CN113863641A - Construction platform and construction platform system - Google Patents

Construction platform and construction platform system Download PDF

Info

Publication number
CN113863641A
CN113863641A CN202111036221.0A CN202111036221A CN113863641A CN 113863641 A CN113863641 A CN 113863641A CN 202111036221 A CN202111036221 A CN 202111036221A CN 113863641 A CN113863641 A CN 113863641A
Authority
CN
China
Prior art keywords
construction platform
bottom plate
chords
chord
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111036221.0A
Other languages
Chinese (zh)
Other versions
CN113863641B (en
Inventor
何冠儒
王航
张佶
李义轩
何健
许海岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong 20 Metallurgical Construction Co ltd
China MCC20 Group Corp Ltd
Original Assignee
Guangdong 20 Metallurgical Construction Co ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong 20 Metallurgical Construction Co ltd, China MCC20 Group Corp Ltd filed Critical Guangdong 20 Metallurgical Construction Co ltd
Priority to CN202111036221.0A priority Critical patent/CN113863641B/en
Publication of CN113863641A publication Critical patent/CN113863641A/en
Application granted granted Critical
Publication of CN113863641B publication Critical patent/CN113863641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/003Devices for storing material on the scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/141Railings with an access door or the like therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention provides a construction platform and a construction platform system. The construction platform comprises: the supporting mechanism, the bottom plate and the three side plates; the supporting mechanism is arranged on the steel member; the bottom plate is arranged on the supporting mechanism, the three side plates are detachably arranged on the bottom plate and are sequentially detachably connected, and the three side plates and the steel member enclose a construction space with a quadrangular cross section; each side plate can be arranged on the same plane with the bottom plate; each side plate is provided with a protective door which can be opened and closed. According to the invention, the three side plates and the steel member can enclose a construction space, so that the construction of workers is facilitated, each side plate plays a role in protecting the workers, each side plate can be arranged at the position which is on the same plane with the bottom plate, the walking of the workers is facilitated, the construction requirements of each position can be met, the overall strength is effectively improved, the influence of external force is not easily caused, the safety is improved, the structure is simple, the side plates can be repeatedly used, the material is saved, the cost is lower, the deformation is not easily caused, and the potential safety hazard is reduced.

Description

Construction platform and construction platform system
Technical Field
The invention relates to the technical field of steel structure construction, in particular to a construction platform and a construction platform system.
Background
With the continuous improvement of construction enterprises in China on the construction capacity of building engineering, more structural forms appear in modern house buildings, particularly super high-rise buildings, and steel structures are more and more popular due to the advantages of convenience in construction and low manufacturing cost, so that a new direction is brought to the building industry. In the installation and construction of steel structures, particularly ultrahigh large-scale steel structures, external steel structure construction platforms are generally applied due to insufficient working surfaces.
Traditional steel construction platform is assembled by steel decking and steel railing and is constituteed, hugs closely steel column or steel sheet wall setting, supports on girder steel or steel corbel during the use. The inconvenience of such a construction platform lies in: the structure is simple, the wind force is easy to influence, and the safety is low; the size and the distance of the components need to be customized according to actual use, the materials cannot be reused, and the use cost is high; the assembled construction platform is easy to deform in the hoisting process, and inconvenience and potential safety hazards are brought to workers working on the super high-rise.
Disclosure of Invention
In view of this, the invention provides a construction platform, and aims to solve the problems that a steel structure construction platform in the prior art is low in safety, cannot be recycled and is easy to deform. The invention also provides a construction platform system.
In one aspect, the present invention provides a construction platform, comprising: the supporting mechanism, the bottom plate and the three side plates; the supporting mechanism is arranged on the steel member; the bottom plate is arranged on the supporting mechanism, the three side plates are detachably arranged on the bottom plate and are sequentially detachably connected, and the three side plates and the steel member enclose a construction space with a quadrangular cross section; each side plate can be arranged on the same plane with the bottom plate; each side plate is provided with a protective door which can be opened and closed.
Further, in the above-mentioned construction platform, each curb plate all includes: the protective door comprises a protective door, two protective assemblies and at least one locking assembly; the two protection assemblies are detachably arranged on the bottom plate and are separated by a preset distance; the protective door clamp is arranged between the two protective assemblies, the protective door is rotatably connected with one of the protective assemblies, and the protective door is connected with the other protective assembly through each locking assembly.
Further, in the above-mentioned construction platform, each protection component includes: the two first chord members, the first web members, the first upright posts and the two first protection plates are arranged in parallel; the two ends of the first vertical rod are detachably connected with the first ends of the two first chords in a one-to-one correspondence manner; the first web members are arranged between the two first chords and connected with the first vertical rods, the first web members divide the space between the first vertical rods and the two first chords into two frames, and the two first protection plates are arranged on the two frames in a one-to-one correspondence mode; one of the first chords is detachably connected with the bottom plate; the second ends of the two first chords in one of the protection assemblies and the first web members are rotatably connected with one side of the protection door, and the second ends of the two first chords in the other protection assembly are connected with the other side of the protection door through the locking assemblies.
Further, in the above-mentioned construction platform, the guard gate includes: the first web member, the first chord members arranged in parallel, the first upright rods arranged in parallel and the first protection plates are arranged in parallel; the two ends of each second chord are correspondingly connected with the two second vertical rods one by one; the second web members are arranged between the two second chords and are connected with the two second vertical rods, the space surrounded by the two second vertical rods and the two second chords is divided into two frames by the second web members, and the two second protection plates are arranged on the two frames in a one-to-one correspondence manner; one of the second upright stanchions is rotatably connected with one of the guard assemblies; the two second chords correspond to the second ends of the two first chords in the other protective component one by one, and the end part of each second chord is connected with the second end of the corresponding first chord through a locking component.
Further, in the above construction platform, each locking assembly includes: the first buckle and the two first circular rings; the two first circular rings are correspondingly arranged at the end part of the corresponding second chord and the second end of the corresponding first chord one by one; the first buckle includes: the two first clamping bodies are arranged at two ends of the first connecting body in a one-to-one correspondence manner, the two first clamping bodies are bent relatively and extend relatively, and the two first clamping bodies and the first connecting body enclose a C-shaped clamping space; the two first circular rings penetrate through the two first clamping bodies in a one-to-one correspondence manner and are arranged in the clamping space.
Further, in the above-mentioned construction platform, the bottom plate includes: four frame rods, a plurality of connecting rods and a plurality of connecting plates; the four frame rods are sequentially detachably connected end to form a quadrilateral framework in an enclosing mode, and each frame rod is arranged on the supporting mechanism; each connecting rod is arranged in the framework and divides the framework into a plurality of frames, and each frame is internally provided with a connecting plate; one of the frame rods contacts with the steel member, and the other three frame rods are detachably connected with the side plates.
Furthermore, in the construction platform, each end of each frame rod is provided with a second ring, and the second rings at the corresponding ends of any two adjacent frame rods are clamped and connected through a second buckle; a second ring is arranged at the first end of each first chord member which is in contact with the bottom plate, and the second ring at each end part of each frame rod is clamped with the second ring at the first end of the corresponding first chord member through a second buckle; and/or, in every protection component, every tip of first pole setting all is provided with the second ring, and the first end of every first chord all is provided with the second ring, and the second ring of every tip of first pole setting all passes through a second buckle looks joint with the second ring that corresponds the first end of first chord.
Further, among the above-mentioned construction platform, every second buckle all includes: the two second clamping bodies are correspondingly arranged at two ends of the second connecting body one by one, the two second clamping bodies are bent relatively and extend relatively, and the two second clamping bodies and the second connecting body enclose a C-shaped clamping space; the two corresponding second circular rings penetrate through the two second clamping bodies in a one-to-one correspondence manner and are arranged in the clamping space.
Further, in the above-mentioned construction platform, the support mechanism includes: at least one support assembly disposed on the steel member; wherein, each supporting component all includes: the steel structure comprises two support frames arranged in parallel on the steel structure and a connecting beam arranged between the two support frames; each support frame all includes: first supporting beam and the second supporting beam that is the tilt state, the first end of first supporting beam is connected with the steel member, and the second end of first supporting beam is connected with the first end of second supporting beam, and the second end of second supporting beam is connected with the steel member.
According to the steel structure construction platform, the supporting mechanism supports the bottom plate and the side plates, the three side plates and the steel member can enclose to form a construction space, construction of workers is facilitated, the side plates can play a role in protecting the workers, each side plate can be arranged at the position which is located on the same plane with the bottom plate, walking of the workers is facilitated, construction requirements of all positions can be met, overall strength is effectively improved, the steel structure construction platform is not easily influenced by external force, safety is improved, the steel structure construction platform is simple in structure, convenient to implement, reusable, low in material saving, low in cost and not easily deformed, potential safety hazards are reduced, and the problems that in the prior art, the steel structure construction platform is low in safety, cannot be reused and is easily deformed are solved.
In another aspect, the present invention further provides a construction platform system, including: at least one construction platform of any of the above and at least one complementary panel; and when any side plate in each construction platform is arranged on the same plane with the bottom plate, a supplement plate is arranged in a gap between the side plate and the adjacent side plate.
The invention can connect a plurality of construction platforms together to form a safe and efficient large construction platform, has the functions of large storage and walking for operators, is convenient for site construction, effectively improves the overall strength, is not easily influenced by external force, improves the safety, has simple structure, is convenient to implement, can be repeatedly used, saves materials, has lower cost, is not easily deformed, and reduces the potential safety hazard.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic side view of a construction platform according to an embodiment of the present invention;
fig. 2 is a schematic front view of a construction platform according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a bottom plate in the construction platform according to the embodiment of the present invention;
FIG. 4 is a schematic structural diagram of a locking assembly in a construction platform according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a first circular ring in the construction platform according to the embodiment of the present invention;
fig. 6 is a schematic structural diagram of a first buckle in the construction platform provided in the embodiment of the present invention;
FIG. 7 is a schematic structural diagram of a construction platform according to an embodiment of the present invention;
fig. 8 is a schematic structural diagram of a construction platform system according to an embodiment of the present invention during use.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
The construction platform comprises the following embodiments:
referring to fig. 1 to 2, there is shown a preferred structure of the construction platform in the present embodiment. As shown, the construction platform includes: a support mechanism 1, a bottom plate 2 and three side plates 3. Wherein the supporting mechanism 1 is used for being arranged on a steel member 4. Specifically, the support mechanism 1 includes: at least one support assembly. Each supporting component is arranged on the steel member 4, and each supporting component is arranged on the steel member 4 at intervals.
Each support assembly includes: two support frames 11 and a connecting beam 12. The two support frames 11 are arranged in parallel on the steel member 4, and a preset distance is formed between the two support frames 11, and the preset distance can be determined according to actual conditions, which is not limited in this embodiment. The connecting beam 12 is disposed between the two support frames 11.
Specifically, each support bracket 11 may include: a first support beam 111 and a second support beam 112. Wherein, the second supporting beam 112 is in an inclined state, the first end of the first supporting beam 111 is connected with the steel member 4, the second end of the first supporting beam 111 is connected with the first end of the second supporting beam 112, and the second end of the second supporting beam 112 is connected with the steel member 4. The first support beam 111 is perpendicular to the steel member 4, and the first support beam 111, the second support beam 112 and the steel member 4 form a right triangle. Both ends of the connecting beam 12 are connected to the first support beams 111 of the two support frames 11 in a one-to-one correspondence.
In specific implementation, only one supporting component may be provided, or a plurality of supporting components may be provided according to actual situations, and the number of the supporting components is not limited in this embodiment.
In specific implementation, both the first support beam 111 and the second support beam 112 may be formed of steel, and the material is Q235B. The first support beam 111 and the steel member 4, the first support beam 111 and the second support beam 112, and the second support beam 112 and the steel member 4 may be connected by welding.
The base plate 2 is provided to the support mechanism 1, and specifically, the base plate 2 is connected to each of the first support beams 111 and the connection beams 12 in each of the support assemblies.
Three curb plate 3 all detachably sets up in bottom plate 2, and three curb plate 3 can dismantle the connection in proper order, and three curb plate 3 encloses into a cross-section with steel member 4 and is tetragonal construction space. Specifically, the bottom plate 2 may have a quadrangular shape, one side of the bottom plate 2 is in contact with the steel member 4, and the remaining three sides of the bottom plate 2 are disposed in one-to-one correspondence with the three side plates 3. Every curb plate 3 all is perpendicular with bottom plate 2 mutually, and one of them curb plate 3 parallels with steel member 4, and two other curb plates 3 parallel and all are perpendicular mutually with steel member 4.
Each side plate 3 is detachable from the bottom plate 2 and is at the same plane with the bottom plate 2 after being detached, and each side plate 3 can be detachably connected with the bottom plate 2 again. Like this, according to actual need can dismantle one of them arbitrary curb plate 3 or two curb plates 3 or three curb plate 3 get off and then can dismantle with bottom plate 2 after being in the coplanar and be connected, then construction platform's whole is straight state, and the staff of being convenient for walks about to and be convenient for construct, specifically can see fig. 7.
Each side plate 3 is provided with a protective door 31 which can be opened and closed, so that workers can conveniently get in and out of the construction space.
It can be seen that, in this embodiment, supporting mechanism 1 supports bottom plate 2 and each curb plate 3, three curb plate 3 can enclose into a construction space with steel member 4, the staff's of being convenient for construction, each curb plate 3 can play the guard action to the staff, every curb plate 3 all can be arranged in and be in coplanar department with bottom plate 2, the staff's of being convenient for walk about, and can satisfy the construction demand of each position, the bulk strength has been improved effectively, be difficult to receive external force influence, the security has been improved, moreover, the steam generator is simple in structure, easy to implement, and repeatedly usable, and materials are saved, the cost is lower, still be difficult to warp, the potential safety hazard is reduced, the problem that steel construction platform security is low among the prior art, unable reuse and easy deformation is solved.
Referring to fig. 1 to 2, in the above embodiment, each side plate 3 may include: a guard door 31, two guard assemblies 32 and at least one locking assembly. Wherein, two protection component 32 all detachably set up in bottom plate 2 to, the interval preset distance between two protection component 32, protection door 31 press from both sides and locate between two protection component 32, then protection door 31 and two protection component 32 form a curb plate 3.
In specific implementation, two protection assemblies 32 are respectively disposed on the left and right sides of the protection door 31 in fig. 1.
The guard door 31 is rotatably connected to one of the guard assemblies 32, and the guard door 31 is connected to the other guard assembly 32 by locking assemblies. Thus, after the protective door 31 is locked by each locking assembly, the protective door 31 and the two protective assemblies 32 are in the same plane; after the protection door 31 is unlocked by each locking assembly, the protection door 31 can rotate relative to the protection assembly 32, that is, the protection door 31 can be in an open state, so that the staff can conveniently enter and exit.
Referring to fig. 2, each guard assembly 32 may include: two first chords 321, a first web member 322, a first upright 323 and two first guard plates 324. The two first chords 321 are arranged in parallel, two ends of the first vertical rod 323 correspond to the first ends of the two first chords 321 one to one, and each end of the first vertical rod 323 is detachably connected with the first end of the corresponding first chord 321. The two first chords 321 are perpendicular to the first vertical rod 323. The two first chords 321 and the first vertical rod 323 enclose a U-shaped space with a lateral opening.
The first web member 322 is interposed between the two first chords 321, and the first web member 322 is connected to the first vertical bar 323. Specifically, the first web member 322 is parallel to the two first chords 321, and a first end of the first web member 322 is connected to a middle portion of the first vertical bar 323. The first web member 322 divides a space between the first upright 323 and the two first chords 321 into two frames, and the two first protection plates 324 are disposed in the two frames in a one-to-one correspondence manner. Specifically, the first web member 322 divides the U-shaped space into two small U-shaped spaces, and a first protection plate 324 is disposed in each of the small U-shaped spaces.
In specific implementation, the first chord 321 may be a 50 × 40 × 2mm rectangular steel tube, the first web member 322 may be a 25 × 2mm rectangular steel tube, and the first vertical rod 323 may be a 50 × 40 × 2mm rectangular steel tube. Each of the first guard plates 324 may be a steel plate.
One of the first chords 321 is in contact with the base plate 2, and the first chord 321 is detachably connected to the base plate 2.
The second ends of the two first chords 321 and the second ends of the first web members 322 in one of the guard assemblies 32 are rotatably connected to one of the sides of the guard door 31. Preferably, the second ends of the two first chords 321 and the second end of the first web member 322 are provided with hinges 8, and each hinge 8 is connected to one side of the protective door 31.
The second ends of the two first chords 321 of the other guard assembly 32 are connected to the other side of the guard door 31 through respective locking assemblies, and the first web member 322 of the guard assembly 32 is in contact with the other side of the guard door 31.
The first vertical rods 323 in two adjacent side plates 3 are in contact, and the two first vertical rods 323 are detachably connected to realize the detachable connection between two adjacent side plates 3.
The guard door 31 may include: a second web 311, two second chords 312, two second vertical rods 313 and two second protection plates 314. Two second chords 312 are arranged in parallel, two second vertical rods 313 are arranged in parallel, two ends of each second chord 312 are connected with the two second vertical rods 313 in a one-to-one correspondence manner, and each second chord 312 is perpendicular to the two second vertical rods 313, so that a quadrilateral space is enclosed by the two second chords 312 and the two second vertical rods 313.
The second web member 311 is parallel to the two second chords 312, the second web member 311 is disposed between the two second chords 312, and two ends of the second web member 311 are respectively connected with the two second vertical rods 313 in a one-to-one correspondence manner. The second web member 311 divides a quadrilateral space enclosed by the two second vertical rods 313 and the two second chords 312 into two frames, and the two second protection plates 314 are disposed in the two frames in a one-to-one correspondence manner. Specifically, the second web member 311 divides the quadrangular space into two small quadrangular frames, each of which is provided therein with one second shielding plate 314.
Preferably, a welded connection may be formed between each second chord 312 and two second vertical rods 313, and between second web 311 and two second vertical rods 313.
In specific implementation, the second chord 312 may be a rectangular steel tube 50x40x2mm, the second web member 311 may be a rectangular steel tube 25x25x2mm, and the second vertical rod 313 may be a rectangular steel tube 40x40x2 mm. Each of the second guard plates 314 may be a steel plate.
One of the second upright bars 313 is rotatably connected with one of the guard assemblies 32, specifically, the second upright bar 313 on the left side of the guard door 31 is rotatably connected with the second ends of the two first chords 321 and the second ends of the first web members 322 of the guard assemblies 32 on the left side, and more specifically, the second upright bar 313 on the left side is rotatably connected with the second ends of the two first chords 321 and the second ends of the first web members 322 through hinges. The other second upright 313 is in contact with the right-hand guard assembly 32.
The two second chords 312 correspond to the second ends of the two first chords 321 in the other protective assembly 32, and the end of each second chord 312 is connected to the second end of the corresponding first chord 321 through a locking assembly. Specifically, the two second chords 312 correspond one-to-one to the two first chords 321 in the right side guard assembly 32. Each locking assembly is capable of locking or unlocking the corresponding second chord 312 and first chord 321.
Referring to fig. 4 to 6, each of the locking assemblies may include: a first snap 5 and two first rings 6. Two first rings 6 are disposed at the end of the corresponding second chord 312 and the second end of the first chord 321 in a one-to-one correspondence. Specifically, the end of the second chord 312 facing the right side guard assembly 32 is provided with a first circular ring 6, the second end of the first chord 321 in the right side guard assembly 32 is also provided with a first circular ring 6, and the two first circular rings 6 are in contact.
The first clip 5 includes: a first coupling body 51 and two first snap bodies 52. The two first engaging bodies 52 correspond to two end portions of the first connecting body 51 one by one, and a first end of each first engaging body 52 is connected to the corresponding end portion of the first connecting body 51. The second ends of the two first engaging members 52 are bent and extended oppositely, and the second ends of the two first engaging members 52 are not closed but have a certain gap. The two first engaging members 52 and the first connecting member 51 enclose a C-shaped engaging space, and the two first rings 6 are correspondingly inserted into the two first engaging members 52 and disposed in the engaging space. Specifically, the two first rings 6 correspond to the two first engaging bodies 52 one by one, and each first ring 6 is disposed through the corresponding first engaging body 52 and then disposed in the C-shaped engaging space.
During the concrete implementation, first buckle 5 can be the complete C type buckle of customization, and first connector 51 can be the straightway, and two first snap-fit bodies 52 all can be the elbow, and two elbows are buckled relatively and are extended relatively by the both ends of straightway and form, and two elbows enclose with the straightway and establish into a complete C type card and establish the space, and every first ring 6 all wears to locate behind the elbow that corresponds and arranges in the C type card and establishes the space.
In each protection component 32, each end of the first vertical rod 323 is provided with a second ring 9, the first end of each first chord 321 is also provided with a second ring 9, and the second ring 9 of each end of the first vertical rod 323 and the second ring 9 of the first end of the corresponding first chord 321 are respectively clamped by a second buckle.
Each second catch may include: the second connector and two second snap bodies. The two second clamping bodies are in one-to-one correspondence with the two end parts of the second connecting body, and the first end of each second clamping body is connected with the corresponding end part of the second connecting body. The second ends of the two second clamping bodies are bent and extended oppositely, and the second ends of the two second clamping bodies are not closed but have certain gaps. Two second snap bodies and second connector enclose to establish into a C type card and establish the space, and two corresponding second rings wear to locate two second snap bodies one-to-one and arrange in the card and establish the space. The structure of the second ring 9 and the second buckle is the same as the structure of the first ring 6 and the first buckle 5, and particularly, see fig. 4 to 6.
During concrete implementation, the second buckle can be the complete C type buckle of customization, and the second connector can be the straightway, and two second block bodies all can be the elbow, and two elbows are buckled relatively and are extended relatively by the both ends of straightway and form, and two elbows enclose with the straightway and establish into a complete C type card and establish the space, and every second ring 9 all wears to locate behind the elbow that corresponds and arranges in C type card and establishes the space.
In particular implementation, each first protection plate 324 is in contact with the second upright 313 of the protection door 31.
In specific implementation, the first vertical rods 323 in two adjacent side plates 3 are in contact, and the two first vertical rods 323 in contact can be connected with the second snap through the second ring 9, so as to realize the detachable connection between the two first vertical rods 323.
It can be seen that, in this embodiment, each side plate 3 has a simple structure, and is convenient to implement, and each first vertical rod 323 in each protection component 32 is connected with two first chords 321 through the second ring 9 and the second snap-fit clip, so that the installation and the detachment are convenient. After the locking assembly of the protection door 31 and the right protection assembly 32 is unlocked, the protection door 31 can rotate relative to the left protection assembly 32, so that the protection door 31 is in an open state; after the locking assembly of the protection door 31 and the right protection assembly 32 is locked, the protection door 31 and the two protection assemblies 32 are in the same plane, so that the protection door 31 is in a closed state.
Referring to fig. 1 and 3, in the above embodiments, the bottom plate 2 includes: four frame bars 21, a plurality of connecting bars 22 and a plurality of connecting plates 23. Wherein, four frame poles 21 are in turn detachably connected end to end, and any two adjacent frame poles 21 are all vertical, and four frame poles 21 enclose into a quadrangular skeleton. Each frame bar 21 is provided to the support mechanism 1.
Specifically, each end of each frame rod 21 is provided with a second ring 9, and the second rings 9 at the corresponding ends of any two adjacent frame rods 21 are clamped together by a second buckle, so that two adjacent frame rods 21 are connected together.
Each connecting rod 22 all sets up in the skeleton to, each connecting rod 22 separates into a plurality of frames with the skeleton, all sets up a connecting plate 23 in every frame. Specifically, the connecting rods 22 are arranged to intersect vertically within the framework to form a grid.
In specific implementation, each frame bar 21 and each connecting bar 22 can be a 50 × 40 × 2mm rectangular steel tube, and each connecting plate 23 can be a 2mm thick steel plate. The connecting rods 22 and the frame rods 21 may be connected by welding.
One of the frame bars 21 is in contact with the steel member 4, and the other three frame bars 21 are detachably connected to the corresponding side plates 3.
Specifically, the first end of each first chord 321 contacting the bottom plate 2 is provided with a second ring 9, and the second ring 9 of each end of each frame bar 21 is clamped with the second ring 9 of the first end of the corresponding first chord 321 through a second clamp.
Each second catch may include: the second connector and two second snap bodies. The two second clamping bodies are in one-to-one correspondence with the two end parts of the second connecting body, and the first end of each second clamping body is connected with the corresponding end part of the second connecting body. The second ends of the two second clamping bodies are bent and extended oppositely, and the second ends of the two second clamping bodies are not closed but have certain gaps. Two second snap bodies and second connector enclose and establish into a C type card and establish the space, and two corresponding second rings 9 wear to locate two second snap bodies one-to-one and arrange in the card and establish the space.
During concrete implementation, the second buckle can be the complete C type buckle of customization, and the second connector can be the straightway, and two second block bodies all can be the elbow, and two elbows are buckled relatively and are extended relatively by the both ends of straightway and form, and two elbows enclose with the straightway and establish into a complete C type card and establish the space, and every second ring 9 all wears to locate behind the elbow that corresponds and arranges in C type card and establishes the space.
In this embodiment, it can be seen that, the frame rods 21 in the bottom plate 2 are connected by the second ring 9 and the second snap, and the frame rods 21 in the bottom plate 2 are connected with the first chord 321 in contact by the second ring 9 and the second snap, so that the structure is simple and the implementation is convenient.
Preferably, each end of each frame bar 21 is provided with a second ring 9, the second rings 9 at the corresponding ends of any two adjacent frame bars 21 are clamped by a second clamp, the first end of each first chord 321 contacting with the bottom plate 2 is provided with the second ring 9, and the second ring 9 at each end of each frame bar 21 is clamped with the second ring 9 at the first end of the corresponding first chord 321 by a second clamp; and/or, in each protective component 32, each end of the first vertical rod 323 is provided with a second ring 9, the first end of each first chord 321 is provided with a second ring 9, and the second ring 9 of each end of the first vertical rod 323 and the second ring 9 of the first end of the corresponding first chord 321 are respectively clamped by a second buckle.
During specific implementation, bottom plate 2 and curb plate 3 are connected through second ring 9 and second buckle, also connect through second ring 9 and second buckle between two adjacent curb plates 3, then curb plate 3 can be dismantled from bottom plate 2 to curb plate 3 that will dismantle according to actual demand is connected through second ring 9 and second buckle with other curb plate 3, or the curb plate 3 that will dismantle is connected through second ring 9 and second buckle with bottom plate 2, in order to make up into various different patterns, as shown in fig. 7.
During specific implementation, a plurality of construction platforms can be arranged at the same time, and after a single construction platform is manufactured, each side plate 3 is flatly placed to be on the same plane with the bottom plate 2. Then, also set level adjacent construction platform's curb plate 3, each curb plate 3 after will setting level can dismantle the connection, like this, can connect into a large-scale construction platform with a plurality of construction platforms of originally discretization, possesses large-scale storing and supplies the function that the staff walked. That is to say, can link into an organic whole with a plurality of parts, form safe efficient large-scale construction platform and interim warehouse, the application is convenient simple, and the material construction is simple and easy.
To sum up, in this embodiment, three curb plate 3 and steel member 4 can enclose into a construction space, the staff's of being convenient for construction, each curb plate 3 can play the guard action to the staff, every curb plate 3 all can be arranged in with bottom plate 2 and be in coplanar department, the staff's of being convenient for walk about, and can satisfy the construction demand of each position, the bulk strength has been improved effectively, be difficult to receive external force influence, the security has been improved, moreover, the steam generator is simple in structure, the operation of being convenient for, and repeatedly usable, and save material, the cost is lower, still be difficult to warp, the potential safety hazard is reduced.
The embodiment of the construction platform system comprises:
this embodiment has still provided a construction platform system, and this construction platform system includes: at least one construction platform of any of the above and at least one complementary panel 7. Wherein, each construction platform interval sets up, and arbitrary curb plate 3 in each construction platform is used for when arranging in the coplanar with bottom plate 2, and the clearance between adjacent curb plate 3 sets up supplementary board 7. Specifically, according to actual requirements, after the side plates 3 and the bottom plate 2 of the construction platform are placed on the same plane, in order to ensure the overall flatness and continuity, one or more supplementary plates 7 may be disposed in the gap between the side plates 3 after being placed flat for filling, as shown in fig. 8. The structure of each supplementary panel 7 may be the same as that of the side panel 3.
The specific implementation process of the construction platform may be as described above, and this embodiment is not described herein again.
During specific implementation, after a single construction platform is erected, the side plates 3 are flatly placed through the second loosening buckles, and the flat side plates 3 in the adjacent construction platforms are connected through the second buckles. Like this, start from the construction platform in the middle of, extend to all around gradually, connect into a large-scale construction platform with originally numerous individual construction platforms of discretization, possess large-scale storing and supply the operation personnel function of walking. Moreover, the steel members which are scattered can be connected into a safe and efficient large-scale construction platform and a temporary warehouse, and the steel members can be connected only by inserting the second buckles, so that the application is convenient and simple, the material construction is simple, the cost is saved, and the steel structure shape characteristics are not limited.
It can be seen that this embodiment can link together a plurality of construction platforms to form the large-scale construction platform of safe efficient, possess large-scale storing and supply the operation personnel walking function, and, site operation is convenient, has improved the bulk strength effectively, is difficult to receive external force influence, has improved the security, simple structure, and the implementation of being convenient for still repeatedly usable, material saving, the cost is lower, simultaneously, is difficult to warp, has reduced the potential safety hazard.
It should be noted that the principles of the construction platform and the construction platform system in the present invention are the same, and the relevant points can be referred to each other.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. A construction platform, comprising: the supporting mechanism (1), the bottom plate (2) and the three side plates (3); wherein the content of the first and second substances,
the supporting mechanism (1) is arranged on a steel component (4);
the bottom plate (2) is arranged on the supporting mechanism (1), the three side plates (3) are detachably arranged on the bottom plate (2) and are sequentially detachably connected, and the three side plates (3) and the steel member (4) form a construction space with a quadrangular cross section;
each side plate (3) can be arranged on the same plane with the bottom plate (2);
each side plate (3) is provided with a protective door (31) which can be opened and closed.
2. The construction platform according to claim 1, characterized in that each of said side plates (3) comprises: the protective door (31), two protective assemblies (32) and at least one locking assembly; wherein the content of the first and second substances,
the two protection assemblies (32) are detachably arranged on the bottom plate (2) and are separated by a preset distance;
the protective door (31) is clamped between the two protective assemblies (32), the protective door (31) is rotatably connected with one of the protective assemblies (32), and the protective door (31) is connected with the other protective assembly (32) through each locking assembly.
3. The construction platform according to claim 2, wherein each of said guard assemblies (32) comprises: the two first chord members (321), the first web members (322), the first vertical rods (323) and the two first protection plates (324) are arranged in parallel; wherein the content of the first and second substances,
two ends of the first vertical rod (323) are detachably connected with first ends of the two first chords (321) in a one-to-one correspondence manner;
the first web members (322) are arranged between the two first chords (321) and connected with the first vertical rods (323), the first web members (322) divide the space between the first vertical rods (323) and the two first chords (321) into two frames, and the two first protection plates (324) are arranged on the two frames in a one-to-one correspondence manner;
one of the first chords (321) is detachably connected with the bottom plate (2);
the second ends of the two first chords (321) in one of the protection assemblies (32) and the first web member (322) are rotatably connected with one side of the protection door (31), and the second ends of the two first chords (321) in the other protection assembly (32) are connected with the other side of the protection door (31) through the locking assemblies.
4. A construction platform according to claim 3, wherein said guard door (31) comprises: the two-dimensional protective plate comprises a second web member (311), two second chord members (312) arranged in parallel, two second vertical rods (313) arranged in parallel and two second protective plates (314); wherein the content of the first and second substances,
two ends of each second chord (312) are correspondingly connected with the two second vertical rods (313) one by one;
the second web member (311) is arranged between the two second chords (312) and is connected with the two second vertical rods (313), the space enclosed by the two second vertical rods (313) and the two second chords (312) is divided into two frames by the second web member (311), and the two second protection plates (314) are arranged on the two frames in a one-to-one correspondence manner;
one of the second uprights (313) is rotatably connected to one of the shielding assemblies (32);
the two second chords (312) correspond to the second ends of the two first chords (321) in the other protective component (32) in a one-to-one mode, and the end portion of each second chord (312) is connected with the second end of the corresponding first chord (321) through one locking component.
5. The construction platform of claim 4, wherein each of the locking assemblies comprises: a first buckle (5) and two first circular rings (6); wherein the content of the first and second substances,
the two first circular rings (6) are arranged at the end part of the corresponding second chord (312) and the second end of the corresponding first chord (321) in a one-to-one correspondence manner;
the first catch (5) comprises: the connecting structure comprises a first connecting body (51) and two first clamping bodies (52), wherein the two first clamping bodies (52) are arranged at two ends of the first connecting body (51) in a one-to-one correspondence manner, the two first clamping bodies (52) are bent oppositely and extend oppositely, and a C-shaped clamping space is defined by the two first clamping bodies (52) and the first connecting body (51);
the two first circular rings (6) penetrate through the two first clamping bodies (52) in a one-to-one correspondence manner and are arranged in the clamping space.
6. A construction platform according to claim 3, wherein said bottom plate (2) comprises: four frame rods (21), a plurality of connecting rods (22) and a plurality of connecting plates (23); wherein the content of the first and second substances,
the four frame rods (21) are detachably connected end to end in sequence to form a quadrilateral framework in an enclosing mode, and each frame rod (21) is arranged on the supporting mechanism (1);
each connecting rod (22) is arranged in the framework and divides the framework into a plurality of frames, and each frame is internally provided with one connecting plate (23);
one of the frame rods (21) is in contact with the steel member (4), and the other three frame rods (21) are detachably connected to the side plates (3).
7. The construction platform of claim 6,
each end part of each frame rod (21) is provided with a second circular ring, and the second circular rings at the corresponding end parts of any two adjacent frame rods (21) are clamped and connected through a second buckle;
a second ring is arranged at the first end of each first chord member (321) which is in contact with the bottom plate (2), and the second ring at each end of each frame rod (21) is clamped with the second ring at the first end of the corresponding first chord member (321) through a second buckle;
and/or the presence of a gas in the gas,
in every among protection component (32), every tip of first pole setting (323) all is provided with the second ring, every the first end of first chord member (321) all is provided with the second ring, the second ring of every tip of first pole setting (323) and the second ring of the first end of corresponding first chord member (321) all through a second buckle looks joint.
8. The construction platform of claim 7,
each said second catch includes: the two second clamping bodies are arranged at two ends of the second connecting body in a one-to-one correspondence manner, the two second clamping bodies are bent relatively and extend relatively, and the two second clamping bodies and the second connecting body enclose a C-shaped clamping space;
the two corresponding second circular rings penetrate through the two second clamping bodies in a one-to-one correspondence manner and are arranged in the clamping space.
9. The construction platform according to claim 1, wherein the support mechanism (1) comprises: at least one supporting assembly provided to said steel member (4); wherein the content of the first and second substances,
each of the support assemblies includes: the steel structure comprises two support frames (11) arranged in parallel on the steel member (4) and a connecting beam (12) arranged between the two support frames (11);
each of the support frames (11) comprises: first supporting beam (111) and second supporting beam (112) that are the tilt state, the first end of first supporting beam (111) with steel member (4) are connected, the second end of first supporting beam (111) with the first end of second supporting beam (112) is connected, the second end of second supporting beam (112) with steel member (4) are connected.
10. A construction platform system, comprising: -at least one construction platform according to any one of claims 1 to 9 and at least one complementary panel (7); wherein the content of the first and second substances,
and any side plate (3) in each construction platform is used for arranging the supplementary plate (7) in a gap between the side plate (3) and the adjacent side plate when the side plate and the bottom plate (2) are arranged on the same plane.
CN202111036221.0A 2021-09-03 2021-09-03 Construction platform and construction platform system Active CN113863641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111036221.0A CN113863641B (en) 2021-09-03 2021-09-03 Construction platform and construction platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111036221.0A CN113863641B (en) 2021-09-03 2021-09-03 Construction platform and construction platform system

Publications (2)

Publication Number Publication Date
CN113863641A true CN113863641A (en) 2021-12-31
CN113863641B CN113863641B (en) 2023-09-26

Family

ID=78989540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111036221.0A Active CN113863641B (en) 2021-09-03 2021-09-03 Construction platform and construction platform system

Country Status (1)

Country Link
CN (1) CN113863641B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205577446U (en) * 2016-04-20 2016-09-14 甘肃通源伟业机械设备股份有限公司 High altitude building work platform
CN207944695U (en) * 2018-01-22 2018-10-09 天津广坤腾阳建筑安装有限公司 aerial work platform
CN110565933A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 method for installing passenger-cargo elevator construction platform for building construction
CN212154457U (en) * 2020-04-03 2020-12-15 徐乙涵 Hidden yard door locking structure
CN212428012U (en) * 2020-01-10 2021-01-29 武汉建工集团股份有限公司 Parapet combination operation platform
CN213038816U (en) * 2020-06-18 2021-04-23 山东华卫建设集团有限公司 Cantilever platform for building construction
CN213171383U (en) * 2020-08-28 2021-05-11 山东北工机械有限公司 Platform for high-altitude operation vehicle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205577446U (en) * 2016-04-20 2016-09-14 甘肃通源伟业机械设备股份有限公司 High altitude building work platform
CN207944695U (en) * 2018-01-22 2018-10-09 天津广坤腾阳建筑安装有限公司 aerial work platform
CN110565933A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 method for installing passenger-cargo elevator construction platform for building construction
CN212428012U (en) * 2020-01-10 2021-01-29 武汉建工集团股份有限公司 Parapet combination operation platform
CN212154457U (en) * 2020-04-03 2020-12-15 徐乙涵 Hidden yard door locking structure
CN213038816U (en) * 2020-06-18 2021-04-23 山东华卫建设集团有限公司 Cantilever platform for building construction
CN213171383U (en) * 2020-08-28 2021-05-11 山东北工机械有限公司 Platform for high-altitude operation vehicle

Also Published As

Publication number Publication date
CN113863641B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
CN105971274A (en) Overhanging support frame formwork system and construction method thereof
AU731675B2 (en) Truss modular scaffolding system
KR20070010143A (en) Articulating work platform support system, work platform system, and methods of use thereof
CN105298107B (en) A kind of high carriage of High Large Cantilever structure
US6581898B2 (en) Bearing block for alignment and handling of concrete forms
CN106894625B (en) Modularized external hanging scaffold
CN113863641A (en) Construction platform and construction platform system
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN211691535U (en) Assembled platform of unloading of encorbelmenting
CN108545593A (en) A kind of tower crane handling plank shackle member
CN114412152A (en) Construction method for constructing I-steel scaffold by large-span overhanging structure of high-rise cluster project
CN216471928U (en) Tower crane and anti-climbing device thereof
CN217537782U (en) Construction steel platform device for large-span stereotyped overhanging structure
CN215717600U (en) Integrally assembled distribution equipment protection shed
CN219840529U (en) Door frame and door opening connecting and fixing device
CN215886132U (en) Anti-climbing platform for tower crane
CN216641382U (en) Turnover plate protection device between external scaffold and building main body
CN212452303U (en) A overhanging type operation platform for girder steel installation
CN214783302U (en) Support structure capable of meeting on-site construction security
CN211369582U (en) Novel discharge of encorbelmenting device
CN218346929U (en) A face limit protective bracket for building carrier plate construction
CN219100434U (en) Steel construction well outer facade curtain wall construction
CN218990849U (en) Side surface operation platform for cantilever component installation
CN218541800U (en) Safety fence for construction engineering management construction
CN108625484A (en) A kind of detachable reinforcing steel truss edges of boards support node structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant