CN113481993A - Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile - Google Patents

Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile Download PDF

Info

Publication number
CN113481993A
CN113481993A CN202110928494.XA CN202110928494A CN113481993A CN 113481993 A CN113481993 A CN 113481993A CN 202110928494 A CN202110928494 A CN 202110928494A CN 113481993 A CN113481993 A CN 113481993A
Authority
CN
China
Prior art keywords
pile
soil
cylinder body
hammer
guide rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110928494.XA
Other languages
Chinese (zh)
Inventor
李玉涛
王慧
孙龙彪
欧林
窦海庆
王影
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202110928494.XA priority Critical patent/CN113481993A/en
Publication of CN113481993A publication Critical patent/CN113481993A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/12Drivers with explosion chambers
    • E02D7/125Diesel drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • E02D7/16Scaffolds or supports for drivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to the field of pile foundation construction, in particular to a synchronous drilling and soil taking and hammering integrated device in a tubular pile of sludge soft soil, which comprises a guide rod type pile hammer, a combined cylinder body, a power head and a spiral drill rod, wherein the combined cylinder body is slidably arranged on a guide rod of the guide rod type pile hammer, the upper end and the lower end of the combined cylinder body are respectively connected with a diesel hammer plunger and a pile cap of the guide rod type pile hammer, the power head is fixedly arranged in the combined cylinder body, the pile cap is of a hollow structure, and the spiral drill rod penetrates through the pile cap to be connected with the power head; through the device, the pile can be synchronously sunk when the hole is led to fetch the soil, the disturbance to the soil body around the pile during pile sinking is avoided, the damage to the surrounding environment is reduced, the task of reinforcing construction of the existing building foundation is reduced, the construction period is shortened, the engineering cost is saved, and good economic benefit and social benefit can be created.

Description

Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile
Technical Field
The invention relates to the field of pile foundation construction, in particular to a synchronous hammering integrated device for drilling and soil taking in a tubular pile in muddy soft soil.
Background
During the construction of the tubular pile in coastal sludge and soft silt land areas, the phenomena of displacement, inclination, sedimentation, uplift and the like of adjacent buildings, pipelines, roads and the constructed tubular pile are often caused by the soil squeezing problem, so that huge economic loss is caused; if the pile tip is used in pile sinking in a soft soil area, the soil squeezing effect is very serious; even if pile sinking is carried out without using pile tips, the problems of soil body uplift, crack generation of buildings, pipeline deformation, pile sinking deviation, floating and even pile breakage caused by insufficient dissipation of stress often occur.
At present, the engineering world often adopts methods such as stress release hole or leading hole earlier, and then hammering or static pressure construction solve this problem, arranges stress release hole or leading hole according to the monitoring data of structure horizontal displacement and vertical displacement usually, but the leading hole is got native and pile sinking can not be gone on simultaneously, causes silt, mucky soil body original state structure to suffer destruction easily, and the hidden danger that the soil body structural deformation brought can not be little worth.
Disclosure of Invention
The invention aims to solve the problems, and provides an integrated device for drilling and soil taking in a tubular pile in muddy soft soil and hammering synchronously.
The invention solves the problems and adopts the technical scheme that:
the utility model provides a synchronous hammering integrated device of drilling borrow in silt matter soft soil tubular pile, includes guide bar formula pile hammer, combination formula cylinder body, unit head and auger stem, slidable mounting has combination formula cylinder body on the guide arm of guide bar formula pile hammer, and the upper and lower both ends of combination formula cylinder body are connected with the diesel hammer plunger and the pile cap of guide bar formula pile hammer respectively, and unit head fixed mounting is in combination formula cylinder body, and the pile cap is hollow structure, and auger stem passes the pile cap and is connected with the unit head.
Compared with the prior art, the invention adopting the technical scheme has the outstanding characteristics that:
through the device, the pile can be synchronously sunk when the hole is led to fetch the soil, the disturbance to the soil body around the pile during pile sinking is avoided, the damage to the surrounding environment is reduced, the task of reinforcing construction of the existing building foundation is reduced, the construction period is shortened, the engineering cost is saved, and good economic benefit and social benefit can be created.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic structural view of the embodiment of the present invention after being connected to a first section of tubular pile;
fig. 3 is a schematic structural view of the embodiment of the invention after being connected with an additional tubular pile.
Labeled as: a guide bar 1; a diesel hammer plunger 2; a combined cylinder 3; a pile cap 4; a power head 5; a flange 6; a auger stem 7; a cable hole 8; a cross-bar 9; a tubular pile 10; a diesel hammer cylinder 11; a pile pad 12; a clamp 13; a smooth round drill rod 14; the screw thread 15 is connected.
Detailed Description
The invention will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the invention.
As shown in fig. 1 to 3, the integrated device for drilling and soil taking and synchronous hammering in the tubular pile in the sludge soft soil comprises a guide rod type pile hammer, a combined cylinder body 3, a power head 5 and a spiral drill rod 7, wherein the combined cylinder body 3 is slidably mounted on a guide rod 1 of the guide rod type pile hammer, the upper end and the lower end of the combined cylinder body 3 are respectively connected with a diesel hammer plunger 2 and a pile cap 4 of the guide rod type pile hammer, the power head 5 is fixedly mounted in the combined cylinder body 3, the pile cap 4 is of a hollow structure, and the spiral drill rod 7 penetrates through the pile cap 4 to be connected with the power head 5; the guide rod 1 is provided with a cable hole 8 for a cable to pass through, and the cable is connected with a power supply and then supplies power to the power head 5; the bottom of the combined cylinder body 3 is fixed with a flange 6, the upper end of the flange 6 is connected with the lower end of a power head 5, and the lower end of the power head is connected with a spiral drill rod through a smooth round drill rod 14 with the diameter of 100mm and the length of 300mm and a connecting screw thread 15; a clamp 13 for fixing the tubular pile 10 and a pile pad 12 are arranged in the pile cap 4; the tubular pile 10 adopts a small-diameter tubular pile with the diameter of 400mm-600 mm.
The specific application method of the device is as follows: firstly, according to the auger stem 7 of the length adaptation of tubular pile 10, fix tubular pile 10 on pile cap 4, wherein, the auger stem 7 of different diameter helical blade can be selected to tubular pile 10 of different stake footpaths, for example: when the diameter of the tubular pile is 300mm, selecting a spiral drill rod with a spiral blade of 190mm in diameter, when the diameter of the tubular pile is 400mm, selecting a spiral drill rod with a spiral blade of 230mm in diameter, and when the diameter of the tubular pile is 500mm, selecting a spiral drill rod with a spiral blade of 320mm in diameter; then, a crane hooks and fixes the cross top beam 9, lifts the device and the tubular pile 7, and moves the device to a correct pile sinking position; the diesel hammer cylinder body 11 drives the diesel hammer plunger 2 to hammer downwards, and meanwhile, the power head 5 drives the spiral drill rod 7 to rotate, so that the lower pile is hammered downwards and the hole is drilled; the device is periodically lifted by a crane, and soil in the tubular pile 10 is taken out through the spiral drill rod 7; then, fixing the next section of spiral drill rod 7 and the next section of tubular pile 10, and repeating the steps until all the tubular piles 10 are sunk; when the first section of tubular pile 10 is sunk, the spiral drill rod 7 selects the perforated spiral drill rod, the length of the perforated spiral drill rod is 1m shorter than that of the first section of tubular pile 10, the spiral drill rod 7 is additionally arranged during pile splicing to select the standard spiral drill rod, and the length of each standard spiral drill rod is equal to that of the tubular pile 10 which is constructed synchronously.
This device, simple structure, convenient to use for hammering, guiding hole and dumping can go on in step, and pile sinking speed is fast, and is efficient, to the disturbance of the pile week soil body when having reduced pile sinking, has reduced the destruction to the surrounding environment, has also reduced the task to existing building foundation reinforcement construction simultaneously, has shortened construction period, has practiced thrift engineering cost, can create good economic benefits and social.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (1)

1. The utility model provides a synchronous hammering integrated device of drilling borrow in silt matter soft soil tubular pile, includes guide bar formula pile hammer, its characterized in that: the combined type pile hammer is characterized by further comprising a combined cylinder body, a power head and a spiral drill rod, the combined cylinder body is slidably mounted on a guide rod of the guide rod type pile hammer, the upper end and the lower end of the combined cylinder body are respectively connected with a diesel hammer plunger and a pile cap of the guide rod type pile hammer, the power head is fixedly mounted in the combined cylinder body, the pile cap is of a hollow structure, and the spiral drill rod penetrates through the pile cap to be connected with the power head.
CN202110928494.XA 2021-08-13 2021-08-13 Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile Pending CN113481993A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110928494.XA CN113481993A (en) 2021-08-13 2021-08-13 Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110928494.XA CN113481993A (en) 2021-08-13 2021-08-13 Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile

Publications (1)

Publication Number Publication Date
CN113481993A true CN113481993A (en) 2021-10-08

Family

ID=77946493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110928494.XA Pending CN113481993A (en) 2021-08-13 2021-08-13 Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile

Country Status (1)

Country Link
CN (1) CN113481993A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203222799U (en) * 2013-04-25 2013-10-02 葛洲坝集团第六工程有限公司 Leg-less alternate piling device for high-strength pipe pile
CN106120789A (en) * 2016-08-05 2016-11-16 上海振中机械制造有限公司 The interior pile sinking process boring vibration PHC tube pile of major diameter
CN110130346A (en) * 2019-05-29 2019-08-16 中国二十二冶集团有限公司 Hammer the prefabricated pile pile-sinking device and construction method in conjunction with static pressure
CN110952552A (en) * 2019-12-17 2020-04-03 广东力源液压机械有限公司 Large-diameter PHC precast tubular pile construction method and pile driver for implementing same
CN211446903U (en) * 2019-12-17 2020-09-08 广东力源液压机械有限公司 Drilling, guiding and hammering integrated machine in PHC (prestressed high-strength concrete) pipe pile
WO2021156314A1 (en) * 2020-02-03 2021-08-12 A Hansson Holding Ab Piledriver modules, adaptive pile driver system and corresponding method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203222799U (en) * 2013-04-25 2013-10-02 葛洲坝集团第六工程有限公司 Leg-less alternate piling device for high-strength pipe pile
CN106120789A (en) * 2016-08-05 2016-11-16 上海振中机械制造有限公司 The interior pile sinking process boring vibration PHC tube pile of major diameter
CN110130346A (en) * 2019-05-29 2019-08-16 中国二十二冶集团有限公司 Hammer the prefabricated pile pile-sinking device and construction method in conjunction with static pressure
CN110952552A (en) * 2019-12-17 2020-04-03 广东力源液压机械有限公司 Large-diameter PHC precast tubular pile construction method and pile driver for implementing same
CN211446903U (en) * 2019-12-17 2020-09-08 广东力源液压机械有限公司 Drilling, guiding and hammering integrated machine in PHC (prestressed high-strength concrete) pipe pile
WO2021156314A1 (en) * 2020-02-03 2021-08-12 A Hansson Holding Ab Piledriver modules, adaptive pile driver system and corresponding method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈裕成: "《建筑机械与设备》", 28 February 2019, 北京理工大学出版社 *

Similar Documents

Publication Publication Date Title
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
CN103603342B (en) Major diameter assembled casing super-long filling pile construction method
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN101328712A (en) Construction method of interlocking pile for soft soil and soil layer with obstacle
CN102776884B (en) In stir and rotate prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof
CN101851922A (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN210288383U (en) Rotary drilling and piling integrated machine
CN106120789A (en) The interior pile sinking process boring vibration PHC tube pile of major diameter
CN215594004U (en) Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile
CN212129131U (en) Crowded native pore-forming stock construction structures
CN113481993A (en) Drilling and soil taking synchronous hammering integrated device in sludge soft soil tubular pile
CN112942299A (en) Construction method of karst cave geological composite foundation
CN101858196A (en) Low gravity center three-axle spiral drilling machine and drilling method thereof
CN214993840U (en) Well-digging vibration pile sinking system for prefabricated inclined piles
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN1807770A (en) Multipurpose ground anchor and its use tool
CN112252312B (en) Construction method for enhancing integral stress performance of PHC pipe pile
CN114790738A (en) Foundation pit supporting construction device and method based on assembled large-diameter tubular piles
CN109505245B (en) Construction method of shallow-covering-layer anchor pile type construction channel in ocean deep water area
CN203924043U (en) A kind of bamboo concrete stake
CN201730538U (en) Low-gravity-center three-shaft spiral drilling machine
CN205277294U (en) A complete set of tubular long spiral drilled stake machine
CN219710260U (en) Construction device for sampling rock and soil at pile end of ultra-deep bored concrete pile
CN218911403U (en) Draw hole and pile sinking integrated precast tubular pile construction device
CN203808865U (en) Drilling rod position limiting system of long spiral drilling machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211008

RJ01 Rejection of invention patent application after publication