CN113445742A - Assembled house construction equipment of full fitment - Google Patents

Assembled house construction equipment of full fitment Download PDF

Info

Publication number
CN113445742A
CN113445742A CN202110880038.2A CN202110880038A CN113445742A CN 113445742 A CN113445742 A CN 113445742A CN 202110880038 A CN202110880038 A CN 202110880038A CN 113445742 A CN113445742 A CN 113445742A
Authority
CN
China
Prior art keywords
fixedly connected
plate
building construction
fixed
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110880038.2A
Other languages
Chinese (zh)
Inventor
吴慧珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110880038.2A priority Critical patent/CN113445742A/en
Publication of CN113445742A publication Critical patent/CN113445742A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a fully-decorated prefabricated house construction device, which relates to the technical field of prefabricated houses and comprises a base and anti-skid plates, wherein the anti-skid plates are fixedly connected to two sides of the bottom of the base, an adjusting device is fixedly connected to the top of the base, and a lifting device is fixedly connected to the top of the adjusting device. According to the invention, through the matching of the fixed box, the electromagnetic plate, the magnet, the movable plate, the straight rod, the electric telescopic rod, the pressure spring, the fixed plate, the rotating shaft, the second motor and the steel wire rope, the electromagnetic plate generates suction and attracts the magnet to drive one end of the electric telescopic rod to move upwards, and then the second motor drives the steel wire rope to be wound on the surface of the rotating shaft, so that the driving material is driven to move upwards, the problem that when an assembly type house is built, a large amount of manpower is consumed to move the material, and the building efficiency is low is solved, the time for workers to transport the material is shortened, and the building working efficiency is improved.

Description

Assembled house construction equipment of full fitment
Technical Field
The invention relates to a house construction device, relates to the technical field of prefabricated houses, and particularly relates to a fully-decorated prefabricated house construction device.
Background
The prefabricated house is built by an industrialized production mode, and is a house which is built by prefabricating part or all components of the house in a factory, then transporting the prefabricated house to a construction site and assembling the components in a reliable connection mode. The following problems exist in the prior art:
1. when the prefabricated building is built, a large amount of manpower is consumed to move materials, so that a large amount of time is wasted, and the building efficiency is low;
2. when the existing construction device moves materials, the materials cannot be fixed, and if the existing construction device meets strong wind, the materials are easily scraped off the ground, so that the materials are damaged and cannot be used.
Disclosure of Invention
The invention provides a fully-decorated prefabricated house construction device, which aims to have the characteristic of rapid material transportation and solve the problems that when a prefabricated house is built, a large amount of manpower is required to be consumed to move materials, so that a large amount of time is wasted, and the building efficiency is low; wherein another purpose is when solving current construction equipment removal material, can't fix the material, if meet during the strong wind, scrape the ground with the material easily, lead to the impaired problem that can't use of material to reach the stability that improves construction equipment, the effect of protection material safety removal.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
the utility model provides a fabricated building construction equipment of fitment entirely, includes base and antiskid ribbed tile, the both sides fixedly connected with antiskid ribbed tile of base bottom, the top fixedly connected with adjusting device of base, adjusting device's top fixedly connected with elevating gear.
The lifting device comprises a driving device, the bottom of the driving device is fixedly connected to the top of the adjusting device, and a stranded rope device is fixedly connected to the bottom of one end of the driving device.
The adjusting device comprises a rotary table, and the bottom of the rotary table is movably connected to the top of the base.
The technical scheme of the invention is further improved as follows: the driving device comprises a fixed box, an electromagnetic plate is fixedly connected to the bottom of the inner wall of the fixed box, a straight rod is movably sleeved inside the fixed box, and a movable plate is fixedly connected to the bottom of the straight rod.
By adopting the technical scheme, the cooperation of the fixed box, the electromagnetic plate, the movable plate and the straight rod in the scheme provides power for the lifting device, and the subsequent movable house material is convenient.
The technical scheme of the invention is further improved as follows: the top of straight-bar extends to the outside and swing joint of fixed case and has electric telescopic handle, electric telescopic handle's both sides swing joint has the movable rod, one side swing joint of movable rod has the connecting plate, the top fixedly connected with flashing board of connecting plate, the bottom fixed connection of movable rod is at the top of revolving stage.
By adopting the technical scheme, the straight rod, the electric telescopic rod, the movable rod and the connecting plate in the scheme are matched to provide a supporting point for the electric telescopic rod, so that the working efficiency of the device is improved.
The technical scheme of the invention is further improved as follows: the rope stranding device comprises a fixed plate, the number of the fixed plate is two, two the top fixed connection of the fixed plate is in the bottom of the electric telescopic handle, the rotating shaft is sleeved on the inner portion of the fixed plate in a movable mode, a motor is fixedly connected to one side of the fixed plate in a second mode, the output end of the motor is fixedly connected to one end of the rotating shaft, and a steel wire rope is sleeved on the outer portion of the rotating shaft in a movable mode.
By adopting the technical scheme, the cooperation of the fixing plate, the rotating shaft, the second motor and the steel wire rope in the scheme is convenient for transporting house materials, and the time of workers is saved.
The technical scheme of the invention is further improved as follows: the bottom fixedly connected with fixing device of wire rope, fixing device is including the backup pad, the bottom fixedly connected with bracing piece of backup pad, the bottom fixedly connected with of bracing piece deposits the board.
By adopting the technical scheme, the supporting plate, the supporting rod and the storage plate in the scheme are matched, so that materials are conveniently placed, and subsequent materials are conveniently fixed.
The technical scheme of the invention is further improved as follows: the bottom of the supporting plate is movably connected with a cross connecting rod, the bottom of the cross connecting rod is movably connected with a pressing plate, and the top of one side of the cross connecting rod is fixedly connected with a return spring.
By adopting the technical scheme, the supporting plate, the cross connecting rods, the pressing plate and the reset spring in the scheme are matched to quickly drive the cross connecting rods to reset, so that the working efficiency of the fixing device is improved.
The technical scheme of the invention is further improved as follows: one side of the cross connecting rod is movably connected with a cylinder, and the top of the cylinder is movably connected to the bottom of the supporting plate.
By adopting the technical scheme, the matching of the supporting plate, the cylinder and the cross connecting rod in the scheme improves the stability of the construction device and protects the safety of the material during moving.
The technical scheme of the invention is further improved as follows: the bottom fixedly connected with dwang of revolving stage, the one end of dwang extends to the bottom and the fixedly connected with of base from the driving wheel, there is the action wheel from one side meshing of driving wheel, the top fixedly connected with motor of action wheel, the top fixed connection of motor is in the bottom of base.
By adopting the technical scheme, the direction of the construction device is quickly adjusted by matching the rotary table, the rotary rod, the driven wheel, the driving wheel and the first motor in the scheme, and the working efficiency of the device is improved.
The technical scheme of the invention is further improved as follows: the both sides fixedly connected with pressure spring at fixed incasement wall top, the bottom fixed connection of pressure spring is at the top of fly leaf.
By adopting the technical scheme, the lifting device is driven to return to the initial position by the cooperation of the fixed box, the movable plate and the pressure spring in the scheme, so that the house materials can be conveniently and continuously transported subsequently.
The technical scheme of the invention is further improved as follows: the bottom fixedly connected with magnet of fly leaf, the quantity of magnet is three, three the even distribution of magnet is in the bottom of fly leaf.
Adopt above-mentioned technical scheme, the cooperation of magnet and fly leaf in this scheme has increased the adsorption affinity of magnet for more firm when removing the material.
Due to the adoption of the technical scheme, compared with the prior art, the invention has the technical progress that:
1. the invention provides a fully-decorated prefabricated house construction device, which is characterized in that a fixed box, an electromagnetic plate, a magnet, a movable plate, a straight rod, an electric telescopic rod, a pressure spring, a fixed plate, a rotating shaft, a second motor and a steel wire rope are adopted for matching, the electromagnetic plate generates suction and attracts the magnet, the magnet drives the straight rod to move downwards at the same time and drives one end of the electric telescopic rod to move upwards, and the second motor drives the steel wire rope to move upwards and wind the steel wire rope on the surface of the rotating shaft, so that a driving material moves upwards, a worker can assemble a house conveniently, the problem that when the prefabricated house is built, a large amount of manpower is consumed to move the material, and the building efficiency is low is solved, the material transportation time of the worker is shortened, and the building working efficiency is improved.
2. The invention provides a fully-decorated fabricated building construction device, which is characterized in that a supporting plate, a supporting rod, a storage plate, a cylinder, a cross connecting rod, a pressing plate and a return spring are matched to place a material on the top of the storage plate, the cylinder drives one end of the cross connecting rod to move downwards and drives the pressing plate to extrude the material downwards, so that the material is quickly fixed between the pressing plate and the storage plate, the problem that the material cannot be fixed when the existing construction device moves the material, and the material is easily scraped off the ground when strong wind exists, so that the material is damaged and cannot be used is solved, and the effects of improving the stability of the construction device and protecting the material from moving safely are achieved.
3. The invention provides a fully-decorated prefabricated house construction device, which is characterized in that a rotary table, a rotary rod, a driven wheel, a driving wheel and a first motor are matched, the first motor drives the driving wheel to rotate, and meanwhile, the driving wheel drives the driven wheel and the rotary table to rotate, so that the direction of the construction device is quickly adjusted, the problem that the direction of the conventional construction device is difficult to adjust according to different construction angles is solved, and the working efficiency of the device is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a driving device according to the present invention;
FIG. 3 is a schematic structural view of the fixing device of the present invention;
FIG. 4 is a schematic view of the construction of the stranding device of the present invention;
FIG. 5 is a schematic view of the adjusting device of the present invention;
fig. 6 is a schematic structural view of the movable rod of the present invention.
In the figure: 1. a base; 2. an anti-skid plate; 3. an adjustment device; 4. a lifting device; 5. a fixing device; 6. a connecting plate; 7. a movable rod; 8. a flashing board;
31. a turntable; 32. rotating the rod; 33. a driven wheel; 34. a driving wheel; 35. a first motor;
41. a drive device; 42. a rope stranding device;
411. a fixed box; 412. an electromagnetic plate; 413. a magnet; 414. a movable plate; 415. a straight rod; 416. an electric telescopic rod; 417. a pressure spring;
421. a fixing plate; 422. a rotating shaft; 423. a second motor; 424. a wire rope;
51. a support plate; 52. a support bar; 53. a storage plate; 54. a cylinder; 55. a cross connecting rod; 56. pressing a plate; 57. a return spring.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-6, the present invention provides a fully-decorated prefabricated building construction device, which comprises a base 1 and anti-skid plates 2, wherein the anti-skid plates 2 are fixedly connected to two sides of the bottom of the base 1, an adjusting device 3 is fixedly connected to the top of the base 1, a lifting device 4 is fixedly connected to the top of the adjusting device 3, the lifting device 4 comprises a driving device 41, the bottom of the driving device 41 is fixedly connected to the top of the adjusting device 3, a stranded rope device 42 is fixedly connected to the bottom of one end of the driving device 41, the adjusting device 3 comprises a turntable 31, the bottom of the turntable 31 is movably connected to the top of the base 1, the driving device 41 comprises a fixed box 411, an electromagnetic plate 412 is fixedly connected to the bottom of the inner wall of the fixed box 411, a straight rod 415 is movably sleeved inside the fixed box 411, a movable plate 414 is fixedly connected to the bottom of the straight rod 415, and a magnet 413 is fixedly connected to the bottom of the movable plate 414, magnet 413's quantity is three, the even distribution of three magnet 413 is in the bottom of fly leaf 414, the top of straight-bar 415 extends to the outside and swing joint of fixed case 411 has electric telescopic handle 416, electric telescopic handle 416's both sides swing joint has movable rod 7, one side swing joint of movable rod 7 has connecting plate 6, the top fixedly connected with weather shield 8 of connecting plate 6, the bottom fixed connection of movable rod 7 is at the top of revolving stage 31, hank rope device 42 is including fixed plate 421, the quantity of fixed plate 421 is two, the top fixed connection of two fixed plates 421 is in electric telescopic handle 416's bottom, the inside activity of two fixed plates 421 has cup jointed pivot 422, No. two motors 423 of one side fixed connection of fixed plate 421, the output fixed connection of No. two motors 423 is in the one end of pivot 422, wire rope 424 has been cup jointed in the outside activity of pivot 422.
In this embodiment, start electromagnetic plate 412, make electromagnetic plate 412 produce suction and inhale magnet 413, magnet 413 drives straight-bar 415 downstream simultaneously, it rotates in one side of movable rod 7 to drive electric telescopic handle 416 simultaneously, electric telescopic handle 416's flexible end rebound simultaneously, rethread No. two motors 423 drives wire rope 424 rebound and twines at pivot 422's surface, it drives material rebound to make wire rope 424, be convenient for the workman assemble the house, when having avoided building the prefabricated house, need consume a large amount of manpowers and remove the material, the lower problem of efficiency that leads to the house to build, make the time that reduces workman transportation material, the work efficiency of building is improved.
As shown in fig. 1 to 6, in this embodiment, preferably, two sides of the top of the inner wall of the fixed box 411 are fixedly connected with a pressure spring 417, the bottom of the pressure spring 417 is fixedly connected to the top of the movable plate 414, and after the material is transported upwards, the electromagnetic plate 412 is powered off, so that the pressure spring 417 drives the magnet 413 to separate from the electromagnetic plate 412 to move upwards by using the self resilience force, and simultaneously drives the fixing device 5 to return to the initial position, thereby facilitating the subsequent transportation of the house material.
Example 2
As shown in fig. 1 to 6, on the basis of embodiment 1, the present invention provides a technical solution: preferably, the bottom of the wire rope 424 is fixedly connected with the fixing device 5, the fixing device 5 comprises a supporting plate 51, the bottom of the supporting plate 51 is fixedly connected with a supporting rod 52, the bottom of the supporting rod 52 is fixedly connected with a storage plate 53, the bottom of the supporting plate 51 is movably connected with a cross connecting rod 55, the bottom of the cross connecting rod 55 is movably connected with a pressing plate 56, the top of one side of the cross connecting rod 55 is fixedly connected with a return spring 57, one side of the cross connecting rod 55 is movably connected with a cylinder 54, and the top of the cylinder 54 is movably connected with the bottom of the supporting plate 51.
In this embodiment, put the material at the top of storing plate 53, rethread cylinder 54 drives the one end of cross-connection 55 and moves down, drive clamp plate 56 extrusion material downwards simultaneously, make quick fixed material between clamp plate 56 and the storing plate 53, when having avoided current construction equipment to remove the material, can't fix the material, if meet the strong wind, scrape the material easily and fall to the ground, lead to the impaired unable problem that uses of material, in order to reach the stability that improves construction equipment, the effect that the protection material moved safely.
Example 3
As shown in fig. 1 to 6, on the basis of embodiment 1, the present invention provides a technical solution: preferably, the bottom fixedly connected with dwang 32 of revolving stage 31, the one end of dwang 32 extend to the bottom of base 1 and fixedly connected with follow driving wheel 33, and the meshing of one side of follow driving wheel 33 has driving wheel 34, and the top fixedly connected with motor 35 of driving wheel 34, the top fixedly connected with of motor 35 are in the bottom of base 1.
In this embodiment, drive action wheel 34 through a motor 35 and rotate, action wheel 34 drives simultaneously and rotates from driving wheel 33 and revolving stage 31 for quick adjustment construction equipment's direction has avoided current construction equipment, is difficult to adjust the problem of direction according to the construction angle of difference, makes the work efficiency who has improved the device.
The working principle of the fully-finished prefabricated building construction device will be described in detail below.
In use, as shown in figures 1 to 6, material is placed on top of the storage plate 53, and one end of the cross-link 55 is moved downwardly by the cylinder 54, at the same time, the pressing plate 56 is driven to extrude the material downwards, so that the material is rapidly fixed between the pressing plate 56 and the storage plate 53, the first motor 35 is started, simultaneously drives the driving wheel 34 to rotate, simultaneously the driving wheel 34 drives the driven wheel 33 and the rotary table 31 to rotate, so as to quickly adjust the direction of the construction device, and then the electromagnetic plate 412 is started, so that the electromagnetic plate 412 generates an attraction force and attracts the magnet 413, the magnet 413 simultaneously drives the straight rod 415 to move downwards, simultaneously, the electric telescopic rod 416 is driven to rotate on one side of the movable rod 7, meanwhile, the telescopic end of the electric telescopic rod 416 moves upwards, and then the second motor 423 drives the steel wire rope 424 to move upwards and wind on the surface of the rotating shaft 422, so that the steel wire rope 424 drives materials to move upwards, and a worker can assemble a house conveniently.
The present invention has been described in general terms in the foregoing, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto based on the present invention. Therefore, modifications or improvements are within the scope of the invention without departing from the spirit of the inventive concept.

Claims (10)

1. The utility model provides a fabricated building construction equipment of fitment entirely, includes base (1) and antiskid ribbed tile (2), the both sides fixedly connected with antiskid ribbed tile (2) of base (1) bottom, its characterized in that: the top of the base (1) is fixedly connected with an adjusting device (3), and the top of the adjusting device (3) is fixedly connected with a lifting device (4);
the lifting device (4) comprises a driving device (41), the bottom of the driving device (41) is fixedly connected to the top of the adjusting device (3), and the bottom of one end of the driving device (41) is fixedly connected with a stranded rope device (42);
the adjusting device (3) comprises a rotary table (31), and the bottom of the rotary table (31) is movably connected to the top of the base (1).
2. A fully finished prefabricated building construction installation according to claim 1, characterised in that: the driving device (41) comprises a fixed box (411), an electromagnetic plate (412) is fixedly connected to the bottom of the inner wall of the fixed box (411), a straight rod (415) is movably sleeved inside the fixed box (411), and a movable plate (414) is fixedly connected to the bottom of the straight rod (415).
3. A fully finished prefabricated building construction installation according to claim 2, characterised in that: the top of straight-bar (415) extends to outside and swing joint of fixed case (411) has electric telescopic handle (416), the both sides swing joint of electric telescopic handle (416) has movable rod (7), one side swing joint of movable rod (7) has connecting plate (6), the top fixedly connected with flashing board (8) of connecting plate (6), the bottom fixed connection of movable rod (7) is at the top of revolving stage (31).
4. A fully finished prefabricated building construction installation according to claim 1, characterised in that: rope stranding device (42) is including fixed plate (421), the quantity of fixed plate (421) is two, two the top fixed connection of fixed plate (421) is in the bottom of electric telescopic handle (416), two pivot (422) have been cup jointed in the inside activity of fixed plate (421), No. two motor (423) of one side fixedly connected with of fixed plate (421), the output fixed connection of No. two motor (423) is in the one end of pivot (422), wire rope (424) have been cup jointed in the outside activity of pivot (422).
5. A fully finished prefabricated building construction installation according to claim 4, characterised in that: the bottom fixedly connected with fixing device (5) of wire rope (424), fixing device (5) are including backup pad (51), the bottom fixedly connected with bracing piece (52) of backup pad (51), the bottom fixedly connected with of bracing piece (52) deposits board (53).
6. A fully finished prefabricated building construction installation according to claim 5, wherein: the bottom of the supporting plate (51) is movably connected with a cross connecting rod (55), the bottom of the cross connecting rod (55) is movably connected with a pressing plate (56), and the top of one side of the cross connecting rod (55) is fixedly connected with a return spring (57).
7. A fully finished prefabricated building construction installation according to claim 6, characterised in that: one side of the cross connecting rod (55) is movably connected with a cylinder (54), and the top of the cylinder (54) is movably connected to the bottom of the supporting plate (51).
8. A fully finished prefabricated building construction installation according to claim 1, characterised in that: the bottom fixedly connected with dwang (32) of revolving stage (31), the one end of dwang (32) extends to the bottom and fixedly connected with of base (1) from driving wheel (33), one side meshing from driving wheel (33) has action wheel (34), the top fixedly connected with motor (35) of action wheel (34), the top fixed connection of motor (35) is in the bottom of base (1).
9. A fully finished prefabricated building construction installation according to claim 2, characterised in that: both sides fixedly connected with pressure spring (417) at fixed case (411) inner wall top, the bottom fixed connection of pressure spring (417) is at the top of fly leaf (414).
10. A fully finished prefabricated building construction installation according to claim 2, characterised in that: the bottom fixedly connected with magnet (413) of fly leaf (414), the quantity of magnet (413) is three, three even distribution in the bottom of fly leaf (414) of magnet (413).
CN202110880038.2A 2021-08-02 2021-08-02 Assembled house construction equipment of full fitment Pending CN113445742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110880038.2A CN113445742A (en) 2021-08-02 2021-08-02 Assembled house construction equipment of full fitment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110880038.2A CN113445742A (en) 2021-08-02 2021-08-02 Assembled house construction equipment of full fitment

Publications (1)

Publication Number Publication Date
CN113445742A true CN113445742A (en) 2021-09-28

Family

ID=77818047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110880038.2A Pending CN113445742A (en) 2021-08-02 2021-08-02 Assembled house construction equipment of full fitment

Country Status (1)

Country Link
CN (1) CN113445742A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019024807A1 (en) * 2017-08-04 2019-02-07 北京华商陆海科技有限公司 Construction device and house
CN209890117U (en) * 2019-03-28 2020-01-03 张建龙 Lifting device for house building construction
CN111606218A (en) * 2020-07-06 2020-09-01 山东鼎鲁建筑有限公司 Hoist device is used in building engineering construction
CN212127348U (en) * 2020-04-14 2020-12-11 江苏燕兴农业发展有限公司 Material lifting device for civil construction
CN213112284U (en) * 2020-07-28 2021-05-04 上海尧哲工程技术有限公司 Building steel structure supporting and hanging traction device
CN112864950A (en) * 2021-01-12 2021-05-28 罗正友 Cable winding and unwinding devices
CN112919333A (en) * 2021-01-25 2021-06-08 南京凡芽智能设备有限公司 Prefabricated wall lifting machine and method for prefabricated building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019024807A1 (en) * 2017-08-04 2019-02-07 北京华商陆海科技有限公司 Construction device and house
CN209890117U (en) * 2019-03-28 2020-01-03 张建龙 Lifting device for house building construction
CN212127348U (en) * 2020-04-14 2020-12-11 江苏燕兴农业发展有限公司 Material lifting device for civil construction
CN111606218A (en) * 2020-07-06 2020-09-01 山东鼎鲁建筑有限公司 Hoist device is used in building engineering construction
CN213112284U (en) * 2020-07-28 2021-05-04 上海尧哲工程技术有限公司 Building steel structure supporting and hanging traction device
CN112864950A (en) * 2021-01-12 2021-05-28 罗正友 Cable winding and unwinding devices
CN112919333A (en) * 2021-01-25 2021-06-08 南京凡芽智能设备有限公司 Prefabricated wall lifting machine and method for prefabricated building

Similar Documents

Publication Publication Date Title
CN113235884A (en) Automatic vertical laminating device of building wall brick
CN113802819B (en) Automatic tile sticking device for building construction
CN109797979B (en) Wall skin ash shoveling robot
CN113445742A (en) Assembled house construction equipment of full fitment
CN109772778A (en) A kind of tubular pole outer surface automatic cleaning apparatus
CN206328096U (en) A kind of airduct mounting platform based on BIM technology
CN2700458Y (en) Wall plastering machine
CN211143696U (en) Lifting mechanism of tower mast structure
CN209405606U (en) Electric power tower climbing mechanism
CN108338735A (en) Environment-friendly type building object surface cleaning utensil working method
CN210888101U (en) Push device for assembled concrete member
CN210264114U (en) High-strength telegraph pole
CN206128671U (en) Building surface cleaning lifting machine constructs
CN218441713U (en) Intelligent environmental protection supervisory equipment for building
CN213996375U (en) Adhesive spraying device for building
CN220534527U (en) Lofting device is used in processing of reinforced concrete spiral case template preparation
CN212319265U (en) Lifting device for building construction and supervision
CN218843803U (en) Spray set is used in room construction
CN218289680U (en) Stacking device
CN112421551B (en) Lightning-arrest area support installation device on ridge tile
CN216968258U (en) Full-automatic wall grooving machine
CN220890149U (en) Soil salvaging device for farmland water conservancy well
CN220485152U (en) Simple lifting device for assembled plate wall construction
CN210214607U (en) Assembly type building assembly platform
CN210973644U (en) Construction transportation assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination