CN113421062B - Auxiliary reminding system for power dispatching planning flow time - Google Patents

Auxiliary reminding system for power dispatching planning flow time Download PDF

Info

Publication number
CN113421062B
CN113421062B CN202110713435.0A CN202110713435A CN113421062B CN 113421062 B CN113421062 B CN 113421062B CN 202110713435 A CN202110713435 A CN 202110713435A CN 113421062 B CN113421062 B CN 113421062B
Authority
CN
China
Prior art keywords
plan
processor
time
reminding
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110713435.0A
Other languages
Chinese (zh)
Other versions
CN113421062A (en
Inventor
邵维廷
田笑
王亚琪
姜振殿
郭宗云
赵琦
丁淑萍
杨扬
王汝强
郑磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Wenshang Power Supply Co
State Grid Corp of China SGCC
Jining Power Supply Co
Original Assignee
State Grid Shandong Electric Power Co Wenshang Power Supply Co
State Grid Corp of China SGCC
Jining Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Wenshang Power Supply Co, State Grid Corp of China SGCC, Jining Power Supply Co filed Critical State Grid Shandong Electric Power Co Wenshang Power Supply Co
Priority to CN202110713435.0A priority Critical patent/CN113421062B/en
Publication of CN113421062A publication Critical patent/CN113421062A/en
Application granted granted Critical
Publication of CN113421062B publication Critical patent/CN113421062B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method and a system for assisting in reminding power dispatching planning flow time. The method comprises the following steps: the system comprises a client, a server and a server, wherein the client comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying workdays, holidays and holidays, and sending a reminding instruction according to a set time node; the display is used for displaying the overhaul plan processed by the processor according to the priority of each plan cut-off time sequence; the reminding module is used for popup window according to the reminding instruction sent by the processor and displaying reminding content.

Description

Auxiliary reminding system for power dispatching planning flow time
Technical Field
The invention belongs to the technical field of power grid dispatching, and particularly relates to a power dispatching planning flow time auxiliary reminding system.
Background
The statements in this section merely provide background information related to the present disclosure and may not necessarily constitute prior art.
The power grid dispatching is a central point of normal operation of a modern power system, is a foundation for guaranteeing safe and stable operation of the power grid, and along with the requirements of the power grid for safe production situation and the continuous upgrading of the power grid scale, the dispatching system operators on duty need to pay attention to strictly control the time node of each maintenance work application while finishing the work of power grid power failure maintenance planning. The maintenance application needs to be submitted three working days in advance, the common application needs to be criticized one working day in advance, the new equipment is started and needs to be criticized two working days in advance, the working ticket opening time is within one hour of the approval maintenance time, the equipment point sending time is before the approval completion time, the time nodes are strict in requirements and difficult to manage and control, the safe production operation of a power grid is affected, the examination indexes of units are directly related, extra workload and thought pressure are added to dispatching operators, the working efficiency of teams is low, and the accuracy is difficult to guarantee.
Disclosure of Invention
In order to solve the technical problems in the background technology, the invention provides a power dispatching planning flow time auxiliary reminding system, which helps operators to finish related work according to the node requirements by auxiliary reminding, ensures safe power outage maintenance and completion power transmission, and ensures that an index completion value is in a leading position.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the invention provides a power dispatching planning flow time auxiliary reminding system.
A power dispatch plan flow time auxiliary alert system comprising: the system comprises a client, a server and a server, wherein the client comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying workdays, holidays and holidays, and sending a reminding instruction according to a set time node; the display is used for displaying the overhaul plan processed by the processor according to the priority of each plan cut-off time sequence; the reminding module is used for popup window according to the reminding instruction sent by the processor and displaying reminding content.
Further, the information input unit is used for inputting a power outage maintenance plan by a user, and the power outage maintenance plan comprises: the service application report date, the common application report date, the new equipment starting reply date, the work ticket construction time, the approval maintenance time, the equipment point-of-delivery time and the approval completion time.
Further, the processor is configured to manage each plan including: and judging the association relation between each plan and other plans.
Further, determining the association relationship between each plan and other plans includes: the relation between the working ticket time and the approval maintenance time, and the relation between the equipment point sending time and the approval completion time.
Further, the reminding module comprises a short message sending reminding.
Further, the client comprises a data interaction module, which is used for transmitting the data processed by the processor.
Further, the processor transmits the processed data to the cloud processor through the data interaction module, and the cloud processor is used for monitoring the progress of the same overhaul plan in different areas.
Further, the cloud processor is connected with a display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of the same maintenance plan in different areas.
Further, the information input unit is used for storing the outage overhaul plan input by the user into the first database.
Further, the processor transmits the processed data to the second database through the data interaction module.
Compared with the prior art, the invention has the beneficial effects that:
the invention carries out carding arrangement on monthly power outage overhauling, displays power outage information to dispatching operators by taking a calendar as a basis, is visual and clear, is convenient for inquiring, greatly reduces the workload of the operators and improves the working efficiency.
According to the invention, each power failure maintenance plan can be automatically checked, the popup window reminding is carried out according to the time node requirement, the accuracy of various standard indexes is ensured, especially, during the spring and autumn detection, the time is tight and the task is heavy, the system can further reduce the work task of the staff, improve the working quality and enable the dispatching operator to have more energy to concentrate on the power grid operation management.
Additional aspects of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention.
FIG. 1 is a block diagram of a power dispatch plan flow time auxiliary alert system of the present invention.
Detailed Description
The invention will be further described with reference to the drawings and examples.
It should be noted that the following detailed description is illustrative and is intended to provide further explanation of the invention. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments according to the present invention. As used herein, the singular is also intended to include the plural unless the context clearly indicates otherwise, and furthermore, it is to be understood that the terms "comprises" and/or "comprising" when used in this specification are taken to specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof.
It is noted that the flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of methods and systems according to various embodiments of the present disclosure. It should be noted that each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the logical functions specified in the various embodiments. It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by special purpose hardware-based systems which perform the specified functions or operations, or combinations of special purpose hardware and computer instructions.
Example 1
As shown in fig. 1, the present embodiment provides a power dispatching planning flow time auxiliary reminding system.
A power dispatch plan flow time auxiliary alert system comprising: the system comprises a client, a server and a server, wherein the client comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying workdays, holidays and holidays, and sending a reminding instruction according to a set time node; the display is used for displaying the overhaul plan processed by the processor according to the priority of each plan cut-off time sequence; the reminding module is used for popup window according to the reminding instruction sent by the processor and displaying reminding content.
As one or more embodiments, the information input unit is configured to input a power outage maintenance plan by a user, where the power outage maintenance plan includes: the service application report date, the common application report date, the new equipment starting reply date, the work ticket construction time, the approval maintenance time, the equipment point-of-delivery time and the approval completion time.
As one or more embodiments, the processor is configured to manage each plan including: judging the association relation between each plan and other plans; wherein, judging the association relation between each plan and other plans comprises: the relation between the working ticket time and the approval maintenance time, and the relation between the equipment point sending time and the approval completion time.
As one or more implementation modes, the reminding module comprises a short message sending reminding.
As one or more embodiments, the client includes a data interaction module, configured to transmit data processed by the processor. The processor transmits the processed data to the cloud processor through the data interaction module, and the cloud processor is used for monitoring the progress of the same overhaul plan in different areas. The cloud processor is connected with the display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of the same maintenance plan in different areas.
As one or more embodiments, the information input unit is configured to store a power outage maintenance plan input by a user into a first database; the processor transmits the processed data to the second database through the data interaction module.
The embodiment provides a power dispatching plan flow time auxiliary reminding system, which intuitively displays a daily power failure plan to a dispatcher by taking a calendar as a support according to a monthly power failure maintenance plan, and carries out popup reminding in advance according to maintenance working time node requirements, so that working pressure is relieved for dispatching operators, and working efficiency is guaranteed. The specific functions are as follows:
1) And displaying the plan. The power outage overhaul plan is input into the system in a proper format in advance, the system can be arranged according to time, and the power outage overhaul plan is displayed to staff in a calendar format, so that the staff can check the power outage plan, and daily work is more convenient to arrange.
2) And screening the working days. The system carries out carding on a power failure maintenance plan, automatically identifies holidays and rest days, so as to remind dispatching operators of submitting maintenance applications in advance, the common maintenance applications need to be submitted in advance by one working day, and the new equipment is started by two working days in advance.
3) And displaying the time of opening and completion. The system displays the power failure plan by taking the calendar as a support, and when the mouse points to a certain plan, the specific completion time is displayed to an operation dispatcher in a form of a suspension window.
4) And reminding the time node. The system compares with a power failure plan, carries out popup reminding of an overhaul ticket (a common overhaul application needs to be submitted by one working day in advance, and new equipment is started by two working days in advance), carries out start preparation work reminding one hour before start according to specific completion time, carries out reminding two hours before completion, and dispatches an operator to inform an overhaul personnel to transact completion or delay application as soon as possible.
5) Event recall. The scheduling operator can query the historical overhaul work record and query and check the completed overhaul work so as to reasonably arrange the power failure overhaul plan.
The above description is only of the preferred embodiments of the present invention and is not intended to limit the present invention, but various modifications and variations can be made to the present invention by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. A power dispatch plan flow time auxiliary alert system, comprising: the system comprises a client, a server and a server, wherein the client comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying workdays, holidays and holidays, and sending a reminding instruction according to a set time node; the display is used for displaying the overhaul plan processed by the processor according to the priority of each plan cut-off time sequence; the reminding module is used for popup window according to the reminding instruction sent by the processor and displaying reminding content;
the information input unit is used for inputting a power outage overhaul plan by a user, and the power outage overhaul plan comprises: the service application report date, the common application report date, the new equipment starting reply date, the work ticket construction time, the approval maintenance time, the equipment point sending time and the approval completion time;
the processor is configured to manage each plan including: judging the association relation between each plan and other plans; the processor transmits the processed data to the cloud processor through the data interaction module, and the cloud processor is used for monitoring the progress of the same overhaul plan in different areas; the cloud processor is connected with the display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of the same maintenance plan in different areas;
judging the association relation between each plan and other plans comprises the following steps: the relation between the working ticket construction time and the approval maintenance time, and the relation between the equipment point sending time and the approval completion time;
the specific functions are as follows:
1. display planning: the power outage overhaul plan is input into the system in a proper format in advance, the system can be arranged according to time, and the power outage overhaul plan is displayed to staff in a calendar format, so that the staff can check the power outage plan, and daily work is more convenient to arrange;
2. screening working days: the system carries out carding on a power failure maintenance plan, automatically identifies holidays and rest days so as to remind a dispatching operator of submitting a maintenance application in advance, the common maintenance application needs to be submitted by one working day in advance, and the new equipment is started by two working days in advance;
3. display on and off time: the system displays a power failure plan by taking a calendar as a support, and when a mouse points to a certain plan, the specific completion time is displayed to an operation dispatcher in a form of a suspension window;
4. time node reminding: the system compares the power failure plan, carries out the popup window reminding of the maintenance ticket report, carries out the start preparation work reminding in one hour before the start according to the specific completion time, carries out the reminding in two hours before the completion, and dispatches the operator to inform the maintenance personnel to transact completion or delay application as soon as possible;
5. event recall: the scheduling operator can query the historical overhaul work record and query and check the completed overhaul work so as to reasonably arrange the power failure overhaul plan.
2. The power dispatch plan flow time auxiliary alert system of claim 1, wherein the alert module includes sending a sms alert.
3. The power dispatch plan flow time auxiliary reminder system according to claim 1, wherein the client includes a data interaction module for transmitting data processed by the processor.
4. The power dispatching planning flow time auxiliary reminding system according to claim 1, wherein the information input unit is used for storing a power outage overhaul plan input by a user into a first database.
5. The power dispatch plan flow time auxiliary reminder system of claim 1, wherein the processor transmits the processed data to the second database through the data interaction module.
CN202110713435.0A 2021-06-25 2021-06-25 Auxiliary reminding system for power dispatching planning flow time Active CN113421062B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110713435.0A CN113421062B (en) 2021-06-25 2021-06-25 Auxiliary reminding system for power dispatching planning flow time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110713435.0A CN113421062B (en) 2021-06-25 2021-06-25 Auxiliary reminding system for power dispatching planning flow time

Publications (2)

Publication Number Publication Date
CN113421062A CN113421062A (en) 2021-09-21
CN113421062B true CN113421062B (en) 2023-05-23

Family

ID=77716817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110713435.0A Active CN113421062B (en) 2021-06-25 2021-06-25 Auxiliary reminding system for power dispatching planning flow time

Country Status (1)

Country Link
CN (1) CN113421062B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014026403A (en) * 2012-07-26 2014-02-06 Chugoku Electric Power Co Inc:The Repair plan support system for power station/substation equipment, and repair plan support system for power station/substation equipment

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6047260A (en) * 1997-06-05 2000-04-04 Attention Control Systems, Inc. Intelligent planning and calendaring system with cueing feature and floating tasks
WO2005038656A1 (en) * 2003-10-21 2005-04-28 Canon Kabushiki Kaisha Information apparatus
CN101795443A (en) * 2009-12-22 2010-08-04 中兴通讯股份有限公司 Service reminder method, service reminder system and communication system
CN107994539B (en) * 2017-12-06 2019-03-08 国网山东省电力公司滨州市滨城区供电公司 A kind of distribution line failure detection system based on Cloud Server
CN109146294B (en) * 2018-08-28 2022-04-08 武汉易普优科技有限公司 Automatic scheduling method for operation and inspection plan of power grid equipment
CN111798088A (en) * 2020-05-20 2020-10-20 广东电网有限责任公司广州供电局 Power grid dispatching method and system
CN112184483A (en) * 2020-09-29 2021-01-05 国网北京市电力公司 Scheduling work display system based on OMS and computer equipment
CN112183896B (en) * 2020-10-31 2022-08-09 国网河南省电力公司漯河供电公司 Intelligent identification and auxiliary compilation method for regional power grid maintenance plan
CN112330076B (en) * 2020-12-10 2022-08-09 国网河南省电力公司漯河供电公司 Auxiliary compilation system for regional power grid maintenance plan

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014026403A (en) * 2012-07-26 2014-02-06 Chugoku Electric Power Co Inc:The Repair plan support system for power station/substation equipment, and repair plan support system for power station/substation equipment

Also Published As

Publication number Publication date
CN113421062A (en) 2021-09-21

Similar Documents

Publication Publication Date Title
US20210192426A1 (en) Roster scheduling and task dispatching system for gate staff
US9747585B2 (en) Method of retrieving and uniformalizing elevator maintenance and callback data and code events
US10282683B2 (en) Technician control system
US9767441B2 (en) System for monitoring elevators and maintaining elevators
CN102930363A (en) Mobile terminal-based scheduling method and system, server and terminal
WO2004051421A2 (en) Capacity planning method and system
CN110850781A (en) Mine management system based on SaaS cloud platform
CN111815122A (en) Intelligent scheduling decision method and decision system for vehicles in port operation field
CN113034051A (en) Intelligent factory dynamic plan scheduling system
CN115879728A (en) Based on capital construction overall process platform system
CN108319638B (en) Dangerous goods production and manufacturing execution system applying handheld inspection equipment
CN113506618A (en) Ambulance information management system
CN109615233A (en) The wisdom water affairs management platform adopted based on basic number
CN113421062B (en) Auxiliary reminding system for power dispatching planning flow time
CN109639508A (en) A kind of Intelligent data center voice sound-light alarm monitoring system
CN114066217A (en) Method, system and equipment for constructing business-oriented enterprise IT operation and service system
US9047757B2 (en) Systems and methods for remotely controlling an advanced metering infrastructure
US9251486B2 (en) Service request orchestrator with smart meters
CN112884447A (en) Civil aviation airport data cooperation method and system
CN110278578B (en) Management system for battery power and signal strength of public network interphone
CN113673903A (en) Task management system for off-site nuclear emergency and control method thereof
KR20140031427A (en) Realtime crane work performance processing system and method
CN111898984A (en) Merchant background project management system
CN111080049A (en) Airport ground guarantee electronic signature management method
CN110675283A (en) Power distribution equipment synchronous management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant