CN113715875B - 一种面向初始延误与区间限速的列车运行调控方法和*** - Google Patents

一种面向初始延误与区间限速的列车运行调控方法和*** Download PDF

Info

Publication number
CN113715875B
CN113715875B CN202110986180.5A CN202110986180A CN113715875B CN 113715875 B CN113715875 B CN 113715875B CN 202110986180 A CN202110986180 A CN 202110986180A CN 113715875 B CN113715875 B CN 113715875B
Authority
CN
China
Prior art keywords
train
event
constraint set
interval
constraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110986180.5A
Other languages
English (en)
Other versions
CN113715875A (zh
Inventor
秦勇
王铭铭
贾利民
王莉
许心越
李建民
张惠茹
徐杰
郭建媛
程晓卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN202110986180.5A priority Critical patent/CN113715875B/zh
Publication of CN113715875A publication Critical patent/CN113715875A/zh
Application granted granted Critical
Publication of CN113715875B publication Critical patent/CN113715875B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

本发明提供了一种面向初始延误与区间限速的列车运行调控方法、***及存储介质。该方法包括:构建表征列车群运行逻辑关系的面向初始延误与区间限速的列车事件活动网络;以列车事件和列车活动为基本单元建立面向初始延误扰动、列车事件容忍延误、列车事件取消和面向区间限速扰动约束集,综合考虑初始延误与区间限速并发突发扰动场景,将初始延误、列车事件容忍延误、列车事件取消约和区间限速扰动等约束集的解耦结果添加到列车群运行调控模型中,求解列车群运行调控模型输出最优列车群运行调控方案。本发明可以生成最优列车运行调控方案,降低了调控后列车运行方案与原计划方案的偏离程度,保障突发事件下列车运行安全和列车服务质量。

Description

一种面向初始延误与区间限速的列车运行调控方法和***
技术领域
本发明涉及列车安全调度技术领域,尤其涉及一种面向初始延误与区间限速的列车运行调控方法、***及存储介质。
背景技术
在日常运营过程中,高速铁路***不可避免地会受到恶劣天气、设施设备故障、人的不安全行为等突发事件的影响,导致列车无法按照计划运行图运行,降低铁路运输服务质量,甚至造成行车安全事故,因此,需要调度员快速制定高质量的列车运行调整方案。目前,我国调度现场主要是通过调度员经验,利用计算机人工手动调整列车运行计划。人工很难在短时间内获得较高质量的列车运行计划调整方案,增加了突发事件响应时间和恢复时间,扩大了突发事件影响,给现场调度员带来了极大的工作压力。
与目前现场高速铁路列车运行的人工调控方法相比,面向初始延误与区间限速的列车运行调控方法,从宏观层面采用事件活动网络刻画列车群运行逻辑关系,基于事件活动网络,刻画列车事件延误、列车事件取消和区间限速等约束,同时基于列车事件活动重新刻画了列车区间运行活动和停站作业时间约束、列车到发时刻逻辑约束、线路能力约束、车站到发线数量等约束条件,以调控后列车运行计划与原列车运行计划的偏离程度最小为目标函数,构建列车运行调控模型,求解模型实现了高质量列车运行调控方案自动化生成,减轻调度员工作压力,提升突发事件下列车服务质量,因此对高速铁路突发事件下列车安全调度具有重大的实用价值和推广意义。
目前,现有技术中还没有一种有效的面向初始延误与区间限速的列车运行调控方法、***及存储介质。
发明内容
本发明的实施例提供了一种面向初始延误与区间限速的列车运行调控方法、***及存储介质,以实现高质量列车运行调控方案自动化生成,减轻调度员工作压力,提升突发事件下列车服务质量。
为了实现上述目的,本发明采取了如下技术方案。
一种面向初始延误与区间限速的列车运行调控方法,包括:
步骤S1:构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络;
步骤S2:以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集,获得线性初始延误约束集合、列车事件容忍延误约束集合和列车事件取消约束集合;
步骤S3:以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向区间限速扰动约束集,添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合;
步骤S4:综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案。
优选地,所述的步骤S1中的构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,包括:
S11:基于铁路线路拓扑结构和列车运行径路,从车次tr、车站s和事件类型type三个属性构建列车事件集合E;从区间运行、停站和列车群相继占用运行资源间隔方面构建列车活动集合A;
S12:根据事件类型不同,列车事件ei分为列车到达事件和列车出发事件,ei∈e{tri,si,typei};根据构成活动的关联事件类型不同,列车活动ai,j=(ei,ej)包括列车区间运行活动、停站活动和间隔活动,间隔活动分为到达间隔活动、出发间隔活动和发到间隔活动;
S13:根据所述列车事件集合E和列车活动集合A构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,初始延误包括单列车到达或出发延误超过30分钟或运行图中大部分列车群发生延误现象,区间限速包括单个或多个高速铁路区间发生临时限速。
优选地,所述的步骤S2中的以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集,获得线性初始延误约束集合、列车事件容忍延误约束集合和列车事件取消约束集合,包括:
S21:以列车事件活动网络中的列车事件和列车活动为基本单元描述初始延误场景,从而构建面向初始延误场景下的约束集合,该约束集合包括面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和事件取消约束集,获得线性初始延误约束集合、列车事件容忍延误约束集合和列车事件取消约束集合;
定义决策变量ωe为列车事件e调整后的发生时刻、决策变量ce为列车事件e是否取消、决策变量de为列车事件e的发生时刻与计划发生时刻的偏差,定义参数pte为列车事件e计划发生时刻、参数dte为列车事件e的初始延误时间,列车事件与计划时刻偏差为:de=|ωe-pte|;
列车事件取消时该列车事件计算入目标函数的偏差为0;列车事件不取消时该列车事件计算入目标函数的偏差为de,引入中间决策变量
Figure GDA0003594531450000041
为计算入目标函数的列车事件发生时刻偏差,则相关约束条件如下:
de≥ωe-pte,e∈e{tr,s,type|tr∈T,s∈Rtr,type∈{dep,arr}}
de≥-(ωe-pte),e∈e{tr,s,type|tr∈T,s∈Rtr,type∈{dep,arr}}
Figure GDA0003594531450000042
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
Figure GDA0003594531450000043
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
Figure GDA0003594531450000044
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
发生初始延误的列车事件调整后的发生时刻不早于列车事件计划发生时刻与初始延误时间的总和,需满足约束如下:
ωe-pte≥ce·(M-dte)+dte
Figure GDA0003594531450000045
S22:定义列车在始发站的出发延误超过延误容忍阈值DTtoler,该列车取消,需要满足约束如下:
de-DTtoler≥(ce-1)·M,e∈e{tr,s,type|tr∈T,s=otr,type=dep}
所属同列车的事件取消决策与前一列车事件的取消决策一致,即同列车的后续事件取消决策取决于列车在始发站出发事件的取消决策,满足约束如下:
Figure GDA0003594531450000046
Figure GDA0003594531450000047
Figure GDA0003594531450000048
将初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集的解耦后的线性约束集合,添加到列车群运行调控模型中。
优选地,所述的步骤S3中的以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向区间限速扰动约束集,添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合,包括:
S31:以列车事件和列车活动为基本单元描述区间限速场景,构建面向区间限速场景下的区间限速扰动约束集,通过添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合;确定直接受区间限速影响的列车,引入中间决策变量:
Figure GDA0003594531450000051
为列车tr∈T在其运行方向突发事件影响结束车站
Figure GDA0003594531450000052
的计划到达时刻是否大于等于突发事件发生时刻
Figure GDA0003594531450000053
为列车tr在其运行方向突发事件影响开始车站
Figure GDA0003594531450000054
的计划出发时刻是否小于等于突发事件结束时刻
Figure GDA0003594531450000055
ztr为列车是否受突发事件影响,当且仅当列车tr在突发事件影响结束车站
Figure GDA0003594531450000056
的计划时刻大于等于突发事件发生时刻
Figure GDA0003594531450000057
和列车tr在突发事件影响开始车站
Figure GDA0003594531450000058
的计划出发时刻小于等于突发事件结束时刻
Figure GDA0003594531450000059
同时成立,即
Figure GDA00035945314500000510
列车tr受到突发事件的影响,满足如下约束:
Figure GDA00035945314500000511
Figure GDA00035945314500000512
Figure GDA00035945314500000513
tr∈T
Figure GDA00035945314500000514
tr∈T
Figure GDA00035945314500000515
tr∈T
S32:确定列车在突发事件下的限速等级和区间运行时分增加程度θ,其满足约束如下:
Figure GDA00035945314500000516
Figure GDA00035945314500000517
Figure GDA00035945314500000518
(ei,ej)=a∈Arun
将区间限速扰动约束集的解耦后的线性约束集合,添加到后续的列车群运行调控模型。
优选地,所述的步骤S4中的综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案,包括:
S41:面向列车初始延误与区间限速并发场景,采用调整后列车在计划停车站的到发时刻与计划时刻的偏差和取消列车数量来衡量,调整后列车调度方案与列车原运行计划方案的偏离程度,以最小化所述偏离程度为目标建立如下的目标函数:
Figure GDA0003594531450000061
其中wdiff和wcancel分别表示列车到发时刻总偏差和停运列车数量的计算权重,且停运列车数量的计算权重远大于列车在其计划停车站到发时刻总偏差计算权重,wdiff=1和wcancel=1000;
S42:构建面向初始延误与区间限速的列车群运行调控模型,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,所述列车群运行调控模型除了包括列车初始延误约束、列车事件容忍延误约束集、列车事件取消约束和区间限速扰动约束之外,还包括如下的基于列车事件活动表征的其他约束:
(1)车站到发线数量约束
Figure GDA0003594531450000062
ei∈e{tri,si,typei|tri∈T,si=sj,typei=arr}
Figure GDA0003594531450000063
ek∈e{trk,sk,typek|trk∈T,sk=sj,typek=dep}
eq∈e{trq,sq,typeq|trq=trj,sq=sj,typeq=dep}
为决策同一方向相邻列车相继到达同一车站时是否占用该车站同一到发线,引入决策变量:χ(ek,ej)为列车事件ek和列车事件ej是否占用相同到发线,满足如下约束:
Figure GDA0003594531450000071
ek∈e{trk,sk,typek|trk∈T,trk≠trj,sk=sj,typek=dep}
Figure GDA0003594531450000072
(2)列车区间运行活动和停站作业时间约束
Figure GDA0003594531450000073
(ei,ej)=a,a∈Arun∪Adwell
Figure GDA0003594531450000074
Figure GDA0003594531450000075
Figure GDA0003594531450000076
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep}
(3)列车在站到发时刻逻辑约束和线路能力约束
Figure GDA0003594531450000077
Figure GDA0003594531450000078
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep},(ei,ej)=a,a∈Astation
Figure GDA0003594531450000079
Figure GDA00035945314500000710
Figure GDA00035945314500000711
Figure GDA00035945314500000712
Figure GDA0003594531450000081
o(ei,ej)+o(ej,ei)=1
Figure GDA0003594531450000082
Figure GDA0003594531450000083
o(ei,ej)-o(ek,eq)=0
Figure GDA0003594531450000084
Figure GDA0003594531450000085
(ei,ej)∈Arun
Figure GDA0003594531450000086
Figure GDA0003594531450000087
(ek,eq)∈Arun
所述的约束条件和目标函数的相关参数变量为:T为列车运行图中所有列车集合;S为列车运行图中所涉及的车站集合;tri为列车编号tri∈T;
Figure GDA0003594531450000088
为列车tri的相邻列车集合;si为车站编号;
Figure GDA0003594531450000089
为列车tri运行方向车站si的下一个车站;otr为列车tr的始发站;dtr为列车tr的终到站;Rtr为列车tr的运行径路;
Figure GDA00035945314500000810
为列车tri和trj的相同径路中车站集合;
Figure GDA00035945314500000811
为列车tr的计划停车站,
Figure GDA00035945314500000812
typei为列车事件类型,typei∈{arr,dep};ei为列车事件,ei=e{tri,si,typei};E为列车事件集合,ei∈E;
Figure GDA00035945314500000813
为发生初始晚点的列车事件集合;ai,j为活动,ai,j=(ei,ej);Arun为区间运行活动集合;Adwell为停站活动集合;Astation为车站活动集合,包括停站活动和通过活动;
Figure GDA00035945314500000814
为相邻列车到达间隔活动集合;
Figure GDA00035945314500000815
为相邻列车出发间隔活动集合;
Figure GDA00035945314500000816
为相继占用同一到发线的列车发到间隔活动集合;pte为列车事件计划发生时刻;
Figure GDA00035945314500000817
为活动最小持续时间;
Figure GDA00035945314500000818
为车站s在列车tr运行方向的到发线数量;
S43:采用分枝定界算法求解所述列车群运行调控模型,优先搜索0-1决策变量,输出最优列车群运行调控方案,所述最优列车群运行调控方案中包括调控后的列车运行线和限速时空范围。
一种面向初始延误与区间限速的列车运行调控***,包括:
基础数据模块:用于存储铁路线路拓扑表和列车运行计划表数据;
事件活动网络构建模块:用于根据铁路线路拓扑和列车运行计划数据,构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络;
列车运行调控方案在线生成模块:用于综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案;
列车运行调控方案显示模块:用于显示列车运行调度方案,并发布列车运行调控方案进行调度。
由上述本发明的实施例提供的技术方案可以看出,本发明实施例克服了传统调度员人工无法短时间内编制高质量的列车运行调控方案的难题,实现了最优列车运行调控方案的在线生成;有效降低了调控后列车运行方案与原计划方案的偏离程度,保障突发事件下列车运行安全和列车服务质量。
本发明附加的方面和优点将在下面的描述中部分给出,这些将从下面的描述中变得明显,或通过本发明的实践了解到。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明实施例提供的一种面向初始延误与区间限速的列车运行调控方法的处理流程图;
图2为本发明实施例提供的一种事件活动网络示意图;
图3为本发明实施例提供的一种岳阳东站至广州南站区段的某日列车运行计划图;
图4为本发明实施例提供的一种某突发事件情况下列车运行调控方案图;
图5为本发明实施例提供的一种面向初始延误与区间限速的列车运行调控***结构图。
具体实施方式
下面详细描述本发明的实施方式,所述实施方式的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施方式是示例性的,仅用于解释本发明,而不能解释为对本发明的限制。
本技术领域技术人员可以理解,除非特意声明,这里使用的单数形式“一”、“一个”、“所述”和“该”也可包括复数形式。应该进一步理解的是,本发明的说明书中使用的措辞“包括”是指存在所述特征、整数、步骤、操作、元件和/或组件,但是并不排除存在或添加一个或多个其他特征、整数、步骤、操作、元件、组件和/或它们的组。应该理解,当我们称元件被“连接”或“耦接”到另一元件时,它可以直接连接或耦接到其他元件,或者也可以存在中间元件。此外,这里使用的“连接”或“耦接”可以包括无线连接或耦接。这里使用的措辞“和/或”包括一个或更多个相关联的列出项的任一单元和全部组合。
本技术领域技术人员可以理解,除非另外定义,这里使用的所有术语(包括技术术语和科学术语)具有与本发明所属领域中的普通技术人员的一般理解相同的意义。还应该理解的是,诸如通用字典中定义的那些术语应该被理解为具有与现有技术的上下文中的意义一致的意义,并且除非像这里一样定义,不会用理想化或过于正式的含义来解释。
为便于对本发明实施例的理解,下面将结合附图以几个具体实施例为例做进一步的解释说明,且各个实施例并不构成对本发明实施例的限定。
本发明提供了一种面向初始延误与区间限速的列车运行调控方法、***,下面结合附图对本发明进一步详细说明。本领域技术人员应当理解,下面所具体描述的内容是说明性的而非限制性的,不应以此限制本发明的保护范围。
首先,如图1所示,本发明实施例提供的一种面向初始延误与区间限速的列车运行调控方法的处理流程如图1所示,包括如下的处理步骤:
步骤S1:构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,以列车事件活动网络中的列车事件和活动为基本单元刻画列车初始延误约束、列车事件容忍延误约束、列车事件取消约束、区间限速扰动约束、车站到发线数量约束、列车区间运行活动和停站作业时间约束、列车在站到发时刻逻辑约束和线路能力约束。
S11:基于铁路线路拓扑结构和列车运行径路,从车次tr、车站s和事件类型type三个属性构建列车事件集合E;从区间运行、停站和列车群相继占用运行资源间隔方面,构建列车活动集合A;
S12:根据事件类型不同,列车事件ei分为列车到达事件和列车出发事件,ei∈e{tri,si,typei};根据构成活动的关联事件类型不同,列车活动ai,j=(ei,ej)包括列车区间运行活动、停站活动和间隔活动,间隔活动可分为到达间隔活动、出发间隔活动和发到间隔活动,从而表征列车群间运行逻辑相关关系;
图2为本发明实施例提供的一种事件活动网络示意图,如图2所示,列车1、2和3在车站A、B、C和D组成的铁路线网上的事件活动网络。列车1和2的运行径路是{车站A,车站B,车站C},列车3的运行径路是{车站D,车站B,车站C},网络中虚线表示相邻列车在其运行冲突径路上的运行顺序关系,列车1最先到达车站C,其次是列车2,最后是列车3。图2表征了3趟列车的运行逻辑关系。
S13:根据所述列车事件集合E和列车活动集合A构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,初始延误场景包括单列车到达或出发延误超过30分钟或运行图中大面积列车群发生延误现象,区间限速场景是指单个或多个高速铁路区间发生临时限速。
步骤S2:以列车事件活动网络中的列车事件和列车活动为基本单元描述初始延误场景,从而构建面向初始延误场景下的约束集合,该约束集合包括面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和事件取消约束集。
S21:定义决策变量ωe为列车事件e调整后的发生时刻、决策变量ce为列车事件e是否取消、决策变量de为列车事件e的发生时刻与计划发生时刻的偏差,定义参数pte为列车事件e计划发生时刻、参数dte为列车事件e的初始延误时间,列车事件与计划时刻偏差为:de=|ωe-pte|
因列车事件取消时,其计算入目标函数的偏差为0;列车事件不取消时,其计算入目标函数的偏差为de,因此引入中间决策变量
Figure GDA0003594531450000121
为计算入目标函数的列车事件发生时刻偏差,则相关约束条件如下:
de≥ωe-pte,e∈e{tr,s,type|tr∈T,s∈Rtr,type∈{dep,arr}}
de≥-(ωe-pte),e∈e{tr,s,type|tr∈T,s∈Rtr,type∈{dep,arr}}
Figure GDA0003594531450000122
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
Figure GDA0003594531450000131
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
Figure GDA0003594531450000132
e∈e{tr,s,type|tr∈T,s=Rtr,type∈{arr,dep}}
发生初始延误的列车事件调整后的发生时刻不早于列车事件计划发生时刻与初始延误时间的总和,需满足约束如下:
ωe-pte≥ce·(M-dte)+dte
Figure GDA0003594531450000133
S22:定义列车在始发站的出发延误超过延误容忍阈值DTtoler,该列车取消,需要满足约束如下:
de-DTtoler≥(ce-1)·M,e∈e{tr,s,type|tr∈T,s=otr,type=dep}
所属同列车的事件取消决策与前一列车事件的取消决策一致,即同列车的后续事件取消决策取决于列车在始发站出发事件的取消决策,满足约束如下:
Figure GDA0003594531450000134
Figure GDA0003594531450000135
Figure GDA0003594531450000136
并将初始延误约束集、列车事件容忍延误约束和列车事件取消约束集的解耦后的线性约束集合,添加到步骤4中的列车群运行调控模型,进一步完善列车群运行调控模型。
步骤S3:以列车事件和列车活动为基本单元描述区间限速场景,从而构建面向区间限速场景下的约束集合。建立面向区间限速扰动约束集,添加中间决策变量方法解耦区间限速扰动约束集。
S31:确定直接受区间限速影响的列车,引入中间决策变量:
Figure GDA0003594531450000137
为列车tr∈T在其运行方向突发事件影响结束车站
Figure GDA0003594531450000138
的计划到达时刻是否大于等于突发事件发生时刻
Figure GDA0003594531450000139
Figure GDA00035945314500001310
为列车tr在其运行方向突发事件影响开始车站
Figure GDA00035945314500001311
的计划出发时刻是否小于等于突发事件结束时刻
Figure GDA00035945314500001312
ztr为列车是否受突发事件影响,当且仅当列车tr在突发事件影响结束车站
Figure GDA0003594531450000141
的计划时刻大于等于突发事件发生时刻
Figure GDA0003594531450000142
和列车tr在突发事件影响开始车站
Figure GDA0003594531450000143
的计划出发时刻小于等于突发事件结束时刻
Figure GDA0003594531450000144
同时成立,即
Figure GDA0003594531450000145
列车tr受到突发事件的影响,满足如下约束:
Figure GDA0003594531450000146
Figure GDA0003594531450000147
Figure GDA0003594531450000148
tr∈T
Figure GDA0003594531450000149
tr∈T
Figure GDA00035945314500001410
tr∈T
S32:受突发事件影响的列车在事件影响时空范围内的区间运行时分增加,其增加程度取决于区间限速等级,根据高速铁路行车规则和突发事件下应急响应预案,确定列车在突发事件下的限速等级和区间运行时分增加程度θ,其满足约束如下:
Figure GDA00035945314500001411
Figure GDA00035945314500001412
Figure GDA00035945314500001413
(ei,ej)=a∈Arun
并将区间限速扰动约束集的解耦后的线性约束集合,添加到后续步骤4中的列车群运行调控模型,进一步完善列车群运行调控模型。
步骤S4:综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到列车群运行调控模型中,求解列车群运行调控模型输出最优列车群运行调控方案。
S41:面向列车初始延误与区间限速并发场景,考虑最小化调整后列车调度方案与列车原运行计划方案的偏离程度,采用偏离程度可用调整后列车在计划停车站的到发时刻与计划时刻的偏差和取消列车数量进行衡量,目标函数:
Figure GDA0003594531450000151
其中wdiff和wcancel分别表示列车到发时刻总偏差和停运列车数量的计算权重,且停运列车数量的计算权重远大于列车在其计划停车站到发时刻总偏差计算权重,wdiff=1和wcancel=1000;
S42:构建面向初始延误与区间限速的列车群运行调控模型,模型全部约束除包括初始延误扰动约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集,还包括基于列车事件活动表征的其他约束如下:
(1)车站到发线数量约束
Figure GDA0003594531450000152
ei∈e{tri,si,typei|tri∈T,si=sj,typei=arr}
ej∈e{trj,sj,typej|trj∈T,sj=Rtrj,typej=arr}
ek∈e{trk,sk,type|ktrk∈T,sk=sj,typek=dep}
eq∈e{trq,sq,typeq|trq=trj,sq=sj,typeq=dep}
此外,为决策同一方向相邻列车相继到达同一车站时是否占用该车站同一到发线,引入决策变量:χ(ek,ej)为列车事件ek和列车事件ej是否占用相同到发线,满足如下约束:
Figure GDA0003594531450000153
ek∈e{trk,sk,typek|trk∈T,trk≠trj,sk=sj,typek=dep}
Figure GDA0003594531450000154
(2)列车区间运行活动和停站作业时间约束
Figure GDA0003594531450000161
(ei,ej)=a,a∈Arun∪Adwell
Figure GDA0003594531450000162
Figure GDA0003594531450000163
Figure GDA0003594531450000164
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep}
(3)列车在站到发时刻逻辑约束和线路能力约束
Figure GDA0003594531450000165
Figure GDA0003594531450000166
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep},(ei,ej)=a,a∈Astation
Figure GDA0003594531450000167
Figure GDA0003594531450000168
Figure GDA0003594531450000169
Figure GDA00035945314500001610
Figure GDA00035945314500001611
o(ei,ej)+o(ej,ei)=1
Figure GDA00035945314500001612
Figure GDA00035945314500001613
o(ei,ej)-o(ek,eq)=0
Figure GDA00035945314500001614
Figure GDA00035945314500001615
(ei,ej)∈Arun
Figure GDA0003594531450000171
eq∈e{trq,sq,typeq|trq=trj,sq=sk,typeq=typek},(ek,eq)∈Arun
所述的约束条件和目标函数的相关参数变量为:T为列车运行图中所有列车集合;S为列车运行图中所涉及的车站集合;tri为列车编号tri∈T;
Figure GDA0003594531450000172
为列车tri的相邻列车集合;si为车站编号;
Figure GDA0003594531450000173
为列车tri运行方向车站si的下一个车站;otr为列车tr的始发站;dtr为列车tr的终到站;Rtr为列车tr的运行径路;
Figure GDA0003594531450000174
为列车tri和trj的相同径路中车站集合;
Figure GDA0003594531450000175
为列车tr的计划停车站,
Figure GDA0003594531450000176
typei为列车事件类型,typei∈{arr,dep};ei为列车事件,ei=e{tri,si,typei};E为列车事件集合,ei∈E;
Figure GDA0003594531450000177
为发生初始晚点的事件集合;ai,j为活动,ai,j=(ei,ej);Arun为区间运行活动集合;Adwell为停站活动集合;Astation为车站活动集合,包括停站活动和通过活动;
Figure GDA0003594531450000178
为相邻列车到达间隔活动集合;
Figure GDA0003594531450000179
为相邻列车出发间隔活动集合;
Figure GDA00035945314500001710
为相继占用同一到发线的列车发到间隔活动集合;pte为列车事件计划发生时刻;
Figure GDA00035945314500001711
为活动最小持续时间;
Figure GDA00035945314500001712
为车站s在列车tr运行方向的到发线数量;
S43:根据所构建的列车群运行调控模型属于混合整数线性规划的特点,同时模型中0-1逻辑决策变量居多,采用分枝定界算法,优先搜索0-1决策变量,进行求解所构建的列车群运行调控模型,输出最优列车群运行调控方案。所述最优列车群运行调控方案中包括调控后的列车运行线和限速时空范围。
以武广高速铁路为实际场景,进行具体实施案例分析。以实际列车运行计划数据和线路网拓扑结构构建列车事件活动网络,并以列车事件和列车活动构建步骤2、3和4中的列车运行调控模型;
如图3所示,2018年7月25日武广高速铁路的岳阳东站至广州南站区段的列车运行计划相关数据。从岳阳东站至广州南站,沿线共经过14个车站,13个运行区间。根据其铁路线网拓扑和列车运行计划构建事件活动网络,并根据发明内容S2、S3和S4构建列车运行调控模型。
为减少列车停运数量,令wdiff=1和wcancel=1000,列车停运阈值为初始晚点时分1800秒。相邻列车最小到达间隔和最小出发间隔同为180秒;相邻同方向列车相继占用同一到发线的最下发到间隔时间为240秒。设置突发事件场景:8:00至9:00,由于自然灾害影响,导致乐昌东站至郴州西站区间,根据铁路行车管理规程,上行方向列车发生临时限速,区间最小运行时间增加程度为θ=1.18。采用分支定界算法求解模型,获得列车运行调控方案,如图4所示。图4中虚线是调控后的列车运行线,标记阴影是限速时空范围。
其次,如图5所示,本发明公开了一种面向初始延误与区间限速的列车运行调控***,所述***包括:
基础数据模块:用于存储铁路线路拓扑表和列车运行计划表数据;
事件活动网络构建模块:用于根据铁路线路拓扑和列车运行计划数据,采用所述方法,表征列车事件和活动,刻画列车群运行逻辑关系,构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络;
列车运行调控方案在线生成模块:用于综合考虑初始延误与区间限速并发突发扰动场景,建立列车群运行调控模型,将所述初始延误约束集、事件取消约束集和列车群运行调控模型的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案;
列车运行调控方案显示模块:用于显示列车运行调度方案,并发布列车运行调控方案进行调度。
综上所述,本发明实施例克服了传统调度员人工无法短时间内编制高质量的列车运行调控方案的难题,实现了最优列车运行调控方案的在线生成;有效降低了调控后列车运行方案与原计划方案的偏离程度,保障突发事件下列车运行安全和列车服务质量;有效减少了突发事件影响恢复时间,减轻调度员工作量和压力。
本发明实施例的方法、***及存储介质面向初始延误与区间限速情况实现了列车运行调控方案自动化生成,克服了人工短时间内无法编制高质量列车运行调控方案的难题,降低了突发事件的影响程度(延误传播和停运列车数)与恢复时间,提升了突发事件情况下列车服务质量。
本领域普通技术人员可以理解:附图只是一个实施例的示意图,附图中的模块或流程并不一定是实施本发明所必须的。
通过以上的实施方式的描述可知,本领域的技术人员可以清楚地了解到本发明可借助软件加必需的通用硬件平台的方式来实现。基于这样的理解,本发明的技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品可以存储在存储介质中,如ROM/RAM、磁碟、光盘等,包括若干指令用以使得一台计算机设备(可以是个人计算机,服务器,或者网络设备等)执行本发明各个实施例或者实施例的某些部分所述的方法。
本说明书中的各个实施例均采用递进的方式描述,各个实施例之间相同相似的部分互相参见即可,每个实施例重点说明的都是与其他实施例的不同之处。尤其,对于装置或***实施例而言,由于其基本相似于方法实施例,所以描述得比较简单,相关之处参见方法实施例的部分说明即可。以上所描述的装置及***实施例仅仅是示意性的,其中所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部模块来实现本实施例方案的目的。本领域普通技术人员在不付出创造性劳动的情况下,即可以理解并实施。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求的保护范围为准。

Claims (3)

1.一种面向初始延误与区间限速的列车运行调控方法,其特征在于,包括:
步骤S1:构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络;
步骤S2:以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集,获得线性初始延误约束、列车事件容忍延误约束和列车事件取消约束集合;
步骤S3:以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向区间限速扰动约束集,添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合;
步骤S4:综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案;
所述的步骤S1中的构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,包括:
S11:基于铁路线路拓扑结构和列车运行径路,从车次tr、车站s和事件类型type三个属性构建列车事件集合E;从区间运行、停站和列车群相继占用运行资源间隔方面构建列车活动集合A;
S12:根据事件类型不同,列车事件ei分为列车到达事件和列车出发事件,ei∈e{tri,si,typei};根据构成活动的关联事件类型不同,列车活动ai,j=(ei,ej) 包括列车区间运行活动、停站活动和间隔活动,间隔活动分为到达间隔活动、出发间隔活动和发到间隔活动;
S13:根据所述列车事件集合E和列车活动集合A构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络,初始延误包括单列车到达或出发延误超过30分钟或运行图中大部分列车群发生延误现象,区间限速包括单个或多个高速铁路区间发生临时限速;
所述的步骤S2中的以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集,获得线性初始延误约束、列车事件容忍延误约束和列车事件取消约束集合,包括:
S21:以列车事件活动网络中的列车事件和列车活动为基本单元描述初始延误场景,从而构建面向初始延误场景下的约束集合,该约束集合包括面向初始延误扰动约束集、列车事件容忍延误约束集和列车事件取消约束集,通过添加中间决策变量方法解耦初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集,获得线性初始延误约束、列车事件容忍延误约束和列车事件取消约束集合;
定义决策变量ωe为列车事件e调整后的发生时刻、决策变量ce为列车事件e是否取消、决策变量de为列车事件e的发生时刻与计划发生时刻的偏差,定义参数pte为列车事件e计划发生时刻、参数dte为列车事件e的初始延误时间,列车事件与计划时刻偏差为:de=|ωe-pte|;
列车事件取消时该列车事件计算入目标函数的偏差为0;列车事件不取消时该列车事件计算入目标函数的偏差为de,引入中间决策变量
Figure FDA0003623708460000021
为计算入目标函数的列车事件发生时刻偏差,则相关约束条件如下:
Figure FDA0003623708460000031
de≥-(ωe-pte),e∈e{tr,s,type|tr∈T,s∈Rtr,type∈{dep,arr}}
Figure FDA0003623708460000032
Figure FDA0003623708460000033
Figure FDA0003623708460000034
发生初始延误的列车事件调整后的发生时刻不早于事件计划发生时刻与初始延误时间的总和,需满足约束如下:
Figure FDA0003623708460000035
S22:定义列车在始发站的出发延误超过延误容忍阈值DTtoler,该列车取消,需要满足约束如下:
de-DTtoler≥(ce-1)·M,e∈e{tr,s,type|tr∈T,s=otr,type=dep}
所属同列车的事件取消决策与前一列车事件的取消决策一致,即同列车的后续事件取消决策取决于列车在始发站出发事件的取消决策,满足约束如下:
Figure FDA0003623708460000036
Figure FDA0003623708460000037
Figure FDA0003623708460000038
将初始延误约束集、列车事件容忍延误约束集和列车事件取消约束集的解耦后的线性约束集合,添加到列车群运行调控模型中;
所述的步骤S4中的综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集合、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型,输出最优列车群运行调控方案,包括:
S41:面向列车初始延误与区间限速并发场景,采用调整后列车在计划停车站的到发时刻与计划时刻的偏差和取消列车数量来衡量,调整后列车调度方案与列车原运行计划方案的偏离程度,以最小化所述偏离程度为目标建立如下的目标函数:
Figure FDA0003623708460000041
其中wdiff和wcancel分别表示列车到发时刻总偏差和停运列车数量的计算权重,且停运列车数量的计算权重远大于列车在其计划停车站到发时刻总偏差计算权重,wdiff=1和wcancel=1000;
S42:构建面向初始延误与区间限速的列车群运行调控模型,将所述初始延误约束集、列车事件容忍延误约束集合、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,所述列车群运行调控模型除了包括列车初始延误约束、列车事件容忍延误约束、列车事件取消约束和区间限速扰动约束之外,还包括如下的基于列车事件活动表征的其他约束:
(1)车站到发线数量约束
Figure FDA0003623708460000042
ei∈e{tri,si,typei|tri∈T,si=sj,typei=arr}
Figure FDA0003623708460000043
ek∈e{trk,sk,typek|trk∈T,sk=sj,typek=dep}
eq∈e{trq,sq,typeq|trq=trj,sq=sj,typeq=dep}
为决策同一方向相邻列车相继到达同一车站时是否占用该车站同一到发线,引入决策变量:χ(ek,ej)为列车事件ek和列车事件ej是否占用相同到发线,满足如下约束:
Figure FDA0003623708460000051
ek∈e{trk,sk,typek|trk∈T,trk≠trj,sk=sj,typek=dep}
Figure FDA0003623708460000052
(2)列车区间运行活动和停站作业时间约束
Figure FDA0003623708460000053
Figure FDA0003623708460000054
Figure FDA0003623708460000055
Figure FDA0003623708460000056
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep}
(3)列车在站到发时刻逻辑约束和线路能力约束
Figure FDA0003623708460000057
Figure FDA0003623708460000058
ej∈e{trj,sj,typej|trj=tri,sj=si,typej=dep},(ei,ej)=a,a∈Astation
Figure FDA0003623708460000059
Figure FDA00036237084600000510
Figure FDA00036237084600000511
Figure FDA00036237084600000512
Figure FDA00036237084600000513
o(ei,ej)+o(ej,ei)=1
Figure FDA00036237084600000514
Figure FDA00036237084600000515
o(ei,ej)-o(ek,eq)=0
Figure FDA0003623708460000061
Figure FDA0003623708460000062
Figure FDA0003623708460000063
eq∈e{trq,sq,typeq|trq=trj,sq=sk,typeq=typek},(ek,eq)∈Arun
所述的基于列车事件活动表征的其他约束和目标函数的相关参数变量为:T为列车运行图中所有列车集合;S为列车运行图中所涉及的车站集合;tri为列车编号tri∈T;
Figure FDA0003623708460000064
为列车tri的相邻列车集合;si为车站编号;
Figure FDA0003623708460000065
为列车tri运行方向车站si的下一个车站;otr为列车tr的始发站;dtr为列车tr的终到站;Rtr为列车tr的运行径路;
Figure FDA0003623708460000066
为列车tri和trj的相同径路中车站集合;
Figure FDA0003623708460000067
为列车tr的计划停车站,
Figure FDA0003623708460000068
typei为列车事件类型,typei∈{arr,dep},ei为列车事件,ei=e{tri,si,typei};E为列车事件集合,ei∈E;
Figure FDA0003623708460000069
为发生初始晚点的事件集合;ai,j为活动,ai,j=(ei,ej);Arun为区间运行活动集合;Adwell为停站活动集合;Astation为车站活动集合,包括停站活动和通过活动;
Figure FDA00036237084600000610
为相邻列车到达间隔活动集合;
Figure FDA00036237084600000611
为相邻列车出发间隔活动集合;
Figure FDA00036237084600000612
为相继占用同一到发线的列车发到间隔活动集合;pte为列车事件计划发生时刻;
Figure FDA00036237084600000613
为列车活动a的最小持续时间;
Figure FDA00036237084600000614
为车站s在列车tr运行方向的到发线数量;
S43:采用分枝定界算法求解所述列车群运行调控模型,优先搜索0-1决策变量,输出最优列车群运行调控方案,所述最优列车群运行调控方案中包括调控后的列车运行线和限速时空范围。
2.根据权利要求1所述的方法,其特征在于,所述的步骤S3中的以所述列车事件活动网络中的列车事件和列车活动为基本单元建立面向区间限速扰动约束集,添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合,包括:
S31:以列车事件和列车活动为基本单元描述区间限速场景,构建面向区间限速场景下的区间限速扰动约束集,通过添加中间决策变量方法解耦区间限速扰动约束集,获得线性区间限速扰动约束集合;确定直接受区间限速影响的列车,引入中间决策变量:
Figure FDA0003623708460000071
为列车tr∈T在其运行方向突发事件影响结束车站
Figure FDA0003623708460000072
的计划到达时刻是否大于等于突发事件发生时刻
Figure FDA0003623708460000073
为列车tr在其运行方向突发事件影响开始车站
Figure FDA0003623708460000074
的计划出发时刻是否小于等于突发事件结束时刻
Figure FDA0003623708460000075
ztr为列车是否受突发事件影响,当且仅当列车tr在突发事件影响结束车站
Figure FDA0003623708460000076
的计划时刻大于等于突发事件发生时刻
Figure FDA0003623708460000077
和列车tr在突发事件影响开始车站
Figure FDA0003623708460000078
的计划出发时刻小于等于突发事件结束时刻
Figure FDA0003623708460000079
同时成立,即
Figure FDA00036237084600000710
列车tr受到突发事件的影响,满足如下约束:
Figure FDA00036237084600000711
Figure FDA00036237084600000712
Figure FDA00036237084600000713
Figure FDA00036237084600000714
Figure FDA00036237084600000715
S32:确定列车在突发事件下的限速等级和区间运行时分增加程度θ,其满足约束如下:
Figure FDA00036237084600000716
Figure FDA00036237084600000717
Figure FDA00036237084600000718
将区间限速扰动约束集的解耦后的线性约束集合,添加到后续的列车群运行调控模型。
3.一种面向初始延误与区间限速的列车运行调控***,其特征在于,应用于权利要求1至2任一项所述的方法,包括:
基础数据模块:用于存储铁路线路拓扑表和列车运行计划表数据;
事件活动网络构建模块:用于根据铁路线路拓扑和列车运行计划数据,构建表征列车群运行逻辑相关关系的面向初始延误与区间限速的列车事件活动网络;
列车运行调控方案在线生成模块:用于综合考虑初始延误与区间限速并发突发扰动场景,将所述初始延误约束集、列车事件容忍延误约束集、列车事件取消约束集和区间限速扰动约束集的解耦结果添加到所述列车群运行调控模型中,求解所述列车群运行调控模型输出最优列车群运行调控方案;
列车运行调控方案显示模块:用于显示列车运行调度方案,并发布列车运行调控方案进行调度。
CN202110986180.5A 2021-08-26 2021-08-26 一种面向初始延误与区间限速的列车运行调控方法和*** Active CN113715875B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110986180.5A CN113715875B (zh) 2021-08-26 2021-08-26 一种面向初始延误与区间限速的列车运行调控方法和***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110986180.5A CN113715875B (zh) 2021-08-26 2021-08-26 一种面向初始延误与区间限速的列车运行调控方法和***

Publications (2)

Publication Number Publication Date
CN113715875A CN113715875A (zh) 2021-11-30
CN113715875B true CN113715875B (zh) 2022-06-10

Family

ID=78678105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110986180.5A Active CN113715875B (zh) 2021-08-26 2021-08-26 一种面向初始延误与区间限速的列车运行调控方法和***

Country Status (1)

Country Link
CN (1) CN113715875B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115339489B (zh) * 2022-07-13 2024-01-09 北京交通大学 一种列车运行图与停站方案协同调整方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112232552A (zh) * 2020-09-27 2021-01-15 中国铁道科学研究院集团有限公司通信信号研究所 面向突发事件不确定性的列车运行计划调整风险控制方法
CN112249101A (zh) * 2020-11-17 2021-01-22 中南大学 基于矩阵表征的高铁网络延误传播定量分析方法
JP2021024542A (ja) * 2019-07-31 2021-02-22 韓国鉄道技術研究院Korea Railroad Research Institute 自律協業基盤の動的列車制御方法及び装置
CN112581002A (zh) * 2020-12-24 2021-03-30 同济大学 基于突发事件扰动的高铁列车运行延误评估方法及***
CN112668101A (zh) * 2020-12-31 2021-04-16 西南交通大学 一种高速铁路列车运行图编制方法
CN113128774A (zh) * 2021-04-26 2021-07-16 北京交通大学 一种固定列车运行线顺序下的列车运行调整优化方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021024542A (ja) * 2019-07-31 2021-02-22 韓国鉄道技術研究院Korea Railroad Research Institute 自律協業基盤の動的列車制御方法及び装置
CN112232552A (zh) * 2020-09-27 2021-01-15 中国铁道科学研究院集团有限公司通信信号研究所 面向突发事件不确定性的列车运行计划调整风险控制方法
CN112249101A (zh) * 2020-11-17 2021-01-22 中南大学 基于矩阵表征的高铁网络延误传播定量分析方法
CN112581002A (zh) * 2020-12-24 2021-03-30 同济大学 基于突发事件扰动的高铁列车运行延误评估方法及***
CN112668101A (zh) * 2020-12-31 2021-04-16 西南交通大学 一种高速铁路列车运行图编制方法
CN113128774A (zh) * 2021-04-26 2021-07-16 北京交通大学 一种固定列车运行线顺序下的列车运行调整优化方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高速铁路区间能力部分失效情况下列车运行;占曙光等;《铁道学报》;20061031;第38卷(第10期);1-13 *

Also Published As

Publication number Publication date
CN113715875A (zh) 2021-11-30

Similar Documents

Publication Publication Date Title
Mo et al. Energy-efficient train scheduling and rolling stock circulation planning in a metro line: A linear programming approach
Zhou et al. Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
CN111353705B (zh) 一种城市轨道交通多场段进路管理***及综合管控***
Jütte et al. Optimizing railway crew scheduling at DB Schenker
Chen et al. Real-time optimization for train regulation and stop-skipping adjustment strategy of urban rail transit lines
Zhang et al. Real-time optimization strategy for single-track high-speed train rescheduling with disturbance uncertainties: A scenario-based chance-constrained model predictive control approach
Zhou et al. Integrated timetable rescheduling for multidispatching sections of high-speed railways during large-scale disruptions
CN113715875B (zh) 一种面向初始延误与区间限速的列车运行调控方法和***
RU2662351C1 (ru) Система для оперативного управления поездной работой участка железной дороги
CN114394135B (zh) 一种基于多粒度时空网的列车运行图与路径选择优化方法
Kang et al. Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
Zhang et al. Train rescheduling for large-scale disruptions in a large-scale railway network
Feng et al. Multi-stage timetable rescheduling for high-speed railways: a dynamic programming approach with adaptive state generation
Zhang et al. Robust Train Scheduling Problem with Optimized Maintenance Planning on High‐Speed Railway Corridors: The China Case
Hao et al. A train timetabling and stop planning optimization model with passenger demand
Ji et al. Optimization of train schedule with uncertain maintenance plans in high-speed railways: A stochastic programming approach
Toletti et al. Modelling customer inconvenience in train rescheduling
Peterson et al. Deliverable D 3.1: analysis of the gap between daily timetable and operational traffic
Cavone et al. Demand-oriented rescheduling of railway traffic in case of delays
Ullrich et al. Do regular timetables help to reduce delays in tram networks? It depends!
Geng et al. Integrated scheduling of metro trains and shuttle buses with passenger flow control strategy on an oversaturated metro line
Gao et al. Reliability Analysis of Bus Timetabling Strategy during the COVID‐19 Epidemic: A Case Study of Yixing, China
CN113177295A (zh) 一种地铁网络列车时刻表快速编制方法
Xu et al. A trade-off method for timetable rescheduling considering transfer connections in subway networks
Tan et al. Techniques for inserting additional train paths into existing cyclic timetables

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant