CN113657871A - Scientific and technological innovation project management system and method - Google Patents

Scientific and technological innovation project management system and method Download PDF

Info

Publication number
CN113657871A
CN113657871A CN202111017122.8A CN202111017122A CN113657871A CN 113657871 A CN113657871 A CN 113657871A CN 202111017122 A CN202111017122 A CN 202111017122A CN 113657871 A CN113657871 A CN 113657871A
Authority
CN
China
Prior art keywords
project
management
innovation
expert
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111017122.8A
Other languages
Chinese (zh)
Other versions
CN113657871B (en
Inventor
夏云峰
刘贯科
任申
戴喜良
王传旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202111017122.8A priority Critical patent/CN113657871B/en
Priority claimed from CN202111017122.8A external-priority patent/CN113657871B/en
Publication of CN113657871A publication Critical patent/CN113657871A/en
Application granted granted Critical
Publication of CN113657871B publication Critical patent/CN113657871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of project management and discloses a scientific and technological innovation project management system and method. The management system comprises a home page display management unit, a content display unit and a display unit, wherein the home page display management unit is used for controlling the display function of the service platform and dividing a home page of the service platform into a home page title bar, a column navigation area and a content display area; the column guide area is used for displaying a column tree which is accessed or operated by a current login user, and the column tree comprises a scientific and technological innovation module for providing related service items of science innovation projects, a studio module for providing related service items of a workshop, an innovation management module for providing related service items in the aspect of enterprise and management innovation management, an expert management module for providing service items in the aspect of human resource expert management, and a comprehensive management module for providing service items of service platform public resources; and the content display area is used for displaying each functional data and the related operation page. The invention improves project management efficiency and saves labor cost.

Description

Scientific and technological innovation project management system and method
Technical Field
The invention relates to the technical field of project management, in particular to a scientific and technological innovation project management system and method.
Background
With the development of society, scientific and technological innovation projects tend to be complicated and diversified, wherein the traditional project management method cannot meet the requirements of project management in different days in terms of project management, quality management, personnel management and the like, the efficiency of the existing project management process is low, management personnel need to process more data, and human resources are wasted.
Disclosure of Invention
The present invention is directed to a system and method for managing scientific and technological innovation projects to overcome the above-mentioned problems.
In order to achieve the purpose, the invention adopts the following technical scheme:
a system for managing a scientific and technological innovation project, comprising:
the home page display management unit is used for controlling the display function of the service platform and dividing a home page of the service platform into a home page title bar, a column navigation area and a content display area;
the home page title bar comprises a name display area for displaying company names and project names and a reminding function area for reminding information to be dealt with, announcements and information;
the column navigation area is used for displaying a column tree which is accessed or operated by a current login user, and the column tree comprises a scientific and technological innovation module for providing related service items of science innovation projects, a studio module for providing related service items of a workshop, an innovation management module for providing related service items in the aspect of enterprise management and innovation management, an expert management module for providing service items in the aspect of human resource expert management, and a comprehensive management module for providing service items of service platform public resources;
and the content display area is used for displaying each functional data and the related operation page.
Optionally, the home page of the service platform is further divided into a floating functional area for displaying a plurality of functional keys, including: at least one of a home button, a my project button, a result list button, a return button, and a show/hide button.
Optionally, on the service platform home page, the display content of the content display area includes: latest scientific and technological information, latest achievement data, project and achievement annual statistics, platform use monthly newspaper, platform suggestions and system guidance.
Optionally, the scientific and technological innovation module includes: the system comprises a project management unit for managing a plurality of projects, a my project unit for displaying a my project list and project flow guidance, an achievement list unit for displaying achievements, an expert review unit for submitting expert review requests, an acceptance review unit for conducting review and acceptance, an expert review unit for managing experts in review, and a help guidance unit for providing various help and guidance.
Optionally, the innovation management module includes: the system comprises a management innovation application unit for performing management innovation, a quality management unit for performing quality management, a department responsible auditing unit for being partially responsible for auditing operation, a professional expert auditing unit for being responsible for auditing operation by professional experts, a management department auditing unit for being responsible for auditing operation by a management department, a result expert scoring unit for scoring results, an innovation management setting unit for setting operation and an expert management unit for managing expert information.
Optionally, the item management unit is specifically configured to: importing projects to be managed in the current year in batch; the process tracking is to export the latest process data from the scientific and technological innovation system of the provincial company at regular time and synchronize the latest process data into the platform; and searching the screening items according to the names and the item states of the items.
Optionally, the my item unit is specifically configured to: displaying all item lists which are currently responsible for and participated in by the user; and guiding project managers to finish the project implementation process orderly in stages, steps and shunting processes.
Optionally, the my project unit, in terms of directing the project principal to finish the project implementation process orderly in stages, in steps, and in a branch, is specifically configured to: according to the current project, the system displays the description of the due expense of the project, the guide of the use process, the related examples and the related accessories of the current expense and the application use description; showing the project achievement flow guide according to the specific requirements of the project; displaying the specific content of the item; providing relevant processes and guidance for project acceptance; project archiving related processes and directions are provided.
Optionally, the management innovation application unit is specifically configured to: and displaying a project management list page, and providing project searching, project adding and project operating functions, wherein the project operating functions comprise editing, deleting, checking results and project details.
A management method of a scientific and technological innovation project is applied to the project management system, and comprises the following steps:
dividing a head page title bar, a column navigation area and a content display area on a head page of the service platform;
displaying company names and project names and carrying out information reminding of pending affairs, announcements and information on the title bar of the home page;
providing a column tree for displaying that a current login user has authority to access or operate in the column navigation area, wherein the column tree comprises a scientific and technological innovation module for providing related service items of science and innovation projects, a studio module for providing related service items of a workshop, an innovation management module for providing related service items in the aspect of enterprise and management innovation management, an expert management module for providing service items in the aspect of human resource expert management, and a comprehensive management module for providing service items of service platform public resources;
and displaying each functional data and the related operation page in the content display area.
Compared with the prior art, the invention has the beneficial effects that:
according to the embodiment of the invention, the project management efficiency is effectively improved, the burden of project management personnel on manually processing data is reduced, and the labor cost is greatly saved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a top view of a scientific and technological innovation project management service platform according to an embodiment of the present invention.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
An embodiment of the present invention provides a project management system, including:
a home page display management unit, configured to control a display function of the service platform, and divide a home page of the service platform into a home page title bar, a column navigation area, a content display area, and a suspension function area, as shown in fig. 1;
the home page title bar comprises a name display area for displaying company names and project names and a reminding function area for reminding information to be dealt with, announcements and intelligence.
Wherein, to be dealt with: the user can remind the user of the latest backlog in a digital form. The latest to-do list can be viewed by clicking the icon, and the to-do list can be directly accessed from the list; announcement: the service platform has the latest announcement official site to remind, and the announcement content can be directly viewed by clicking; information: and displaying the latest scientific and technological information.
The column navigation area is used for visually displaying a column tree which is accessed or operated by a current login user, and the column of the service platform comprises a plurality of blocks of contents: the system comprises a scientific and technological innovation module, a working room module, an innovation management module, an expert management module and a comprehensive management module.
Wherein, scientific and technological innovation module: mainly comprises related service items of the scientific innovation type project. A working chamber module: mainly comprises the service items related to the workshop of the workshop. The innovation management module: mainly comprises related service items in the aspect of enterprise and management innovation. An expert management module: the service items in all aspects managed by the human resource experts are included. The comprehensive management module comprises: service items of the service platform common resources.
And the content display area is used for displaying each function data and the related operation page. The default contents of the home page include: science and technology notice: the system is used for displaying latest released scientific and technological information and mastering the latest scientific and technological dynamics of a company in real time; and (3) result display: the system is used for displaying latest result data including scientific and technological project results, innovation management results and the like; annual statistics of projects and results: a report for counting the annual projects and achievements; the platform uses the monthly report: carrying out monthly statistics on the service condition of the platform; the platform suggests that: the method has the advantages that the method has broad thought, collects suggestions and opinions of the user on the platform and helps the platform to be better improved; and (3) system guidance: the system of each module directs articles and accessories.
The suspension functional area is used for showing a plurality of functional keys and comprises: at least one of a home button, a my project button, a result list button, a return button, and a show/hide button.
Specifically, a scientific and technological innovation module of a column navigation area mainly provides seven service projects, namely project management, my project, expert review, acceptance review, result list, review expert, help guide and the like.
And (4) project management: the technical innovation class project of the current year is imported into the system in batch by an administrator every year, and the function only has the authority to operate by the technical innovation administrator. The method mainly comprises project import and project progress tracking.
The operation flow of the project management is as follows:
(1) item list: clicking 'project management' in column navigation to enter a project management list page.
(2) And (4) importing items: the imported project can be imported in batch for the project to be managed in the current year. Click the import item button to enter the import page.
The template can download the latest template format from the 'download template' in the template, and can be imported after being filled according to the requirement. Note: only the format of excel spreadsheets is supported.
(3) Item tracking: and the progress tracking is realized, and the latest progress data is exported from the scientific and technological innovation system of the province company at regular time by an administrator and is synchronized to the platform, so that the inquiry and tracking of people are facilitated. Clicking an import progress button, and popping up a project tracking import page.
The template can download the latest template format from the 'download template' in the template, and can be imported after being filled according to the requirement. Note: only the format of excel spreadsheets is supported.
(4) And (3) item query: the screening items can be looked up according to the names of the items and the item states. Clicking on the right details listed in the item column allows the item content and progress tracking of the item.
My project: after the project is uniformly imported by management, each project principal and project team member can check the project of the project principal and project team member in the 'my project' column and complete the related operation. The method comprises project flow guide and project online acceptance check.
The operation flow of this "my project" is:
(1) my items list, shows all the items lists that i are responsible for and that i participate in.
(2) And (4) project flow guiding, grading, stepping, and distributing flow guiding (guiding) project responsible persons to orderly complete the project implementation process. Click on the item name or "details" and go to the corresponding item guide page.
The project is divided into three stages: "project implementation", "project acceptance", "project archiving".
The project implementation is divided into four parts, namely project expense, project achievement, project progress and project detail.
The item expenses are assigned to corresponding item expense types according to different items. Mainly comprises the following steps: "material fee", "intellectual property transaction fee", "test laboratory processing fee", "management fee", "expert consultation fee", "labor fee". According to the actual situation of the project, the system displays the description of the due expense of the project, the guide of the use process, the related example and the related accessory and application use description of the current expense. And clicking the font 'flow details', and checking the fee taking and using flow. Clicking the 'download template' button can download the expense approval table. Clicking on the font "download instance" can view the instance.
The 'project achievement' is used for displaying the project achievement flow guide according to the specific requirements of the project.
"project details" are used to show the specific content of a project.
And the 'project acceptance' is used for providing relevant processes and guidance for project acceptance.
And the item filing guide is used for providing relevant processes and guides for item filing.
(3) And (4) checking and accepting the project: after the project is implemented, project responsible persons and project members can initiate project acceptance application on line at any time, the service platform randomly distributes 4 experts to audit acceptance data according to project specialties, and the acceptance of the project is completed on line.
The method specifically comprises the following steps:
checking and accepting the application, and clicking a link of 'checking and accepting the application' in the my project list to enter a project checking and accepting application page.
Secondly, uploading inspection and acceptance and result data: selecting project speciality, clicking 'next' to enter a data uploading page. The acceptance data comprises two parts of contents, wherein one part is the acceptance data which is the material for item acceptance; the other part is result data, and after the project is checked and accepted, the platform forms a corresponding result:
and (3) checking and accepting data: the data of project acceptance application form, project summary report, acceptance certificate, project application book, project expense condition table and the like are prepared according to the requirement of project acceptance rules and are uploaded one by one.
The achievement data comprises an achievement report PPT, three achievement pictures and a project related description.
Saving and submitting: after the above-mentioned data are filled in according to the requirements, there are two operations:
and (3) storage: temporarily storing data, allowing to store in midway, and subsequently supplementing data;
submitting: after the data is determined to be correct, a 'submit' button is clicked, and the acceptance application is sent to the expert for evaluation.
And after the application is submitted, entering the next process, and returning the acceptance application when the evaluation process has problems. And the project is responsible for submitting the evaluation after finishing the data according to the evaluation opinions.
Acceptance and rollback: and clicking a resubmission button to enter an acceptance data editing page, and rectifying, reforming and resubmitting according to the opinions given by the experts.
And (4) expert review: and after the project acceptance of the project responsible person is submitted, the project responsible person randomly distributes the project to four experts of the related experts, and after the experts enter the project responsible person, the distributed project can be evaluated online.
The operation flow of the expert audit comprises the following steps:
(1) and (4) review list: and the right side of the audit list displays the current state of the project, the audit result, the audit/viewing and other operations.
(2) And (3) data auditing: and entering an audit interface after the audit is clicked, wherein the audit page can be checked/downloaded, and an audit result is submitted.
(3) Submitting and auditing: the experts are divided into a main evaluation expert and an auxiliary evaluation expert, and the main evaluation expert needs to fill in expert opinions for generating an acceptance certificate. And if the verification result is that the failure reason needs to be filled in when the verification result is failed, the method is used for corresponding modification of project personnel.
After all four experts submit the examination results, the examination and acceptance examination is carried out
And (4) checking and accepting: and (4) carrying out final acceptance and audit on the projects which are already reviewed by the experts by a person in charge of the scientific and technological innovation projects.
The operation flow of the acceptance and audit is as follows:
(1) list to be audited: the acceptance and audit list is basically consistent with the expert audit.
(2) And (4) checking and accepting: the audit information interface has more expert opinions and is used for displaying the audit results of four experts, and an administrator can decide whether the examination and acceptance pass or not according to the opinions of the experts, and if the examination and acceptance do not pass, the administrator returns to project personnel for modification and then resubmits the project personnel. And after resubmission, only experts with the verification results of failure need to perform re-verification, and if the results of verification pass, the results enter a result list.
The result list mainly comprises:
(1) and (3) result display: the achievement list is used for showing achievements passing acceptance, the top right corner position can screen the specialty of the achievements, and the right side position is used for building a new achievement. The achievement list is used for showing achievements passing acceptance, the top right corner position can screen the specialty of the achievements, and the right side position is used for building a new achievement.
(2) The newly increased result is as follows:
newly adding: and after clicking the menu at the upper right corner of the result list, the option with the newly added result can be seen, the lower position is provided with a submission record and a to-be-checked result, the submission record is used for recording the result history submitted by the user, and the to-be-checked result indicates that the administrator has the viewing permission. And clicking the newly added achievement, entering an achievement entry page, marking the achievement with a mark as a necessary option, filling the option to submit, and transferring to an administrator for examination and verification after the option is submitted.
And (4) auditing: after the result data is submitted, the administrator can see the submitted results, and the results enter an audit interface after 'audit' is clicked. After entering the audit interface, the submitted data can be checked, whether the submitted data pass or not is judged according to the result data, and if the submitted data do not pass, the submitted data can be modified again by the submitter.
Review expert management, including:
(1) expert list: the administrator can click batch import or manual addition at the upper right corner, and the batch import can be uploaded after data is input according to the template.
(2) Manual addition: after searching the user, a specialty and a job are selected, and the same expert/specialty is existed and cannot be added.
(3) Batch import: and clicking a batch import button to perform batch import operation on the review experts.
Help guide: various help and guide for the scientific and technological innovation module.
Comprehensive management, including: managing intelligence, publishing intelligence and checking online.
A platform proposal, comprising: publishing suggestions and viewing suggestions.
A studio module, comprising: and (4) result input and system guidance. And (4) outcome input: the results of the studio can be displayed on the platform. Platform home page: and (4) result display, clicking result input, and checking whether the result belongs to a studio.
The innovation management module: the application, approval, grading and result display of two services of management innovation and quality management are provided. The method specifically comprises the following steps: managing innovation application, quality management, department administration and examination, professional expert examination, management department examination and examination, achievement expert scoring, innovation management setting and expert management.
And (4) innovation management setting: the expert scoring period is defined, and after the value is set by management, the expert scoring can be controlled to be modified again within the set period range. Clicking the "save" button, the scoring cycle setting is in effect. The minimum unit of the cycle is 1 day.
Expert management: experts of the innovation management module are arranged, and the experts can review and grade the subjects and the results of the module. The method specifically comprises the following steps: expert list: searching, adding experts, editing and deleting experts according to the specific mode can be carried out in the list.
Management innovation application: clicking 'management innovation application' in column navigation to enter a project management list page. The item management list includes several functional areas: item search: the group inquiry can be carried out according to specific conditions, and the data to be inquired is quickly positioned. Newly adding: the user can add a new management innovation. The operation is as follows: the operation comprises four operations of editing, deleting, checking results and project details.
Quality management: click the 'quality management topic' in column navigation and enter the topic management list page. The topic management list includes several functional areas: and (3) subject searching: the group inquiry can be carried out according to specific conditions, and the data to be inquired is quickly positioned. Newly adding: the user can add a new topic of management innovation. The operation is as follows: the operation comprises four operations of editing, deleting, checking results and detail.
And (5) department director auditing: after the project is submitted, a department supervisor is required to audit the project submitted by the department supervisor, the audit state comprises 'agreement' and 'rollback', and the opinion must be filled in during the rollback. Clicking 'department in charge of audit' in column navigation, and entering a department in charge of audit list page. On this page, the query, review, detail information: and (3) inquiring: the group inquiry can be carried out according to specific conditions, and the data to be inquired is quickly positioned. And (4) auditing: and performing an audit page. Details are as follows: and checking the detailed information of the project.
Auditing by a tongued and grooved department: after the project is approved by the department, the enterprise and administration part is required to examine the project submitted by the user, the examination state comprises 'agreement' and 'rollback', and the opinion must be filled in during the rollback. Clicking 'the audit of the bureau of the company and the government' in the column navigation, and entering a page of an audit list in charge of the department. The page can be queried, reviewed, and detailed. Wherein, inquiring: the group inquiry can be carried out according to specific conditions, and the data to be inquired is quickly positioned. And (4) medium-term evaluation: performing intermediate-term review on the project which passes the review at a specific time; the auditor of the management department initiates medium-term evaluation, and when the medium-term evaluation is carried out, the auditor needs to submit medium-term evaluation required materials; an audit expert is required to be selected at the time of initiation. The mid-term review requires review by experts in the relevant profession. And (4) auditing: performing an audit page; and (4) checking results: the outcome of the project is reviewed. Details are as follows: and checking the detailed information of the project. Data change: allowing the changed operation for the respective item requiring data change.
And (4) auditing by professional experts: after the project mid-term review is submitted, professional experts are required to review the project submitted by the experts, the review state comprises 'agreement' and 'rollback', and the opinion must be filled in during the rollback. Clicking 'professional expert review' in column navigation, entering a professional expert review list page, and performing query, review and detail information on the page: and (3) inquiring: group inquiry can be carried out according to specific conditions, and the data to be inquired is quickly positioned; and (4) auditing: performing an audit page; details are as follows: and checking the detailed information of the project.
And (4) scoring by a result expert: after the project achievements are audited, experts are required to score the project achievements submitted by the experts.
Expert management, comprising:
(1) personal information display list: the personal information provides functions of displaying and editing personal basic information; clicking 'personal information' in column navigation, and entering a personal information display page. The functions of reminding, showing and editing the personal basic information can be realized on the page:
wherein, remind: and (4) according to the time of the end of the tenure, red setting is carried out within 3 months, and the information of the tenure responsibility is uploaded. And (3) displaying: and displaying the personal basic information. Editing: and editing the personal basic information.
(2) And (3) editing personal information: and clicking an editing button beside the detailed information to enter an editing page.
Expert information: clicking 'expert information' in column navigation and entering an expert list page. The page mainly has the functions of inquiring, downloading templates, importing, editing, detailing, relieving, list selecting, list sorting, exporting and the like.
Wherein, inquiring: and inquiring the data according to the prompt input condition. Downloading a template: and downloading an expert information import template. Introducing: and importing an expert information template, and covering according to the matching of the identity card number and the data of the same identity card number. Editing: and entering into editing expert information. Details are as follows: and entering a page for checking the details of the expert information. Releasing the recruitment: and entering a recruitment expert information page. List selection: and selecting an expert list display field according to the requirement of the expert list. Sorting the list: clicking on the header may sort the list in ascending order and descending order. And (3) deriving: expert information is derived from the query.
In addition, the method further comprises the following steps: adding an expert, editing the expert, detailing the expert, separating the expert, exporting the expert, sorting information and selecting a list.
And (3) managing the responsibility: the page mainly has the functions of inquiry, annual responsibility uploading, duty responsibility uploading, text sending and deleting.
Wherein, inquiring: and inquiring related responsibility book information according to the input conditions. Uploading annual responsibility: and uploading the template file of the annual responsibility book of the expert. Uploading duty responsibility: and uploading the template file of the obligation book of the expert. Sending a text: and sending out the expert assessment information. And (3) deleting: and deleting the responsibility book information record.
Annual responsibility examination: the page mainly comprises inquiry, template downloading, responsibility book uploading and tenure sending and downloading.
Wherein, the template downloading: and downloading the annual responsibility book uploaded by the administrator. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. Importing a responsibility book: the expert downloads the responsibility template. And uploading after editing, and generating an assessment record by the system according to the uploaded file. Application for amendment: when the interface person has not uploaded the assessment content and the scoring related information, the expert can apply for modifying the responsibility content. And (6) viewing: and the expert checks the subsequent related information after uploading the responsibility book. And (3) inquiring: and inquiring the assessment list information according to the selection condition. Annual text distribution downloading, application modification and viewing functions.
Duty book: the page mainly has the functions of inquiry, template downloading, responsibility uploading, appointed text downloading, annual text downloading, application modification and viewing.
Wherein, the template downloading: downloading the responsibility book uploaded by the administrator at tenure. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. Importing a responsibility book: the expert downloads the responsibility template. And uploading after editing, and generating an assessment record by the system according to the uploaded file. Application for amendment: when the interface person has not uploaded the assessment content and the scoring related information, the expert can apply for modifying the responsibility content. And (6) viewing: and the expert checks the subsequent related information after uploading the responsibility book. And (3) inquiring: and inquiring the assessment list information according to the selection condition.
And (5) auditing by a responsibility department: the page mainly has the functions of inquiry, download of documents sent at any time, download of documents sent annually and audit. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. 2. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. And (4) auditing: and clicking to audit, and entering a responsibility book audit page. The page mainly has the functions of passing, returning and returning. Wherein, by: and (5) making the content of the responsibility book meet the requirement, and entering the next link. And (3) withdrawing: and returning to the expert to re-edit and upload if the responsibility content does not meet the requirement. And returning: and returning to the previous page.
And (4) checking the responsibility people: the page mainly has the functions of inquiry, download of documents sent at any time, download of documents sent annually and audit. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. And (4) auditing: and clicking to audit, and entering a responsibility book audit page which mainly has the functions of passing, returning and returning. Wherein, by: and (5) making the content of the responsibility book meet the requirement, and entering the next link. And (3) withdrawing: and returning to the expert to re-edit and upload if the responsibility content does not meet the requirement. And returning: and returning to the previous page.
And (3) auditing the administrator responsibility: the page mainly has the functions of inquiry, download of documents sent at any time, download of documents sent annually and audit. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. And (4) auditing: and clicking to audit, and entering a responsibility book audit page which mainly has the functions of passing, returning and returning. Wherein, by: and (5) making the content of the responsibility book meet the requirement, and entering the next link. And (3) withdrawing: and returning to the expert to re-edit and upload if the responsibility content does not meet the requirement. And returning: and returning to the previous page.
Evaluating the interface person: the page mainly has the functions of inquiry, downloading text at will, downloading text annually and uploading checking data. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. Uploading the audit data: clicking the uploaded audit data, entering an upload audit data page, wherein the page mainly has the functions of submitting, returning, uploading check data and rating. Wherein, submitting: and (4) the responsibility content meets the requirement, the audit data is uploaded and the evaluation information is filled in, and the next link is entered. And (3) withdrawing: and returning to the expert to re-edit and upload if the responsibility content does not meet the requirement. And returning: and returning to the previous page. Uploading the audit data: and clicking an examination file button to upload examination data (uploading multiple files).
And (3) human resource examination and evaluation: the page mainly has the functions of inquiry, download of documents sent at any time, download of documents sent annually and audit. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. And (4) auditing: clicking to audit, and entering an audit page, wherein the page mainly has the functions of passing, returning, uploading the assessment data and grading. Wherein, by: the checking information content meets the requirements, the checking data is uploaded and the evaluation information is filled, and the responsibility book process is completed. And (3) withdrawing: and returning to the expert to edit and upload again when the assessment information does not meet the requirements. And returning: and returning to the previous page.
Checking information inquiry: the page mainly has the functions of inquiry, download of scheduled messages, download of annual messages and viewing. Wherein, inquiring: and inquiring the assessment information list according to the selection condition. Sending a text at an appointed time for downloading: downloading the file of the appointed sending text uploaded by the administrator. Annual text distribution downloading: and downloading the annual text file uploaded by the administrator. And (6) viewing: clicking to check and entering the data detail page.
Based on the same concept, the embodiment of the invention also provides a project management method, which has the same implementation principle and is not described herein again.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A system for managing a scientific and technological innovation project, comprising:
the home page display management unit is used for controlling the display function of the service platform and dividing a home page of the service platform into a home page title bar, a column navigation area and a content display area;
the home page title bar comprises a name display area for displaying company names and project names and a reminding function area for reminding information to be dealt with, announcements and information;
the column navigation area is used for displaying a column tree which is accessed or operated by a current login user, and the column tree comprises a scientific and technological innovation module for providing related service items of science innovation projects, a studio module for providing related service items of a workshop, an innovation management module for providing related service items in the aspect of enterprise management and innovation management, an expert management module for providing service items in the aspect of human resource expert management, and a comprehensive management module for providing service items of service platform public resources;
and the content display area is used for displaying each functional data and the related operation page.
2. A management system of a scientific and technological innovation project according to claim 1, wherein a floating functional area is further divided on a home page of the service platform for displaying a plurality of functional keys, and the system comprises: at least one of a home button, a my project button, a result list button, a return button, and a show/hide button.
3. The project management system of claim 1, wherein, on the service platform home page, the content of the content exhibition area comprises: latest scientific and technological information, latest achievement data, project and achievement annual statistics, platform use monthly newspaper, platform suggestions and system guidance.
4. The system for managing a scientific and technological innovation project according to claim 1, wherein the scientific and technological innovation module comprises: the system comprises a project management unit for managing a plurality of projects, a my project unit for displaying a my project list and project flow guidance, an achievement list unit for displaying achievements, an expert review unit for submitting expert review requests, an acceptance review unit for conducting review and acceptance, an expert review unit for managing experts in review, and a help guidance unit for providing various help and guidance.
5. The system for managing a scientific and technological innovation project according to claim 1, wherein the innovation management module comprises: the system comprises a management innovation application unit for performing management innovation, a quality management unit for performing quality management, a department responsible auditing unit for being partially responsible for auditing operation, a professional expert auditing unit for being responsible for auditing operation by professional experts, a management department auditing unit for being responsible for auditing operation by a management department, a result expert scoring unit for scoring results, an innovation management setting unit for setting operation and an expert management unit for managing expert information.
6. The system of claim 4, wherein the project management unit is specifically configured to: importing projects to be managed in the current year in batch; the process tracking is to export the latest process data from the scientific and technological innovation system of the provincial company at regular time and synchronize the latest process data into the platform; and searching the screening items according to the names and the item states of the items.
7. The system of claim 4, wherein the my project unit is specifically configured to: displaying all item lists which are currently responsible for and participated in by the user; and guiding project managers to finish the project implementation process orderly in stages, steps and shunting processes.
8. The system of claim 7, wherein the project unit is specifically configured to, in the aspect of directing project managers to complete project implementation processes orderly in stages, steps and branches,: according to the current project, the system displays the description of the due expense of the project, the guide of the use process, the related examples and the related accessories of the current expense and the application use description; showing the project achievement flow guide according to the specific requirements of the project; displaying the specific content of the item; providing relevant processes and guidance for project acceptance; project archiving related processes and directions are provided.
9. The system for managing a scientific and technological innovation project of claim 5, wherein the management innovation application unit is specifically configured to: and displaying a project management list page, and providing project searching, project adding and project operating functions, wherein the project operating functions comprise editing, deleting, checking results and project details.
10. A scientific and technological innovation project management method applied to the project management system of any one of claims 1 to 9, comprising:
dividing a head page title bar, a column navigation area and a content display area on a head page of the service platform;
displaying company names and project names and carrying out information reminding of pending affairs, announcements and information on the title bar of the home page;
providing a column tree for displaying that a current login user has authority to access or operate in the column navigation area, wherein the column tree comprises a scientific and technological innovation module for providing related service items of science and innovation projects, a studio module for providing related service items of a workshop, an innovation management module for providing related service items in the aspect of enterprise and management innovation management, an expert management module for providing service items in the aspect of human resource expert management, and a comprehensive management module for providing service items of service platform public resources;
and displaying each functional data and the related operation page in the content display area.
CN202111017122.8A 2021-08-31 Technological innovation project management system and method Active CN113657871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111017122.8A CN113657871B (en) 2021-08-31 Technological innovation project management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111017122.8A CN113657871B (en) 2021-08-31 Technological innovation project management system and method

Publications (2)

Publication Number Publication Date
CN113657871A true CN113657871A (en) 2021-11-16
CN113657871B CN113657871B (en) 2024-06-21

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104408587A (en) * 2014-12-25 2015-03-11 浪潮电子信息产业股份有限公司 Government project management information system
CN108241966A (en) * 2018-01-23 2018-07-03 广州明城信息服务有限公司 A kind of use system suitable for technological project management
CN108416571A (en) * 2018-03-08 2018-08-17 青岛东方深蓝信息科技股份有限公司 A kind of application method of scientific research service integration management system
CN108960627A (en) * 2018-07-02 2018-12-07 王红岩 A kind of full Schedule monitoring management system and method based on scientific research project
CN109858751A (en) * 2018-12-26 2019-06-07 中国大唐集团科学技术研究院有限公司 Power engineering Evaluating Projects System

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104408587A (en) * 2014-12-25 2015-03-11 浪潮电子信息产业股份有限公司 Government project management information system
CN108241966A (en) * 2018-01-23 2018-07-03 广州明城信息服务有限公司 A kind of use system suitable for technological project management
CN108416571A (en) * 2018-03-08 2018-08-17 青岛东方深蓝信息科技股份有限公司 A kind of application method of scientific research service integration management system
CN108960627A (en) * 2018-07-02 2018-12-07 王红岩 A kind of full Schedule monitoring management system and method based on scientific research project
CN109858751A (en) * 2018-12-26 2019-06-07 中国大唐集团科学技术研究院有限公司 Power engineering Evaluating Projects System

Similar Documents

Publication Publication Date Title
US20070033093A1 (en) Automated proposal development toolset
US20180129989A1 (en) Systems and methods for providing vendor management, risk assessment, due diligence, reporting, and custom profiles
US8290807B2 (en) Systems, program products and methods of human resources planning and development
CN108197258B (en) Scientific research information management system and scientific research information management method
CN103136626A (en) On-line management method for engineering project
US20080270214A1 (en) System and Process for Managing the Preparation of a Bid Document in Response to a Tender
CN110210775B (en) Information management platform, application and method thereof
US20170053329A1 (en) Systems and methods for providing vendor management and custom profiles
CN111951137A (en) Method, system and electronic equipment for dynamic operation of service research
US20020055937A1 (en) Immigration case management system
CN113610595B (en) Report and examination price informatization management method and system
CN113449957A (en) Intelligent working system based on PAGEOFFLICE control
CN113657871A (en) Scientific and technological innovation project management system and method
CN110796573A (en) Intellectual property life cycle management method, system and storage medium
CN113011794B (en) Science and technology project collaborative management system
CN113657871B (en) Technological innovation project management system and method
US20180082232A1 (en) Uniform workers compenstation cost containment system
CN113052547A (en) Capital transfer management method and management system for construction project in petrochemical industry
Gramckow et al. Case Flow Management: Key Principles and the Systems to Support Them
JP3656710B2 (en) Minutes management method and minutes management system
CN115796814B (en) Construction management method and system
RU2769644C1 (en) Online higher education system
Koddebusch et al. A song of digitization and law: design requirements for a digitization check of the legislative process
US20220237198A1 (en) System and method for creating and managing actionable data
Hofmann et al. Putting Process Optimisation in Practice

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant