CN113818700A - Leveling device and method for quickly mounting and positioning columnar member - Google Patents
Leveling device and method for quickly mounting and positioning columnar member Download PDFInfo
- Publication number
- CN113818700A CN113818700A CN202111164378.1A CN202111164378A CN113818700A CN 113818700 A CN113818700 A CN 113818700A CN 202111164378 A CN202111164378 A CN 202111164378A CN 113818700 A CN113818700 A CN 113818700A
- Authority
- CN
- China
- Prior art keywords
- hoop
- guide plate
- steel column
- positioning
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- 238000005192 partition Methods 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 abstract description 13
- 239000000463 material Substances 0.000 abstract description 12
- 238000011900 installation process Methods 0.000 abstract description 3
- 238000003466 welding Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to the technical field of construction of steel structures, in particular to a leveling device and a leveling method for quickly mounting and positioning a columnar member; the method is characterized in that: the positioning base comprises a hoop and hoop connectors, the hoop is arranged around the periphery of the columnar member and connected with each other through the hoop connectors to form an annular base, a positioning seat is arranged on the hoop and comprises a supporting arm, a platform and a guide plate, the platform and the guide plate are arranged at the top of the supporting arm, and the positioning seat is connected with the hoop through bolts; the partition rests on the platform guided by the guide plate. The device provided by the invention does not need to operate the component in the whole installation process, and does not damage the base material.
Description
Technical Field
The invention relates to the technical field of construction of steel structures, in particular to a leveling device and a leveling method for quickly mounting and positioning a columnar member.
Background
The steel column is used as a structural component and matched with the horizontal support to improve the longitudinal rigidity and the overall stability of the building. Therefore, the accuracy of the installation position of the steel column can greatly influence the installation of subsequent components, and has relevance with the stability and the safety of the whole building to a certain extent. Therefore, the accuracy of steel column positioning is an important factor influencing the subsequent construction progress, the construction difficulty and the overall safety performance of the building.
In the current construction process, the method for positioning the steel column mainly comprises two methods, one method is to adopt cross-shaped marking, then to align by means of proficiency of workers and visual conditions, and the other method is to adjust by welding the clamping plate on the steel column. The former has high operation difficulty, needs the combined action of workers and mechanical equipment, has difficult error control, long construction time consumption and low efficiency; the steel column is corrected by the strength of the clamping plate and the bolts, construction processes are multiple, alignment is long, the clamping plate needs to be processed and cut subsequently, materials are wasted, and the steel column does not accord with the national development strategy.
Disclosure of Invention
The invention aims to overcome the defects and provides an assembled device for quickly positioning and leveling a columnar member and a using method thereof.
In order to achieve the above object, the present invention is realized by:
a quick installation and in-place leveling device for a columnar member comprises a positioning base, a connecting seat and a shelf, wherein the positioning base comprises a hoop and hoop connecting pieces, the hoop is arranged around the periphery of the columnar member and connected with each other through the hoop connecting pieces to form an annular base, a positioning seat is arranged on the hoop and comprises a supporting arm, a platform and a guide plate, the platform and the guide plate are arranged at the top of the supporting arm, and the positioning seat is connected with the hoop through bolts; the partition rests on the platform guided by the guide plate.
The use method of the leveling device for quickly installing the columnar member in place comprises
step 3, connecting the positioning base at the bottom end of the upper section steel column with a partition plate;
and 4, assembling the upper section steel column and the lower section steel column, and placing the partition plate in the guide plate and gradually sitting on the platform of the connecting seat along the guide plate in the process.
The device provided by the invention has wide application range, can be used for leveling and mounting almost all columnar components such as square steel columns, circular pipe columns, special-shaped columns and the like, only needs to adjust the number and the mounting positions of the hoops, has strong universality, reduces the waste of materials and improves the turnover utilization rate of the materials. And the whole installation process does not need to operate the component, and the base material is not damaged. Compared with the existing hoisting mode, the hoisting device has the advantages of improving the on-site construction efficiency, shortening the construction period, ensuring the on-site construction quality, effectively improving the on-site human resource utilization rate, along with low cost, simple manufacture, shallow and understandable structure, convenience in installation and convenience in popularization and use.
Drawings
Fig. 1 is a schematic view of the leveling device in use.
FIG. 2 is a partial connection schematic view of the leveling device.
FIG. 3 is a first structural view of the leveling device.
Fig. 4 is a second structural view of the leveling device.
Fig. 5 is a third structural view of the leveling device.
FIG. 6 is a schematic view of the use of the leveling device.
Detailed Description
The invention is further illustrated by the following specific examples.
A quick installation and in-place leveling device for a columnar member comprises a positioning base, a connecting seat and a shelf, wherein the positioning base comprises a hoop and hoop connecting pieces, the hoop is arranged around the periphery of the columnar member and connected with each other through the hoop connecting pieces to form an annular base, a positioning seat is arranged on the hoop and comprises a supporting arm, a platform and a guide plate, the platform and the guide plate are arranged at the top of the supporting arm, and the positioning seat is connected with the hoop through bolts; the partition rests on the platform guided by the guide plate.
The use method of the leveling device for quickly installing the columnar member in place comprises
step 3, connecting the positioning base at the bottom end of the upper section steel column with a partition plate;
and 4, assembling the upper section steel column and the lower section steel column, and placing the partition plate in the guide plate and gradually sitting on the platform of the connecting seat along the guide plate in the process.
As shown in fig. 1 to 6, in actual operation, the leveling device is manufactured in the following manner:
And 2, reasonably arranging the number of the hoops and the length of the bolts according to the shape and the size of the on-site hoisting component, using a plurality of hoops to surround the component for one circle, and connecting and hooping the component through the bolts. The lower sliding plate is connected with the hoop ring through a bolt, the limiting sliding chute, the guide plate, the stiffening plate and the support plate are connected to the lower sliding plate through welding, and the elevation adjusting plate is placed on the support plate. The upper slide plate is connected with the hoop (R) through a bolt (C), corresponds to the lower slide plate (I) one by one and is positioned on the other component.
And step 3, the upper sliding plate is capable of sliding towards the center of the supporting plate along the guide plate, then sliding into the limiting sliding groove, then sliding downwards along the limiting sliding groove until the supporting plate is mounted in place, and the upper sliding plate is capable of falling onto the elevation adjusting plate.
And 4, after the installation is finished, the upper component and the lower component can be accurately aligned, and after the welding is finished, the hoop (b) can be disassembled, so that the base material of the component is not damaged, and the whole device can be repeatedly used.
The device provided by the invention has wide application range, can be used for leveling and mounting almost all columnar components such as square steel columns, circular pipe columns, special-shaped columns and the like, only needs to adjust the number and the mounting positions of the hoops, has strong universality, reduces the waste of materials and improves the turnover utilization rate of the materials. And the whole installation process does not need to operate the component, and the base material is not damaged. Compared with the existing hoisting mode, the hoisting device has the advantages of improving the on-site construction efficiency, shortening the construction period, ensuring the on-site construction quality, effectively improving the on-site human resource utilization rate, along with low cost, simple manufacture, shallow and understandable structure, convenience in installation and convenience in popularization and use.
Claims (2)
1. The utility model provides a column component is installed leveling device of taking one's place fast which characterized by: the positioning base comprises a hoop and hoop connectors, the hoop is arranged around the periphery of the columnar member and connected with each other through the hoop connectors to form an annular base, a positioning seat is arranged on the hoop and comprises a supporting arm, a platform and a guide plate, the platform and the guide plate are arranged at the top of the supporting arm, and the positioning seat is connected with the hoop through bolts; the partition rests on the platform guided by the guide plate.
2. The use method of the quick installation and in-place leveling device for the columnar member as recited in claim 1, is characterized in that: comprises that
Step 1, respectively arranging a positioning base at the top end of a lower section steel column and the bottom end of an upper section steel column,
step 2, connecting the connecting seat with a positioning base at the top end of the lower section steel column,
step 3, connecting the positioning base at the bottom end of the upper section steel column with a partition plate;
and 4, assembling the upper section steel column and the lower section steel column, and placing the partition plate in the guide plate and gradually sitting on the platform of the connecting seat along the guide plate in the process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111164378.1A CN113818700A (en) | 2021-09-30 | 2021-09-30 | Leveling device and method for quickly mounting and positioning columnar member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111164378.1A CN113818700A (en) | 2021-09-30 | 2021-09-30 | Leveling device and method for quickly mounting and positioning columnar member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113818700A true CN113818700A (en) | 2021-12-21 |
Family
ID=78920051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111164378.1A Pending CN113818700A (en) | 2021-09-30 | 2021-09-30 | Leveling device and method for quickly mounting and positioning columnar member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113818700A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753511A (en) * | 2022-04-29 | 2022-07-15 | 上海泰大建筑科技有限公司 | Steel column building site concatenation installation locator |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2754681A1 (en) * | 1977-01-18 | 1978-07-20 | Hiab Foco Ab | JOINT BETWEEN THE LOWER PART AND THE MAIN PART OF THE STAND ON LOADING CRANES, AS WELL AS PROCESS OF MAKING THE JOINT |
CA1090981A (en) * | 1978-10-02 | 1980-12-09 | Lawrence J. Sweeney | Post construction |
CN102021908A (en) * | 2010-11-30 | 2011-04-20 | 上海中技桩业股份有限公司 | Mechanical connection structure and construction method for splicing precast square piles |
CN203247859U (en) * | 2013-05-16 | 2013-10-23 | 中国十七冶集团有限公司 | Alignment device for butt joint perpendicularity of large steel columns |
CN208650540U (en) * | 2018-06-28 | 2019-03-26 | 中国华冶科工集团有限公司 | The fixed device of the adjustment of steel column butt joint installation |
CN208668638U (en) * | 2018-08-31 | 2019-03-29 | 山东莱钢建设有限公司 | A kind of steel column fast junction apparatus |
CN209760448U (en) * | 2019-03-30 | 2019-12-10 | 中国二十二冶集团有限公司 | guiding and temporary fixing device for installation process of inclined steel column |
-
2021
- 2021-09-30 CN CN202111164378.1A patent/CN113818700A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2754681A1 (en) * | 1977-01-18 | 1978-07-20 | Hiab Foco Ab | JOINT BETWEEN THE LOWER PART AND THE MAIN PART OF THE STAND ON LOADING CRANES, AS WELL AS PROCESS OF MAKING THE JOINT |
CA1090981A (en) * | 1978-10-02 | 1980-12-09 | Lawrence J. Sweeney | Post construction |
CN102021908A (en) * | 2010-11-30 | 2011-04-20 | 上海中技桩业股份有限公司 | Mechanical connection structure and construction method for splicing precast square piles |
CN203247859U (en) * | 2013-05-16 | 2013-10-23 | 中国十七冶集团有限公司 | Alignment device for butt joint perpendicularity of large steel columns |
CN208650540U (en) * | 2018-06-28 | 2019-03-26 | 中国华冶科工集团有限公司 | The fixed device of the adjustment of steel column butt joint installation |
CN208668638U (en) * | 2018-08-31 | 2019-03-29 | 山东莱钢建设有限公司 | A kind of steel column fast junction apparatus |
CN209760448U (en) * | 2019-03-30 | 2019-12-10 | 中国二十二冶集团有限公司 | guiding and temporary fixing device for installation process of inclined steel column |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753511A (en) * | 2022-04-29 | 2022-07-15 | 上海泰大建筑科技有限公司 | Steel column building site concatenation installation locator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108265741B (en) | Practical method for foundation bolt construction positioning | |
CN113818700A (en) | Leveling device and method for quickly mounting and positioning columnar member | |
CN107246026B (en) | Tower equipment foundation bolt embedding construction mold and embedding method thereof | |
CN109849173B (en) | Manufacturing device for hollow cylindrical test piece and using method thereof | |
CN102392540B (en) | High-precision method and structure for positioning high-precision precast beam | |
CN203887445U (en) | Giant-tower segmented assembling jig frame | |
CN203383331U (en) | Steel mold used for simply and conveniently positioning section steel column embedded bolt | |
CN215801775U (en) | Foundation bolt positioning device for multi-leg concrete foundation | |
CN203531804U (en) | Novel injection head support frame fine adjustment mechanism | |
CN202055258U (en) | Accurate sample frame for positioning pre-embedded bolts of contact network stand column foundation | |
CN206105738U (en) | Rubber bush location of high accuracy is hung auris pressure and is gone into device | |
CN213015474U (en) | Loading hole built-in fitting location frock | |
CN201896289U (en) | Anchor rod locating device with two-way gradient | |
CN210067466U (en) | Vertical storage tank flip-chip method roof construction location and support mould | |
CN114233022A (en) | Circular steel structure dome auxiliary installation equipment and construction method | |
CN204491652U (en) | The architecture basics great diameter and long foundation bolt high-precision ring device of installing flare tower frame | |
CN210597281U (en) | Bridge pile foundation in-situ binding reinforcement cage deviation control die carrier | |
CN102704696A (en) | Space locator for high, big and heavy steel upright column | |
CN203200776U (en) | Anchor bolt mounting template for large-sized tower | |
CN218893977U (en) | Structure of vertical assembling process equipment for annular seam of pier column of assembled bridge | |
CN215484674U (en) | High-precision splicing device for combined steel templates in constructional engineering | |
CN214363592U (en) | A installation pouring template subassembly for circular concrete foundation built-in fitting | |
CN218622223U (en) | Large-diameter pile foundation reinforcement cage positioning structure arranged on steel platform | |
CN215432241U (en) | Small-size stand truss pole setting welding position device | |
CN221256201U (en) | Adjustable multifunctional split heads structure of pre-buried landing leg of tower crane basis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211221 |