CN113882642A CN202111304435.1A CN202111304435A CN113882642A CN 113882642 A CN113882642 A CN 113882642A CN 202111304435 A CN202111304435 A CN 202111304435A CN 113882642 A CN113882642 A CN 113882642A
Authority
CN
China
Prior art keywords
fixed
platform
hydraulic engineering
group
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111304435.1A
Other languages
Chinese (zh)
Inventor
白永峰
李胜利
王小坡
高峰
颜培庆
吕子阳
耿鑫鑫
张帅
才继超
崔贤沛
马扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111304435.1A priority Critical patent/CN113882642A/en
Publication of CN113882642A publication Critical patent/CN113882642A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a supporting platform suitable for hydraulic engineering construction, which comprises four bearing plates and is characterized in that: the two bearing plates on the same side are in a group, two first hydraulic cylinders are mounted on one bearing plate in the same group, the two first hydraulic cylinders on the same side are in a group, and the tail ends of the piston rods of the two first hydraulic cylinders in the same group are jointly fixed with a backing plate; a construction method suitable for a supporting platform for hydraulic engineering construction comprises the following steps: and S1, selecting the number of corresponding platforms according to the construction requirement, and forming a group by two. The invention can realize the quick assembly of the construction platform, can also ensure the firmness after the assembly, can adapt to construction areas with different heights and widths, expands the application range and the use space of the construction platform, ensures the firmness and the stability of the whole structure by combining the construction platform with the hydraulic cylinder and the folding machine, effectively ensures the structural strength of the construction platform and has strong practicability.

Description

Supporting platform suitable for hydraulic engineering construction and construction method
Technical Field
The invention relates to the technical field of scaffolds, in particular to a supporting platform suitable for hydraulic engineering construction and a construction method.
Background
In the hydraulic engineering construction, often need set up supporting platform in one side of dam for place devices such as artifical or material.
The existing general platforms are all small scaffold structures, and are single in structure and poor in functionality, and in addition, the structures and components of the platforms have initial defects, such as large initial bending and corrosion of rod pieces, large erection size errors, large load eccentricity and the like, and large constraint variation of the scaffold at the connection points of the platforms and walls.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a supporting platform suitable for hydraulic engineering construction and a construction method.
In order to achieve the purpose, the invention adopts the following technical scheme:
a supporting platform suitable for hydraulic engineering construction comprises four bearing plates, wherein two bearing plates on the same side are in a group, two first hydraulic cylinders are arranged on one bearing plate in the same group, two first hydraulic cylinders on the same side are in a group, the tail ends of piston rods of the two first hydraulic cylinders in the same group are jointly fixed with a backing plate, the lower end of the backing plate is provided with a walking mechanism, first connecting blocks are fixed on two sides of the upper end of each bearing plate, corresponding second connecting blocks are arranged on the upper ends of the first connecting blocks, one first connecting block and one second connecting block on the same side are in a group, a folding frame is rotatably connected between the first connecting block and the second connecting block in the same group, transverse plates are respectively fixed on the upper ends of the two second connecting blocks, fixing plates are arranged on the upper ends of the transverse plates, and twelve connecting rods are arranged between the two folding frames and the two fixing plates, sliding connection has fixed pipe between two connecting rods on the same horizontal plane, and it is connected with the second pneumatic cylinder to rotate on one of them fixed pipe, the piston rod end of second pneumatic cylinder rotates to be connected on another fixed pipe, installs eight stay tubes on eight other connecting rods jointly, and is located two stay tubes on the same horizontal plane and installs respectively on two connecting rods on the same horizontal plane, and the pedal has been erect jointly to the upper end of two stay tubes on the same horizontal plane.
Preferably, four limiting plates are fixed on two connecting rods on the same horizontal plane, the two limiting plates on the same side are in a group, openings are arranged at two ends of two supporting tubes on the same horizontal plane, the openings at two ends of the same supporting tube are clamped on the two connecting rods, and one end of the supporting tube is located between the two limiting plates on the same side.
Preferably, the four corners of the lower end of the pedal are provided with threaded blind holes, the threaded blind holes are internally sleeved with positioning rods, the positioning rods are sleeved with rubber sleeves, the rubber sleeves are located on the two supporting tubes on the same plane and provided with two jacks, and the lower ends of the four positioning rods extend into the four jacks.
Preferably, running gear is including fixing the protection box at the backing plate lower extreme, bottom in the protection box is equipped with the through-hole, sliding connection has the mounting panel in the protection box, the lower extreme both sides of mounting panel all are fixed with the mounting, it is connected with the gyro wheel to rotate on the mounting, the both ends of mounting panel all are connected with locking mechanism.
Preferably, the folding frame is composed of three groups of rotating plates which are arranged in a pairwise crossing manner, the rotating plates which are arranged in a pairwise crossing manner are connected in a rotating manner, and the rotating plates which are arranged in a pairwise crossing manner are connected in a rotating manner.
Preferably, locking mechanism is including running through the screw rod that sets up at protection box both ends, the both sides of protection box are equidistant to be equipped with a plurality of through-holes, the both sides of mounting panel all are equipped with the screw thread through-hole, and the one end of a screw rod with one side runs through the through-hole and the screw thread cup joints in the screw thread through-hole, the one end of screw rod is fixed with the connector.
Preferably, the both sides of mounting panel all are equipped with two draw-in grooves, all be fixed with two guide rails that correspond with the draw-in groove on the relative lateral wall in the protection box, and a draw-in groove joint with one side is on a guide rail with one side.
Preferably, two sliding plates are slidably connected in the fixed tube, and a connecting rod on the same side penetrates through the side wall of the fixed tube on the same side and one end of the sliding plate fixed on the same side.
Preferably, the guide rods are fixed at one end of each of the two bearing plates, and one end of one guide rod on the same side penetrates through one bearing plate on the other side and extends to one end of the other bearing plate.
A construction method suitable for a supporting platform for hydraulic engineering construction comprises the following steps:
s1, selecting the number of corresponding platforms according to the construction requirement, and forming a group by two;
s2, hoisting the corresponding platform to a construction operation area by using hoisting equipment;
s3, pushing the corresponding platforms into a group two by two to an area needing to be built by an operator through the travelling mechanisms of the platforms, and retracting and fixing the travelling mechanisms;
s3, adjusting the width of the platform to a corresponding distance according to the requirements of the terrain environment;
s4, after the step is finished, the step pedal stepped by the operator is gradually set up and installed;
s5, adjusting the height of the platform according to the requirement;
s6, climbing a support platform by workers to perform construction operation;
and S7, after one operation is finished, the hoisting mechanism hoists the whole platform, the operator releases the travelling mechanism and then quickly moves to the next place to carry out construction operation.
The invention has the following advantages:
1. according to the invention, through the combination of the four first hydraulic cylinders and the second hydraulic cylinder, the height and width of the construction platform are adjusted, and the application range and the use space of the construction platform are greatly enlarged;
2. the combination of the hydraulic cylinders arranged at the four corners and the base plate can stably and fully support the scaffold, so that the bearing performance and the structural strength of the scaffold are ensured;
3. the invention can ensure the rapid splicing and installation of the pedal plate, can also ensure the firmness and stability after the pedal plate is installed by the connection of the plug-in and buckle-connection modes of the limiting plate, the supporting tube and the pedal plate,
4. by combining the travelling mechanism and the integral modularization, the invention can greatly reduce the erection speed of the platform when constructing different areas, reduce the construction time cost and the erection labor cost and improve the construction efficiency;
in conclusion, the construction platform can be quickly assembled, the firmness of the assembled construction platform can be ensured, the construction platform can be adapted to construction areas with different heights and widths, the application range and the use space of the construction platform are expanded, the firmness and the stability of the whole structure are ensured by the combination of the construction platform, the hydraulic cylinder and the folding machine, the structural strength is effectively ensured, and the practicability is high.
Drawings
Fig. 1 is a schematic structural diagram of a supporting platform suitable for hydraulic engineering construction according to the present invention;
FIG. 2 is a pedal installation state diagram of a support platform for hydraulic engineering construction according to the present invention;
fig. 3 is a schematic structural diagram of a support tube suitable for a support platform for hydraulic engineering construction according to the present invention;
FIG. 4 is a schematic structural diagram of connection between a pedal and a support tube of the support platform for hydraulic engineering construction according to the present invention;
FIG. 5 is a schematic view of a mounting structure of a positioning rod and a pedal of the support platform for hydraulic engineering construction according to the present invention;
FIG. 6 is an enlarged view of a structure at the position A of the supporting platform for hydraulic engineering construction, which is provided by the invention;
FIG. 7 is a schematic view of a connection structure of a mounting plate and a roller suitable for a support platform for hydraulic engineering construction according to the present invention;
FIG. 8 is a schematic view of the internal structure of a protection box suitable for a support platform for hydraulic engineering construction according to the present invention;
FIG. 9 is a schematic view of a slide plate arrangement structure of a support platform for hydraulic engineering construction according to the present invention;
fig. 10 is an enlarged view of a structure at a position B of the supporting platform for hydraulic engineering construction according to the present invention.
In the figure: the device comprises a mounting plate 1, a fixing plate 2, a transverse plate 3, a limiting plate 4, a first hydraulic cylinder 5, a backing plate 6, a folding frame 7, a connecting rod 8, a second hydraulic cylinder 9, a fixing pipe 10, a first connecting block 11, a bearing plate 12, a second connecting block 13, a pedal 14, a supporting pipe 15, a positioning rod 16, a jack 17, an opening 18, a rubber sleeve 19, a threaded blind hole 20, a guide rod 21, a connector 22, a protection box 23, a through hole 24, a screw 25, a sliding plate 26, an idler wheel 27, a fixing part 28, a clamping groove 29 and a threaded through hole 30.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-10, a supporting platform suitable for hydraulic engineering construction includes four bearing plates 12, two bearing plates 12 with one side are in a group, two first hydraulic cylinders 5 are all installed on one bearing plate 12 in the same group, and two first hydraulic cylinders 5 with one side are in a group, a backing plate 6 is jointly fixed at the end of the piston rod of two first hydraulic cylinders 5 in the same group, the lower end of the backing plate 6 is provided with a traveling mechanism, first connecting blocks 11 are fixed on both sides of the upper end of the bearing plate 12, corresponding second connecting blocks 13 are arranged on the upper end of the first connecting blocks 11, a first connecting block 11 and a second connecting block 13 on the same side are in a group, the first connecting block 11 and the second connecting blocks 13 are used for connecting a folding frame 7, so that the folding frame 7 can be ensured to stably rise or fall, and the effects of installation limiting and stable connection are achieved.
In the invention, folding frames 7 are rotatably connected between a first connecting block 11 and a second connecting block 13 in the same group, transverse plates 3 are respectively fixed at the upper ends of the two second connecting blocks 13, fixing plates 2 are installed at the upper ends of the transverse plates 3, twelve connecting rods 8 are installed between the two groups of folding frames 7 and the two fixing plates 2, fixing pipes 10 are slidably connected between the two connecting rods 8 on the same horizontal plane, one fixing pipe 10 is rotatably connected with a second hydraulic cylinder 9, the tail end of a piston rod of the second hydraulic cylinder 9 is rotatably connected to the other fixing pipe 10, eight supporting pipes 15 are jointly installed on the other eight connecting rods 8, two supporting pipes 15 on the same horizontal plane are respectively installed on the two connecting rods 8 on the same horizontal plane, a pedal 14 is jointly erected at the upper ends of the two supporting pipes 15 on the same horizontal plane, and the length of the pedal 14 is 3-8m, the distances of different degrees are selected according to use requirements, and the width of the pedal 14 is 0.5-1.5m, so that the construction requirements of various types are conveniently met.
In the invention, four limiting plates 4 are fixed on two connecting rods 8 on the same horizontal plane, two limiting plates 4 on the same side are in a group, two ends of two supporting tubes 15 on the same horizontal plane are respectively provided with a notch 18, the notches 18 at two ends of the same supporting tube 15 are respectively clamped on the two connecting rods 8, one end of the supporting tube 15 is positioned between the two limiting plates 4 on the same side, the support 15 can be conveniently erected by utilizing the notches 18, meanwhile, the quick positioning can be realized, meanwhile, the firm clamping and fixing can be realized, and the installation stability can be ensured.
In the invention, threaded blind holes 20 are respectively arranged at four corners of the lower end of a pedal 14, positioning rods 16 are sleeved in the threaded blind holes 20, rubber sleeves 19 are sleeved on the positioning rods 16, the rubber sleeves 19 are sleeved on the positioning rods 16 and are convenient to detach, friction is increased after the positioning rods are inserted, the stability after insertion is ensured, two insertion holes 17 are respectively arranged on two support tubes 15 on the same plane, the lower ends of four positioning rods 16 extend into the four insertion holes 17 and are convenient to insert quickly, comprehensive support can be carried out on four corners simultaneously, and the safety and the stability of workers during construction are ensured.
In the invention, the travelling mechanism comprises a protection box 23 fixed at the lower end of the base plate 6, a through hole is arranged at the bottom in the protection box 23, the mounting plate 1 is connected in the protection box 23 in a sliding manner, fixing pieces 28 are fixed on both sides of the lower end of the mounting plate 1, rollers 27 are rotatably connected on the fixing pieces 28, locking mechanisms are connected at both ends of the mounting plate 1, the travelling mechanism can store the rollers 27 in the protection box 23 when not moving, the construction platform is stably supported by using the protection box 23, and meanwhile, when moving is needed, the platform can be lifted by using a hoisting device, and the rollers 27 on the travelling mechanism are released again.
In the invention, the folding frame 7 is composed of three groups of rotating plates which are arranged in a pairwise crossing manner, the rotating plates which are arranged in a pairwise crossing manner are connected in a rotating manner, the distance between two adjacent connecting rods 8 after the folding frame 7 is unfolded is 2.5m, and the adjustable range is 1-2.5 m.
In the invention, the locking mechanism comprises screw rods 25 penetrating through two ends of the protection box 23, a plurality of through holes 24 are arranged at equal intervals on two sides of the protection box 23, threaded through holes 30 are arranged on two sides of the mounting plate 1, one end of one screw rod 25 on the same side penetrates through the through hole 24 and is sleeved in the threaded through hole 30 in a threaded manner, and a connector 22 is fixed at one end of the screw rod 25 and is used for fixing the mounting plate 1 through the screw rod 25 after the roller 27 is released or stored.
In the invention, two clamping grooves 29 are respectively arranged at two sides of the mounting plate 4, two guide rails 31 corresponding to the clamping grooves 29 are respectively fixed on opposite side walls in the protection box 23, one clamping groove 29 at the same side is clamped on one guide rail 31 at the same side, and the combination of the clamping grooves 29 and the guide rails 31 can ensure that the roller 27 smoothly and stably slides up and down.
In the invention, two sliding plates 26 are slidably connected in the fixed tube 10, a connecting rod 8 on the same side penetrates through the side wall of one fixed tube 10 on the same side and one end of one sliding plate 26 fixed on the same side, the sliding plates 26 are arranged in the fixed tube 10 to ensure the limiting and connection after the left and right expansion, guide rods 21 are fixed at one ends of two bearing plates 12, one end of one guide rod 21 on the same side penetrates through one bearing plate 12 on the other side and extends to one end of the other bearing plate, and the guide rods 21 ensure the stable movement when the platform is adjusted left and right and play a supporting role at the same time.
The construction method of the supporting platform for the hydraulic engineering construction comprises the following steps: selecting the corresponding number of platforms according to the construction requirement, and forming a group by two; hoisting the corresponding platform to a construction operation area by using hoisting equipment; an operator pushes the corresponding platforms in pairs into a group to be erected through the traveling mechanisms of the platforms, and the traveling mechanisms are retracted and fixed; adjusting the width of the platform to a corresponding distance according to the requirements of the terrain environment; after the installation is finished, the pedal treaded by the operator is gradually erected and installed; then adjusting the height of the platform according to the requirement; a worker climbs the supporting platform to carry out construction operation; after one operation is finished, the hoisting mechanism hoists the whole platform, and an operator releases the travelling mechanism and then quickly moves to the next place to carry out construction operation.
In the invention, when constructing a hydraulic junction such as a low dam, the construction platform is moved to the corresponding position by using the hoisting equipment, the folding frame 7 is driven to unfold by the expansion and contraction of the piston rod of the second hydraulic cylinder 9, after the folding frame 7 is completely unfolded, the supporting tubes 15 are taken out, the notches 18 at the two ends of the supporting tubes 15 are clamped on two connecting rods 8 on the same plane of the two groups of bearing plates 12, the eight supporting tubes 15 are clamped in sequence, a pedal 14 is arranged at the upper ends of two support tubes 15 on the same plane, four corners of the lower end of the pedal 14 are sleeved with a positioning rod 16 through screw threads, then inserted into the four insertion holes 17 on the same plane, after the four pedal plates 14 are installed, the height of the scaffold is adjusted by adjusting the telescopic range of the piston rods through the four first hydraulic cylinders 5 so as to adapt to the corresponding construction height, and after the construction is completed, workers construct on the pedal 14.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The utility model provides a be applicable to supporting platform for hydraulic engineering construction, includes four loading boards (12), its characterized in that: the two bearing plates (12) on the same side are in a group, two first hydraulic cylinders (5) are arranged on one bearing plate (12) in the same group, the two first hydraulic cylinders (5) on the same side are in a group, the tail ends of the piston rods of the two first hydraulic cylinders (5) in the same group are jointly fixed with a backing plate (6), the lower end of the backing plate (6) is provided with a walking mechanism, the two sides of the upper end of the bearing plate (12) are respectively fixed with a first connecting block (11), the upper end of the first connecting block (11) is provided with a corresponding second connecting block (13), the first connecting block (11) and the second connecting block (13) on the same side are in a group, a folding frame (7) is rotatably connected between the first connecting block (11) and the second connecting block (13) in the same group, and the upper ends of the two second connecting blocks (13) are respectively fixed with a transverse plate (3), fixed plate (2) are installed to the upper end of diaphragm (3), install twelve connecting rod (8) between two sets of folding leg (7) and two fixed plate (2), and sliding connection has fixed pipe (10) between two connecting rod (8) on the same horizontal plane, and it is connected with second pneumatic cylinder (9) to rotate on one of them fixed pipe (10), the piston rod end of second pneumatic cylinder (9) rotates to be connected on another fixed pipe (10), installs eight stay tubes (15) jointly on eight connecting rod (8) in addition, and is located two stay tubes (15) on the same horizontal plane and installs respectively on two connecting rod (8) on the same horizontal plane, and the upper end of two stay tubes (15) on the same horizontal plane is erect pedal (14) altogether.
2. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: four limiting plates (4) are fixed on two connecting rods (8) on the same horizontal plane, two limiting plates (4) on the same side are in a group, openings (18) are arranged at two ends of two supporting tubes (15) on the same horizontal plane, the openings (18) at two ends of the same supporting tube (15) are clamped on the two connecting rods (8), and one end of the supporting tube (15) is located between the two limiting plates (4) on the same side.
3. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: the lower extreme four corners of pedal (14) all is equipped with screw thread blind hole (20), screw thread blind hole (20) internal thread has cup jointed locating lever (16), the cover is equipped with rubber sleeve (19) on locating lever (16), and is located all to be equipped with two jacks (17) on two stay tubes (15) of coplanar, and the lower extreme of four locating levers (16) extends to in four jacks (17).
4. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: running gear is including fixing protection box (23) at backing plate (6) lower extreme, bottom in protection box (23) is equipped with the through-hole, sliding connection has mounting panel (1) in protection box (23), the lower extreme both sides of mounting panel (1) all are fixed with mounting (28), it is connected with gyro wheel (27) to rotate on mounting (28), the both ends of mounting panel (1) all are connected with locking mechanism.
5. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: the folding frame (7) is composed of three groups of rotating plates which are arranged in a pairwise crossing manner, the rotating plates which are arranged in a pairwise crossing manner are connected in a rotating manner, and the rotating plates which are arranged in a pairwise crossing manner are connected in a rotating manner.
6. The supporting platform for hydraulic engineering construction according to claim 4, wherein: locking mechanism is including running through screw rod (25) that set up at protection box (23) both ends, the both sides equidistant of protection box (23) are equipped with a plurality of through-holes (24), the both sides of mounting panel (1) all are equipped with screw thread through-hole (30), and the one end of a screw rod (25) with one side runs through-hole (24) and the screw thread cup joints in screw thread through-hole (30), the one end of screw rod (25) is fixed with connector (22).
7. The supporting platform for hydraulic engineering construction according to claim 4, wherein: the both sides of mounting panel (4) all are equipped with two draw-in grooves (29), all be fixed with two guide rail (31) that correspond with draw-in groove (29) on the relative lateral wall in protection box (23), and on draw-in groove (29) joint with one side guide rail (31) with one side.
8. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: two sliding plates (26) are connected in the fixed tube (10) in a sliding mode, and one connecting rod (8) on the same side penetrates through the side wall of one fixed tube (10) on the same side and is fixed at one end of one sliding plate (26) on the same side.
9. The supporting platform for the hydraulic engineering construction according to claim 1, wherein: one end of each of the two bearing plates (12) is fixed with a guide rod (21), and one end of one guide rod (21) on the same side penetrates through the other bearing plate (12) and extends to one end of the other bearing plate.
10. A construction method suitable for a supporting platform for hydraulic engineering construction is characterized by comprising the following steps:
s1, selecting the number of corresponding platforms according to the construction requirement, and forming a group by two;
s2, hoisting the corresponding platform to a construction operation area by using hoisting equipment;
s3, pushing the corresponding platforms into a group two by two to an area needing to be built by an operator through the travelling mechanisms of the platforms, and retracting and fixing the travelling mechanisms;
s3, adjusting the width of the platform to a corresponding distance according to the requirements of the terrain environment;
s4, after the step is finished, the step pedal stepped by the operator is gradually set up and installed;
s5, adjusting the height of the platform according to the requirement;
s6, climbing a support platform by workers to perform construction operation;
and S7, after one operation is finished, the hoisting mechanism hoists the whole platform, the operator releases the travelling mechanism and then quickly moves to the next place to carry out construction operation.
CN202111304435.1A 2021-11-05 2021-11-05 Supporting platform suitable for hydraulic engineering construction and construction method Pending CN113882642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111304435.1A CN113882642A (en) 2021-11-05 2021-11-05 Supporting platform suitable for hydraulic engineering construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111304435.1A CN113882642A (en) 2021-11-05 2021-11-05 Supporting platform suitable for hydraulic engineering construction and construction method

Publications (1)

Publication Number Publication Date
CN113882642A true CN113882642A (en) 2022-01-04

Family

ID=79016472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111304435.1A Pending CN113882642A (en) 2021-11-05 2021-11-05 Supporting platform suitable for hydraulic engineering construction and construction method

Country Status (1)

Country Link
CN (1) CN113882642A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060086569A1 (en) * 2004-10-26 2006-04-27 Jimmydeer Llc Mobile hunting stand
CN208718326U (en) * 2018-08-23 2019-04-09 海宁新越建设有限公司 A kind of building construction scaffold
WO2019079683A1 (en) * 2017-10-20 2019-04-25 Oshkosh Corporation Scissor desk access arrangement
CN110700538A (en) * 2019-10-08 2020-01-17 日照市伟业工具股份有限公司 Building scaffold convenient to dismouting
CN210713736U (en) * 2019-04-29 2020-06-09 丁奇 Building construction is with safe elevating platform that has and prevent weighing down thing function
CN210976527U (en) * 2019-10-28 2020-07-10 李金龙 Movable building construction platform
CN211850716U (en) * 2020-03-10 2020-11-03 四川天合源工程技术有限公司 Construction platform for building construction decoration service
CN212480539U (en) * 2020-04-10 2021-02-05 天津犇犇科技有限公司 Special peripheral equipment mounting frame for image processing work
CN112554526A (en) * 2020-11-27 2021-03-26 南京铁道职业技术学院 Lifting platform for civil engineering construction with guardrail capable of being adjusted in lifting mode
CN112854725A (en) * 2019-11-28 2021-05-28 张传生 Improved generation quick assembly disassembly scaffold frame

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060086569A1 (en) * 2004-10-26 2006-04-27 Jimmydeer Llc Mobile hunting stand
WO2019079683A1 (en) * 2017-10-20 2019-04-25 Oshkosh Corporation Scissor desk access arrangement
CN208718326U (en) * 2018-08-23 2019-04-09 海宁新越建设有限公司 A kind of building construction scaffold
CN210713736U (en) * 2019-04-29 2020-06-09 丁奇 Building construction is with safe elevating platform that has and prevent weighing down thing function
CN110700538A (en) * 2019-10-08 2020-01-17 日照市伟业工具股份有限公司 Building scaffold convenient to dismouting
CN210976527U (en) * 2019-10-28 2020-07-10 李金龙 Movable building construction platform
CN112854725A (en) * 2019-11-28 2021-05-28 张传生 Improved generation quick assembly disassembly scaffold frame
CN211850716U (en) * 2020-03-10 2020-11-03 四川天合源工程技术有限公司 Construction platform for building construction decoration service
CN212480539U (en) * 2020-04-10 2021-02-05 天津犇犇科技有限公司 Special peripheral equipment mounting frame for image processing work
CN112554526A (en) * 2020-11-27 2021-03-26 南京铁道职业技术学院 Lifting platform for civil engineering construction with guardrail capable of being adjusted in lifting mode

Similar Documents

Publication Publication Date Title
CN113235948B (en) Spatial vertical rotation construction method for steel structure roof of large-scale venue
CN106320713B (en) 3D building printing operation platform
CN115095161A (en) Hydraulic pushing and sliding construction process for truss structure
CN214169903U (en) Hydraulic jacking climbing mold mechanism
CN117248714B (en) Construction platform and construction method for horizontal beam plates of mutually climbing steel upright posts
CN113882642A (en) Supporting platform suitable for hydraulic engineering construction and construction method
CN112049019A (en) Accurate installation structure and construction method for complex three-dimensional variable cross-section arch rib
CN208918545U (en) A kind of extension type tunnel excavation operation platform
CN114991305B (en) Full-flexible spoke type cable net structure and method for integrally lifting framework-free aerial deformation of full-flexible spoke type cable net structure
CN113775881B (en) Movable urban bridge erects surveyor's level
CN112758862B (en) Roller way installation method
CN217517652U (en) Be applicable to multi-functional assembly platform truck of full assembled subway station formula of exempting from to tear open
CN219081586U (en) Jacking mobile device and multifunctional rack suitable for intermediate wall construction
CN116557007B (en) Tunnel arch frame installation device
CN115467258B (en) High efficiency culvert construction bearing structure
CN220081500U (en) Small-section tunnel excavation self-moving type foldable trolley
CN219690419U (en) Flood control wall for flood control engineering
CN219858339U (en) Box for engineering machinery
CN214530234U (en) Self-walking type pushing equipment
CN218624248U (en) Variable cross-section ditch cable trough construction trolley
CN110748148B (en) Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN117052137B (en) Large grid steel structure sliding installation device and construction method thereof
CN108413157B (en) Method and device for fine tuning of position of large pipeline
CN112726571B (en) Method for manufacturing reinforcement cage
CN221524165U (en) Scaffold frame for construction is built in room convenient to remove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220104