CN113430881A - Regenerated roadbed laying method based on solid waste full utilization - Google Patents

Regenerated roadbed laying method based on solid waste full utilization Download PDF

Info

Publication number
CN113430881A
CN113430881A CN202110045682.8A CN202110045682A CN113430881A CN 113430881 A CN113430881 A CN 113430881A CN 202110045682 A CN202110045682 A CN 202110045682A CN 113430881 A CN113430881 A CN 113430881A
Authority
CN
China
Prior art keywords
layer
roadbed
regenerated
solid waste
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110045682.8A
Other languages
Chinese (zh)
Inventor
王伟
刘静静
李娜
姜屏
姚扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shaoxing
Original Assignee
University of Shaoxing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shaoxing filed Critical University of Shaoxing
Priority to CN202110045682.8A priority Critical patent/CN113430881A/en
Publication of CN113430881A publication Critical patent/CN113430881A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/003Foundations for pavings characterised by material or composition used, e.g. waste or recycled material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a regeneration roadbed laying method based on solid waste full utilization, which comprises the following steps: (a) prefabricating an asphalt layer solid waste reclaimed material and a macadam mixture; (b) mixing the asphalt layer solid waste regeneration material, the broken stone mixture and lime to build a regenerated roadbed lime stone layer; (c) paving an impermeable layer and a fixing frame, mixing the asphalt layer solid waste reclaimed materials, the broken stone mixture, the plastic strips and the nylon ropes, and then injecting the mixture into the fixing frame to build a regenerated roadbed graded drainage layer; (d) mixing the crushed stone mixture with natural crushed stone, cement and water to build a regenerated roadbed cement-stabilized crushed stone layer; (e) mixing the solid waste recycled materials of the asphalt layer with natural macadam to build the asphalt layer of the recycled roadbed. The regenerated roadbed paved by the method has the characteristics of high structural strength, high stability, good drainage effect and the like, and simultaneously solves the problems of low utilization rate of solid waste treatment, untimely drainage of the regenerated roadbed, damage to a base layer and the like.

Description

Regenerated roadbed laying method based on solid waste full utilization
Technical Field
The invention relates to the technical field of roadbeds, in particular to a regeneration roadbed laying method based on solid waste full utilization.
Background
With the demand of social development, urban construction is continuously carried out, wherein a large amount of asphalt roads need to be rebuilt, expanded and rebuilt, which inevitably generates a large amount of urban solid wastes, and the stacking and treatment of the solid wastes become a huge problem. In order to respond to the national requirements on building a conservation-oriented society, developing circular economy and the like, the recycling of solid wastes is increasingly emphasized. For recycling of solid wastes, related researchers have proposed methods, such as "method of applying construction waste recycled material to semi-rigid base inorganic recycled material (CN 201910654238.9)", in which construction waste is crushed into recycled material particles, soil solidifying agent and water are added to perform material sealing, and gelling agent is added to adjust to an optimal water content during use, so as to obtain semi-rigid base inorganic recycled material; "slope protection structure and river course bank protection (CN201720825703.7) that have building rubbish reclaimed materials", the bed course, basic unit, the bank protection brick of this bank protection are made by building rubbish reclaimed materials. Although the method recycles the solid waste, the method has the disadvantages of complex components of the construction waste, incomplete utilization and low utilization rate, and cannot fundamentally solve the problem of solid waste accumulation pollution. In addition, the roadbed paved by the reclaimed materials has the phenomenon that the base layer is damaged due to untimely water drainage because the roadbed is broken stone.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a method for paving a regenerated roadbed based on full utilization of solid wastes.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for paving a regenerative roadbed based on solid waste full utilization comprises the following steps:
(a) separating an asphalt layer of old asphalt road solid waste through milling and crushing, and recycling to prepare an asphalt layer solid waste reclaimed material; preparing an old road foundation concrete block layer, a water-stable gravel layer and a slag road foundation layer of the solid waste of the old asphalt road into a gravel mixture;
(b) mixing 20% of the solid waste regeneration material of the asphalt layer, 10% of the gravel mixture and lime, and filling into a regenerated roadbed lime stone layer;
(c) paving impermeable geotextile on the upper surface of the mud lime stone layer of the regeneration roadbed to form an impermeable layer, then arranging a fixing frame on the impermeable layer, preparing 50% of the solid waste reclaimed material of the asphalt layer and 20% of the crushed stone mixture into a graded ingredient, mixing the graded ingredient with plastic strips and nylon ropes to form a mixed building material, and injecting the mixed building material into the fixing frame to build the graded drainage layer of the regeneration roadbed;
(d) drainage ditches are dug at the edges of two sides of the bottom of the graded drainage layer of the regenerated roadbed in the width direction;
(e) grading 70% of the crushed stone mixture, mixing with natural crushed stone, cement and water, and paving above the regenerated roadbed graded drainage layer to build a regenerated roadbed cement stabilized crushed stone layer;
(f) mixing 30% of the solid waste reclaimed materials of the asphalt layer with new asphalt, and paving the mixture above the cement stabilized gravel layer of the regenerated roadbed to build the asphalt layer of the regenerated roadbed.
In the step (a), the lime mixing amount is 2% of the total mass of the regenerated roadbed mud-lime bonded layer.
The regenerated roadbed mud lime stone layer comprises a trapezoidal main body part and a trapezoidal convex block part positioned on the upper surface of the main body part, and the laying shape of the fixing frame is consistent with the surface structure shape formed by the upper surface and the inclined plane of the main body part and the upper surface of the convex block part (52)
In the step (c), the thickness of the impermeable layer is 10-12mm, and the total mixing amount of the plastic strips and the nylon ropes is 2% of the total mass of the regenerated roadbed graded drainage layer.
In the step (c), the fixing frame comprises material placing grooves which are arranged in a grid shape, and water leakage holes for draining water are arranged on the material placing grooves.
In the step (c), the grading materials are prepared according to the following particle grading and mass fraction: 35% of pellets having a particle size of 4.75mm or less, 20% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 10% of pellets having a particle size of 9.5mm or more and 13.2mm or less, 10% of pellets having a particle size of 13.2mm or more and 16mm or less, 5% of pellets having a particle size of 16mm or more and 19mm or less, 10% of pellets having a particle size of 19mm or more and 26.5mm or less, and 8% of pellets having a particle size of 26.5mm or more and 31.5mm or less.
In the step (e), the mixing amount of the natural macadam is 20 percent of the total mass of the regenerated roadbed cement stable macadam layer, the mixing amount of the cement is 4.5 percent of the total mass of the regenerated roadbed cement stable macadam layer, and the mixing amount of the water is 4.8 percent of the total mass of the regenerated roadbed cement stable macadam layer.
In the step (e), the crushed stone mixture is prepared according to the following particle composition and mass ratio: 29% of pellets having a particle size of 4.75mm or less, 25% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 26% of pellets having a particle size of 9.5mm or more and 19mm or less, and 20% of pellets having a particle size of 19mm or more and 31.5mm or less.
In the step (f), the mixing amount of the new asphalt is 70 percent of the total mass of the asphalt layer of the regeneration roadbed; the thickness of the regenerated roadbed asphalt layer is 17-20 cm.
The invention has the beneficial effects that:
(1) the method recycles and remakes all solid wastes of old asphalt roads (the old asphalt roads are composed of asphalt layers, concrete block layers of old road bases, water stabilizing gravel layers and slag road base layers of the old asphalt roads), and then utilizes the solid wastes in proportion to newly build the asphalt roadbed, the laying method is simple and easy to implement, the utilization rate of the solid wastes of the old asphalt roads reaches 100%, the problem of solid waste stacking is solved, the environmental protection is facilitated, and the laying cost of the asphalt roadbed is greatly reduced.
(2) The regenerated roadbed paved by the method comprises the regenerated roadbed graded drainage layer with the impermeable layer, which is beneficial to timely drainage of the asphalt road and ensures that the filling soil below the roadbed is not damaged.
(3) The regenerated roadbed paved by the method comprises the regenerated roadbed graded drainage layer with the trapezoidal convex block part and the fixing frame capable of draining water, is favorable for fixing mixed building materials, particularly for paving the mixed building materials on the slope of the convex block part, can ensure that seepage water quickly flows out, and can reinforce the roadbed.
Drawings
FIG. 1 is a schematic cross-sectional structure of a regenerated roadbed paved by the method of the invention;
fig. 2 is a perspective view of a fixed frame of a roadbed to be regenerated, which is laid by the method of the invention.
In the figure: the recycled roadbed asphalt layer 1, the recycled roadbed cement stabilized gravel layer 2, the recycled roadbed graded drainage layer 3, the fixing frame 31, the material placing groove 311, the water leakage holes 312, the impermeable layer 4, the recycled roadbed lime stone layer 5, the main body part 51, the bump part 52 and the drainage ditch 6.
Detailed Description
The invention is further described with reference to the accompanying drawings and the detailed description below:
a method for paving a regenerative roadbed based on solid waste full utilization comprises the following steps:
(a) separating an asphalt layer of old asphalt road solid waste through milling and crushing, and recycling to prepare an asphalt layer solid waste reclaimed material; preparing an old road foundation concrete block layer, a water-stable gravel layer and a slag road foundation layer of the solid waste of the old asphalt road into a gravel mixture;
(b) mixing 20% of the solid waste regeneration material of the asphalt layer, 10% of the gravel mixture and lime, and filling into a regenerated roadbed lime stone layer 5; the lime mixing amount is 2 percent of the total mass of the regenerated roadbed mud lime stone layer 5; before construction, the water content of the asphalt layer solid waste reclaimed material and the crushed stone mixture needs to be measured, and if the water content does not reach the construction standard, a proper amount of water can be added to ensure the bonding strength of the regenerated roadbed lime stone layer 5;
(c) paving impermeable geotextile on the upper surface of a regenerated roadbed lime stone layer 5 to form an impermeable layer 4, then arranging a fixing frame 31 on the impermeable layer 4, preparing 50% of the asphalt layer solid waste reclaimed material and 20% of the gravel mixture into a graded material, mixing the graded material with a plastic strip and a nylon rope to form a mixed material, and injecting the mixed material into the fixing frame 31 to form a regenerated roadbed graded drainage layer 3; the total mixing amount of plastic strip, nylon rope is 2% of 3 total mass of regeneration road bed gradation drainage blanket, and the length of plastic strip, nylon rope is 20mm, adds the plastic strip and plays to add the muscle winding effect with the nylon rope, not only can improve the intensity of regeneration road bed gradation drainage blanket 3, can also prevent the scattering of gradation rubble.
The grading materials are prepared according to the following particle grading and mass fractions: 35% of pellets having a particle size of 4.75mm or less, 20% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 10% of pellets having a particle size of 9.5mm or more and 13.2mm or less, 10% of pellets having a particle size of 13.2mm or more and 16mm or less, 5% of pellets having a particle size of 16mm or more and 19mm or less, 10% of pellets having a particle size of 19mm or more and 26.5mm or less, and 8% of pellets having a particle size of 26.5mm or more and 31.5mm or less.
The regenerated roadbed mud-ash stone layer 5 comprises a trapezoidal main body part 51 and a trapezoidal convex block part 52 positioned on the upper surface of the main body part 51, the laying shape of the fixing frame 31 is consistent with the surface structure shape formed by the upper surface and the inclined plane of the main body part 51 and the upper surface of the convex block part 52, and the regenerated roadbed graded drainage layer 3 is made into a structure with a trapezoidal convex shape through the arrangement, so that the drainage ditch 6 is favorably drained of seepage water.
The fixed frame 31 comprises material placing grooves 311 which are arranged in a grid shape, and water leakage holes 312 for water drainage are arranged on the material placing grooves 311. The fixed frame 31 is made of high polymer plastics such as PVC, ABS and the like, the height of the fixed frame is 15-20cm, each material placing groove 311 is of an upper end and lower end opening structure, or of a structure with an opening at the upper end and a water leakage hole 312 at the bottom, and the wall thickness of the material placing groove 311 is 30 mm; the water leakage holes 312 are arranged on two side surfaces of the material placing groove 311 along the width direction of the regeneration roadbed graded drainage layer 3, and the diameter of the water leakage holes 312 is 1 cm. The fixing frame 31 is used for fixing the crushed stone mixture, is beneficial to paving materials on the slope of the bump part 52, and can ensure the smooth drainage of the seepage water. The water leakage holes 312 at the joint of the edges of two adjacent fixing frames 31 are aligned and communicated one by one, which is more beneficial to timely discharge of water seepage.
The impermeable layer 4 is paved by adopting geotechnical impermeable cloth with the thickness of 1mm, the thickness of the impermeable layer 4 is 10-12mm, and the impermeable layer 4 plays a role in water resistance and can prevent water from continuously seeping to damage filled soil below the roadbed.
(d) Drainage ditches 6 are dug at the edges of two sides of the bottom of the regenerated roadbed graded drainage layer 3 in the width direction; the depth of the drainage ditch 6 is 30-35cm, and the height of the upper end of the drainage ditch 6 is arranged between the upper surface and the lower surface of the impermeable layer 4, so that the seepage water is ensured to flow into the drainage ditch 6.
(e) Grading 70% of the crushed stone mixture, mixing with natural crushed stone, cement and water, and paving the mixture above a regenerated roadbed graded drainage layer 3 to build a regenerated roadbed cement stabilized crushed stone layer 2; the mixing amount of the natural macadam is 20 percent of the total mass of the regenerated roadbed cement stable macadam layer 2, the mixing amount of the cement is 4.5 percent of the total mass of the regenerated roadbed cement stable macadam layer 2, and the mixing amount of the water is 4.8 percent of the total mass of the regenerated roadbed cement stable macadam layer 2.
The crushed stone mixture is prepared according to the following particle composition and mass ratio: 29% of pellets having a particle size of 4.75mm or less, 25% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 26% of pellets having a particle size of 9.5mm or more and 19mm or less, and 20% of pellets having a particle size of 19mm or more and 31.5mm or less.
(f) Mixing 30% of the solid waste reclaimed materials of the asphalt layer with new asphalt, and paving the mixture above the regenerated roadbed cement stable crushed stone layer 2 to build a regenerated roadbed asphalt layer 1. The new asphalt mixing amount is 70 percent of the total mass of the regenerated roadbed asphalt layer 1; the thickness of the regenerated roadbed asphalt layer 1 is 17-20 cm.
The regenerated roadbed structure paved by the method is shown in figures 1-2, and the regenerated roadbed lime stone layer 5, the regenerated roadbed graded drainage layer 3, the regenerated roadbed cement stabilized gravel layer 2 and the regenerated roadbed asphalt layer 1 are paved from bottom to top in sequence, so that the problems that the existing solid waste treatment utilization rate is low, the regenerated roadbed drainage does not damage a base layer in time and the like are solved, and the use requirements of the roadbed structure such as high strength, high stability and the like are met.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. A method for paving a regenerative roadbed based on full utilization of solid wastes is characterized by comprising the following steps: the method comprises the following steps:
(a) separating an asphalt layer of old asphalt road solid waste through milling and crushing, and recycling to prepare an asphalt layer solid waste reclaimed material; preparing an old road foundation concrete block layer, a water-stable gravel layer and a slag road foundation layer of the solid waste of the old asphalt road into a gravel mixture;
(b) mixing 20% of the solid waste regeneration material of the asphalt layer, 10% of the gravel mixture and lime, and filling into a regenerated roadbed lime stone layer;
(c) paving impermeable geotextile on the upper surface of the mud lime stone layer of the regeneration roadbed to form an impermeable layer, then arranging a fixing frame on the impermeable layer, preparing 50% of the solid waste reclaimed material of the asphalt layer and 20% of the crushed stone mixture into a graded ingredient, mixing the graded ingredient with plastic strips and nylon ropes to form a mixed building material, and injecting the mixed building material into the fixing frame to build the graded drainage layer of the regeneration roadbed;
(d) drainage ditches are dug at the edges of two sides of the bottom of the graded drainage layer of the regenerated roadbed in the width direction;
(e) grading 70% of the crushed stone mixture, mixing with natural crushed stone, cement and water, and paving above the regenerated roadbed graded drainage layer to build a regenerated roadbed cement stabilized crushed stone layer;
(f) mixing 30% of the solid waste reclaimed materials of the asphalt layer with new asphalt, and paving the mixture above the cement stabilized gravel layer of the regenerated roadbed to build the asphalt layer of the regenerated roadbed.
2. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (a), the lime mixing amount is 2% of the total mass of the regenerated roadbed mud-lime bonded layer.
3. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: the regenerated roadbed mud lime stone layer comprises a trapezoidal main body part and a trapezoidal convex block part positioned on the upper surface of the main body part, and the laying shape of the fixing frame is consistent with the surface structure shape formed by the upper surface and the inclined plane of the main body part and the upper surface of the convex block part (52).
4. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (c), the thickness of the impermeable layer is 10-12mm, and the total mixing amount of the plastic strips and the nylon ropes is 2% of the total mass of the regenerated roadbed graded drainage layer.
5. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (c), the fixing frame comprises material placing grooves which are arranged in a grid shape, and water leakage holes for draining water are arranged on the material placing grooves.
6. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (c), the grading materials are prepared according to the following particle grading and mass fraction: 35% of pellets having a particle size of 4.75mm or less, 20% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 10% of pellets having a particle size of 9.5mm or more and 13.2mm or less, 10% of pellets having a particle size of 13.2mm or more and 16mm or less, 5% of pellets having a particle size of 16mm or more and 19mm or less, 10% of pellets having a particle size of 19mm or more and 26.5mm or less, and 8% of pellets having a particle size of 26.5mm or more and 31.5mm or less.
7. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (e), the mixing amount of the natural macadam is 20 percent of the total mass of the regenerated roadbed cement stable macadam layer, the mixing amount of the cement is 4.5 percent of the total mass of the regenerated roadbed cement stable macadam layer, and the mixing amount of the water is 4.8 percent of the total mass of the regenerated roadbed cement stable macadam layer.
8. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (e), the crushed stone mixture is prepared according to the following particle composition and mass ratio: 29% of pellets having a particle size of 4.75mm or less, 25% of pellets having a particle size of 4.75mm or more and 9.5mm or less, 26% of pellets having a particle size of 9.5mm or more and 19mm or less, and 20% of pellets having a particle size of 19mm or more and 31.5mm or less.
9. The method for laying the regeneration roadbed based on the full utilization of the solid wastes as claimed in claim 1, wherein the method comprises the following steps: in the step (f), the mixing amount of the new asphalt is 70 percent of the total mass of the asphalt layer of the regeneration roadbed; the thickness of the regenerated roadbed asphalt layer is 17-20 cm.
CN202110045682.8A 2021-01-14 2021-01-14 Regenerated roadbed laying method based on solid waste full utilization Pending CN113430881A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110045682.8A CN113430881A (en) 2021-01-14 2021-01-14 Regenerated roadbed laying method based on solid waste full utilization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110045682.8A CN113430881A (en) 2021-01-14 2021-01-14 Regenerated roadbed laying method based on solid waste full utilization

Publications (1)

Publication Number Publication Date
CN113430881A true CN113430881A (en) 2021-09-24

Family

ID=77753424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110045682.8A Pending CN113430881A (en) 2021-01-14 2021-01-14 Regenerated roadbed laying method based on solid waste full utilization

Country Status (1)

Country Link
CN (1) CN113430881A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817299A (en) * 2012-09-05 2012-12-12 华中科技大学 Structure for repairing urban bituminous pavements and construction method thereof
CN204530364U (en) * 2015-03-11 2015-08-05 湖南省交通科学研究院 The complete thick formula revived structure of semi-rigid asphalt pavement
CN106320127A (en) * 2016-08-18 2017-01-11 陕西长大博源公路养护科技有限公司 Recycling asphalt pavement
CN207062670U (en) * 2017-07-18 2018-03-02 浙江华严建设有限公司 A kind of asphalt roads
CN207079437U (en) * 2017-06-13 2018-03-09 和优建设有限公司 A kind of discharge structure of town road
CN108069642A (en) * 2017-11-23 2018-05-25 扬州市职业大学 A kind of useless nylon yarn enhancing steady crushed stone material of recycled water
CN110258224A (en) * 2019-07-10 2019-09-20 河南省光大路桥工程有限公司 Super thick recycled cement stabilized macadam base
CN110284409A (en) * 2019-07-10 2019-09-27 河南省光大路桥工程有限公司 Super thick degree paves Vibratory Mixing reworked material Construction of Cement Stabilized Macadam technique
CN209759936U (en) * 2019-01-28 2019-12-10 湖南大学 Permeable pavement structure based on building rubbish crushed aggregates
CN209907139U (en) * 2019-04-25 2020-01-07 江苏邦实建设工程有限公司 Novel pavement pervious concrete pavement structure
CN110790535A (en) * 2019-12-05 2020-02-14 广东高翔建设有限公司 Maintenance method of asphalt road
CN210216073U (en) * 2019-04-20 2020-03-31 中国华西工程设计建设有限公司 Cement concrete pavement normal position adds spreads bituminous paving drainage structures
CN111719371A (en) * 2019-03-22 2020-09-29 中交隧道工程局有限公司 Road base layer component and road paving method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817299A (en) * 2012-09-05 2012-12-12 华中科技大学 Structure for repairing urban bituminous pavements and construction method thereof
CN204530364U (en) * 2015-03-11 2015-08-05 湖南省交通科学研究院 The complete thick formula revived structure of semi-rigid asphalt pavement
CN106320127A (en) * 2016-08-18 2017-01-11 陕西长大博源公路养护科技有限公司 Recycling asphalt pavement
CN207079437U (en) * 2017-06-13 2018-03-09 和优建设有限公司 A kind of discharge structure of town road
CN207062670U (en) * 2017-07-18 2018-03-02 浙江华严建设有限公司 A kind of asphalt roads
CN108069642A (en) * 2017-11-23 2018-05-25 扬州市职业大学 A kind of useless nylon yarn enhancing steady crushed stone material of recycled water
CN209759936U (en) * 2019-01-28 2019-12-10 湖南大学 Permeable pavement structure based on building rubbish crushed aggregates
CN111719371A (en) * 2019-03-22 2020-09-29 中交隧道工程局有限公司 Road base layer component and road paving method
CN210216073U (en) * 2019-04-20 2020-03-31 中国华西工程设计建设有限公司 Cement concrete pavement normal position adds spreads bituminous paving drainage structures
CN209907139U (en) * 2019-04-25 2020-01-07 江苏邦实建设工程有限公司 Novel pavement pervious concrete pavement structure
CN110284409A (en) * 2019-07-10 2019-09-27 河南省光大路桥工程有限公司 Super thick degree paves Vibratory Mixing reworked material Construction of Cement Stabilized Macadam technique
CN110258224A (en) * 2019-07-10 2019-09-20 河南省光大路桥工程有限公司 Super thick recycled cement stabilized macadam base
CN110790535A (en) * 2019-12-05 2020-02-14 广东高翔建设有限公司 Maintenance method of asphalt road

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔京浩主编: "《第19届全国结构工程学术会议论文集第Ⅱ册》", 31 October 2010, 《工程力学》杂志社 *

Similar Documents

Publication Publication Date Title
CN110080166B (en) Geotextile bag dam reinforcing method
CN105297571A (en) Mudstone filled roadbed structure and construction method thereof
CN212452152U (en) Geotechnique's check room adds muscle cement concrete pavement structure
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN105951672A (en) Construction technology for novel embankment and slope protection
CN209338948U (en) A kind of water-permeable pavement structure
CN106087639A (en) A kind of highway, Irish bridge structure and Irish bridge construction method
CN109338839A (en) Seep storage system in a kind of building waste recycling city
CN214782984U (en) Road repairing structure of sponge city
CN210529400U (en) Solidified building residue soil road structure
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN209211198U (en) A kind of urban environmental protection road surface
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN114411921B (en) Road reconstruction and extension roadbed drainage ditch masonry method and structure
CN214497037U (en) Regeneration roadbed structure based on solid waste full utilization
CN110205895A (en) A kind of green low-carbon environment-friendly type road structure using regrown material
CN215758302U (en) High liquid limit soil roadbed structure
CN113430881A (en) Regenerated roadbed laying method based on solid waste full utilization
CN212335677U (en) Farmland operation way with drainage function
CN211079810U (en) Avoid pitch highway of ponding
CN209975287U (en) Mountain area highway subgrade structure in narrow construction operation area
CN114318993A (en) Cold region highway cutting slope interlayer water disease treatment method
CN203360969U (en) Central separation belt drainage system for expressway reconstruction and extension project
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN108824418B (en) Construction method for whole roadbed to penetrate through pond based on in-situ curing technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210924