CN113763207B - 一种基于互联网的移动数据采集*** - Google Patents
一种基于互联网的移动数据采集*** Download PDFInfo
- Publication number
- CN113763207B CN113763207B CN202110181018.6A CN202110181018A CN113763207B CN 113763207 B CN113763207 B CN 113763207B CN 202110181018 A CN202110181018 A CN 202110181018A CN 113763207 B CN113763207 B CN 113763207B
- Authority
- CN
- China
- Prior art keywords
- data
- management
- platform
- codes
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 65
- 238000000034 method Methods 0.000 claims abstract description 29
- 238000000354 decomposition reaction Methods 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 83
- 238000012795 verification Methods 0.000 claims description 9
- 238000012544 monitoring process Methods 0.000 claims description 8
- 238000013461 design Methods 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 claims description 5
- 210000001503 joint Anatomy 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000013439 planning Methods 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000004891 communication Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 9
- 238000007689 inspection Methods 0.000 description 4
- 238000012360 testing method Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110181018.6A CN113763207B (zh) | 2021-02-09 | 2021-02-09 | 一种基于互联网的移动数据采集*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110181018.6A CN113763207B (zh) | 2021-02-09 | 2021-02-09 | 一种基于互联网的移动数据采集*** |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113763207A CN113763207A (zh) | 2021-12-07 |
CN113763207B true CN113763207B (zh) | 2023-11-24 |
Family
ID=78786622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110181018.6A Active CN113763207B (zh) | 2021-02-09 | 2021-02-09 | 一种基于互联网的移动数据采集*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113763207B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115062380A (zh) * | 2022-06-09 | 2022-09-16 | 保利长大工程有限公司 | 一种基于bim平台的可视化施工*** |
CN115860429B (zh) * | 2023-01-06 | 2023-07-14 | 三峡高科信息技术有限责任公司 | 一种基于标签二维码的管网施工管理方法及*** |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060073729A (ko) * | 2004-12-24 | 2006-06-29 | 한국철도기술연구원 | 정보화 시스템을 이용한 전동차 검수 시스템 및 방법 |
CN106845919A (zh) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | 施工信息收集处理方法 |
CN107424432A (zh) * | 2017-06-09 | 2017-12-01 | 成都智建新业建筑设计咨询有限公司 | 基于bim技术对停车场车位进行实时监控的方法 |
CN108197356A (zh) * | 2017-12-20 | 2018-06-22 | 中国铁路总公司 | 一种基于bim技术的四电设施定位优化方法及装置 |
CN108520342A (zh) * | 2018-03-23 | 2018-09-11 | 中建三局第建设工程有限责任公司 | 基于bim的物联网平台管理方法及其*** |
CA3003842A1 (en) * | 2017-05-05 | 2018-11-05 | Nucor Corporation | System for on-site tracking, managing, planning, and staging construction projects |
CN110275932A (zh) * | 2019-06-18 | 2019-09-24 | 西安新视窗科技有限公司 | 一种基于bim+gis技术的路面铺筑动态监管装置 |
-
2021
- 2021-02-09 CN CN202110181018.6A patent/CN113763207B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060073729A (ko) * | 2004-12-24 | 2006-06-29 | 한국철도기술연구원 | 정보화 시스템을 이용한 전동차 검수 시스템 및 방법 |
CN106845919A (zh) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | 施工信息收集处理方法 |
CA3003842A1 (en) * | 2017-05-05 | 2018-11-05 | Nucor Corporation | System for on-site tracking, managing, planning, and staging construction projects |
CN107424432A (zh) * | 2017-06-09 | 2017-12-01 | 成都智建新业建筑设计咨询有限公司 | 基于bim技术对停车场车位进行实时监控的方法 |
CN108197356A (zh) * | 2017-12-20 | 2018-06-22 | 中国铁路总公司 | 一种基于bim技术的四电设施定位优化方法及装置 |
CN108520342A (zh) * | 2018-03-23 | 2018-09-11 | 中建三局第建设工程有限责任公司 | 基于bim的物联网平台管理方法及其*** |
CN110275932A (zh) * | 2019-06-18 | 2019-09-24 | 西安新视窗科技有限公司 | 一种基于bim+gis技术的路面铺筑动态监管装置 |
Non-Patent Citations (9)
Title |
---|
地铁工程建设安全综合监控***建设;方炯;;低温建筑技术(第04期);全文 * |
基于BIM的施工信息管理平台的应用;饶平平;梁晓东;徐明;王翔宇;王喜春;;土木建筑工程信息技术(第03期);全文 * |
基于BIM的桥梁全生命期管理技术及应用研究;吴巨峰;祁江波;方黎君;左小明;赵训刚;;世界桥梁(第04期);全文 * |
基于BIM的装配式建筑协同管理***GDAD-PCMIS的研发及应用;杨新;焦柯;;土木建筑工程信息技术(第03期);全文 * |
基于电网工程监控平台的项目群管理研究与实践;林立鹏;邹新梧;史天涌;李俊元;祁彦鹏;;电气时代(第04期);全文 * |
方炯 ; .地铁工程建设安全综合监控***建设.低温建筑技术.2018,(第04期),全文. * |
杨新 ; 焦柯 ; .基于BIM的装配式建筑协同管理***GDAD-PCMIS的研发及应用.土木建筑工程信息技术.2017,(第03期),全文. * |
水电站物资智慧管理平台研究与实践;程天满;李建威;;水电站机电技术(第05期);全文 * |
饶平平 ; 梁晓东 ; 徐明 ; 王翔宇 ; 王喜春 ; .基于BIM的施工信息管理平台的应用.土木建筑工程信息技术.2017,(第03期),全文. * |
Also Published As
Publication number | Publication date |
---|---|
CN113763207A (zh) | 2021-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109447479B (zh) | 一种基于三维可视化项目管理*** | |
CN113763207B (zh) | 一种基于互联网的移动数据采集*** | |
CN109557934B (zh) | 一种基于装配式建筑平台的无人机巡航的控制方法及装置 | |
CN110363852B (zh) | 一种三维数字梁场、构建方法、计算机设备及存储介质 | |
CN210605801U (zh) | 一种建筑工程项目施工信息化监管*** | |
CN109559069B (zh) | 基于装配式建筑平台的生产管理方法、装置及终端设备 | |
CN106815681B (zh) | 基于二维码的变电站二次设备闭环管理平台及其管理*** | |
CN113361975A (zh) | 一种bim+智慧工地管理平台*** | |
CN117035691B (zh) | 一种基于bim技术的工程建设数字化项目管理方法及*** | |
CN115511322A (zh) | 一种智慧工地及数智化建管*** | |
CN115456206B (zh) | 基于bim+gis的隧道施工可视化管控方法及*** | |
CN112465309A (zh) | 一种可视化施工管控***及其实现方法 | |
CN104778502A (zh) | 适用于建筑装饰构件的数字化监控方法 | |
CN115049306A (zh) | 一种全过程工程咨询管理*** | |
CN107693997B (zh) | 一种消防设备检测与维护保养管理***及管理方法 | |
CN112907390A (zh) | 一种基于bim的建筑全生命周期动态智能管理***及方法 | |
CN112508343A (zh) | 一种施工质量管理的可视化施工管控***的实现方法 | |
CN115809785A (zh) | 一种智慧工地管理*** | |
CN113807599B (zh) | 一种智慧建造信息化综合管理云平台 | |
CN110400075A (zh) | 一种智慧工地质量安全管理*** | |
CN110880096B (zh) | 一种建筑工程多方协同办公*** | |
CN113393342A (zh) | 一种建筑装修工程全过程管理方法及*** | |
CN111625892A (zh) | 一种基于全景技术和bim模型的建筑工程管理***及其方法 | |
CN116401430A (zh) | 一种基于元宇宙的水务运维服务平台及方法 | |
CN110287566A (zh) | 一种基于bim对隧道掘进进度及工序控制的*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220629 Address after: Room 13F, building B, metropolis international, No.3 Shilibao a, Chaoyang Road, Chaoyang District, Beijing 100025 Applicant after: BEIJING ZHONGJIAOJINGWEI HIGHWAY CONSTRUCTION COST CO.,LTD. Applicant after: Hunan CCCC Jingwei Information Technology Co.,Ltd. Applicant after: Nanjing Hongdi Engineering Consulting Co.,Ltd. Address before: 410114 14th floor, Gaosheng Jindian business center, Xiangfu Middle Road, Yuhua District, Changsha City, Hunan Province Applicant before: Hunan CCCC Jingwei Information Technology Co.,Ltd. Applicant before: BEIJING ZHONGJIAOJINGWEI HIGHWAY CONSTRUCTION COST CO.,LTD. Applicant before: Hunan Hongdi Engineering Consulting Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |