CN113818482A - New and old pipe gallery connecting method for reducing uneven settlement - Google Patents
New and old pipe gallery connecting method for reducing uneven settlement Download PDFInfo
- Publication number
- CN113818482A CN113818482A CN202110876938.XA CN202110876938A CN113818482A CN 113818482 A CN113818482 A CN 113818482A CN 202110876938 A CN202110876938 A CN 202110876938A CN 113818482 A CN113818482 A CN 113818482A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- top plate
- steel bars
- joint
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 35
- 239000010959 steel Substances 0.000 claims abstract description 35
- 238000010276 construction Methods 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 claims description 3
- 238000009415 formwork Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 3
- 238000004062 sedimentation Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention relates to the technical field of underground pipe gallery construction, in particular to a new and old pipe gallery connection method for reducing uneven settlement; the method comprises the following steps of 1, excavating earth below a bottom plate of the constructed pipe gallery; step 2, binding steel bars of the bottom plate; step 3, installing a bottom plate template; step 4, pouring concrete on the bottom plate; step 5, binding side wall steel bars; step 6, installing side wall and top plate templates; step 7, binding steel bars of a top plate; step 8, installing a template at the joint of the top plate; (9) and concrete pouring of the side wall and the top plate. According to the invention, the new and old pipe galleries at the joint are integrated by adopting a hard joint mode at the joint of the new and old pipe galleries, so that the purpose of reducing uneven settlement at the joint of the new and old pipe galleries is achieved. Compared with a simple method of arranging a steel-edge water stop belt at a construction joint, the method has the remarkable advantage of reducing uneven settlement.
Description
Technical Field
The invention relates to the technical field of underground pipe gallery construction, in particular to a new and old pipe gallery connection method for reducing uneven settlement.
Background
With the development of society, more and more cities begin to conduct the construction of utility tunnels. Along with the popularization of the utility tunnel, criss-cross utility tunnel nets can be gradually formed. However, due to the difference of the time of the construction of the pipe gallery, the natural sedimentation of the pipe gallery which is firstly built after one year or more tends to be stable, and the sedimentation amount of the newly-built pipe gallery is difficult to control. How to reduce the uneven settlement of new and old piping lane hookup location becomes the problem that awaits solution urgently. Regarding the connection method of new and old pipe galleries, a method for realizing the connection of pipe galleries by adopting an extensible end well (CN 201710407764.6 a comprehensive pipe gallery extensible end well and a construction method thereof, under the condition that the comprehensive pipe gallery is built in different periods, the problem that the traditional pipe gallery end well cannot be connected with a long-term pipe gallery can be solved. In the aspect of considering the uneven settlement, a fixing structure for preventing the uneven settlement of the pipe gallery joint (CN 202020746908.8 a fixing structure for preventing the uneven settlement of the pipe gallery joint, wherein the fixing structure is arranged at the joint of two pipe gallery sections and comprises a cushion layer and a micro pile, the cushion layer is arranged at the bottom of the joint of the two pipe gallery sections, and the cushion layer limits the lower part of the joint of the two pipe gallery sections to prevent the two pipe gallery sections from settling), and the micro pile is adopted, so that the cost is increased, and the construction is complicated. The cast-in-place pipe gallery is connected through setting up the steel limit waterstop (CN202011355026. X bury formula steel limit waterstop structure and construction method in cast-in-place pipe gallery expansion joint) in the expansion joint department, also does not consider new and old pipe gallery and connects the uneven settlement problem, and does not have reversibility if the waterstop protection is improper, influences water-proof effects.
Disclosure of Invention
The invention aims to overcome the defects and provide a new and old pipe gallery connecting method for reducing uneven settlement.
In order to achieve the above object, the present invention is realized by:
a new and old pipe gallery connecting method for reducing uneven settlement is characterized in that: comprises that
Adopt machinery to add artificial mode, carry out the earthwork excavation below the piping lane bottom plate of having built. Digging 400mm deep, digging 1000mm inwards from the cross section of the built pipe gallery, digging 1500mm more on two sides of the outer wall of the built pipe gallery to serve as a reserved operation space;
Binding steel bars according to the connecting part of the bottom plates and a reinforcement arrangement diagram of the bottom plate of the newly-built pipe gallery;
After the steel bars are bound, installing templates at the connecting part of the bottom plates and the newly-built pipe gallery bottom plate;
After the templates are installed, welding water-stop steel plates at the connecting positions of the bottom plates and the central line positions of the side walls of the bottom plates of the newly-built pipe gallery, then performing concrete pouring, forming the connecting positions of the bottom plates and the bottom plates of the newly-built pipe gallery into a whole, reserving construction joints at the connecting positions of the bottom plates as same as the bottom plates during concrete pouring, and arranging the construction joints 500mm away from the surfaces of the bottom plates;
step 5, binding of side wall steel bars
Binding steel bars according to the side wall joints and the side wall reinforcement map of the newly-built pipe gallery;
step 6, side wall and top plate template installation
After the steel bars are bound, mounting the side wall joints, the side walls and the top plate templates;
step 7, binding of steel bars of top plate
After the top plate template is installed, binding steel bars at the joint of the top plate and the top plate;
step 8, installing the template at the joint of the top plate
After the steel bars at the joint of the top plate are bound, installing a template;
(9) side wall and top plate concrete pouring
After the formwork is installed, concrete is poured on the side walls and the top plate (including the connecting part) at the same time to form a whole.
According to the invention, the new and old pipe galleries at the joint are integrated by adopting a hard joint mode at the joint of the new and old pipe galleries, so that the purpose of reducing uneven settlement at the joint of the new and old pipe galleries is achieved. Compared with a simple method of arranging a steel-edge water stop belt at a construction joint, the method has the remarkable advantage of reducing uneven settlement. The method is simple and convenient to operate, cost-saving and good in effect, has more obvious advantages compared with a method for arranging the micro-piles at the connecting positions, can be suitable for connecting new and old pipe galleries, and the structure for arranging the micro-piles only aims at the connection of a newly-built pipe gallery.
Drawings
Fig. 1 is a schematic view of the joint of the top plate and the bottom plate of the new pipe gallery and the old pipe gallery.
Fig. 2 is a schematic view of the joint of the side walls of the old pipe gallery and the new pipe gallery.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and fig. 2, a new and old pipe gallery connection method for reducing uneven settlement is characterized in that: comprises that
Adopt machinery to add artificial mode, carry out the earthwork excavation below the piping lane bottom plate of having built. Digging 400mm deep, digging 1000mm inwards from the cross section of the built pipe gallery, digging 1500mm more on two sides of the outer wall of the built pipe gallery to serve as a reserved operation space;
Binding steel bars according to the connecting part of the bottom plates and a reinforcement arrangement diagram of the bottom plate of the newly-built pipe gallery;
After the steel bars are bound, installing templates at the connecting part of the bottom plates and the newly-built pipe gallery bottom plate;
After the templates are installed, welding water-stop steel plates at the connecting positions of the bottom plates and the central line positions of the side walls of the bottom plates of the newly-built pipe gallery, then performing concrete pouring, forming the connecting positions of the bottom plates and the bottom plates of the newly-built pipe gallery into a whole, reserving construction joints at the connecting positions of the bottom plates as same as the bottom plates during concrete pouring, and arranging the construction joints 500mm away from the surfaces of the bottom plates;
step 5, binding of side wall steel bars
Binding steel bars according to the side wall joints and the side wall reinforcement map of the newly-built pipe gallery;
step 6, side wall and top plate template installation
After the steel bars are bound, mounting the side wall joints, the side walls and the top plate templates;
step 7, binding of steel bars of top plate
After the top plate template is installed, binding steel bars at the joint of the top plate and the top plate;
step 8, installing the template at the joint of the top plate
After the steel bars at the joint of the top plate are bound, installing a template;
(9) side wall and top plate concrete pouring
After the formwork is installed, concrete is poured on the side walls and the top plate (including the connecting part) at the same time to form a whole.
According to the invention, the new and old pipe galleries at the joint are integrated by adopting a hard joint mode at the joint of the new and old pipe galleries, so that the purpose of reducing uneven settlement at the joint of the new and old pipe galleries is achieved. Compared with a simple method of arranging a steel-edge water stop belt at a construction joint, the method has the remarkable advantage of reducing uneven settlement. The method is simple and convenient to operate, cost-saving and good in effect, has more obvious advantages compared with a method for arranging the micro-piles at the connecting positions, can be suitable for connecting new and old pipe galleries, and the structure for arranging the micro-piles only aims at the connection of a newly-built pipe gallery.
Claims (1)
1. A new and old pipe gallery connecting method for reducing uneven settlement is characterized in that: comprises that
Step 1, excavating earthwork below a bottom plate of a constructed pipe gallery
Adopting a mechanical and manual mode to perform earth excavation below the bottom plate of the built pipe gallery;
digging 400mm deep, digging 1000mm inwards from the cross section of the built pipe gallery, digging 1500mm more on two sides of the outer wall of the built pipe gallery to serve as a reserved operation space;
step 2, binding of steel bars of bottom plate
Binding steel bars according to the connecting part of the bottom plates and a reinforcement arrangement diagram of the bottom plate of the newly-built pipe gallery;
step 3, installing a bottom plate template
After the steel bars are bound, installing templates at the connecting part of the bottom plates and the newly-built pipe gallery bottom plate;
step 4, pouring concrete on the bottom plate
After the templates are installed, welding water-stop steel plates at the connecting positions of the bottom plates and the central line positions of the side walls of the bottom plates of the newly-built pipe gallery, then performing concrete pouring, forming the connecting positions of the bottom plates and the bottom plates of the newly-built pipe gallery into a whole, reserving construction joints at the connecting positions of the bottom plates as same as the bottom plates during concrete pouring, and arranging the construction joints 500mm away from the surfaces of the bottom plates;
step 5, binding of side wall steel bars
Binding steel bars according to the side wall joints and the side wall reinforcement map of the newly-built pipe gallery;
step 6, side wall and top plate template installation
After the steel bars are bound, mounting the side wall joints, the side walls and the top plate templates;
step 7, binding of steel bars of top plate
After the top plate template is installed, binding steel bars at the joint of the top plate and the top plate;
step 8, installing the template at the joint of the top plate
After the steel bars at the joint of the top plate are bound, installing a template;
(9) side wall and top plate concrete pouring
After the formwork is installed, concrete is poured on the side walls and the top plate (including the connecting part) at the same time to form a whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110876938.XA CN113818482A (en) | 2021-07-31 | 2021-07-31 | New and old pipe gallery connecting method for reducing uneven settlement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110876938.XA CN113818482A (en) | 2021-07-31 | 2021-07-31 | New and old pipe gallery connecting method for reducing uneven settlement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113818482A true CN113818482A (en) | 2021-12-21 |
Family
ID=78924098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110876938.XA Pending CN113818482A (en) | 2021-07-31 | 2021-07-31 | New and old pipe gallery connecting method for reducing uneven settlement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113818482A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960742A (en) * | 2022-03-28 | 2022-08-30 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102345297A (en) * | 2011-07-20 | 2012-02-08 | 同济大学 | Prefabricated and assembled comprehensive pipe gallery with semi-rigid joints |
CN203007992U (en) * | 2012-11-21 | 2013-06-19 | 中国核电工程有限公司 | Structure of controlling relative sedimentation at joint of gutter channel and underground structure |
CN105908777A (en) * | 2016-05-04 | 2016-08-31 | 东北大学 | Comprehensive pipe gallery sliding mold and application method thereof |
CN106894451A (en) * | 2017-01-25 | 2017-06-27 | 上海建工五建集团有限公司 | Suitable for overlapping layers waterproof construction and its construction method at Foundation strengthened |
CN107687178A (en) * | 2017-09-04 | 2018-02-13 | 滨州学院 | A kind of precast assembly comprehensive pipe gallery structure of anti-uneven settlement of foundation |
CN107700533A (en) * | 2017-10-12 | 2018-02-16 | 海门市帕源路桥建设有限公司 | A kind of box quick assembly and disassembly mould piping lane construction technology |
CN111764429A (en) * | 2020-06-10 | 2020-10-13 | 北京万兴建筑集团有限公司 | Steel-edged rubber water stop for trapezoid-shaped socket of underground pipe gallery and construction method of steel-edged rubber water stop |
CN112726663A (en) * | 2020-12-25 | 2021-04-30 | 中国建筑第八工程局有限公司 | Connecting construction method for cast-in-situ sections of prefabricated comprehensive pipe gallery |
-
2021
- 2021-07-31 CN CN202110876938.XA patent/CN113818482A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102345297A (en) * | 2011-07-20 | 2012-02-08 | 同济大学 | Prefabricated and assembled comprehensive pipe gallery with semi-rigid joints |
CN203007992U (en) * | 2012-11-21 | 2013-06-19 | 中国核电工程有限公司 | Structure of controlling relative sedimentation at joint of gutter channel and underground structure |
CN105908777A (en) * | 2016-05-04 | 2016-08-31 | 东北大学 | Comprehensive pipe gallery sliding mold and application method thereof |
CN106894451A (en) * | 2017-01-25 | 2017-06-27 | 上海建工五建集团有限公司 | Suitable for overlapping layers waterproof construction and its construction method at Foundation strengthened |
CN107687178A (en) * | 2017-09-04 | 2018-02-13 | 滨州学院 | A kind of precast assembly comprehensive pipe gallery structure of anti-uneven settlement of foundation |
CN107700533A (en) * | 2017-10-12 | 2018-02-16 | 海门市帕源路桥建设有限公司 | A kind of box quick assembly and disassembly mould piping lane construction technology |
CN111764429A (en) * | 2020-06-10 | 2020-10-13 | 北京万兴建筑集团有限公司 | Steel-edged rubber water stop for trapezoid-shaped socket of underground pipe gallery and construction method of steel-edged rubber water stop |
CN112726663A (en) * | 2020-12-25 | 2021-04-30 | 中国建筑第八工程局有限公司 | Connecting construction method for cast-in-situ sections of prefabricated comprehensive pipe gallery |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960742A (en) * | 2022-03-28 | 2022-08-30 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
CN114960742B (en) * | 2022-03-28 | 2024-05-14 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107542108B (en) | A kind of reverse construction method of building basement structure | |
CN108842819B (en) | Urban rail transit cable line tunnel construction method | |
CN103741714A (en) | Construction method for full cover-excavation reverse method of underground engineering | |
CN102322064A (en) | Construction method for underground diaphragm wall of deep foundation pit for subway station in collapsible loess areas | |
CN207512745U (en) | A kind of caisson device and its foundation pit structure | |
CN202194148U (en) | Waterproof curtain | |
CN110939303B (en) | Semi-reverse construction method of cyclone pool | |
CN104727302A (en) | Cast-in-place construction process for inter-pile board wall between slide-resistant piles | |
CN112064751A (en) | Deep groove construction method for drainage pipeline | |
CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
CN101538832B (en) | Construction method for controlling two-dimension jacking of large-scale case | |
CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
CN108035379A (en) | A kind of pipe gallery and its construction method | |
CN103215958A (en) | Construction method of dewatering and retaining and protecting of deep foundation pit in expansive-soil area | |
CN205205844U (en) | Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit | |
CN114575208A (en) | Abrupt slope roadbed structure convenient to prefabricated installation | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN113818482A (en) | New and old pipe gallery connecting method for reducing uneven settlement | |
CN109457705A (en) | A kind of Open Cut Method construction method | |
CN110117959B (en) | Construction method for foundation pit support near river | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN104846837B (en) | The construction method of ultra-deep well in a kind of bright draining foundation ditch | |
CN210122735U (en) | Underground structure anti-floating system based on outward-protruding wing foot plate | |
CN204551521U (en) | The cast-in-place construction structure of board wall between a kind of antislide pile stake | |
CN210315908U (en) | Immersed tube type inspection well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211221 |
|
RJ01 | Rejection of invention patent application after publication |