (321), the circumferential side wall of the non-toothed part (322) is smooth, and the toothed part (321) is meshed with the locking rack (33) or the limiting rack (34).
4. A fabricated building structure according to claim 2, wherein: the eccentric feedback piece (333) that is provided with on locking gear (32), be provided with touch piece (334) on fossil fragments (1), the tip of touch piece (334) is located the rotation route of feedback portion, when touch piece (334) contradicts with one of them side wall of feedback piece (333), locking rack (33) stretch into locking groove (211), when touch piece (334) contradicts with the opposite side wall of feedback piece (333), spacing rack (34) stretch into in the groove of stepping down (212).
5. A fabricated building structure according to claim 1, wherein: be provided with many sealing strips (4) on fossil fragments (1), sealing strip (4) are located between two adjacent ceramic tile bodies (2).
6. A fabricated building structure according to claim 5, wherein: be provided with hexagonal piece (44) on sealing strip (4), it is connected with rotation axis (31) to rotate on fossil fragments (1), locking gear (32) are fixed on rotation axis (31), offer on rotation axis (31) and be used for supplying hexagonal piece (44) to insert hexagonal groove (311) of establishing.
7. A fabricated building structure according to claim 6, wherein: the hexagonal block (44) has elasticity, and the sectional area of the hexagonal block (44) is slightly larger than that of the hexagonal groove (311).
8. A fabricated building structure according to claim 5, wherein: the water blocking groove (42) is formed in the sealing strip (4), the water blocking blocks (43) are arranged on the sealing strip (4), the water blocking blocks (43) and the water blocking groove (42) are located at two ends of the sealing strip (4) respectively, when the sealing strip (4) is installed on the keel (1), one of the water blocking blocks (43) on the sealing strip (4) is inserted into the water blocking groove (42) of the adjacent sealing strip (4).
9. A fabricated building structure according to claim 5, wherein: the side wall of the sealing strip (4) close to the tile body (2) is provided with an extending strip (41).
CN202111236781.0A 2021-10-23 2021-10-23 Assembly type building structure Active CN113931402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111236781.0A CN113931402B (en) 2021-10-23 2021-10-23 Assembly type building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111236781.0A CN113931402B (en) 2021-10-23 2021-10-23 Assembly type building structure

Publications (2)

Publication Number Publication Date
CN113931402A true CN113931402A (en) 2022-01-14
CN113931402B CN113931402B (en) 2022-12-06

Family

ID=79283903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111236781.0A Active CN113931402B (en) 2021-10-23 2021-10-23 Assembly type building structure

Country Status (1)

Country Link
CN (1) CN113931402B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115012769A (en) * 2022-07-04 2022-09-06 中建安装集团有限公司 Portable light elevator guard gate that can have enough to meet need

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9402904U1 (en) * 1994-01-14 1994-05-19 Seaking (International) AG, Küssnacht am Rigi Wall or ceiling cladding
US20020056237A1 (en) * 2000-04-12 2002-05-16 Alliance Concrete Concepts Inc. Mortarless wall structure
KR20110024401A (en) * 2009-09-02 2011-03-09 주식회사 일신석재 Assembly external wall structure of a building
DE202012005431U1 (en) * 2012-06-01 2012-06-18 Jürgen Scriba Plate holding element for mounting on a groove profile, plate holding system and decorative wall
US20140109504A1 (en) * 2012-10-24 2014-04-24 Stephen W. Steffes System, method and apparatus for manufactured building panel
CN207846961U (en) * 2018-02-08 2018-09-11 深圳市雅度空间装饰设计工程有限公司 Heat-preserving decorative wall board mounting structure
CN208533803U (en) * 2018-06-25 2019-02-22 江苏华欣装饰集团有限公司 A kind of assembled curtain wall
CN109898774A (en) * 2019-04-13 2019-06-18 浙江屹立建设有限公司 A kind of assembled ceramic tile metope and its construction method
CN210152138U (en) * 2019-05-21 2020-03-17 中通(天津)铝业有限公司 Aluminum veneer with replaceable decorative panel
CN111255130A (en) * 2019-01-10 2020-06-09 徐超悦 A dry hanging curtain is with back of body bolt formula connecting device for green building
CN111997292A (en) * 2020-08-08 2020-11-27 南通市建筑装饰装璜有限公司 Decorative wall wood veneer structure
CN112127578A (en) * 2020-11-23 2020-12-25 佛山市顺德区新景建筑工程有限公司 Energy-saving environment-friendly building wallboard installation structure and construction method
CN112502378A (en) * 2020-11-17 2021-03-16 金螳螂精装科技(苏州)有限公司 Assembled convenient installation integrated configuration plate body
CN112709396A (en) * 2020-12-24 2021-04-27 广东承洋建设工程有限公司 Energy-saving environment-friendly building wallboard installation structure and construction method
CN213926881U (en) * 2020-11-20 2021-08-10 广州金辉建设集团有限公司 Heat-insulating energy-saving assembled wallboard structure
CN113250397A (en) * 2021-06-11 2021-08-13 蓝城乐居建设管理集团有限公司 Assembled building heat-insulation wallboard convenient to mount and construction method thereof
CN214035198U (en) * 2020-06-19 2021-08-24 济南市人防建筑设计研究院有限责任公司 Rail type civil air defense sealing door limiting device
CN113293955A (en) * 2021-05-31 2021-08-24 变形积木(北京)科技有限公司 Wall surface assembly type tile structure and installation method
CN214144316U (en) * 2020-12-05 2021-09-07 湖南瑞一幕墙装饰有限公司 Unit type door and window curtain wall connecting structure
CN214302666U (en) * 2020-12-09 2021-09-28 北京建黎铝门窗幕墙有限公司 Curtain decorative board convenient to assemble
CN214329732U (en) * 2021-02-26 2021-10-01 上海梵辰空间设计工程有限公司 Flame-retardant floor
CN113482281A (en) * 2021-07-05 2021-10-08 杭州守佳健康科技有限公司 Assembled ceramic tile, mounting bracket and ground system
CN214885082U (en) * 2021-05-28 2021-11-26 李福生 Magnetic attraction type building decoration panel
CN114908910A (en) * 2022-05-31 2022-08-16 深圳华创建筑装饰股份有限公司 Glass curtain wall structure

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9402904U1 (en) * 1994-01-14 1994-05-19 Seaking (International) AG, Küssnacht am Rigi Wall or ceiling cladding
US20020056237A1 (en) * 2000-04-12 2002-05-16 Alliance Concrete Concepts Inc. Mortarless wall structure
KR20110024401A (en) * 2009-09-02 2011-03-09 주식회사 일신석재 Assembly external wall structure of a building
DE202012005431U1 (en) * 2012-06-01 2012-06-18 Jürgen Scriba Plate holding element for mounting on a groove profile, plate holding system and decorative wall
US20140109504A1 (en) * 2012-10-24 2014-04-24 Stephen W. Steffes System, method and apparatus for manufactured building panel
CN207846961U (en) * 2018-02-08 2018-09-11 深圳市雅度空间装饰设计工程有限公司 Heat-preserving decorative wall board mounting structure
CN208533803U (en) * 2018-06-25 2019-02-22 江苏华欣装饰集团有限公司 A kind of assembled curtain wall
CN111255130A (en) * 2019-01-10 2020-06-09 徐超悦 A dry hanging curtain is with back of body bolt formula connecting device for green building
CN109898774A (en) * 2019-04-13 2019-06-18 浙江屹立建设有限公司 A kind of assembled ceramic tile metope and its construction method
CN210152138U (en) * 2019-05-21 2020-03-17 中通(天津)铝业有限公司 Aluminum veneer with replaceable decorative panel
CN214035198U (en) * 2020-06-19 2021-08-24 济南市人防建筑设计研究院有限责任公司 Rail type civil air defense sealing door limiting device
CN111997292A (en) * 2020-08-08 2020-11-27 南通市建筑装饰装璜有限公司 Decorative wall wood veneer structure
CN112502378A (en) * 2020-11-17 2021-03-16 金螳螂精装科技(苏州)有限公司 Assembled convenient installation integrated configuration plate body
CN213926881U (en) * 2020-11-20 2021-08-10 广州金辉建设集团有限公司 Heat-insulating energy-saving assembled wallboard structure
CN112127578A (en) * 2020-11-23 2020-12-25 佛山市顺德区新景建筑工程有限公司 Energy-saving environment-friendly building wallboard installation structure and construction method
CN214144316U (en) * 2020-12-05 2021-09-07 湖南瑞一幕墙装饰有限公司 Unit type door and window curtain wall connecting structure
CN214302666U (en) * 2020-12-09 2021-09-28 北京建黎铝门窗幕墙有限公司 Curtain decorative board convenient to assemble
CN112709396A (en) * 2020-12-24 2021-04-27 广东承洋建设工程有限公司 Energy-saving environment-friendly building wallboard installation structure and construction method
CN214329732U (en) * 2021-02-26 2021-10-01 上海梵辰空间设计工程有限公司 Flame-retardant floor
CN214885082U (en) * 2021-05-28 2021-11-26 李福生 Magnetic attraction type building decoration panel
CN113293955A (en) * 2021-05-31 2021-08-24 变形积木(北京)科技有限公司 Wall surface assembly type tile structure and installation method
CN113250397A (en) * 2021-06-11 2021-08-13 蓝城乐居建设管理集团有限公司 Assembled building heat-insulation wallboard convenient to mount and construction method thereof
CN113482281A (en) * 2021-07-05 2021-10-08 杭州守佳健康科技有限公司 Assembled ceramic tile, mounting bracket and ground system
CN114908910A (en) * 2022-05-31 2022-08-16 深圳华创建筑装饰股份有限公司 Glass curtain wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴林地等: "一种手动齿轮齿条移动装置研制", 《内燃机与配件》 *
庞晓挺: "绿色节能技术在暖通设计中的应用研究", 《建材与装饰》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115012769A (en) * 2022-07-04 2022-09-06 中建安装集团有限公司 Portable light elevator guard gate that can have enough to meet need
CN115012769B (en) * 2022-07-04 2024-03-08 中建安装集团有限公司 Portable turnover light elevator protection door

Also Published As

Publication number Publication date
CN113931402B (en) 2022-12-06

Similar Documents

Publication Publication Date Title
CN113931402B (en) Assembly type building structure
EP1662201A3 (en) Tile and exo-skeleton tile structure
RU2359090C2 (en) Method for erection of structures and device for its realisation
CN108360900B (en) Structure is built to antidetonation room
CN113293958A (en) Ceramic tile laying structure and laying method thereof
KR100920933B1 (en) Wallboard
CN210508175U (en) Assembled wallboard assembly
CN218149036U (en) Assembled steel construction wallboard for architectural decoration
CN112459534B (en) Energy-conserving quick detach formula wood system building
KR100557478B1 (en) The arch-roof structure and a construction method thereof
CN115822122A (en) Energy-conserving assembled light steel wall connection structure of building
CN112064842B (en) Construction method of assembled bayonet type aluminum plate curtain wall system
CN110984433B (en) Indoor partition wall installing the system of prefabricated building
CN211922967U (en) Prefabricated wallboard structure of integration
KR200317808Y1 (en) Anchor for exposed concrete panel
CN211666142U (en) Corrosion-resistant outer wall protection panel mosaic structure
CN115095040B (en) Assembled concrete building convenient to adjust
CN113653422B (en) Civil air defense door frame convenient to install and installation method thereof
CN220814526U (en) Assembled building ALC wallboard
CN118207979A (en) Waterproof connected node structure of assembled building
CN220133332U (en) External corner splicing structure for integral bathroom wallboard
CN221095588U (en) Integrated assembly type building wallboard
CN218060875U (en) Assembled building design major structure
CN114319752A (en) Archaized building outer facade decoration structure and construction method thereof
CN221194003U (en) Large-span aluminum plate cornices structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant